Site_Visit_Information.pdf

PDF 47 KB Posted

Attached to
McNary Levee Drainage Pump Stations Roof and Roof Hatches
Solicitation number
W912EF-16-B-0004
Issued by

About this file

Site visit Information

View the file

Other files

File Type Posted
Bid_Opening_Abstract.pdf PDF
16-B-0004_0003.pdf PDF
Amend-0002_Section_02_82_14.00_28.pdf PDF
16-B-0004_0002.pdf PDF
Amend-0001_SUBMITTAL_REGISTER.pdf PDF
16-B-0004_0001.pdf PDF
Amend-0001_Section_01_22_00.00_28.pdf PDF
Amend-0001_Plans.pdf PDF
Amend-0001_Section_07_72_00.10_28.pdf PDF
Site_Visit_Attendance_8-9-2016.pdf PDF
Solicitation_16-B-0004.pdf PDF
Specs.pdf PDF
Plans.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- August 9 2016 at 08:00 AM

(c) Participants will meet at-- Tri‐Rivers Natural Resources Office

1215 E. Ainsworth St.

Pasco, WA 99301

There will be only one site visit offered. The site visit will be a full day in order to view all 11 sites.

Offerors planning to attend must register for the site visit by sending an email to: Cristina.a.vega@usace.army.mil and Jani.C. Long@usace.army.mil.

Firms must register no later than 2:00PM the day before the site visit.

Site visit attendees must provide the following information:

1) Solicitation Number;

2) Project Title;

3) Name(s) of individual(s) attending site visit;

4) Are all individuals U.S. Citizens?

If not, please refer to ACCESS FOR FOREIGN NATIONALS in Section 0800;

5) Name of Company;

6) Phone Number of Company.

Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.

Participants of scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, “Personal Protective and Safety Equipment.” It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation.

Failure to comply could result in denial of access to site visit location.

The latest version of EM 385-1-1 is available online at:

http://www.usace.army.mil/SafetyandOccupationalHealth.aspx.

(End of provision)

File details come from the government source that posted it. Updated .