Amendment 0005 W912EF20R0004.pdf
PDF 430 KB Posted
- Attached to
- Ice Harbor Gantry Crane Controls Upgrade Federal contract opportunity
- Solicitation number
- W912EF20R0004
About this file
This document contains an amendment to a solicitation and the related federal contract opportunity. The amendment revises specifications for an Ice Harbor Gantry Crane Controls Upgrade project located at Ice Harbor Dam in Burbank, Washington. The project involves replacing crane controls and motors with AC systems, adding radio remote controls, replacing the overhead trolley conductor system, replacing operation consoles, replacing an air winch tugger hoist with an electric system, inspecting and rehabilitating speed reducers, inspecting and load testing below-the-hook lifting devices, and performing structural modifications for fall protection. The amendment changes the issuing office and modifies the submission deadline for closeout documents. The estimated value of the firm fixed-price construction contract is between $1,000,000 and $5,000,000, requiring 100% performance and payment bonds. The on-site work window is December 2020 through March 2021. Safety and quality control requirements are outlined. The solicitation number is W912EF20R0004 and will be posted on betaSAM in mid-February 2020, with proposals due approximately 30 days later. A site visit will be offered approximately two weeks after solicitation posting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0007 W912EF20R0004.pdf | ||
| Amendment 0006 TechSpecs 20R0004.pdf | ||
| Amendment 0006 W912EF20R0004.pdf | ||
| Amendment 0005 TechSpecs 20R0004.pdf | ||
| 20R0004 Amend 0004 TechSpecs.pdf | ||
| W912EF20R0004 Amend 0004.pdf | ||
| Amendment 0003 TechSpecs W912EF20R0004 .pdf | ||
| W912EF20R0004 Amend 0003.pdf | ||
| Site Visit attendees 20R0004 HLD Gantry Crane Controls Upgrade.pdf | ||
| Amendment 0002 W912EF20R0004.pdf | ||
| Amendment 0002 TechSpecs 20R0004.pdf | ||
| 20R0004_Amend-0001_Plans.pdf | ||
| Amendment 0001 W912EF20R0004.pdf | ||
| 2_20R0004_PLANS_Resource1.pdf | ||
| 1_20R0004_PLANS_Signed_1.pdf | ||
| 3_20R0004_PLANS_Resource2.pdf | ||
| Site Visit Information W912EF20R0004.pdf | ||
| Solicitation W912EF20R0004.pdf | ||
| 20R0004 Tech Specs.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is the follow ing:
See Continuation Sheet for details.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF20R0004
X 9B. DATED (SEE ITEM 11)
26-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Apr-2020
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
DAVID C BOONE 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF20R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
Summary of Changes for Amendment-0005 Ice Harbor Intake Gantry Crane Controls Upgrade
1. Revised the following Specifications:
a. SECTION 00 70 00 CONDITIONS OF THE CONTRACT
Revised Submittal Date to FAR Clause 52.211-10 (5) Change the requirement for final submission of closeout submittals to 60 days after 16 April 2021.
b. SECTION 41 01 20.16 26 GANTRY CRANE DATA, SPARE PARTS, TESTING, AND TRAINING
Revised paragraph 1.6.2 Below-The-Hook Lifting Devices.
See revised specifications for details.
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
USAED, WALLA WALLA - CONTRACTING DIV.
CYNTHIA H JACOBSEN
201 N. THIRD AVE
WALLA WALLA WA 99362-1876
to
USAED, WALLA WALLA - CONTRACTING DIV.
DAVID C BOONE 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to:
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the work during the work windows described below.
(1) The Contractor shall complete all work requiring the crane to be taken out of service by not later than 15 March 2021. The contractor shall complete all work by not later than 16 April 2021.
(2) The Gantry Crane can only be out of service by the Contractor between 23 December 2020 and 15 March 2021.
(3) The Gantry crane will be made available to the Contractor for work prior to 23 December 2020 and after 15 March 2021 as defined in section 01 11 00.00 28 paragraph 1.6.
(4) The Contractor shall complete final cleanup and demobilization by not later than 15 calendar days after completion of work in (c)(1) above.
(5) The Contractor shall complete the final, approved submission of the following by not later than 60 calendar days after completion of all work in (c)(1) above (60 days after 16 April 2021). See SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS for additional information:
a. O&M manuals
b. As-Built drawings.
c. Shop Drawings.
d. Record Drawings.
e. Spare Parts submission.
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .