This amendment modifies the solicitation for the Ice Harbor Gantry Crane Controls Upgrade project to update specifications and resource drawings.
The project involves replacing the gantry crane's DC motor controls with AC motors and controls at Ice Harbor Dam, adding a radio remote control, replacing the overhead trolley conductor system, operation consoles, air winch tugger hoist with an electric motor tugger hoist, shear blocks, and inspecting and rehabilitating speed reducers. Structural modifications will address fall protection with guardrails and safety gates. The contractor must load test all affected crane functions upon completion of on-site work. Work must be performed during a winter window from December 2020 to March 2021. The contractor will be responsible for safety, quality control, and using the government's QCS system to record and submit project information. The Army Corps of Engineers seeks a fixed-price contract for work estimated between $1-5 million. A site visit will be offered after solicitation release in February 2020. Security clearance is required for any foreign national attendees five weeks in advance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0007 W912EF20R0004.pdf | ||
| Amendment 0006 W912EF20R0004.pdf | ||
| Amendment 0006 TechSpecs 20R0004.pdf | ||
| Amendment 0005 TechSpecs 20R0004.pdf | ||
| Amendment 0005 W912EF20R0004.pdf | ||
| 20R0004 Amend 0004 TechSpecs.pdf | ||
| W912EF20R0004 Amend 0004.pdf | ||
| Amendment 0003 TechSpecs W912EF20R0004 .pdf | ||
| W912EF20R0004 Amend 0003.pdf | ||
| Site Visit attendees 20R0004 HLD Gantry Crane Controls Upgrade.pdf | ||
| Amendment 0002 TechSpecs 20R0004.pdf | ||
| 20R0004_Amend-0001_Plans.pdf | ||
| Amendment 0001 W912EF20R0004.pdf | ||
| 2_20R0004_PLANS_Resource1.pdf | ||
| 1_20R0004_PLANS_Signed_1.pdf | ||
| 3_20R0004_PLANS_Resource2.pdf | ||
| Site Visit Information W912EF20R0004.pdf | ||
| Solicitation W912EF20R0004.pdf | ||
| 20R0004 Tech Specs.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is the follow ing:
See Continuation Sheet for details.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF20R0004
X 9B. DATED (SEE ITEM 11)
26-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2020
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CYNTHIA H JACOBSEN
201 N. THIRD AVE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF20R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
Summary of Changes for Amdment-0002 Ice Harbor Intake Gantry Crane Controls Upgrade
W912EF20R0004
1. Revised the following Specifications:
a. SECTION 00 01 15.00 28 LIST OF DRAWINGS
Revised 00 01 15.00 28 paragraph 1.3 “LIST OF DRAWINGS” changed “FIO” to “Resource drawing”.
Revised list of Resource drawings in 00 01 15.00 28 paragraph 1.3 “LIST OF DRAWINGS” and added 4 more resource drawings to the list.
b. SECTION 41 01 20.17 26 BELOW-THE-HOOK LIFTING DEVICES INSPECTION AND
CERTIFICATION
Revised 41 01 20.17 26 paragraph 1.5.1.3 “Drawings” changed “FIO” to “Resource drawing”.
c. SECTION 41 01 20.75 26 BELOW-THE-HOOK LIFTING DEVICES INSPECTION AND
CERTIFICATION
Revised 41 01 20.75 26 paragraph 1.4.2(c) (d) (e) “DATA AND CAPACITIES” based on newly provided resource drawings.
Revised 41 01 20.75 26 paragraph 1.6.1.1 “Dimensioned Design and Assembly Drawings” changed “FIO” to “Resource drawing”.
See revised specifications for details.
2. Revised the following Drawings:
a. No changes.
(End of Summary of Changes)