A,07.24_Amendment_00001,_17R0006.pdf
PDF 291 KB Posted
- Solicitation number
- W912EF-17-R-0006
About this file
Amendment 00001
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV63270594
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the Bid Schedule, Measurement and Payment, update some specifications. No draw ing changes.
The proposal due date has been extended to 22 August 2017 at 2:00 PM PDT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-R-0006
X 9B. DATED (SEE ITEM 11)
30-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2017
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
KENT R. BERNARD 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 01-Aug-2017 02:00 PM to 22-Aug-2017 02:00 PM.
The following have been added by full text:
AMENDMENT 0001
Summary of Changes for amendment 0001
Bid Schedule:
Removed CLIN 0007 (LEAD BASED PAINT ABATEMENT AND REMOVAL) Removed CLIN 0015 (RUNNER AND THRUST COLLAR STONING) Renumbered CLINs due to removal of CLINs 0007 and 0015
Specifications:
01 22 00.00 26 MEASUREMENT AND PAYMENT
Deleted subpart 1.4.2 to remove CLIN 0014 Runner and Thrust Collar Stoning (Optional) Subsequent subparts were renumbered and the CLIN numbers revised starting at the new subpart 1.4.2 for what is now CLIN 0014 - Refurbish One Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)
Updated subpart 1.4.5.1 (CLIN 0017AA) to be on a “per job” basis vice “per hour
02 83 33.12 28 LEAD BASED PAINT (LBP) REMOVAL AND DISPOSAL
Attachment “Unit 5 Asbestos1710242d” provided
48 13 13.06 26 GENERATOR THRUST BEARING INSPECTION AND OPTIONAL REFURBISHMENT
Attachment “Little Goose U5 Rotor Frame Upgrade Repair Recommendations provided
48 13 16.03 26 ELECTRICAL POWER GENERATION
Updated “eight” to “nine” in subpart 2.1.2
Drawings:
No changes
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers Little Goose Unit 5 Rotor Repair Starbuck, WA
UNRESTRICTED COMPETITION
The estimated magnitude of construction will be between $1,000,000 and $5,000,000
CLIN DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
BASE BID ITEMS
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $______________ $______________
PRE-DISASSEMBLY OPERATIONAL TESTING,
ALIGNMENT CHECKS, AND UNIT
DISASSEMBLY
1 JOB $______________ $______________
UNIT REASSEMBLY, ALIGNMENT, AND
POST-ASSEMBLY OPERATIONAL TESTING
1 JOB $______________ $______________
0004 THRUST BEARING INSPECTION – PHASE 1 1 JOB $______________ $______________
REFURBISH ONE TURBINE GUIDE BEARING
INCLUDING BABBITTING AND MACHINING
1 JOB $______________ $______________
GENERATOR GUIDE BEARING SITE
INSPECTION (INCLUDING SPARES)
4 EA $______________ $______________
WELD REPAIR, CONTOURING, AND
STRENGTHENING – ROTOR SPIDER AND
UPPER BEARING BRACKET
1 JOB $______________ $______________
NDE VERIFICATION AND REPORT – ROTOR
SPIDER AND UPPER BEARING BRACKET
1 JOB $______________ $______________
FEA ANALYSIS AND VERIFICATION OF
ROTOR MODIFICATIONS
1 JOB $______________ $______________
GENERATOR INSPECTION, TESTING, AND
CLEANING
1 JOB $______________ $______________
INSTALL AND TEST MACHINE CONDITION
MONITORING SYSTEM
1 JOB $______________ $______________
SUPPLY AND INSTALL THRUST BEARING
COOLERS, THRUST BEARING RTDS, HIGH
PRESSURE LIFT HOSES, AND HIGH
PRESSURE LIFT CHECK VALVES.
1 JOB $______________ $______________
SUBTOTAL BASE $______________
OPTIONAL BID ITEMS
0013 THRUST BEARING INSPECTION – PHASE 2 1 JOB $______________ $______________
REFURBISH ONE SET OF THRUST BEARING
SHOES INCLUDING BABBITTING AND
MACHINING
1 JOB $______________ $______________
REFURBISH ONE SET OF UPPER GENERATOR
GUIDE BEARING SHOES INCLUDING
BABBITTING AND MACHINING
1 JOB $______________ $______________
REFURBISH ONE SET OF LOWER
GENERATOR GUIDE BEARING SHOES
INCLUDING BABBITTING AND MACHINING
1 JOB $______________ $______________
REFURBISH GENERATOR THRUST BEARING
RUNNER AND COLLAR
0017AA
STONING OF THRUST BEARING RUNNER
RUNNING SURFACE
1 JOB $______________ $______________
0017AB
MACHINING OF THRUST BEARING RUNNER
RUNNING SURFACE
1 JOB $______________ $______________
0017AC
MACHINING OF THRUST BEARING RUNNER
BACKSIDE AND RUNNING SURFACE
1 JOB $______________ $______________
0017AD
REFURBISHMENT OF THRUST RUNNER
SPLIT LINE
1 JOB $______________ $______________
0017AE
REFURBISHMENT OF THRUST BEARING
RUNNER AND COLLAR
1 JOB $______________ $______________
0018 ADDITIONAL WELDING *
*Est.
Cu.
In.
0019 ADDITIONAL NDE *
Est.
Cu.
In.
INSPECTION AND INSTALLATION OF
SPARE SHAFT SLEEVE
1 JOB $______________ $______________
SUBTOTAL OPTIONS $______________
TOTAL BASE + OPTIONS $______________
* OPTIONAL CLINS 0018 and 0019 are NTE (Not-to-exceed) bid items. See Section 01 22 00.00 26 for detail.
*Est = Estimated
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00700.
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)
(a) Definitions. As used in this clause (in accordance with 29 CFR 13.2)--
Child, domestic partner, and domestic violence have the meaning given in 29 CFR 13.2.
Employee--(1)(i) Means any person engaged in performing work on or in connection with a contract covered by Executive Order (E.O.) 13706; and
(A) Whose wages under such contract are governed by the Service Contract Labor Standards statute (41 U.S.C.
chapter 67), the Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV), or the Fair Labor Standards Act (29 U.S.C. chapter 8);
(B) Including employees who qualify for an exemption from the Fair Labor Standards Act's minimum wage and overtime provisions;
(C) Regardless of the contractual relationship alleged to exist between the individual and the employer; and
(ii) Includes any person performing work on or in connection with the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor's Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.
(2)(i) An employee performs ``on'' a contract if the employee directly performs the specific services called for by the contract; and
(ii) An employee performs ``in connection with'' a contract if the employee's work activities are necessary to the performance of a contract but are not the specific services called for by the contract.
Individual related by blood or affinity whose close association with the employee is the equivalent of a family relationship has the meaning given in 29 CFR 13.2.
Multiemployer plan means a plan to which more than one employer is required to contribute and which is maintained pursuant to one or more collective bargaining agreements between one or more employee organizations and more than one employer.
Paid sick leave means compensated absence from employment that is required by E.O. 13706 and 29 CFR part 13.
Parent, sexual assault, spouse, and stalking have the meaning given in 29 CFR 13.2.
United States means the 50 States and the District of Columbia.
(b) Executive Order 13706. (1) This contract is subject to E.O. 13706 and the regulations issued by the Secretary of Labor in 29 CFR part 13 pursuant to the E.O.
(2) If this contract is not performed wholly within the United States, this clause only applies with respect to that part of the contract that is performed within the United States.
(c) Paid sick leave. The Contractor shall--
(1) Permit each employee engaged in performing work on or in connection with this contract to earn not less than 1 hour of paid sick leave for every 30 hours worked;
(2) Allow accrual and use of paid sick leave as required by E.O. 13706 and 29 CFR part 13;
(3) Comply with the accrual, use, and other requirements set forth in 29 CFR 13.5 and 13.6, which are incorporated by reference in this contract;
(4) Provide paid sick leave to all employees when due free and clear and without subsequent deduction (except as otherwise provided by 29 CFR 13.24), rebate, or kickback on any account;
(5) Provide pay and benefits for paid sick leave used no later than one pay period following the end of the regular pay period in which the paid sick leave was taken; and
(6) Be responsible for the compliance by any subcontractor with the requirements of E.O. 13706, 29 CFR part 13, and this clause.
(d) Contractors may fulfill their obligations under E.O. 13706 and 29 CFR part 13 jointly with other contractors through a multiemployer plan, or may fulfill their obligations through an individual fund, plan, or program (see 29
CFR 13.8).
(e) Withholding. The Contracting Officer will, upon his or her own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the Contractor under this or any other Federal contract with the same Contractor, so much of the accrued payments or advances as may be considered necessary to pay employees the full amount owed to compensate for any violation of the requirements of E.O. 13706, 29 CFR part 13, or this clause, including--
(1) Any pay and/or benefits denied or lost by reason of the violation;
(2) Other actual monetary losses sustained as a direct result of the violation; and
(3) Liquidated damages.
(f) Payment suspension/contract termination/contractor debarment. (1) In the event of a failure to comply with E.O.
13706, 29 CFR part 13, or this clause, the contracting agency may, on its own action or after authorization or by direction of the Department of Labor and written notification to the Contractor take action to cause suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
(2) Any failure to comply with the requirements of this clause may be grounds for termination for default or cause.
(3) A breach of the contract clause may be grounds for debarment as a contractor and subcontractor as provided in
29 CFR 13.52.
(g) The paid sick leave required by E.O. 13706, 29 CFR part 13, and this clause is in addition to the Contractor's obligations under the Service Contract Labor Standards statute and Wage Rate Requirements (Construction) statute, and the Contractor may not receive credit toward its prevailing wage or fringe benefit obligations under those Acts for any paid sick leave provided in satisfaction of the requirements of E.O. 13706 and 29 CFR part 13.
(h) Nothing in E.O. 13706 or 29 CFR part 13 shall excuse noncompliance with or supersede any applicable Federal or State law, any applicable law or municipal ordinance, or a collective bargaining agreement requiring greater paid sick leave or leave rights than those established under E.O. 13706 and 29 CFR part 13.
(i) Recordkeeping. (1) The Contractor shall make and maintain, for no less than three (3) years from the completion of the work on the contract, records containing the following information for each employee, which the Contractor shall make available upon request for inspection, copying, and transcription by authorized representatives of the Administrator of the Wage and Hour Division of the Department of Labor:
(i) Name, address, and social security number of each employee.
(ii) The employee's occupation(s) or classification(s).
(iii) The rate or rates of wages paid (including all pay and benefits provided).
(iv) The number of daily and weekly hours worked.
(v) Any deductions made.
(vi) The total wages paid (including all pay and benefits provided) each pay period.
(vii) A copy of notifications to employees of the amount of paid sick leave the employee has accrued, as required under 29 CFR 13.5(a)(2).
(viii) A copy of employees' requests to use paid sick leave, if in writing, or, if not in writing, any other records reflecting such employee requests.
(ix) Dates and amounts of paid sick leave taken by employees (unless the Contractor's paid time off policy satisfies the requirements of E.O. 13706 and 29 CFR part 13 as described in 29 CFR 13.5(f)(5), leave shall be designated in records as paid sick leave pursuant to E.O. 13706).
(x) A copy of any written responses to employees' requests to use paid sick leave, including explanations for any denials of such requests, as required under 29 CFR 13.5(d)(3).
(xi) Any records reflecting the certification and documentation the Contractor may require an employee to provide under 29 CFR 13.5(e), including copies of any certification or documentation provided by an employee.
(xii) Any other records showing any tracking of or calculations related to an employee's accrual or use of paid sick leave.
(xiii) The relevant contract.
(xiv) The regular pay and benefits provided to an employee for each use of paid sick leave.
(xv) Any financial payment made for unused paid sick leave upon a separation from employment intended, pursuant to 29 CFR 13.5(b)(5), to relieve the Contractor from the obligation to reinstate such paid sick leave as otherwise required by 29 CFR 13.5(b)(4).
(2)(i) If the Contractor wishes to distinguish between an employee's covered and noncovered work, the Contractor shall keep records or other proof reflecting such distinctions. Only if the Contractor adequately segregates the employee's time will time spent on noncovered work be excluded from hours worked counted toward the accrual of paid sick leave. Similarly, only if the Contractor adequately segregates the employee's time may the Contractor properly refuse an employee's request to use paid sick leave on the ground that the employee was scheduled to perform noncovered work during the time he or she asked to use paid sick leave.
(ii) If the Contractor estimates covered hours worked by an employee who performs work in connection with contracts covered by the E.O. pursuant to 29 CFR 13.5(a)(1)(i) or (iii), the Contractor shall keep records or other proof of the verifiable information on which such estimates are reasonably based. Only if the Contractor relies on an estimate that is reasonable and based on verifiable information will an employee's time spent in connection with noncovered work be excluded from hours worked counted toward the accrual of paid sick leave. If the Contractor estimates the amount of time an employee spends performing in connection with contracts covered by the E.O., the Contractor shall permit the employee to use his or her paid sick leave during any work time for the Contractor.
(3) In the event the Contractor is not obligated by the Service Contract Labor Standards statute, the Wage Rate Requirements (Construction) statute, or the Fair Labor Standards Act to keep records of an employee's hours worked, such as because the employee is exempt from the Fair Labor Standards Act's minimum wage and overtime requirements, and the Contractor chooses to use the assumption permitted by 29 CFR 13.5(a)(1)(iii), the Contractor is excused from the requirement in paragraph (i)(1)(iv) of this clause and 29 CFR 13.25(a)(4) to keep records of the employee's number of daily and weekly hours worked.
(4)(i) Records relating to medical histories or domestic violence, sexual assault, or stalking, created for purposes of E.O. 13706, whether of an employee or an employee's child, parent, spouse, domestic partner, or other individual related by blood or affinity whose close association with the employee is the equivalent of a family relationship, shall be maintained as confidential records in separate files/records from the usual personnel files.
(ii) If the confidentiality requirements of the Genetic Information Nondiscrimination Act of 2008 (GINA), section 503 of the Rehabilitation Act of 1973, and/or the Americans with Disabilities Act (ADA) apply to records or documents created to comply with the recordkeeping requirements in this contract clause, the records and documents shall also be maintained in compliance with the confidentiality requirements of the GINA, section 503 of the Rehabilitation Act of 1973, and/or ADA as described in 29 CFR 1635.9, 41 CFR 60-741.23(d), and 29 CFR 1630.14(c)(1), respectively.
(iii) The Contractor shall not disclose any documentation used to verify the need to use 3 or more consecutive days of paid sick leave for the purposes listed in 29 CFR 13.5(c)(1)(iv) (as described in 29 CFR 13.5(e)(1)(ii)) and shall maintain confidentiality about any domestic abuse, sexual assault, or stalking, unless the employee consents or when disclosure is required by law.
(5) The Contractor shall permit authorized representatives of the Wage and Hour Division to conduct interviews with employees at the worksite during normal working hours.
(6) Nothing in this contract clause limits or otherwise modifies the Contractor's recordkeeping obligations, if any, under the Service Contract Labor Standards statute, the Wage Rate Requirements (Construction) statute, the Fair Labor Standards Act, the Family and Medical Leave Act, E.O. 13658, their respective implementing regulations, or any other applicable law.
(j) Interference/discrimination.
(1) The Contractor shall not in any manner interfere with an employee's accrual or use of paid sick leave as required by E.O. 13706 or 29 CFR part 13. Interference includes, but is not limited to--
(i) Miscalculating the amount of paid sick leave an employee has accrued;
(ii) Denying or unreasonably delaying a response to a proper request to use paid sick leave;
(iii) Discouraging an employee from using paid sick leave;
(iv) Reducing an employee's accrued paid sick leave by more than the amount of such leave used;
(v) Transferring an employee to work on contracts not covered by the E.O. to prevent the accrual or use of paid sick leave;
(vi) Disclosing confidential information contained in certification or other documentation provided to verify the need to use paid sick leave; or
(vii) Making the use of paid sick leave contingent on the employee's finding a replacement worker or the fulfillment of the Contractor's operational needs.
(2) The Contractor shall not discharge or in any other manner discriminate against any employee for--
(i) Using, or attempting to use, paid sick leave as provided for under E.O. 13706 and 29 CFR part 13;
(ii) Filing any complaint, initiating any proceeding, or otherwise asserting any right or claim under E.O. 13706 and 29 CFR part 13;
(iii) Cooperating in any investigation or testifying in any proceeding under E.O. 13706 and 29 CFR part 13; or
(iv) Informing any other person about his or her rights under E.O. 13706 and 29 CFR part 13.
(k) Notice. The Contractor shall notify all employees performing work on or in connection with a contract covered by the E.O. of the paid sick leave requirements of E.O. 13706, 29 CFR part 13, and this clause by posting a notice provided by the Department of Labor in a prominent and accessible place at the worksite so it may be readily seen by employees. Contractors that customarily post notices to employees electronically may post the notice electronically, provided such electronic posting is displayed prominently on any Web site that is maintained by the Contractor, whether external or internal, and customarily used for notices to employees about terms and conditions of employment.
(l) Disputes concerning labor standards. Disputes related to the application of E.O. 13706 to this contract shall not be subject to the general disputes clause of the contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR part 13. Disputes within the meaning of this contract clause include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the Department of Labor, or the employees or their representatives.
(m) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (m), in all subcontracts, regardless of dollar value, that are subject to the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, and are to be performed in whole or in part in the United States.
(End of clause)
The following have been modified:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the time period stated below. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
CLIN DESCRIPTION TIMEFRAME WHEN OPTIONAL
ITEM MAY BE EXERCISED
IF EXERCISED, TIME
EXTENSION TO
COMPLETE WORK
FOR ITEM
0013 THRUST BEARING INSPECTION –
PHASE 2
Within 30 15 days of Government acceptance of Phase I Inspection Report
No additional time will be provided.
0014 RUNNER AND THRUST COLLAR
STONING
Within 30 15 days of
0015 REFURBISH ONE SET OF THRUST
BEARING SHOES INCLUDING
BABBITTING AND MACHINING
Within 30 15 days of
0016 REFURBISH ONE SET OF UPPER
GENERATOR GUIDE BEARING
SHOES INCLUDING BABBITTING
AND MACHINING
Within 30 15 days of Government acceptance of As‐ Found Recommendation Report
0017 REFURBISH ONE SET OF LOWER
GENERATOR GUIDE BEARING
SHOES INCLUDING BABBITTING
AND MACHINING
Within 30 15 days of Government acceptance of As‐ Found Recommendation Report
0018 REFURBISH GENERATOR THRUST
BEARING RUNNER AND COLLAR
Within 30 15 days of
Phase II Inspection Report
0018A STONING OF THRUST BEARING
RUNNER RUNNING SURFACE
Within 30 15 days of
0018B MACHINING OF THRUST BEARING
RUNNER RUNNING SURFACE
Within 30 15 days of
0018C MACHINING OF THRUST BEARING
RUNNER BACKSIDE AND RUNNING
SURFACE
Within 30 15 days of
0018D REFURBISHMENT OF THRUST
RUNNER SPLIT LINE
Within 30 15 days of
0018E REFURBISHMENT OF THRUST
BEARING RUNNER AND COLLAR
Within 30 150 days of
0019 ADDITIONAL WELDING Available until completion of contract
1 day of additional time will be provided per 25 cubic inches of additional welding.
No additional time will be provided.
0020 ADDITIONAL NDE Available until completion of contract
1 day of additional time will be provided per 25 cubic inches of additional NDE.
No additional time will be provided.
0021 INSPECTION AND INSTALLATION OF
SPARE SHAFT SLEEVE
Within 30 15 days of Government acceptance of Post Disassembly Inspection Report
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
LISTING OF GFP
LISTING OF GOVERNMENT-FURNISHED PROPERTY
(a) The following items will be made available to the Contractor at Little Goose. The Contractor will verify the condition of the property and acknowledge receipt in writing to the Contracting Officer. The Contractor shall provide the Government a minimum 48-hour notice prior to the date that receipt of Government Furnished Property is required.
The following will be made available to the Contractor to use during the performance of this job. The Contractor is responsible to ensure this property is returned to the Government in the same condition as prior to use.
Item No.
Description Quantity Total Acquisition
Cost 1 Powerhouse Bridge Crane 1 each $ 4,000,000
2 Shaft and runner support Set $ 40,000 3 Shaft Lifting Device 1 each $ 50,000 4 Thrust Bracket Lifting Beam 1 each $ 35,000 5 Thrust Collar Lifting Lugs 2 each $ 20,000
7 Maintenance Scaffolding 1 each $ 150,000 8 Upper Generator Guide Shoes 1 set $ 75,350 9 Lower Generator Guide Shoes 1 set $ 75,350 10 Thrust Bearing Shoes 1 set $ 84,000 11 Turbine Guide Bearings 1 set $ 92,500
The following will be provided to the Contractor for incorporation (installation) into the work.
Item No.
Description Quantity Unit Acquisition
Cost
Total Acquisition
Cost 1 Upper Generator Guide Shoes - Set 1 each $75,350 $75,350 2 Lower Generator Guide Shoes - Set 1 each $75,350 $75,350 3 Thrust Bearing Shoes - Set 1 each $84,000 $84,000 4 Turbine Guide Bearing 1 each $92,500 $92,500
(b) The above estimated acquisition cost is applicable to accounting for Government-furnished property.
This cost shall not be included by the Contractor in the proposal price. (52.245-1, Government Property)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .