Repair Recommendation Report
ATR
Prepared By:
US Army Corps of Engineers Hydroelectric Design Center
August 2014
US Army Corps of Engineers Northwestern Division
H Y
D R
O E
L E
C T
R
IC
D
E
SI
G N
C E
N T
PR
PA
R
ED
B Y
Engineers Northwestern Division
Little Goose Lock and Dam Unit 5 Repair
Little Goose Unit 5 Recommendations
Table of Contents
1. Executive Summary
2. Introduction
2.1. Previous Inspections
2.1.1. Little Goose Unit 5 Generator Rotor Inspection – October 2010
2.1.2. Little Goose Unit 5 Vibration Measurement – February 2012
2.1.3. Little Goose Unit 5 Rotor Spider Crack Analysis – May 2012
2.1.4. Little Goose Unit 5 Upper Bearing Bracket Crack Analysis – May 2012
2.1.5. Little Goose Unit 5 Crack Inspections –March 2014
2.1.6. Little Goose Unit 5 Oxarc Weld Inspections – February and March 2014
2.2. HDC Operational Recommendations and Limitations -
3. Repair Discussion
3.1. Requirements
3.2. Risks
3.3. Assumptions
1. EXECUTIVE SUMMARY
Little Goose Unit 5 has excessive vibration, cracking in the upper bearing bracket, and cracking in the rotor spider. These phenomena have been studied and closely observed over time by Little Goose Project personnel, and they continue to grow and be problematic. They will require substantial repair to avoid unit damage in the future. The time frame for ultimate failure is not practicably estimated. To avoid a potentially more substantial and emergency repair than what is documented here, it is recommended that funding for the efforts documented below are procured, and design efforts begin.
The ROM estimated cost for the efforts listed above is #, and is estimated to take approximately 1.5 years to completion, after award of the contract.
2. INTRODUCTION
Over the past 5+ years, rotor spider cracks, upper bearing bracket cracks, and more-than-normal vibration have been observed on Unit 5. Little Goose Project has, over the course of those years, requested assistance from HDC in order to identify the source of the issues, as well as prepare a long-term solution so that Unit 5 can be brought into a state of normal operation with minimized risk of continued damage due to the vibrations and weld cracks. This document may be used as a starting point for designing the long-term solution, and encapsulates pertinent findings from previously executed studies and inspections. Most of these studies and inspection reports are included as appendices to aid the understanding of the reader.
2.1. PREVIOUS INSPECTIONS
Included in this section is a list of previously executed inspections, tests, and trip reports performed by HDC, as well as Oxarc, Inc. Key findings are denoted below.
2.1.1. Little Goose Unit 5 Generator Rotor Inspection – October 2010 This site visit was conducted following completion of the recommended procedure in 2009 to drill stress-relieving holes in order to limit crack growth. Some key findings from this report are:
- Crack growth appears to be time based, not start/stop cycle based.
- Inspection schedule should be 3 months apart.
- Recommended to obtain sweep air-gap readings, during service.
- First recommendation for making future plans for an in-depth and substantial repair.
The trip report can be found in Appendix A.
2.1.2. Little Goose Unit 5 Vibration Measurement – February 2012 After taking vibration data on the unit, and performing some analysis, the following recommendations were documented in this report:
- Adjust upper and lower guide bearing to design clearances.
- Avoid running Unit 5 at loads of 40MW or less as much as possible.
- Check alignment of the unit.
- Modify rotor spider arms as suggested by the FEA to avoid fatigue cracks.
- Repair rotor spider arm cracks.
- Repair upper bearing bracket cracks.
The trip report can be found in Appendix B.
2.1.3. Little Goose Unit 5 Rotor Spider Crack Analysis – May 2012 After performing Finite Element Analysis on the rotor spider, it was found that the biggest contributor to high stress at the rotor spider crack location is due to the force imposed by the weight of the rotor itself. Torque also has an effect on stress. Alternating stress can occur due to air gap variation and load and excitation changes. The spider arm cracks on this unit are very similar to cracks on Bonneville unit 11. Some stop drilling was done on the cracks in the fall of 2009, but that is only a temporary solution. Recommended repairs include adding a large radius cutout to reduce stress concentration, repair the welds, and verify weld quality with NDT. This type of modification was done to Bonneville unit 11 when it was repaired recently by Alstom.
The analysis can be found in Appendix C.
2.1.4. Little Goose Unit 5 Upper Bearing Bracket Crack Analysis – May 2012 Finite Element Analysis was performed on the upper bearing bracket. Both the FEA and hand calculations show tensile stresses to be relatively low, <5000 psi, in the crack location when the weight of the unit plus operating loads are applied. These probably started as original weld cracks.
Once cracks are initiated, they can continue to grow by fatigue.
The analysis can be found in Appendix D.
2.1.5. Little Goose Unit 5 Crack Inspections –March 2014
In conjunction with weld inspections (see section 2.1.6), Little Goose Project visually inspected the progress of the cracks in the spider rotor and the upper bearing bracket.
This inspection report can be found in Appendix E.
2.1.6. Little Goose Unit 5 Oxarc Weld Inspections – February and March 2014 Little Goose Project contracted Oxarc to perform several phased array weld inspections.
These reports can be found in Appendix F.
2.2. HDC OPERATIONAL RECOMMENDATIONS AND LIMITATIONS -
After receipt of the Oxarc Weld Inspections, HDC held the stance that the following operational restrictions should apply to Unit 5:
- Unit 5 is last on, first off, attempting to avoid low and no load runs to reduce further vibration damage.
- Every opportunity to re-take crack length measurements should be taken advantage of, and those should be closely monitored. Any change in their current state should be reported to us.
- Any DRASTIC or non-trending changes should be reported.
- Plans should be made to secure funding for the full repair of the rotor and upper bearing bracket.
3. REPAIR DISCUSSION
Over the course of the Inspections listed above, it has been noted that a more thorough and substantial repair should be performed in order to bring Unit 5 back to a normally functional status.
This section will indicate the Requirements, Risks, and Assumptions associated with this repair.
3.1. REQUIREMENTS
The basic scope of work for the repair of Unit 5 will incorporate the following items:
- Modify rotor spider arms.
- Repair rotor spider arm cracks.
- Repair upper bearing bracket cracks.
- Check alignment of the unit to ensure it is still within acceptable limits.
- Install vibration monitoring and dynamic air gap measurement equipment.
3.2. RISKS
The table below indicates the risks and impacts that may be part of this work effort:
RISK IMPACT MITIGATION
Rim keys stuck in place. Keys gall, cause damage to rim and keyways.
Additional repair time and effort required.
Ensure level working surface during rim removal.
Ensure rim keys are not indexed prior to work.
Paint / weld removal before weld repair.
Unwanted debris in rotor / stator, potentially causing major damage to unit.
Recommended to remove rotor from unit, and remove weight of rim from spider before repair work is conducted.
Spider arms warp during weld repair.
Loss of concentricity and fit with the existing rim.
Careful control on weld details and extra caution to be taken during heat treatment / stress relief.
3.3. ASSUMPTIONS
As of the creation of this document, the following assumptions are made:
- The work is intended to be contracted.
o If the work is to be done in-house, it will change the way the repair is designed and specified.
- The unit will be able to be offline for the duration of the repair.
- The cracks have not shown appreciable growth since the last report sent to HDC.
- Unit 5 is still being operated as per HDC recommendations.
- The rim keys will be checked in advance to assure there has been no indexing.
Due to the complexity and extent of the weld repairs to be performed, and to ensure the welds can be properly prepared, performed, inspected, and painted without potential harm to other parts of
APPENDIX E
Little Goose Unit 5 Crack Inspections
March 2014
Unit 5 Inspection Results March 2014
Unit 5 rotor and upper bearing bracket were inspected in March 25, 2014.
1. Spider Arm:
Figure 1. Spider Arm Locations
Perform MT testing of spider arm in areas of cracks that were last reported present in arms 4, 8, and 14 (both sides). The latest measurements are provided below:
Length of Cracks in Unit 5 Rotor Spider Arms
Arm 8/2008 10/2009 5/5/2010 7/7/2010 10/26/2010 3/1/2011 7/7/2011 9/23/2013 3/25/2014
4 16-1/8” 16-1/2” 17-15/16'' 18-1/16'' 18-1/16'' 18-5/8" 19-11/16"* 19-11/16"* 19-11/16"*
4A 13” 14-5/8” 14-5/8'' 14-5/8'' 15-1/4'' 16-1/2"* 16-1/2"* 16-1/2"* 17-3/4”
8 9-5/8” 10-7/16” 10-3/4'' 10-3/4'' 10-3/4'' 10-7/8" 11-3/16" 11-3/4” 11-3/4”
8A 12-1/2” 13-7/16”* 13-7/16''* 13-7/16''* 13-7/16''* 13-7/16"* 13-7/16"* 13-7/16"* 13-7/16"*
14 7-1/8” 7-1/4” 7-1/4'' 7-3/4'' 7-3/4'' 8-7/8" 9-1/8"* 9-1/8"* 13-3/4”
14A 8-1/8” 8-1/8'' 8-1/8'' 8-1/8'' 9-1/2''* 9-1/2"* 9-1/2"* 11-1/8” 11-1/8”
1 6-3/4” 6-3/4”
1A 7-3/4” 7-3/4”
*Indicates crack propagated to hole and stopped Red measurements indicate changes from last measurement.
Figure 2. Rotor Arm 14
Propagated Crack
2. Inspect Upper Bearing Bracket-Hub
Inspected the upper bearing bracket hub on the upper side of the lower horizontal structure using phased array equipment to determine the depth of the cracks that are seen on the structure.
Figure 5. Upper Bearing Bracket Hub (Lower plate)
3. Inspect Upper Bearing Bracket-Hub and Arms
Inspected the upper bearing bracket hub and arm on the bottom side of the lower horizontal structure using phased array equipment to determine the location of cracks. No surface cracks were discovered. In most cases, the weld on the arm was 1-1/4” deep on each side of the lower horizontal structure, which resulted in a ½” gap between the welds (total structure thickness was 3”).
Figure 6. Upper Bearing Bracket Inspections (Red: Subsurface cracked welds, Yellow: weld indications, White: inspected, no indications or cracks).
APPENDIX F
Oxarc Weld Inspections February and March 2014
Repair Recommendation Report
ATR
Prepared By:
US Army Corps of Engineers Hydroelectric Design Center
August 2014
Engineers Northwestern Division
H Y
D R
O E
L E
C T
IC
D
SI
G N
C E
N T
PR
PA
R
ED
B Y
Northwestern Division
Little Goose Lock and Dam Unit 5 Repair
Table of Contents
1. Executive Summary
2. Introduction
2.1. Previous Inspections
2.1.1. Little Goose Unit 5 Generator Rotor Inspection – October 2010
2.1.2. Little Goose Unit 5 Vibration Measurement – February 2012
2.1.3. Little Goose Unit 5 Rotor Spider Crack Analysis – May 2012
2.1.4. Little Goose Unit 5 Upper Bearing Bracket Crack Analysis – May 2012
2.1.5. Little Goose Unit 5 Crack Inspections –March 2014
2.1.6. Little Goose Unit 5 Oxarc Weld Inspections – February and March 2014
2.2. HDC Operational Recommendations and Limitations -
3. Repair Discussion
3.1. Requirements
3.2. Risks
3.3. Assumptions
1. EXECUTIVE SUMMARY
Little Goose Unit 5 has excessive vibration, cracking in the upper bearing bracket, and cracking in the rotor spider. These phenomena have been studied and closely observed over time by Little Goose Project personnel, and they continue to grow and be problematic. They will require substantial repair to avoid unit damage in the future. The time frame for ultimate failure is not practicably estimated. To avoid a potentially more substantial and emergency repair than what is documented here, it is recommended that funding for the efforts documented below are procured, and design efforts begin.
The ROM estimated cost for the efforts listed above is #, and is estimated to take approximately 1.5 years to completion, after award of the contract.
2. INTRODUCTION
Over the past 5+ years, rotor spider cracks, upper bearing bracket cracks, and more-than-normal vibration have been observed on Unit 5. Little Goose Project has, over the course of those years, requested assistance from HDC in order to identify the source of the issues, as well as prepare a long-term solution so that Unit 5 can be brought into a state of normal operation with minimized risk of continued damage due to the vibrations and weld cracks. This document may be used as a starting point for designing the long-term solution, and encapsulates pertinent findings from previously executed studies and inspections. Most of these studies and inspection reports are included as appendices to aid the understanding of the reader.
2.1. PREVIOUS INSPECTIONS
Included in this section is a list of previously executed inspections, tests, and trip reports performed by HDC, as well as Oxarc, Inc. Key findings are denoted below.
2.1.1. Little Goose Unit 5 Generator Rotor Inspection – October 2010 This site visit was conducted following completion of the recommended procedure in 2009 to drill stress-relieving holes in order to limit crack growth. Some key findings from this report are:
- Crack growth appears to be time based, not start/stop cycle based.
- Inspection schedule should be 3 months apart.
- Recommended to obtain sweep air-gap readings, during service.
- First recommendation for making future plans for an in-depth and substantial repair.
The trip report can be found in Appendix A.
2.1.2. Little Goose Unit 5 Vibration Measurement – February 2012 After taking vibration data on the unit, and performing some analysis, the following recommendations were documented in this report:
- Adjust upper and lower guide bearing to design clearances.
- Avoid running Unit 5 at loads of 40MW or less as much as possible.
- Check alignment of the unit.
- Modify rotor spider arms as suggested by the FEA to avoid fatigue cracks.
- Repair rotor spider arm cracks.
- Repair upper bearing bracket cracks.
The trip report can be found in Appendix B.
2.1.3. Little Goose Unit 5 Rotor Spider Crack Analysis – May 2012 After performing Finite Element Analysis on the rotor spider, it was found that the biggest contributor to high stress at the rotor spider crack location is due to the force imposed by the weight of the rotor itself. Torque also has an effect on stress. Alternating stress can occur due to air gap variation and load and excitation changes. The spider arm cracks on this unit are very similar to cracks on Bonneville unit 11. Some stop drilling was done on the cracks in the fall of 2009, but that is only a temporary solution. Recommended repairs include adding a large radius cutout to reduce stress concentration, repair the welds, and verify weld quality with NDT. This type of modification was done to Bonneville unit 11 when it was repaired recently by Alstom.
The analysis can be found in Appendix C.
2.1.4. Little Goose Unit 5 Upper Bearing Bracket Crack Analysis – May 2012 Finite Element Analysis was performed on the upper bearing bracket. Both the FEA and hand calculations show tensile stresses to be relatively low, <5000 psi, in the crack location when the weight of the unit plus operating loads are applied. These probably started as original weld cracks.
Once cracks are initiated, they can continue to grow by fatigue.
The analysis can be found in Appendix D.
2.1.5. Little Goose Unit 5 Crack Inspections –March 2014
In conjunction with weld inspections (see section 2.1.6), Little Goose Project visually inspected the progress of the cracks in the spider rotor and the upper bearing bracket.
This inspection report can be found in Appendix E.
2.1.6. Little Goose Unit 5 Oxarc Weld Inspections – February and March 2014 Little Goose Project contracted Oxarc to perform several phased array weld inspections.
These reports can be found in Appendix F.
2.2. HDC OPERATIONAL RECOMMENDATIONS AND LIMITATIONS -
After receipt of the Oxarc Weld Inspections, HDC held the stance that the following operational restrictions should apply to Unit 5:
- Unit 5 is last on, first off, attempting to avoid low and no load runs to reduce further vibration damage.
- Every opportunity to re-take crack length measurements should be taken advantage of, and those should be closely monitored. Any change in their current state should be reported to us.
- Any DRASTIC or non-trending changes should be reported.
- Plans should be made to secure funding for the full repair of the rotor and upper bearing bracket.
3. REPAIR DISCUSSION
Over the course of the Inspections listed above, it has been noted that a more thorough and substantial repair should be performed in order to bring Unit 5 back to a normally functional status.
This section will indicate the Requirements, Risks, and Assumptions associated with this repair.
3.1. REQUIREMENTS
The basic scope of work for the repair of Unit 5 will incorporate the following items:
- Modify rotor spider arms.
- Repair rotor spider arm cracks.
- Repair upper bearing bracket cracks.
- Check alignment of the unit to ensure it is still within acceptable limits.
- Install vibration monitoring and dynamic air gap measurement equipment.
3.2. RISKS
The table below indicates the risks and impacts that may be part of this work effort:
RISK IMPACT MITIGATION
Rim keys stuck in place. Keys gall, cause damage to rim and keyways.
Additional repair time and effort required.
Ensure level working surface during rim removal.
Ensure rim keys are not indexed prior to work.
Paint / weld removal before weld repair.
Unwanted debris in rotor / stator, potentially causing major damage to unit.
Recommended to remove rotor from unit, and remove weight of rim from spider before repair work is conducted.
Spider arms warp during weld repair.
Loss of concentricity and fit with the existing rim.
Careful control on weld details and extra caution to be taken during heat treatment / stress relief.
3.3. ASSUMPTIONS
As of the creation of this document, the following assumptions are made:
- The work is intended to be contracted.
o If the work is to be done in-house, it will change the way the repair is designed and specified.
- The unit will be able to be offline for the duration of the repair.
- The cracks have not shown appreciable growth since the last report sent to HDC.
- Unit 5 is still being operated as per HDC recommendations.
- The rim keys will be checked in advance to assure there has been no indexing.
Due to the complexity and extent of the weld repairs to be performed, and to ensure the welds can be properly prepared, performed, inspected, and painted without potential harm to other parts of
(This page left intentionally blank.)
APPENDIX A
Generator Rotor Inspection October 2010
APPENDIX B
Vibration Measurement February 2012
APPENDIX C
Rotor Spider Crack Analysis May 2012
APPENDIX D
Upper Bearing Bracket Crack Analysis May 2012
APPENDIX E
Crack Inspections
March 2014
Unit 5 Inspection Results March 2014
Unit 5 rotor and upper bearing bracket were inspected in March 25, 2014.
1. Spider Arm:
Figure 1. Spider Arm Locations
Perform MT testing of spider arm in areas of cracks that were last reported present in arms 4, 8, and 14 (both sides). The latest measurements are provided below:
Length of Cracks in Unit 5 Rotor Spider Arms
Arm 8/2008 10/2009 5/5/2010 7/7/2010 10/26/2010 3/1/2011 7/7/2011 9/23/2013 3/25/2014
4 16-1/8” 16-1/2” 17-15/16'' 18-1/16'' 18-1/16'' 18-5/8" 19-11/16"* 19-11/16"* 19-11/16"*
4A 13” 14-5/8” 14-5/8'' 14-5/8'' 15-1/4'' 16-1/2"* 16-1/2"* 16-1/2"* 17-3/4”
8 9-5/8” 10-7/16” 10-3/4'' 10-3/4'' 10-3/4'' 10-7/8" 11-3/16" 11-3/4” 11-3/4”
8A 12-1/2” 13-7/16”* 13-7/16''* 13-7/16''* 13-7/16''* 13-7/16"* 13-7/16"* 13-7/16"* 13-7/16"*
14 7-1/8” 7-1/4” 7-1/4'' 7-3/4'' 7-3/4'' 8-7/8" 9-1/8"* 9-1/8"* 13-3/4”
14A 8-1/8” 8-1/8'' 8-1/8'' 8-1/8'' 9-1/2''* 9-1/2"* 9-1/2"* 11-1/8” 11-1/8”
1 6-3/4” 6-3/4”
1A 7-3/4” 7-3/4”
*Indicates crack propagated to hole and stopped Red measurements indicate changes from last measurement.
Figure 2. Rotor Arm 14
Propagated Crack
2. Inspect Upper Bearing Bracket-Hub
Inspected the upper bearing bracket hub on the upper side of the lower horizontal structure using phased array equipment to determine the depth of the cracks that are seen on the structure.
Figure 5. Upper Bearing Bracket Hub (Lower plate)
3. Inspect Upper Bearing Bracket-Hub and Arms
Inspected the upper bearing bracket hub and arm on the bottom side of the lower horizontal structure using phased array equipment to determine the location of cracks. No surface cracks were discovered. In most cases, the weld on the arm was 1-1/4” deep on each side of the lower horizontal structure, which resulted in a ½” gap between the welds (total structure thickness was 3”).
Figure 6. Upper Bearing Bracket Inspections (Red: Subsurface cracked welds, Yellow: weld indications, White: inspected, no indications or cracks).
APPENDIX F
Oxarc Weld Inspections February and March 2014 sotarc.INSPECTION REPORT
PROJECT NAME
Little Goose Dam Unit 5 Spider Rotor Arm Crack Inspection
DATE
2-19-14
PAGE
1 o f 3
PROJECT LOCATION
Little Goose Dam, Whitman Countv, WA P O # Attached PA Reports t-12
CLIENT
US ACE / Little Goose Dan FABzuCATION FACILITY
N/A
GENERAL CONTRACTOR/SUPERINTENDENT
N/A SUBCONTRACTOR,f OREMAN
N/A INSPECTION ryPE (S) / COVERAGE: Check appropriate box(s)
LocArIoN oF INsPEcrloN: Lig!9J@DgEJI4!
INSPECTION REQUESTED BY: US ACE / Martin Evans
I wetoing ! N/a fl continuous Ll refloorc
X other: NDT
I Not testing n N/A nMr Xur Epr Ev r
INSPECTION DETAILS:
Arrived on site at Little Goose Dam as requested by Martin Evaas to perform NDT on Unit 5.
Met with Martin Evans to review the details of the inspection. Martin has requested Phased Anay Flaw Imaging, (PA) on areas of cracking on the Spider Rotor Arm Cracks on unit #5.
Performed PA on all 12 wedge locations on the Spider Rotor Upper Groove Welds.
All Welds were actually Partial Penetration Groove Welds. Not CJP welds.
Indications of Cracking were noted at Swedge locations:2,3,4,5, 6, 7, 8 and 10.
See UT Examination Report on pages 2 and 3. Ald attached PA Reports 1-12.
To the best of mv knowledse all NDT was performed as per Oxarc PA-UT-I, and was reported to the same.
Comments:
INSPECTOR'S SIGNATURE
.1'-- t .-z r&z-*/ F<.^
PRINTED NAME
David Parr*""*x5h DATE
3-d? s
OXARC,lnc.
4003 E. Broadway Ave.
Spokane. Washinglon 99202 Phone 509/535-7794 Toll Fr€€ 800/765-9055 Fax 509/535-0368 rev. 09/10
ULTRASONIC EXAMINATION REPORT
CUSTOMER CONTACT
US ACE Little Goose Dam / Martin Evans
DATE
2-19-t4
PAGE
2 o f 3
PROJECT LOCATION
Little Goose Dam - Powerhouse / Unit 5
P O # TJNIT/SYSTEM
Unit 5
ITEM DESCRIPTION
Groove Weld PA-UT on Little Goose Dam Unit 5 (12 Wedge areas with cracking on PP Groove Welds)
MATERIAL
Steel Plate
THICKNESS
3', QTY.
12 areas
SURFACE CONDITION
Painted Steel
PROCEDURE
Oxarc PA-UT-I
ACCEPTANCE STANDARD
ASME sec. VlUArticle 12
ITEM TEMP/CAL BLOCK TEMP.
7 0 0 F / 7 0 0 F
STAGE OF
MANUFACTURE
LI INITIAL COMMENT:
! FINAL Crack pA-UT Exam
X REPA-IR
SURFACE PREPARATION:
Smoothed with hand file
XLONGITUDINAI LI OTHER
X SHEARwAvE PA Flaw Imasins
TYPE OF EXAM
Phased Array Flaw Imaging 40o-70o Angle beam 0" Straieht Beam
COUPLANT
Sonotrace 30
INSTRUMENT MFC.MODEL-SN
OMNl-Scan - MX / 100631
TRANSDUCER FREQ. 5 MH?./2.25 MHz SIZE 1.5" / l"
SSINGLE WEDGE ANGLE 45"-70" / 0" MEAS. ANGLE 45'-70"10"
EDUAr MFG, S,N Olvmpus-5l64 SA2 IHC DELAY None c/E / 0lYDlw
CAIIBRATION BLOCK
SBLocK f]CURVED
TYPE
DSC
MATEzuAL Steel
MFG
Insp€ction Technolosies
SN
07-6t4E
COMMENTS INCLUDE ACCEPT,REJECT SKETCH
Little Goose Dam - Unit 5 SDider Rotor Groove Weld Cracks
See attached Phased Array Flaw Imaging Report I
See attached Phased Array Flaw lmsging Report 2
See attached Phased Array Flaw lmaging Report 3
See attached Phased Array Flaw lmaging Report 4
See attached Phased Array Flaw lmaging Report 5
See attached Phased Arrry Flaw Imaging Report 6
W€dse 2 - Cracked all the wav throueh both Upner PP Groov€ welds
Wedse 3 - Cracked all the wav throush both UDDer PP Groove welds Wedge 4 - Crack€d all the way through one (Left Side) Upper PP Groove weld / Crackins from root on Risht Side
Wedee 5 Cracked all the wav throush both UDDer PP Groove welds
Wedse 6 Cracks startins from rool on both UDDer PP Groove welds Wedg€ 7 - Cracked Sporadically most ofthe way through both Upper PP Groove welds
PRINTED NAME
David Parr Torrr/ ,Ar.
OXARC, Inc.
4003 E. Broadway Ave.
Spokare, washinsron 99202 Phone 509/535-?794 Toll Frce 800/765-9055 Fax 509/535-0368 rev.03/13
ULTRASONIC EXAMINATION REPORT s ohtt.
CUSTOMER CONTACT
US ACE Little Goose Dam / Martin Evans
DATE
2-19-14
PAGE
3 o f 3
PROJECT LOCATION
Little Goose Dam - Powerhouse / Unit 5
P O # UNIT/SYSTEM
Unit 5 ITEM DESCzuPTION Groove Weld PA-UT on Little Goose Dam Unit 5 (12 Wedqe areas with cracking on PP Groove Welds)
MATERIAL
Steel Plate
THICKNESS
f , "
QTY,
12 areas
SURFACE CONDITION
Painted Steel
PROCEDURE
Oxarc PA-UT-I
ACCEPTANCE STANDARD
ASMf, sec. VlVArticle 12
ITEM TEMP/CAL BLOCK TEMP.
700 f,' / 700 F
STAGE OF
MANUFACTURE
LI INITIAL
E FINAL
E REPAIR
COMMENT:
Crack PA-UT Exam
SURFACE PREPARATION:
Smoothed with hand file
X LONGITUDINAL LI OTHER
X SHEARWAVE PA Flaw Imasins
TYPE OF EXAM
Phased Array Flaw Imaging 40o-70o Angle beam 0" Straieht Beam
COUPLANT
Sonotrace 30
INSTRUMENT MFG-MODEL.S/N
OMNI-Scrn-MX/100631
TRANSDUCER FREQ. 5 MHz/2.25 MHz SIZE !E/ !:
ESINGLE WEDGE ANGLE 45"-70" | 0o MEAS. ANCLE 4s'-10'l 0" fIDUAL MFG, SN Olvmpus-5l64 SA2IHC DELAY N9r9
G/E / OIYD1W
CALIBRATION BLOCK
XBLOCK ECURVED
TYPE
DSC
MATERIAL
Steel
MFC
Inspection Technolosies
SN
07-6148
COMMENTS INCLUDE ACCEPT/REJECT SKETCH
Little Goose Dam - Unit 5 SDider Rotor Groove Weld Cracks
See attached Phased Array Flaw Imaging Report 7
See aftached Phased Array Flaw Imaging Report 8
See attached Phased Array Flaw Imaging Report 9
See attached Phased Array Flaw Imaging Report l0
See attached Phased Array Flaw Imaging Report ll
See attached Phased Array Flaw Imaging Report 12
Wedge 8 - Cracked all the way through one (Left side) Upper PP Groove weld / Rieht side -OK
Wedg€ 9 - No Cracks Noted, Weld Discontinuities noted on both Upner PP Groove Welds Wedg€ 10 - Cracked all the way through on€ (Right side) PP Groove Weld / Left side - OK Wedge 11 - No Cracks Noted, Weld Discontinuities not€d on both Upner PP Groove Welds Wedge 12 - No Cracks Noted, W€ld Discontinuities not€d on Left side UDDer PP Groove Weld / Risht Side - OK
Wede€ I - No Indications noted
LEYEL
il 7d ft, PRINTED NAME
David Parr
OXARC,Irc.
4003 E. Broadway Ave Spokane, Washinglon 99202 Phon€ 509/535-7794 Toll Free 800165-9055 Fax J09l535-0368 rev.03/13
P A - I
2 . 4 % l(m-r)
0 000 in u(m-r) 2 . 4 % -- in
2-19-14 L ' t l l c Goose Dm Ur i l5
Wedge 2 ' Cracked all the way ikough bolh Uppcr PPBloolc wclds
D P<rc
U S A l E
2- t7-tu fi le:/,{E.:\User\Report\LGU5- 1.htm
P A - 2
2 . 4 %
DA^ I(n-r)
0.000 in u(n{) 1.98? in 2 . 4 %
DA^
-- in
2-19- l4 l - in le Goose Dm Uni t 5
Wedge 3 ' Cracked all the *ay rhroush bnrh Upp* PP Groole welds t- '\ recrDicirnr\rme J, Yaf f
2n-"/ a-us A tE
2 - r r - r l fi le ://E :\User\Reoort\LGU5-2.htm
P A - 3
2.4 yo
DA^ I(dj)
0.000 in u(--.)
I 987 in 2 . 1 %
DA^
2- l9- I ,1 Little Coose Dah Unil 5
Wedge 4 - Cracked alldte way thJough oi left sidc ed qackhg liom rool on right sidc
D ?.r n*4 P' us Aze
2 - t? - /4 fi le ://E lUser\Reoort\LGU5 -3.htm
P A . 4
2.4 yo u(n-r) I 987 i . 2 4 %
DA^
2-19-14 Little Goose Dm Unit 5
Wedge 5 ' Cracted all 6e way throueh bolh upp€r PP groolc wclds
D P, "r" -D-1 F-., us A/[
2 ^ / 7 - / { fi le ://E :\User\Reoort\LGU 5 -4.htm
PA _5
3.5 %
DA"
1.987 in 3 5 %
2'19'14 Linle Goo5e DD Unil5
Wedse 6 - Cracks Slartine fiom roor on both Upper PP Groove welds
D, Po rr
P.*/ P', as lcf
2 - / f - / 4 fi le:/,iE :\User\Report\LGU5-5.htm
P A - 6
4 7 0 / d
DA^
t .9E? in 4 . 1 %
DA^
2-19-14 Linle Goose Dm Unit 5
Wegde 7 ' Cracled spoEdically most offie way throueh both upper PP Croole Welds
D , ? ^ . , Ace
2 - /?- /// file :i,{E :\User\Reoort\LGU5-6.htm
P A " Z
4 1 0 / d
DA" u(m-r) L96? in 4 1 %
DA^
2 19-14 Litile Coose Dm U.n 5
Wedge 8 - Cracked all the *ay rhroush L€ft side PP sroov. qeld
D 7o", U5 ,4zt
2 - t 7 - r q fi le ://E :\User\Report\L GU5 -7.htm
P A . T
4 . 3 % ..- in u(m-r) I 987 in 430/ r
DA^
2-19-14 Linle Goose Dm Unit 5 wedgc 9 - Weld di$ondnuiries nor€d on both upperPP Groove Welds
D' Parr
T- E" as l/{
2 - t q ' t fi le:/,iE lUser\Reporl\LGU5-8.htm
P A - q
DA^ u(m{) DA^ -.- in
2-19- l4 Linlc Coose Dan Unit 5 wedge l0 -Cractedalltc ivay through Righl side upper PP Goove weld
D' ?o" '
[-rnol E'- /,t S /4 /E
2 - /f- /// fi le :/,/E :\User\Report\LGU5 -9.htm
P A - t o
2 4 y o
DA^ u(--t
1.987 in 2 . 4 %
2-19-14 L in le Coose Dm Uni r 5
Wedge I I - Weld discontinuiiies nored oi both upper PP Croole Welds
D. ?orr n,/ n< U5 AlE
2- t? ' tq fi le://E:\User\Reoort\LGU5- I 0.htm
PA - rt
DA"
0 000 in u(m') 1987 'n
2-19-14 Lrttlc Coose Dm Unil 5
Wedge l2 - weld discontinuities noted on lell side Upp€r PP Croovc Wcld
D. Torr u5 /l zf
2- /?- / / t fi le:/iE:\User\Report\LGU5- 1 1.htm
P A . / 2
6 1 0 / o
DA^ u(h'r)
1.987 in 6.7 %
DA^
-- in
2-19-14 Little Coose DM Unn 5
Wedge I - No indicalions nored f .chnici ln\,mr l) ("tr r.chni.i,nsignrtu,e 7-rrr/ F"'' as A4[ fi le:/iEIUser\Reoort\LGU5- 1 2.htm
Report #
U5SRADP32514 .@-
otalcINSPECTION REPORT
OXARC,Inc.
4003 E. Broadway Ave.
Spokane, Washjneton 99202 Phone 509/J35-7794 Toll Fr€e 800/?65-9055 Fax 509/535-0368
PROJECT NAME
Unit 5 Spider Rotor Arm Fillet Weld Cracks Inspection
DATE
3-2s-14
PAGE
l o f 2
PROJECT LOCATION
Little Goose Dam, Whitman County, WA P O # Attached PA Reports
N/A
CLIENT
US ACE / Little Goose Dam
FABRICATION FACILITY
NiA
GENERAL CONTRACTOR/SUPERINTENDENT
N/A
SUBCONTRACTOR/FOREMAN
N/A INSPEC flON TYPE (S) / COVERACE: Check appropriare box1.
X wetoing n Nta I Not testing n Nla E continuous X MT E ur I Periodic E PT E vT X Otheri NDT
LoCATIoN oF INSPECTIoNT LilUg.t@9SgDAlq:.M
INSPECTION REQUESTED BY: US ACE / Martin Evans
INSPECTION DETAILS:
Arrived on site at Little Goose Dam as requested by Martin Evans to perform Magnetic Particle Inspection (MT) on Unit 5 Spider Rotor Arm Upper Fillet Weld Cracks.
Met with Martin Evans to review the details of the inspection.
Martin has requested MT on the Spider Rotor Arm Upper Fillet Welds.
Performed Magnetic Particle on all 14 wedge locations on the Spider Rotor Arm Upper Fillet Welds.
Indications of Cracking were noted at 8 wedge locations: 1A, 18,4.A, 4B, 8A, 8B, 14A and 14B.
2 locations showed a growth in crack length: wedge locations 4A - 2-114" inches longer.
l4B - 2-5/8" inches longer.
See MT Report on page 2.
To the best of my knowledge all NDT was performed as per Oxarc MT-l, and was reported to the same.
Comments:
INSPECTOR'S SIGNATURE
,E-
PRINTED NAME
David Parr
REVIEWED BY
/iz-nt sk ga
DATE
0J- a?-/L/ rev.09/10
MAGNETIC PARTICLE INSPECTION
s o|atc
PROJECT NAME
Little Goose Unit 5 Spider Rotor Arm Cracls
DATE
3-25-14
REFERENCE REPORT NO.
U5SRADP32514
JOB LOCATION
Little Goose Dam / Unit 5
INSPECTION TYPEI
E roo% I Spot - Areas ofcracking l-l As oer oroiect soecification
MAT'L TYPE/TEMP,
Ferrous / 80oF
PAGE
2 o r 2
INSPECTION STD. #
E-709
NDT PROC. #
OXARC MT-l
ACCEPTANCE STD. #
AWS D1.1 / Table 6.1
PRE EXAMINATION
SurfacePreparation: None
EQUIPMENT
lnstrument Maker Parker Contour Probe Ki t#8
METHOD OF INSPECTION: X Dry Ll Wet X Visible Ll Fluorescent How Media Applied: Manual Maenetic Particle blower
Calibrationl
I Cu.rent I Continuous ! Half Wave 8 A c X D C
! Other: Unit Tesred Prior to [l Vote n Other:
Direction for fietd: ! Circular X Longitudinal
WELD or
LOCATION
TYPE OF
WELD OR PART ACCEPT REJECT REMARKS
Unit 5 Spider Rotor Arm Upper Fillet Weld Cracks
IA Fillet XX
4A srowth - 2-114" l4B erowth - 2-518"
1B Fillet xx 4A Fillet xx 4B Fillet XX
8A Fillet xx 8B Fillet xx l4A. Fillet xx 148 Fillet xx
2A. / 28 / 3A. / 3B / 5A I 5B | 6A / 68 I 7A t7B /94 /98 / tOA / tOB / t tA / t tB/ tz l / tzB/13A/138 Fillet xx No cracks were noted at theses locations
SKETCH/DRAWINC:
REMARKS:
PzuNTED NAME
David Parr
'/ -a--h4t 'k cs-a7- / q
OXARC, Inc.
4003 E Broadway Ave.
Spokane, Washington 99202 Phone 509/535-7794 Toll Free 800/765-9055 Fax509/535-0368 www.oxrrc.com 10/10 Rev.l
LGU5DP32514
INSPECTION REPORT
OXARC,Inc.
4003 E. Broadway Ave.
Spokane, washinBon 99202 Phone 509/535-7794 Toll Free 800/?65-9055 Fax 509/535-0368
PROJECT NAME
Unit 5 Upper Bearins Bracket Hub Crack Insnection
DATE
3-25-L4
PAGE
l o f 4
PROJECT LOCATION
Little Goose Dam, Whitman County, WA
P O # Attached PA Reports
CLIENT
US ACE / Little Goose Dam
FABRICATION FACILITY
N/A
GENERAI- CONTMCTOR/SUPERINTENDENT
N/A
SUBCONTRACTOR/TOREMAN
N/A INSPECTION TYPE (S) / COVERAGE: Check appropriate box(s)
LOCATION OF INSPECTION: Little Goose Dam. WA
INSPECTION REQUESTED BY: US ACE / Martin Evans
I wetotg ! Nta E Continuous E Periodic X Other: Phased Array
X NDT Testing
I M r I P T
NDT
nNla X U T E V T
INSPECTION DETAILS:
Arrived on site at Little Goose Dam as requested by Martin Evans to perfonn Phased Array NDT on Unit 5.
Met with Martin Evans to review the details of the inspection. Martin has requested Phased Array Flaw Imaging, (PA) on areas of cracking on the Unit 5 Upper Bearing Bracket Hub Cracks.
Performed PA on 6 wedge locations on the Spider Rotor Lower Groove Welds on the bottom surface.
6 locations on the 5" plate and 6 locations on the 3" plate.
All Welds were actually Partial Penetration Groove Welds. Not CJP welds.
Indications of Cracking were noted at 3 wedge locations: 415, 6/7 (5 inch plate,) and 415 (3 inch plate).
See UT Examination Report on pages 2-4. And attached PA Reports 1-12.
To the best of my knowledge all NDT was performed as per Oxarc PA-UT-I, and was reported to the same.
Comments:
INSPECTOR'S SIGNATURE
"1---_\l2*/ tr
PRINTED NAME
David Parr*""*Y7tz DATE
3 r9E-tz( rev. 09/10
ULTRASONIC EXAMINATION REPORT
LGU5DP32514 oilarc
CUSTOMER CONTACT
US ACE Little Goose Dam / Martin Evans
DATE
3-25-t4
PAGE
2 o f 4
PROJECT LOCATION
Little Goose Dam - Powerhouse / Unit 5 P O # lJl\llT/SYSTEM
Unit 5
ITEM DESCRIPTION
Groove Weld PA-UT on Little Goose Dam Unit 5 (12 Wedee areas with crackins on PP Groove Welds)
MATERIAL
Steel Plate
THICKNESS
5" 13"
QTY.
6 areas / each thickness
SURFACE CONDITION
Painted Steel
PROCEDURE
Oxarc PA-UT-I
ACCEPTANCE STANDARD
ASME sec. VlUArticle 12
ITEM TEMP/CAL BLOCK TEMP,
7 0 0 F / 7 0 0 F
STAGE OF
MANUFACTURE
I INITIAL COMMENT:
I FTNAL Crack pA-UT Exam
X REPAIR
SURFACE PREPARATION:
Smoothed with hand file
X LONGITUDINAL LI OTHER
I SHEARwAvE PA Flaw lmaerns
TYPE OF EXAM
Phased Array Flaw Imaging 40o-70o Angle beam 0' Straisht Beam
COUPLANT
Sonotrace 30
INSTRUMENT MFG-MODEL.SN
OMNI-Scan - MX / 100631
STZE 1,5" I 1"
MEAS. ANGLE 45"-10"/O'
DELAY None
TRANSDUCER FREQ. 5 MHz/2.25 MIIZ XSTNGLE WEDGEANGLE 45.-70. / Oo EDUAL MFG, S,N Olvlnpus-5l-64 SA2 IHC
G/E / OlYDlW
CAIIBRATION BLOCK
SBLOCK ECURVED
TYPE
DSC
MATERIAL
Steel
MFG
Inspection Technologies s,oJ 07-614E
COMMENTS INCLUDE ACCEPT/REJECT SKETCH
Little Goose Dam - Unit 5 SDider Rotor Groove Weld Cracks See attached Phased Array Flaw Imaging Report I
See attached Phased Array Flaw Imaging Report 2
See attached Phased Array Flaw lmaging Report 3
See attached Phas€d Array Flaw Imaging Report 4
See attached Phased Array Flaw Imaging Report 5
See attached Phased Array Flaw lmaging Report 6
Wedse - l/2 (3'" bolt) - sinsle discontinuitv indication @ l-1/2" deeo
WedEe - ll2 Uth bolt) - PA-OK
Wedee - 2/3 (lst bolt) - 2 sinsle discontinuitv indication @ l-112" deeo
Wedge - 2/3 (2nd bolt) - PA-OK
Wedse - 2/J (3rd bolt) - sinsle discontinuitv indication @ l-l14" deeo
Wedse - 2/3 (4th bolt) - sinsle discontinuitv indication @ l" deeD
Wedse - 3/4 (boltsl-4) - PA-OK
W€dse - 4/5 (lst bolt) -crack@3/4"deep
Wedee - 4i5 (2nd boll) - sinsle discontinuitv indication @ l" deep
Wedse - 4/5 (3rd bolt) - PA-OK
INSPECTOR'S SIGNATURE PRINTED NAME
David Parr
LEVEL
il
DATE
sCf tq
OXARC, Inc.
4003 E Broadway Ave.
Spokane, washington 99202 Phone 509/53J-7794 Toll Free 800/?65-9055 Fax 509/535-0368 rcv.03113
ULTRASONIC EXAMINATION REPORT s o|tatc.
Report # LGU5DP325l,l
CUSTOMER CONTACT
US ACE Little Goose Dam / Martin Evans
DATE
3-25-14
PAGE
3 o f 4
PROJECT LOCATION
Little Goose Dam - Powerhouse / Unit 5
P O # LTNIT/SYSTEM
Unit 5
ITEM DESCRIPTION
Groove WeId PA-UT on Little Goose Dam Unit 5 (12 Wedse areas with crackins on PP Groove Welds) MATERIAl- Steel Plate
THICKNESS
5" 13"
QTY,
6 areas / each thickness
SURFACE CONDITION
Painted Steel
PROCEDURE
Oxarc PA-UT-I
ACCEPTANCE STANDARD
ASME sec. VlVArticle 12
ITEM TEMP/CAL BLOCK TEMP,
7 0 0 F / 7 0 0 F
STAGE OF
MANUFACTURE
LI INITIAL COMMENT:
n FrNAL Crack pA-UT Exam
X REPAIR
SURFACE PREPARATION:
Smoothed with hand file
X LONGITUDINAL L-I OTHER
El SHEAR wAvE pA Flaw Imasine
TYPE OF EXAM
Phased Array Flaw Imaging 40"-70" Angle beam 0" Straight Bean
COUPLANT
Sonotrace 30
INSTRUMENT MFG-MODEL-S/N
OMNI-Scan-MX/100631
TRANSDUCER FREQ. 5 MHzl2.25 MHz XsrNcLE wEDcE ANGLE 4s'Jo' tqo MEAS. ANGLE !5'-201_0!
EDUAI MFG, S,4\1 Olympus-5l64 SA2 IHC DELAY None
G/f, / olYDlw
CALIBRATION BLOCK
XBLocK ECURVED
TYPE
DSC
MATERIAL
Steel
MFG
Inspection Technolosies
SN
07-6148
COMMENTS INCLUDE ACCEPT/REJECT SKETCH
Little Goose Dam - Unit 5 SDider Rotor Groove Weld Cracks - 5" plate See attached Phased Array Flaw Imaging Report 7
(W€ld was not completed and was visually unacceptable)
See attached Phased Array Flaw Imaging Report 8
See attached Phased Array Flaw Imaging Report 9
See attach€d Phased Array Flaw Imaging Report l0
Wedge - 4/5 (4th bolt) - 2 single discontinuity indication @ 3/4" and l" deeD wedse - 5/6 (bolts 1-4) - PA-OK
Weds€ - 6/7 (lst bolt) - crack @ 3/4" deeD
Wedse - 6/7 (bolts 2-4) - PA-OK
Little Goose Dam - Unit 5 SDider Rotor Groove Weld Cracks - 3" Dlate
Wedse - 6/7 (bolts t-4 ) - PA-OK
Wedse - 5/6 (1" bolt) - sinsle discontinuity @ 3/8" deeD
Wedse - 5/6 (2nd bolt) - sinsle discontinuitv @ 3/4" deeD
W€dee - 5/6 (bolts 3&4 ) - PA-OK
PRINTED NAME
David Parr
LEVEL
II
REv'E*EDBYIA
Srk
DATE
,7 ef -/?
OXARC, Inc 4003 E. Broadway Ave.
Spokane, Washinglon 99202 Phone 509/515-7794 Toll Free 800/765-9055 Fax 509/535-0366
ULTRASONIC EXAMINATION REPORT s, ilarc
Report #
LGU5DP325I4
CUSTOMER CONTACT
US ACE Little Goose Dam / Martin Evans
DATE
3-25-t4
PAGE
4 o f 4
PROJECT LOCATION
Little Goose Dam - Powerhouse / Unit 5
P O # TJNIT/SYSTEM
Unit 5
ITEM DESCRIPTION
Groove Weld PA-UT on Little Goose Dam Unit 5 (12 Wedee areas with cracking on PP Groove Welds)
MATERIAL
Steel Plate
THICKNESS
s" /3"
QTY.
6 areas / each thickness
SURFACE CONDITION
Painted Steel
PROCEDURE
Oxarc PA-UT-I
ACCEPTANCE STANDARD
ASME sec. \{IVArticle 12
ITEM TEMP/CAL BLOCK TEMP.
7 0 0 F / 7 0 0 F
STAGE OF
MANUFACTURE
J INITIAL COMMENT:
f FrNAL Crack pA-UT Exam
X REPA]R
SI-IRFACE PREPARATION :
Smoothed with hand file
X LONGITUDINAL LI OTHER
X SHEAR WAVE PA Flaw Imasing
TYPE OF EXAM
Phased Array Flaw Imaging 40o-70o Angle beam 0' Straisht Beam
COUPLANT
Sonotrace 30
INSTRUMENT MFG.MODEL.S,N
OMNI-Scan-MX/100631
TRANSDUCER FREQ. 5 MHz/2.25 MHz SIZE 1.5" / l" XSTNGLE WEDGE ANGLE 4s'-10" tqo MEAS. ANGLE 4s'-70"t0o EDUAr MFG, S,Atr Olvmpus-5l64 SA2 IHC DELAY N9!9 c/f, / olYDlw
CALIBRATION BLOCK
XBLoCK ECURVED
TYPE
DSC
MATERIAI
Steel
MFG
Inspection Technolosies s,,N 07 -6148
COMMENTS INCLUDE ACCEPT/REJECT SKETCH
Little Goose Dam - Unit 5 Spid€r Rotor Groov€ Weld Cracks - 3" nlate
See rttsched Phased Array Flaw Imaging Report l1
See attached Phased Array Flaw Imaging Report l2
Wedee - 4/5 (lst bolt) - cracked from root @ l" to 2" deeD
Wedse - 4/5 (2nd bolt) - 2 sinsle discontinuities @ l-l12" & 2" deeo
Wedse - 4/5 (bolts 3&4 ) - PA-OX
Wedse - 3/4 (bolts l-4) - PA-OK
Wedee - 2/3 (1" bolt) - sinsle discontinuity @ l-l/2" deeo
Wedse - 2/3 (bolts 2-4 ) - PA-OK
Wedee - l/2 (bolts 3&4 ) - PA-OK
INSPECTOR'S SIGNATURE
//4*z
PRINTED NAME
David Parr
LEVEL
II
DATE
,i 'A7F- / tl
O)GRC,Inc.
4003 E. Broadway Ave.
Spokane, Washinslon 99202 Phone 509/535-7794 Toll Free 800165-9055 rev.03/13
OmniScan Report Rcport Dit
2014 | 03 t27
O$rtscrr Typc
Ohrisoe l,D(
IVD<IJ - 2.0R27
Onds.$r S.rtd f oMNI-100631 r!D(r - 2.0R27
Cilibrrtlon Du.
20\4 / 09 t26
S.v. Modc
INpection Dato
D.ar Filc N.m.
drtA06.opd
S.rup FiI. Nu. IBpetio D.t
I inch pldc 55 lisr 40-70 2Ot4 | B I Zs
ModoLTyp. Modul. Scrid # oMM-M-PAl6t28 0MNI-200252 fi le://E :\User\Report\LGU5- 1 .htn
P A - t
Gmup I
P.ob.Mod.l P.obc S.ftr# 5L64-42 n494 Prob. Fr.qu.ncy P.rk Fftqu.ncy w.dgc Mod.l wcdg. Argc Prob. Ap.rfu.
5.00 Mtlz SA2-N55S dud 51,64 36.00 0.378 ir
lnw.r Fr.qudcy High.r Fr.qucNy C.na.r Fr.qucncy Drnle/idth (MHz) Bc.dwidth (%)
.6dB N/A N/A N/A N/A
.2OdE N/A N/A N/A
Drt Tim. Prc.de Cdibntior Blek Chnc..rintion G.in Ay"
N/A N/A N/A N/A
SctuD
Sk090 L:001 B.u Ihr.y
14.654 us S.d. Typ.
a0 (Low)
S.rr OII!.I
0.000 itr
Sr.rt(H.[P.th) R!rg.(U.rP.ltt) PRF Tvp.
RGcdfc.tlon
I
Eind-P$r trllt r
Nd. (0.54 - 22 MrL)
-0.007 ir l8
Grin 33.30da
Id.r OtBct
0.000 in
Sa.n 5.?39ir 0.295in
5.739 i
3.674i,n 13 Vid.o filt r Pr.trig, Otr 0.00 Fs Mod. Wn.TyF
PE (Pulse-Exho) Shear
S k w 90.e
Sound Vclocity Pubc Widtl
0.12Ei Fs 100.00$
C,ea.
I
B
]vidh
0.0l2 in
0.253 in
0.013 in
Thr6hold
20.000/o
20.000/6
30.00 v6
Synchro
TCGPohtNqDb.! Pctitiodfi.ltPialr) Giin
I 0.000 in 0.0 dB
Ulcd ElcncotQay. IInt El.D.ot L.rtEbnlIt RclolutioD
Shesr
Irr Colfguntior
Ml...irl V.loctly
0.128in./Fsl6
ShraAlglc 55.0p
I
Saop Arglc
64 1.0
A.gl.RBoluaio! FocdDcpih N/A 0.400 in fi le ://E IUser\Reoort\LGU5- l.htm 3t28/2014 hob.Modd Prot S.ri.lf, 5Lil-42 Fl49t
Probrr.$.!.y P61ft.{u.Fy W.4. Modd fvdglArtL ?nb.AFrturc 5.00MIL SA2-N55S dnlst + 36.0" 0.378in lrw.r F'tqucy Ed.r rl.qwriy C.[t.I lrqucrIy Brdwtdth (MI&) Erftvtdrh (%) .6 dB }vA -20d8 rVA I,I/A
Ifrt Th. MrI. Crlthdorno* Chrnc!.rlEdm Grlr AYr
IVA N/A IVA
Gr.uD 2
N. Chnlce(irrtioo
Crldddtr
U|.du.o.dQcy. IttrtDho.lt krtB.d.da xsolldod Wrv. Typ. Mrr.ritlvdo.lry
15 U 39 1.0 Us.( DdDCd 0.127in./lr!
St rt^ntb SroDAntL ArtL nehd.r Fo.dlhpfr f,rs Corngufrdor
40.0' ru.0p l.c o.7oo i,I s.rbbl
B.rl'.ry &rn(ErlfLt) Rrrgc(HrIPr|b) ?RI TypG Av.rrghg lrclor
20.Yt4l!I 0.{X7id 10.3&Z h 13 PA 1
ScxblyD. s.d.rrclor VU.o nlbr P!.iig. R.{tr!.rtioD Brr&Prlrmbr Cory!.dm 5l Ofr 0.00 F! FW 5Mtlr(3.1"7.5MHr)
Volhac fth ModG WwrTypc Sond Vcbcny "ut
Wtdth 10(L.w) 5l.00dB PE(PuL€-Frho) Us!i-D.6nd Ol27i'-4rs l0o.0on5
S.eolt l hdqolt t sl.tv
0000 in 0.m0 in 90.f
Crc I
B
Srrrt 3.451in Ol03 ir 3.461itr wi|l6
0.023 ir
0.643 in 0.031in
Itr..holil
55.00 % 25.00%
49.00 %
Stnctro
Puls.
Pt l* Prko
Pet
M&dd
S]EI4MILD
My Pldc f c.h6r
5.000 ir
&nstEr S.m l,.[ith S.|rR.dnd@ Iid.nst rt hd.! I4t8fr hd.t R..ohahr
0.000in lo.9Eri! 0.039in O000in 0000 i! l.432itl
Syrhto scrlsF.d Titr O.5l2irJ3
An h..d.r En d.r flpc Iocod.. B..offion Pobrit' scs off ofr Otr otr Indo( Otr Ofl Of Om fi le://E:\User\Report\Lcu5- l.htm 3t28t2014
56.4 %
DA"
1.362 in
I(m{)
0 000 in u(m-r)
1.042 in 56.4 %
DA^
1.162 'n 2.876 in 10.984 in
3'25-14 Linle Goose Dm Unit 5 Upper Beding tsracletHub Cracks 5 lldte/ Wedge Locatio. l/2/ 3rd Bolt discontinuiiy at I5 deep
Dar,/ k,r
Lls aof 3- =s -t4 file ://E :\User\Reoort\L GU5 - 1 .htm
P A . 2
140 9 ya
DA^
0 485 in
I(m-r)
0 000 in u(D{) 0 581 in 1 4 0 9 %
DA^
0 485 in 0.465 in l0 984 in l-25-14 Linle Gmse Dm Unil5 Upper Beding Bracker HubCracks 5" inch plale / W€dg€ Location 2/3 r Ist Boh discontiniuties at l/2 dd l-l/4 decp
D"r,) ?at us /of 3 -25-/4 fi le :/,/E :\User\Report\LGU5 -2.htm
F 4 - 3
23.1 t /o
I(mj)
0.000in u(m-r) 3 580 i i 2 3 t v "
DA"
3'25'14 Litde Goose Dm Unn 5 Upper BerinS Bracker HubCracks 5 plare/ W€dge location 2/3 / Bolt*3 Disconiinuity ai l'l/4" deep
Dor,/ 7^"r
US 'OE
3 -25-/4 fi le ://E :\User\Report\LGU5 -3.htm
P A . +
3 9 9 % 0.81? in
I(h-r)
0 000 rn u(m{)
4.109 in 3 9 9 v r
DA^
0 . 8 1 7 i n | 177 in 10.984 in
3-25-14 Linle Goose D@ Unit 5 Upper Beadns Brackcl HubCracks 5 inch platc / Wedge location 2/l / Dolt d4 Dscontinuity al l" deep i'\ | -)
Dau;d, l/af f
7*J t/s / oF
3 - 2 5 - / 4 fi le :/,/E lUser\Renort\LGU5 -4.htm
# - s
4 8 5 %
DA^
0 455 in
I(m-r)
0 000 in u(m-r)
0.842 in
A%
48.5 %
DA^
0 455 in 0.182 rn 10.984 in
3-25- l4 Linle Goose Dm Unn 5 Upper Bering Bracket Hub Ciacks 5 inch plate / wedge location ,l/5 / Boh + l Cracked down lo applox. l-l/,1 deep
D"n'/ P""r as /a{ 3-2s - /4 file:/,/E:\ U ser\Report\LG U 5-5.htm
P A - 6
A%
92I o/"
DA^
0 957 in r(m-r)
0.000 'n
U(nr)
0 . 5 6 l i n 9 2 8 %
DA^
0 957 in 10.984 in
3 2ll4 Little Coose Dm Unit 5 Upper tsetuing Br.clet Hub Craclc 5 inch plar€ / wedge localion 4/5 / Boh 42 Dnconlinuity al l deep
Dr,/ ?ot a5 /o{ 3- 3s -/4 fi le ://E :\User\Reoort\LGU5 -6.htm
P A . 7
DA" (n-4
0.000 rn u(m-r)
0.902 rn
DA^
0.817 in l .542 rn 10.984 'n
3-25-14 Little G6se Dm Unn 5 Upper BeMing Bracket Hub Cracks 5" inchplare/ w€dge loc.rion 4/5 i Bolr 14 Discontinu'tres al l/2" ad l" deep
U5 {or 3 - 2 5 - / 1
2 t fi le ://E :\User\Reoort\LGU5-7.htm
P A . Y
7 t 6 v r I(m-r)
0 000 rn u(m'r) I 16 l in 11.6 yo
DA^
0.877 in I 542 ir 10.984 in
3-25-14 Little GooseDm Unit 5 Upper Beding tsraclet rlub Crlcts 5" inch plare / Wedge Ledtion 6/7/ Boh rl
Dor,/ Ponr us lo f v -25- /4 fi le ://E :\User\Reoort\L GU5-8.htm
Prq 'q
DA^
0 322 in
I(m'r)
0.000 in u(d{) I 299 in
DA^
0 322 in 0 0 1 8 i n I0 .984 i !
3-25-14 Linle Goose DmUnil5 Uppcr Beeing Brackct HubCracks 3 inch plate / W€dg€ locatiotr 5/6 / Bolt #2 Discontinuity at l-3/4' deep
Dorr/ f>o r-r tls LoE 3-25 - /4 fi le :/,/E :\User\Report\LGU5-9.htm
PA -to
6 4 6 %
DA"
0.361 in
I(m-r)
0.000 in u(m-r)
3.626 in
DA^
0 361 i r 0 l 2 4 i h 10.984 i .
3-25-l,l Liiile Coose Dm Lhil5 Upper Beeing Brackei HubCracks 3 irchplate/ wedge location 5/6/ Bolt #l Disconlinuty at 3/8 deep
Dot;/ Pat us (0r 3 - 2 s - / 4 fi le://E:\User\Reoort\LGU5- 1 0.htm
PA - rr
6t.8 0/d
DA^
0 913 in
I(m-r)
0 000 in u(n-r)
4.624 in 6t.8 0/o
DA^
0 913 in 1.642 in 10.984 in
3-25-14 LittleGooseDm Unit 5 Upper Bering Bracket Hub Cracks 3 inch plate / Wedge Location 5/6 / Boli 42 discontinuities at ll/2" and ll/4" deep
DaY,al (aff
Us toF
3-25- /4 fi le:/,/E:\User\Reoort\LGU5-1 1.htm
P A - 1 2
2 t 9 y .
DA^ I(n-r)
5 730 in u(nr) 0.91? in 21.9 %
DA^
3-2r14 LinleC@so DM Unii 5 Upper Beeing Bracker Hub Cracks 3' plate / Wedge lsation 4/5 / Boh CI Cackedton root 2 io I deep
D^,r,cl ?, rr P*; E"- Us lotr 7 -P5 ^r/l fi le://EiUser\Reoort\LGU5- 1 2.htm
| LGS_U5 Rotor Frame Upgrade_Repair Recommendations |
| Weld report |
File details come from the government source that posted it. Updated .