3_20R0004_PLANS_Resource2.pdf
PDF 38 MB Posted
- Attached to
- Ice Harbor Gantry Crane Controls Upgrade
- Solicitation number
- W912EF20R0004
About this file
This document provides details for a federal construction contract opportunity with the U.S. Army Corps of Engineers. The Ice Harbor Gantry Crane Controls Upgrade project involves replacing crane function DC motors controls with AC motors and controls, adding a radio remote control, replacing the overhead trolley line conductor system, replacing operation chair consoles, replacing an air winch tugger hoist system with an electric motor tugger hoist system, replacing hoist shear blocks, inspecting and rehabilitating speed reducers, conducting inspection, analysis, and load testing of "below the hook" lifting devices, and performing structural modifications to address fall protection at Ice Harbor Dam in Burbank, Washington. The construction magnitude is estimated between $1,000,000 to $5,000,000. The NAICS code is 238290 and the small business size standard is $16.5M. Proposals are due no sooner than 30 calendar days after issuance of solicitation number W912EF20R0004, which is expected to be posted to betaSAM in mid-February 2020. The contract is to be awarded by the end of April 2020 with on-site work occurring from December 2020 through March 2021.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .