AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the plans and specifications for this project.
The due date for bids remains the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-B-0004
X 9B. DATED (SEE ITEM 11)
26-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2016
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CRISTINA VEGA
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-16-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
Summary of changes for Amend - 0001
McNary Levee Pumping Stations Hatches and Roofing
SPECIFICATIONS
1. Revised section 01 22 00.00 28 “Measurement and Payment”
a. Removed the words “pumping station” from all CLIN descriptions
2. Revised Submittal Register attachment
3. Revised section 07 72 00.10 28 “ROOF HATCH MODIFICATIONS”
a. Revised paragraph 1.2 “SUBMITTALS”
- Added submittal – “Embedded Material Survey” – See red line for location of added submittal
b. Revised paragraph 2.7.1 “Description”
- See red line for location of revised wording
c. Revised paragraph 2.8.1 “General”
d. Revised paragraph 3.2 “CONCRETE REMOVAL”
DRAWINGS
1. Revised drawing A-101 – See brackets for locations of drawing revisions
2. Revised drawing A-502 – See brackets for locations of drawing revisions
3. Revised drawing A-503 – See brackets for locations of drawing revisions
CLAUSES
1. Revised Clause 252.236-7001 “CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS” – See highlights for location of revisions
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED
GOODS—BUY AMERICAN STATUTE—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Construction material,” “domestic construction material,” “foreign construction material,” “manufactured construction material,” “steel,” and “unmanufactured construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Required Use of Iron, Steel, and Manufactured Goods—Buy American statute—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L.
111-5) (Recovery Act) or the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American statute by adding to the offered price of the contract—
(i) 25 percent of the offered price of the contract, if foreign manufactured construction material is incorporated in the offer based on an exception for unreasonable cost of comparable manufactured domestic construction material; and
(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on an exception for the unreasonable cost of comparable domestic unmanufactured construction material.
(2) If the solicitation specifies award on the basis of factors in addition to cost or price, the Contracting Officer will apply the evaluation factors as specified in paragraph (c)(1) of this provision and use the evaluated price in determining the offer that represents the best value to the Government.
(3) Unless paragraph (c)(2) of this provision applies, if two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost of comparable domestic construction material.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(3) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
The following have been deleted:
52.225-10 Notice of Buy American Requirement--Construction
Materials
MAY 2014
SECTION 00700 - CONTRACT CLAUSES
52.225-21 REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS—BUY
AMERICAN STATUTE—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause—
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Component means an article, material, or supply incorporated directly into a construction material.
Domestic construction material means the following—
(1) An unmanufactured construction material mined or produced in the United States. (The Buy American statute applies.)
(2) A manufactured construction material that is manufactured in the United States and, if the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States. (Section 1605 of the Recovery Act applies.)
Foreign construction material means a construction material other than a domestic construction material.
Manufactured construction material means any construction material that is not unmanufactured construction material.
Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
Unmanufactured construction material means raw material brought to the construction site for incorporation into the building or work that has not been—
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference.
(1) This clause implements—
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all manufactured construction material in the project is manufactured in the United States and, if the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives);
and
(ii) 41 U.S.C. chapter 83, Buy American by providing a preference for unmanufactured construction material mined or produced in the United States over unmanufactured construction material mined or produced in a foreign country.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by the Government as follows:
N/A
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable;
(A) The cost of domestic manufactured construction material, when compared to the cost of comparable foreign manufactured construction material, is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;
(B) The cost of domestic unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of comparable foreign unmanufactured construction material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality;
(iii) The application of the restriction of section 1605 of the Recovery Act to a particular manufactured construction material would be inconsistent with the public interest or the application of the Buy American statute to a particular unmanufactured construction material would be impracticable or inconsistent with the public interest.
(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American statute applies, use of foreign construction material is noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Cost Comparison
Construction Material Unit of Quantity Cost (Dollars)* Description Measure
Item 1:
Foreign construction material _______ _______ _______ Domestic construction material_______ _______ _______
Item 2:
Foreign construction material _______ _______ _______ Domestic construction material_______ _______ _______ (List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.])
(End of clause)
The following have been deleted:
52.225-9 Buy American--Construction Materials MAY 2014
(End of Summary of Changes)
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
LEVEE PUMPING STATIONS HATCHES AND
ROOFING
Revision Number
Date
GENERAL
MDG‐1‐0‐0/566 G‐001 LOCATION MAP, VICINITY MAP, ‐ AND SITE PLAN
MDG‐1‐0‐0/567 G‐002 INDEX TO DRAWINGS
MDG‐1‐0‐0/568 G‐003 ABBREVIATIONS
MDG‐1‐0‐28/4 G‐101 SITE MAPS ‐ CLUSTER GROUP I
MDG‐1‐0‐28/5 G‐102 SITE MAPS ‐ CLUSTER GROUP II
MDG‐1‐0‐28/6 G‐103 SITE MAPS ‐ CLUSTER GROUP III
STRUCTURAL
MDL‐1‐5‐55/1 S‐101 ROOF PLANS ‐ AT PUMPING STATIONS 12‐1 & 15C
MDL‐1‐5‐55/2 S‐301 SECTIONS ‐ AT PUMPING STATIONS 12‐1 & 15C
MDL‐1‐5‐55/3 S‐501 DETAILS ‐ AT PUMPING STATIONS 12‐1 & 15C
ARCHITECTURAL
MDL‐1‐2‐51/1 A‐101
PLANS, SECTIONS, AND ELEVATIONS ‐ AT
PUMPING STATION 2C
A
8/11/16
MDL‐1‐2‐52/1 A‐102
PUMPING STATION 4A
MDL‐1‐2‐53/1 A‐103
PUMPING STATION 5‐D
MDL‐1‐2‐63/1 A‐104
PUMPING STATION 6‐B
MDL‐1‐2‐55/1 A‐105
PUMPING STATION 12‐1
MDL‐1‐2‐62/1 A‐106
PUMPING STATION 12‐1A
MDL‐1‐2‐56/1 A‐107
PUMPING STATION 12‐2
MDL‐1‐2‐57/1 A‐108
PUMPING STATION 15‐C
MDL‐1‐2‐58/1 A‐109
PUMPING STATION 15‐D
MDL‐1‐2‐59/1 A‐110
PUMPING STATION 15‐E
MDL‐1‐2‐61/1 A‐111
PUMPING STATION 15E‐1
MDL‐1‐2‐51/2 A‐501 ROOFING DETAILS ‐ AT PUMPING STATION 2C
MDL‐1‐2‐51/3 A‐502 ROOFING DETAILS ‐ AT PUMPING STATION 2C A 8/11/16
MDL‐1‐2‐51/4 A‐503 ROOFING DETAILS ‐ AT PUMPING STATION 2C A 8/11/16
MDL‐1‐2‐52/2 A‐504
ROOFING DETAILS ‐ AT PUMPING STATIONS 4A ‐
15E1
MDL‐1‐2‐52/3 A‐505
ROOFING DETAILS ‐ AT PUMPING STATIONS 4A ‐
15E1
MDL‐1‐2‐51/5 A‐901
EXISTING CONDITION PHOTOS ‐ AT PUMPING
STATIONS 2C, 4A, 5‐D
MDL‐1‐2‐63/2 A‐902
STATIONS 6‐B, 12‐1, 12‐1A
MDL‐1‐2‐56/2 A‐903
STATIONS 12‐2, 15‐C, 15‐D
MDL‐1‐2‐59/2 A‐904
STATIONS 15‐E & 15E‐1
ELECTRICAL
MDL‐1‐6‐52/1 E‐102 LIGHTING PLAN ‐ AT PUMPING STATION 4A
MDL‐1‐6‐53/1 E‐103 LIGHTING PLAN ‐ AT PUMPING STATION 5D
MDL‐1‐6‐55/1 E‐105 LIGHTING PLAN ‐ AT PUMPING STATION 12‐1
MDL‐1‐6‐57/1 E‐108 LIGHTING PLAN ‐ AT PUMPING STATION 15C
MDL‐1‐6‐59/1 E‐110 LIGHTING PLAN ‐ AT PUMPING STATION 15E
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
MDL‐1‐7‐52/17B FIO‐001 PUMPING PLANT‐LEVEE 2C ‐ SECTIONS
MDL‐1‐7‐52/18A FIO‐002
PUMPING PLANT‐LEVEE 2C ‐ ARCHITECTURAL
ELEVATIONS
MDL‐1‐7‐52/19A FIO‐003 PUMPING PLANT‐LEVEE 2C ‐ ROOF DETAILS
MDL‐1‐7‐52/20A FIO‐004
PUMPING PLANT‐LEVEE 2C ‐ OPERATING FLOOR
PLAN & SECTIONS
MDL‐1‐7‐52/25A FIO‐005
PUMPING PLANT‐LEVEE 2C ‐ DOOR AND
WINDOW DETAILS
MDL‐1‐7‐52/26A FIO‐006
PUMPING PLANT‐LEVEE 2C ‐ MISCELLANEOUS
DETAILS
MDL‐1‐0‐4/5D FIO‐007
PUMPING PLANT‐LEVEE 4A ‐ PLAN, ELEVATIONS
AND DETAILS
MDL‐1‐0‐4/6C FIO‐008
PUMPING PLANT‐LEVEE 4A ‐ SECTIONS AND
MDL‐1‐7‐54/2 FIO‐009 PUMPING PLANT‐LEVEE 5D ‐ PLAN AND SECTIONS
MDL‐1‐7‐54/3 FIO‐010
PUMPING PLANT‐LEVEE 5D ‐ ELEVATIONS &
SECTIONS
MDL‐1‐7‐54/9D FIO‐011
PUMPING PLANT‐LEVEE 6B ‐ PLAN, ELEVATIONS
& SECTIONS
MDL‐1‐7‐53/9 FIO‐012 PUMPING PLANT‐LEVEE 12‐1 ‐ PLAN, ELEVATIONS
MDL‐1‐7‐62/4 FIO‐013
PUMPING PLANT‐LEVEE 12‐1A ‐ SECTIONS AND
MDL‐1‐7‐62/3 FIO‐014
PUMPING PLANT‐LEVEE 12‐1A ‐ PLANS &
ELEVATIONS
MDL‐1‐7‐53/5D FIO‐015
PUMPING PLANT‐LEVEE 12‐2 ‐ PLAN, ELEVATIONS
MDL‐1‐7‐54/18G FIO‐016
PUMPING PLANT‐LEVEE 15‐C ‐ PLANS,
ELEVATIONS & SECTIONS
MDL‐1‐7‐54/16E FIO‐017
PUMPING PLANT‐LEVEE 15‐D ‐ PLAN,
ELEVATIONS & SECTIONS
MDL‐1‐7‐54/13B FIO‐018
PUMPING PLANT‐LEVEE 15‐E ‐ ELEVATIONS AND
MDL‐1‐7‐54/12D FIO‐019
PUMPING PLANT‐LEVEE 15‐E ‐ PLAN AND
SECTIONS
MDL‐1‐7‐61/3 FIO‐020
PUMPING PLANT‐LEVEE 15E‐1 ‐ PLAN AND
MDL‐1‐7‐61/4 FIO‐021 PUMPING PLANT‐LEVEE 15E‐1 ‐ ELEVATIONS
MDL‐1‐7‐61/6 FIO‐022
PUMPING PLANT‐LEVEE 15E‐1 ‐ REINFORCEMENT
DETAILS II
MDL‐1‐7‐54/21D FIO‐023 PUMPING PLANTS ‐ TYPICAL DETAILS
(End of clause)