Amend-0002_Section_02_82_14.00_28.pdf
PDF 610 KB Posted
- Solicitation number
- W912EF-16-B-0004
About this file
Amendment 0002 - Revised Technical Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract.pdf | ||
| 16-B-0004_0003.pdf | ||
| 16-B-0004_0002.pdf | ||
| Amend-0001_SUBMITTAL_REGISTER.pdf | ||
| 16-B-0004_0001.pdf | ||
| Amend-0001_Section_01_22_00.00_28.pdf | ||
| Amend-0001_Plans.pdf | ||
| Amend-0001_Section_07_72_00.10_28.pdf | ||
| Site_Visit_Attendance_8-9-2016.pdf | ||
| Site_Visit_Information.pdf | ||
| Solicitation_16-B-0004.pdf | ||
| Specs.pdf | ||
| Plans.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McNary Levee Pumping Stations Hatches and Roofing W912EF-16-B-0004 Amend-0002
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 82 14.00 28
ASBESTOS CONTAINING MATERIAL (ACM) REMOVAL AND DISPOSAL
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DEFINITIONS
1.4.1 Amended Water
1.4.2 Asbestos-Containing Material (ACM)
1.4.3 Authorized Person
1.4.4 Building Inspector
1.4.5 Class II Asbestos Work
1.4.6 Competent Person
1.4.7 Contractor/Supervisor
1.4.8 Critical Barrier
1.4.9 Demolition
1.4.10 Disposal Bag
1.4.11 Disturbance
1.4.12 Fiber
1.4.13 Friable ACM
1.4.14 High-Efficiency Particulate Air (HEPA) Filter
1.4.15 Intact
1.4.16 Model Accreditation Plan (MAP)
1.4.17 Negative Initial Exposure Assessment
1.4.18 National Emission Standards for Hazardous Air Pollutants
1.4.19 Nonfriable ACM
1.4.20 Nonfriable ACM (Category I)
1.4.21 Nonfriable ACM (Category II)
1.4.22 Permissible Exposure Limits (PELs)
1.4.22.1 PEL-Time Weighted Average(TWA)
1.4.22.2 PEL-Excursion Limit
1.4.23 Regulated Area
1.4.24 Removal
1.4.25 Worker
1.5 QUALITY ASSURANCE
1.5.1 Written Qualifications and Organization Report
1.5.2 Specific Requirements
1.6 LICENSES, PERMITS, AND NOTIFICATIONS
1.7 ASBESTOS HAZARD ABATEMENT PLAN
1.8 WORK AREA REGULATION AND CONTROL
1.8.1 Regulated Areas
1.8.2 Warning Signs and Tape
1.8.3 Warning Labels
1.8.4 Daily Narrative Log
PART 2 PRODUCTS
SECTION 02 82 14.00 28 - Page 1
2.1 DELIVERY AND STORAGE
2.2 ENCAPSULANTS
2.3 EXPENDABLE SUPPLIES
2.3.1 Duct Tape
2.3.2 Disposal Containers
2.3.3 Sheet Plastic
2.3.4 Mastic Removing Solvent
2.3.5 Leak-tight Wrapping
2.3.6 Wetting Agents
2.3.7 Strippable Coating
2.4 EQUIPMENT
2.4.1 Tools
2.4.2 Rental Equipment
2.4.3 Air Monitoring Equipment
PART 3 EXECUTION
3.1 EXPOSURE ASSESSMENT AND AIR MONITORING
3.1.1 General Requirements
3.1.2 Initial Exposure Assessment
3.1.3 Negative Exposure Assessment
3.1.4 3.8.4 Environmental Air Monitoring During Abatement
3.1.5 Air-Monitoring Results and Documentation
3.2 REMOVAL AND DISPOSAL OF ROOFING MATERIALS
3.2.1 General
3.2.2 Specific Removal and Disposal Requirements
3.3 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN
3.4 PUMPING STATION VENTILATION SYSTEM AND CRITICAL BARRIERS
3.5 FINAL CLEANUP AND CLEARANCE CERTIFICATION
3.6 TITLE TO MATERIALS
3.7 ASBESTOS WASTE SHIPMENT RECORDS
3.8 SITE INSPECTION
ATTACHMENTS:
Bulk Asbestos Fiber Analysis Report
-- End of Section Table of Contents --
SECTION 02 82 14.00 28 - Page 2 g4edddca Line
SECTION 02 82 14.00 28
ASBESTOS CONTAINING MATERIAL (ACM) REMOVAL AND DISPOSAL
PART 1 GENERAL
1.1 SCOPE
ACM is confirmed to be present in the felt plies, flashings and coating materials used on portions of the existing built-up roofing (BUR) system at some of the pumping stations. See the Bulk Asbestos Fiber Analysis Report attached at the end of this specification section for the locations, type, and concentration level of asbestos fibers found and components of the roofing system assembly they are present in. Asbestos fibers are anticipated to be encapsulated and pliable in the asphalt bitumens used to adhere the plies and the top coatings used at certain roofs. Thus, for OSHA Class II ACM determined to be intact by the Industrial Hygienist (IH), the Contractor will be allowed to use the alternative methods for compliance pursuant to meeting all of the conditions required by 29 CFR 1926.1101 (g)(11), Alternative methods of compliance for installation, removal, repair, and maintenance of certain roofing and pipeline coating material. Use of alternate methods for compliance shall also be subject to meeting the additional requirements for ACM removal and disposal as specified herein. For Class II ACM that is not intact or that may become non-intact as determined by the IH, the Contractor shall follow the broader requirements of 29 CFR 1926.1101 .
Suspect friable ACM shall require the Contractor to stop work and notify the COR.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 1331 (1989; R 2001) Surface and Interfacial Tension of Solutions of Surface-Active Agents
ASTM D 4397 (2009) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH 94-113 (1994; 4th Ed) NIOSH Manual of Analytical Methods
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
SECTION 02 82 14.00 28 - Page 3
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.1101 Asbestos
29 CFR 1926.32 Safety and Health Regulations for Construction - Definition
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 763 Asbestos
49 CFR 107 Hazardous Materials Program Procedures
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Asbestos Hazard Abatement Plan; G, C
SD-03 Product Data
Qualifications; G, C
Licenses, Permits, and Notifications; G, C
Encapsulants; G, C
Asbestos Waste Shipment Records; G, ECC
SD-06 Test Reports
Daily Narrative Log; G, C
Exposure Assessment and Air Monitoring; G, C
SECTION 02 82 14.00 28 - Page 4
SD-07 Certificates
Encapsulants; G, C
Asbestos Worker Certification; G, C
Asbestos Supervisor Certification; G, C
1.4 DEFINITIONS
1.4.1 Amended Water
Water containing a wetting agent or surfactant with a surface tension of at least 29 dynes per square centimeter when tested in accordance with
ASTM D 1331 .
1.4.2 Asbestos-Containing Material (ACM)
Any materials containing more than one percent asbestos.
1.4.3 Authorized Person
Any person authorized by the Contractor and required by work duties to be present in the regulated areas.
1.4.4 Building Inspector
Individual who inspects buildings for asbestos and has EPA Model Accreditation Plan (MAP) "Building Inspector" training; accreditation required by 40 CFR 763 , Subpart E, Appendix C, has EPA/State certification/license as a "Building Inspector."
1.4.5 Class II Asbestos Work
Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos - containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic.
Certain "incidental" roofing materials such as mastic, flashing, and cements when they are still intact are excluded from Class II asbestos work.
1.4.6 Competent Person
In addition to the definition in 29 CFR 1926.32 (f), a person who is capable of identifying existing asbestos hazards as defined in 29 CFR 1926.1101 , selecting the appropriate control strategy, has the authority to take prompt corrective measures to eliminate them and has EPA Model Accreditation Plan (MAP) "Contractor/Supervisor" training; has EPA/State certification/license as a "Contractor/Supervisor."
1.4.7 Contractor/Supervisor
Individual who supervises asbestos abatement work and has EPA Model Accreditation Plan "Contractor/Supervisor" training; has EPA/State certification as a "Contractor/Supervisor." The supervisor shall have completed the 40 hour Asbestos Contractor Training course and obtained the asbestos supervisor certification in accordance with Washington State WAC 296-65.
SECTION 02 82 14.00 28 - Page 5
1.4.8 Critical Barrier
One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.
1.4.9 Demolition
The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.
1.4.10 Disposal Bag
A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101 , used for transporting asbestos waste from containment to disposal site.
1.4.11 Disturbance
Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in one standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a pumping station component.
1.4.12 Fiber
A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.
1.4.13 Friable ACM
A term defined in 40 CFR 61 , Subpart M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763 , Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
1.4.14 High-Efficiency Particulate Air (HEPA) Filter
A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
1.4.15 Intact
ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.
Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.
1.4.16 Model Accreditation Plan (MAP)
USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763 .
1.4.17 Negative Initial Exposure Assessment
A demonstration by the Contractor to show that employee exposure during an
SECTION 02 82 14.00 28 - Page 6 operation is expected to be consistently below the OSHA Permissible Exposure Limits (PELs).
1.4.18 National Emission Standards for Hazardous Air Pollutants
National Emission Standards for Hazardous Air Pollutants (NESHAP). The USEPA NESHAP regulation for asbestos is at 40 CFR 61 , Subpart M.
1.4.19 Nonfriable ACM
A NESHAP term defined in 40 CFR 61 , Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
1.4.20 Nonfriable ACM (Category I)
A NESHAP term defined in 40 CFR 61 , Subpart E and EPA 340/1-90/018 meaning asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos.
1.4.21 Nonfriable ACM (Category II)
A NESHAP term defined in 40 CFR 61 , Subpart E and EPA 340/1-90/018 meaning any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos.
1.4.22 Permissible Exposure Limits (PELs)
1.4.22.1 PEL-Time Weighted Average(TWA)
Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8 hour time weighted average (TWA).
1.4.22.2 PEL-Excursion Limit
An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.
1.4.23 Regulated Area
An OSHA term defined in 29 CFR 1926.1101 meaning an area established by the Contractor to demarcate areas where Class I, II, and III asbestos work is conducted; also any adjoining area where debris and waste from such asbestos work accumulate; and an area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.
1.4.24 Removal
All operations where ACM is taken out or stripped from structures or substrates, and includes demolition operations.
1.4.25 Worker
Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101 , to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation if required by the OSHA Class of work to be performed or by the state where the work is to be performed. All
SECTION 02 82 14.00 28 - Page 7 persons working in asbestos removal shall have completed the 32 hour Asbestos Worker Training course and obtained the asbestos worker certification in accordance with Washington State WAC 296-65.
1.5 QUALITY ASSURANCE
In addition to detailed requirements of this specification, work performed under this contract shall comply with EM 385-1-1 , applicable federal, state, and local laws, ordinances, criteria, rules and regulations regarding handling, storing, transporting, and disposing of asbestos waste materials. Matters of interpretation of standards shall be submitted to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
1.5.1 Written Qualifications and Organization Report
Submit a general report with site-specific supplemental submittal on written qualifications and organization report providing evidence of qualifications of the Contractor, Contractor's Project Supervisor, Designated Competent Person, supervisors and workers; Designated IH; all subcontractors to be used including disposal transportation and disposal facility firms, subcontractor supervisors, subcontractor workers; and any others assigned to perform asbestos abatement and support activities.
Include in the report an organization chart showing the Contractor's staff organization chain of command and reporting relationship with all subcontractors. The report shall be signed by the Contractor, the Contractor's onsite project manager, Designated Competent Person, Designated IH, designated testing laboratory and the principals of all subcontractors to be used. Include the following statement in the report: "By signing this report I certify that the personnel I am responsible for during the course of this project fully understand the contents of 29 CFR 1926.1101 , 40 CFR 61 , Subpart M, and the federal, state and local requirements for those asbestos abatement activities that they will be involved in."
1.5.2 Specific Requirements
Designate in writing, personnel meeting the following qualifications:
a. Designated Competent Person: Qualified in accordance with 29 CFR 1926.32 and 29 CFR 1926.1101 , has EPA MAP "Contractor/Supervisor" training accreditation, has EPA/State certification/license as a "Contractor/Supervisor" and is experienced in the administration and supervision of asbestos abatement projects The Designated Competent Person shall be responsible for compliance with applicable federal, state and local requirements, the Contractor's Accident Prevention Plan (APP) and Asbestos Hazard Abatement Plan (AHAP). Submit the "Contractor/Supervisor" course completion certificate and the most recent certificate for required refresher training, and EPA/State certification/license. Submit evidence that this person has a minimum of 2 years of on-the-job asbestos abatement experience relevant to OSHA competent person requirements. The Designated Competent Person shall be onsite at all times during the conduct of this project.
b. Designated Project and Other Supervisors: Have EPA Model Accreditation Plan (MAP) "Contractor/Supervisor" training
SECTION 02 82 14.00 28 - Page 8 accreditation. Submit the "Contractor/Supervisor" course completion certificate and the most recent certificate for required refresher training, and EPA/State certification/license. Also submit evidence that the Project Supervisor has a minimum of 2 years of on-the-job asbestos abatement experience relevant to project supervisor responsibilities and the other supervisors have a minimum of 1 year on-the-job asbestos abatement experience commensurate with the responsibilities they will have on this project.
c. Designated Industrial Hygienist: Resume for the Industrial Hygienist (IH) selected to prepare the Contractor's AHAP, prepare and perform training, direct air monitoring and assist the Contractor's Competent Person in implementing and ensuring that safety and health requirements are complied with during the performance of all required work. The Designated IH shall be a person who is board certified in the practice of industrial hygiene as determined and documented by the American Board of Industrial Hygiene (ABIH) and has a minimum of 2 years of comprehensive experience in planning and overseeing asbestos abatement activities. The Designated IH shall be completely independent from the Contractor according to federal, state, or local regulations; that is, shall not be a Contractor's employee or be an employee or principal of a firm in a business relationship with the Contractor negating such independent status. A copy of the Designated IH's current valid ABIH certification shall be included. Each task order will specify when the Designated IH shall be onsite. In addition, submit resumes of additional IH's and industrial hygiene technicians (IHT) who will be assisting the Designated IH in performing onsite tasks. IHs and IHTs supporting the Designated IH shall have a minimum of 2 years of practical onsite asbestos abatement experience. The formal reporting relationship between the Designated IH and the support IHs and IHTs, the Designated Competent Person, and the Contractor shall be indicated.
d. Asbestos Abatement Workers: Meet the requirements contained in 29 CFR 1926.1101 , 40 CFR 61 , Subpart M, and other applicable federal, state and local requirements. Training documentation is required for each employee who will perform OSHA Class I, Class II, Class III, or Class IV asbestos abatement operations. Training course completion certificates (initial and most recent update refresher) required by the information checked on the form shall be attached.
e. Air Monitoring Personnel: Personnel performing air monitoring and sampling analysis shall have, as a minimum, one year of experience in the analysis of air samples, and shall have successfully completed the NIOSH 582 course. In addition, within the past year, these personnel shall have been judged proficient by their successful participation in the National Institute for Occupational Safety and Health (NIOSH) Proficiency Analytical Testing (PAT) Program. As an acceptable alternative to this requirement, the individual performing the monitoring, testing and reporting shall participate and be listed on the Asbestos Analysis Registry. Air monitoring personnel shall not be affiliated with the Contractor performing the abatement work in any way other than through this contract.
f. Disposal Facility, Transporter: The Contractor shall provide written evidence for each task order that the landfill to be used is approved for asbestos disposal by the USEPA and state and local regulatory agencies. Copies of signed agreements between the Contractor (including subcontractors and transporters) and the
SECTION 02 82 14.00 28 - Page 9 asbestos waste disposal facility to accept and dispose of all asbestos containing waste shall be provided. The Contractor and transporters shall meet the DOT requirements of 49 CFR 171 , 49 CFR 172 , and 49 CFR 173 as well as registration requirements of 49 CFR 107 and other applicable state or local requirements. The disposal facility shall meet the requirements of 40 CFR 61 , Sections .154 or .155, as required in 40 CFR 61 150(b), and other applicable state or local requirements.
1.6 LICENSES, PERMITS, AND NOTIFICATIONS
The Contractor shall obtain necessary licenses, permits, and notifications in conjunction with the asbestos abatement, storage, transportation and disposal actions and timely notification furnished of such actions as required by federal, state, regional, and local authorities. The Contractor shall notify the state's environmental protection agency responsible for asbestos air emissions, local air pollution control district/agency, or state OSHA program and the COR in writing, at least 10 days prior to the commencement of work, in accordance with 40 CFR 61 , Subpart M, and state and local requirements to include the mandatory "Notification of Demolition and Renovation Record" form and other required notification documents unless an emergency notification is required by the COR. If an emergency notification is required, follow state or local rules for emergency notification. Furnish copies of the receipts to the COR, in writing, prior to the commencement of work. Costs associated with obtaining licenses, permits, and notifications shall not be submitted for separate reimbursement. The Government will not be responsible for the reimbursement of penalties and/or late fees incurred due to Contractor negligence
1.7 ASBESTOS HAZARD ABATEMENT PLAN
The Contractor shall submit a detailed plan of the response actions to be taken (ACM items to be abated and method of abatement for each abatement work task) and the control procedures (containment techniques to include safety precautions and work procedures) to be used in the abatement of ACM shall be submitted. The plan shall be prepared by and signed and dated by the Contractor's IH. Such plan shall include, but not be limited to the precise personal protective equipment to be used, the location of asbestos regulated work areas, abatement methodologies, sequencing of asbestos related work, disposal procedures and plan, initial exposure assessment in accordance with 29 CFR 1926.1101 , planned air monitoring strategies, and a detailed description of the method to be employed in order to control the spread of ACM wastes and airborne fiber concentrations. The asbestos hazard abatement plan shall be submitted at least 30 days prior to the start of work. The plan must be accepted in writing prior to the start of any asbestos abatement work.
1.8 WORK AREA REGULATION AND CONTROL
During abatement work, entry into the regulated areas shall be restricted to only authorized and trained personnel donning personal protection.
These personnel may include Contractor's employees, Government-authorized representatives, State and local inspectors. A list of authorized personnel shall be established prior to the initiation of work and the Contractor shall be responsible for site security during the abatement work. Personnel authorized to enter regulated areas shall be trained, medically evaluated, and wear the required personal protective equipment.
SECTION 02 82 14.00 28 - Page 10
1.8.1 Regulated Areas
All Class II asbestos work shall be conducted within regulated areas. The regulated area shall be demarcated to minimize the number of persons within the area and to protect persons outside the area from exposure to airborne asbestos. The Contractor shall control access to regulated areas, ensure that only authorized personnel enter, and verify that Contractor required medical surveillance, training and respiratory protection program requirements are met prior to allowing entrance.
1.8.2 Warning Signs and Tape
Warning signs and tape printed in English shall be provided at the regulated boundaries and entrances to regulated areas. Signs shall be located to allow personnel to read the signs and take the necessary protective steps required before entering the area. Warning signs must at a minimum display the following information:
DANGER
ASBESTOS
CANCER AND LUNG DISEASE HAZARD
AUTHORIZED PERSONNEL ONLY
RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
1.8.3 Warning Labels
Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to requirements are acceptable. The warning label shall be legible, printed in large bold letters on a contrasting background, and display the following legend
DANGER
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
1.8.4 Daily Narrative Log
A Daily Narrative Log kept by the industrial hygienist or designated personnel shall be maintained. The log shall include the names of all persons who visit the job site and all persons who enter the sealed or restricted work areas. It shall contain details such as the number of persons on the job, the time they entered the work area and the time they left, and the nature of the work-in-progress. It shall provide a comprehensive description of conditions in and around the job site and major events which occur each day such as details of all accidents, emergencies, breakdowns of equipment, and any material, procedural or safety difficulties including issues and complaints brought to management's attention by the Contractor's employees. Each day's entries shall be signed and dated by the person who made them. A copy of the daily narrative log shall be submitted to the COR daily for the previous work day.
SECTION 02 82 14.00 28 - Page 11
PART 2 PRODUCTS
2.1 DELIVERY AND STORAGE
Deliver all the materials in their original package, container, or bundle bearing the name of the manufacturer and, where applicable, the brand names. Store all materials subject to damage off the ground, away from wet or damp surfaces, and under cover sufficient enough to protect them from damage or contamination. Replacement materials shall be stored outside of the work area until abatement is completed.
2.2 ENCAPSULANTS
Encapsulants shall conform to USEPA requirements, shall contain no toxic or hazardous substances and no solvent. Submit certificates stating that encapsulants meet the applicable specified performance requirements.
2.3 EXPENDABLE SUPPLIES
2.3.1 Duct Tape
Industrial grade duct tape of appropriate widths suitable for bonding sheet plastic and disposal container.
2.3.2 Disposal Containers
Leak-tight (defined as solids, liquids, or dust that cannot escape or spill out) disposal containers shall be provided for ACM wastes as required by 29 CFR 1926.1101 . Disposal containers can be in the form of:
a. Disposal Bags.
b. Fiberboard Drums.
c. Cardboard Boxes.
2.3.3 Sheet Plastic
Sheet plastic shall be polyethylene of 6 mil minimum thickness and shall be provided in the largest sheet size necessary to minimize seams. Film shall be clear, frosted, or black and conform to ASTM D 4397 .
2.3.4 Mastic Removing Solvent
Mastic removing solvent shall be nonflammable and shall not contain methylene chloride, glycol ether, or halogenated hydrocarbons. Solvents used onsite shall have a flash point greater than 140 degrees F.
2.3.5 Leak-tight Wrapping
Two layers of 6 mil minimum thick polyethylene sheet stock shall be used for the containment of removed asbestos-containing components or materials such as reactor vessels, large tanks, boilers, insulated pipe segments and other materials too large to be placed in disposal bags. Upon placement of the ACM component or material, each layer shall be individually leak-tight sealed with duct tape.
SECTION 02 82 14.00 28 - Page 12
2.3.6 Wetting Agents
Amended water shall meet the requirements of ASTM D 1331 . Removal encapsulant (a penetrating encapsulant) shall be provided when conducting removal abatement activities that require a longer removal time or are subject to rapid evaporation of amended water. The removal encapsulant shall be capable of wetting the ACM and retarding fiber release during disturbance of the ACM greater than or equal to that provided by amended water. Performance requirements for penetrating encapsulants are specified in subparagraph entitled Encapsulation of ACM.
2.3.7 Strippable Coating
Strippable coating in aerosol cans shall be used to adhere to surfaces and to be removed cleanly by stripping, at the completion of work.
2.4 EQUIPMENT
2.4.1 Tools
Vacuums shall be equipped with HEPA filters, of sufficient capacity and necessary capture velocity at the nozzle or nozzle attachment to efficiently collect, transport and retain the ACM waste material. Power tools shall not be used to remove ACM unless the tool is equipped with effective, integral HEPA filtered exhaust ventilation capture and collection system. Reusable tools shall be thoroughly decontaminated prior to being removed from regulated areas.
2.4.2 Rental Equipment
If rental equipment is to be used, written notification shall be provided to the rental agency, concerning the intended use of the equipment, the possibility of asbestos contamination of the equipment and the steps that will be taken to decontaminate such equipment.
2.4.3 Air Monitoring Equipment
The Contractor's Designated IH shall approve air monitoring equipment in the asbestos hazard abatement plan. The equipment shall include, but shall not be limited to:
a. High-volume sampling pumps that can be calibrated and operated at a constant airflow up to 16 liters per minute.
b. Low-volume, battery powered, body-attachable, portable personal pumps that can be calibrated to a constant airflow up to approximately
3.5 liters per minute, and a self-contained rechargeable power pack capable of sustaining the calibrated flow rate for a minimum of 10 hours. The pumps shall also be equipped with an automatic flow control unit which shall maintain a constant flow, even as filter resistance increases due to accumulation of fiber and debris on the filter surface.
c. Single use standard 25 mm diameter cassette, open face, 0.8 micron pore size, mixed cellulose ester membrane filters and cassettes with 50 mm electrically conductive extension cowl, and shrink bands for personal air sampling.
d. Single use standard 25 mm diameter cassette, open face, 0.45 micron
SECTION 02 82 14.00 28 - Page 13 pore size, mixed cellulose ester membrane filters and cassettes with 50 mm electrically conductive cowl, and shrink bands when conducting environmental area sampling using NIOSH 94-113 Methods 7400 and 7402, (and the transmission electric microscopy method specified at 40 CFR 763 if required).
e. A flow calibrator capable of calibration to within plus or minus 2 percent of reading over a temperature range of minus 4 to plus 140 degrees F and traceable to a NIST primary standard.
PART 3 EXECUTION
3.1 EXPOSURE ASSESSMENT AND AIR MONITORING
3.1.1 General Requirements
a. Exposure assessment, air monitoring and analysis
Exposure assessment, air monitoring and analysis of airborne concentration of asbestos fibers shall be performed in accordance with 29 CFR 1926.1101 , and the Contractor's air monitoring plan.
Results of breathing zone samples shall be posted at the job site and made available to the COR. Submit all documentation regarding initial exposure assessments, negative exposure assessments, and air-monitoring results.
b. Worker Exposure
(1) The Contractor's Designated IH, their approved designee, or air monitoring personnel shall collect samples representative of the exposure of each employee who is assigned to work within a regulated area. Breathing zone samples shall be taken for at least 25 percent of the workers in each shift, or a minimum of 2, whichever is greater. Air monitoring results at the 95 percent confidence level shall be calculated.
(2) The Contractor shall provide an onsite independent testing laboratory with qualified analysts and appropriate equipment to conduct sample analyses of air samples using the methods prescribed in 29 CFR 1926.1101 , to include NIOSH 94-113 Method 7400.
(3) The Contractor's workers shall not be exposed to an airborne fiber concentration in excess of 1.0 f/cc, as averaged over a sampling period of 30 minutes. Should a personal excursion concentration of 1.0 f/cc expressed as a 30-minute sample occur inside a regulated work area, stop work immediately, notify the COR, and implement additional engineering controls and work practice controls to reduce airborne fiber levels below prescribed limits in the work area. Work shall not restart until authorized by the COR.
c. Environmental Exposure
(1) All environmental air monitoring shall be performed by the Contractor's Designated IH, designee, or air monitoring personnel.
(2) Environmental and final clearance air monitoring shall be performed using NIOSH 94-113 Method 7400 (PCM) with optional
SECTION 02 82 14.00 28 - Page 14 confirmation of results by TEM if specified in the task order.
(3) For environmental and final clearance, air monitoring shall be conducted at a sufficient velocity and duration to establish the limit of detection of the method used at 0.005 f/cc.
(4) When reconfirmation is required of asbestos fiber concentrations (asbestos f/cc) from environmental and final clearance samples, use TEM in accordance with NIOSH 94-113 Method 7402. When such confirmation is conducted, it shall be from the same sample filter used for the NIOSH 94-113 Method 7400 PCM analysis. All confirmation of asbestos fiber concentrations, using NIOSH 94-113 Method 7402, shall be at the Contractor's expense.
3.1.2 Initial Exposure Assessment
The Contractor shall conduct an exposure assessment immediately before or at the initiation of an operation to ascertain expected exposures during that operation. The assessment shall be completed in time to comply with the requirements, which are triggered by exposure data or the lack of a negative exposure assessment, and to provide information necessary to assure that all control systems planned are appropriate for that operation. The assessment shall take into consideration monitoring results and all observations, information or calculations which indicate employee exposure to asbestos, including any previous monitoring conducted in the workplace, or of the operations of the Contractor which indicate the levels of airborne asbestos likely to be encountered on the job.
3.1.3 Negative Exposure Assessment
Provide a negative exposure assessment for all asbestos jobs prior to initiation of work or within the first 2 days of work and conform to the following criteria:
a. Objective Data: Objective data demonstrating that the product or material containing asbestos minerals or the activity involving such product or material cannot release airborne fibers in concentrations exceeding the PEL-TWA and PEL-Excursion Limit under those work conditions having the greatest potential for releasing asbestos.
b. Prior Asbestos Jobs: Where the Contractor has monitored prior asbestos jobs for the PEL and the PEL-Excursion Limit within 12 months of the current job, the monitoring and analysis were performed in compliance with asbestos standard in effect; the data were obtained during work operations conducted under workplace conditions closely resembling the processes, type of material, control methods, work practices, and environmental conditions used and prevailing in the Contractor's current operations; the operations were conducted by employees whose training and experience are no more extensive than that of employees performing the current job; and these data show that under the conditions prevailing and which will prevail in the current workplace, there is a high degree of certainty that the monitoring covered exposure from employee exposures will not exceed the PEL-TWA and PEL-Excursion Limit.
c. Initial Exposure Monitoring: The results of initial exposure monitoring of the current job, made from breathing zone air samples that are representative of the 8-hour PEL-TWA and 30-minute short-term
SECTION 02 82 14.00 28 - Page 15 exposures of each employee. The monitoring covered exposure from operations which are most likely during the performance of the entire asbestos job to result in exposures over the PELs.
3.1.4 3.8.4 Environmental Air Monitoring During Abatement
Until an exposure assessment is provided to the COR, environmental air monitoring shall be conducted at locations and frequencies that will accurately characterize any evolving airborne asbestos fiber concentrations. The assessment shall demonstrate that the product or material containing asbestos minerals, or the abatement involving such product or material, cannot release airborne asbestos fibers in concentrations equal to or exceeding 0.01 f/cc as a TWA under those work conditions having the greatest potential for releasing asbestos. The monitoring shall be at least once per shift at representative locations outside of the perimeter of a regulated area. If the sampling outside regulated area shows airborne fiber levels have exceeded background or equal to 0.01 f/cc, whichever is greater, work shall be stopped immediately, and the COR notified. The condition causing the increase shall be corrected. Work shall not restart until authorized by the COR.
3.1.5 Air-Monitoring Results and Documentation
Air sample fiber counting shall be completed and results provided within 24 hours for breathing zone samples. The COR shall be notified immediately of any airborne levels of asbestos fibers in excess of established requirements. Written sampling results shall be provided within 5 working days of the date of collection. The written results shall be signed by testing laboratory analyst, testing laboratory principal and the Contractor. The air sampling results shall be documented on a Contractor's daily air monitoring log. The daily air monitoring log shall contain the following information for each sample:
a. Sampling and analytical method used.
b. Date sample collected.
c. Sample number.
d. Sample type: BZ = Breathing Zone (Personal), P = Preabatement, E = Environmental, C = Abatement Clearance.
e. Location/activity/name where sample collected.
f. Sampling pump manufacturer, model and serial number, beginning flow rate, end flow rate, average flow rate (L/min).
g. Calibration date, time, method, location, name of calibrator, signature.
h. Sample period (start time, stop time, elapsed time (minutes).
i. Total air volume sampled (liters).
j. Sample results (f/cc and S/mm square) if EPA methods are required for final clearance.
k. Laboratory name, location, analytical method, analyst, confidence level. In addition, the printed name and a signature and date block
SECTION 02 82 14.00 28 - Page 16 for the Industrial Hygienist who conducted the sampling and for the Industrial Hygienist who reviewed the daily air monitoring log verifying the accuracy of the information.
3.2 REMOVAL AND DISPOSAL OF ROOFING MATERIALS
3.2.1 General
When removing roofing materials which contain ACM as described in 29 CFR 1926.1101 (g)(8)(ii), use the following practices: Roofing material shall be removed in an intact state. Wet methods shall be used to remove roofing materials that are not intact, or that will be rendered not intact during removal, unless such wet methods are not feasible or will create safety hazards. Wet methods shall only be used at the approval of the COR.
3.2.2 Specific Removal and Disposal Requirements
The Contractor shall use the following procedures for removal and disposal of roofing materials containing asbestos:
a. The onsite ACM removal supervisor shall assess that the roofing material is in-tact prior to removal work.
b. The felt plies and flashing shall be removed by hand-held spudding tools or shovels. The use of power tools to cut, drill, grind or abrade ACM will not be allowed unless the tools are equipped with HEPA filtered dust and particulate capture and collection systems as specified above. At the approval of the COR, wet methods may be used to remove roofing materials that are not intact, or that will be rendered not intact during removal, unless such wet methods are not feasible or will create safety hazards.
c. All demolished ACM material shall be double "burrito" wrapped in 6-mil plastic sheeting while still on the roof. Stockpiles of unwrapped ACM will not be allowed to remain on the roof any longer than 4 hours of one work shift and no burrito wraps shall be left on any roof surface overnight. Burrito wraps shall be tightly bound with duct tape such that they are sealed tight with no leakage of material. Warning labels conforming to CFR 29, Part 1926 shall be affixed to all burrito wraps. Burrito wraps shall not be dropped or thrown to the ground, but shall be lowered to the ground via crane, hoist or other method approved by the Contracting Officer Representative. Roll off containers and NOT dump trucks should be used for the burrito wraps and transport vehicle to the landfill. Any waste that contains nonfriable asbestos material must be handled and disposed of using methods that will prevent the release of airborne asbestos-containing material.
d. Wrapped ACM roofing material shall be segregated from other waste material for transportation to the accepting landfill. For the purpose of developing an ACM profile, the Contractor shall also provide copies of the test results from the ACM analysis to the landfill operator. The roofing Contractor must send a Representative with the load for disposal. In the case of the burrito wrap coming apart or needing repairs before dumping, the Contractor Representative will be responsible for making all re-taping or repairs to the wrapping before the load will be dumped.
SECTION 02 82 14.00 28 - Page 17
3.3 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN
Perform asbestos abatement without damage to or contamination of adjacent work or area. Where such work or area is damaged or contaminated, it shall be restored to its original condition or decontaminated at no expense to the Government. When spills occur, work shall stop in all effected areas immediately and the spill shall be cleaned. When satisfactory visual inspection and air sampling analysis results are obtained and have been evaluated by the Contractor and the COR, work shall proceed.
3.4 PUMPING STATION VENTILATION SYSTEM AND CRITICAL BARRIERS
Pumping Station ventilation system ventilators and louvers in a regulated area shall be isolated by airtight seals to prevent the spread of contamination throughout the system. The airtight seals shall consist of air-tight rigid covers for pumping station ventilation supply and exhaust grills where the ventilation system is required to remain in service during abatement or 2 layers of polyethylene as appropriate. Edges to wall, ceiling and floor surfaces shall be sealed with industrial grade duct tape.
3.5 FINAL CLEANUP AND CLEARANCE CERTIFICATION
After completion of all asbestos removal work, the Contractor and the COR shall conduct a final visual inspection of the regulated area to ensure they are clean in accordance with ASTM E1368 and document the results. If the COR rejects the clean regulated area as not meeting final cleaning requirements, reclean as necessary and have a follow-on inspection conducted with the COR. Recleaning and follow-up reinspection shall be at the Contractor's expense. Upon government acceptance of final cleaning, the COR will allow the warning signs and boundary warning tape to be removed.
3.6 TITLE TO MATERIALS
ACM material resulting from abatement work, except as specified otherwise, shall become the property of the Contractor and shall be disposed of as specified and in accordance with applicable federal, state and local regulations. The Government will remain the documented owner of the ACM.
3.7 ASBESTOS WASTE SHIPMENT RECORDS
Complete and provide the COR final completed copies of the Waste Shipment Record for all shipments of waste material as specified in 40 CFR 61 , Subpart M and other required state waste manifest shipment records, within 3 days of delivery to the landfill. Include a description of the disposal process and provisions for the Project ECC to sign the ACM record, the non-hazardous waste manifests, or waste related bills of lading for all regulated waste being shipped off of project. Each Waste Shipment Record shall be signed and dated by the Project ECC, the waste transporter, and the disposal facility operator.
3.8 SITE INSPECTION
While performing asbestos removal work, the Contractor shall be subject to on-site inspection. If the work is in violation of specification requirements or any Federal, State, or local regulations, work shall stop
SECTION 02 82 14.00 28 - Page 18 g4edddca Line immediately and remain stopped until the violation is resolved. Standby time and expenses required to resolve the violation shall be at the Contractor's expense.
-- End of Section --
SECTION 02 82 14.00 28 - Page 19
| PROJECT TABLE OF CONTENTS |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 82 14.00 28 - ASBESTOS CONTAINING MATERIAL ACM REMOVAL AND DISPOSAL |
| ASBESTOS CONTAINING MATERIAL ACM REMOVAL AND DISPOSAL |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 DEFINITIONS |
| 1.4.1 Amended Water |
| 1.4.2 Asbestos-Containing Material ACM |
| 1.4.3 Authorized Person |
| 1.4.4 Building Inspector |
| 1.4.5 Class II Asbestos Work |
| 1.4.6 Competent Person |
| 1.4.7 Contractor/Supervisor |
| 1.4.8 Critical Barrier |
| 1.4.9 Demolition |
| 1.4.10 Disposal Bag |
| 1.4.11 Disturbance |
| 1.4.12 Fiber |
| 1.4.13 Friable ACM |
| 1.4.14 High-Efficiency Particulate Air HEPA Filter |
| 1.4.15 Intact |
| 1.4.16 Model Accreditation Plan MAP |
| 1.4.17 Negative Initial Exposure Assessment |
| 1.4.18 National Emission Standards for Hazardous Air Pollutants |
| 1.4.19 Nonfriable ACM |
| 1.4.20 Nonfriable ACM Category I |
| 1.4.21 Nonfriable ACM Category II |
| 1.4.22 Permissible Exposure Limits PELs |
| 1.4.22.1 PEL-Time Weighted AverageTWA |
| 1.4.22.2 PEL-Excursion Limit |
| 1.4.23 Regulated Area |
| 1.4.24 Removal |
| 1.4.25 Worker |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Written Qualifications and Organization Report |
| 1.5.2 Specific Requirements |
| 1.6 LICENSES, PERMITS, AND NOTIFICATIONS |
| 1.7 ASBESTOS HAZARD ABATEMENT PLAN |
| 1.8 WORK AREA REGULATION AND CONTROL |
| 1.8.1 Regulated Areas |
| 1.8.2 Warning Signs and Tape |
| 1.8.3 Warning Labels |
| 1.8.4 Daily Narrative Log |
| PART 2 PRODUCTS |
| 2.1 DELIVERY AND STORAGE |
| 2.2 ENCAPSULANTS |
| 2.3 EXPENDABLE SUPPLIES |
| 2.3.1 Duct Tape |
| 2.3.2 Disposal Containers |
| 2.3.3 Sheet Plastic |
| 2.3.4 Mastic Removing Solvent |
| 2.3.5 Leak-tight Wrapping |
| 2.3.6 Wetting Agents |
| 2.3.7 Strippable Coating |
| 2.4 EQUIPMENT |
| 2.4.1 Tools |
| 2.4.2 Rental Equipment |
| 2.4.3 Air Monitoring Equipment |
| PART 3 EXECUTION |
| 3.1 EXPOSURE ASSESSMENT AND AIR MONITORING |
| 3.1.1 General Requirements |
| 3.1.2 Initial Exposure Assessment |
| 3.1.3 Negative Exposure Assessment |
| 3.1.4 3.8.4 Environmental Air Monitoring During Abatement |
| 3.1.5 Air-Monitoring Results and Documentation |
| 3.2 REMOVAL AND DISPOSAL OF ROOFING MATERIALS |
| 3.2.1 General |
| 3.2.2 Specific Removal and Disposal Requirements |
| 3.3 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN |
| 3.4 PUMPING STATION VENTILATION SYSTEM AND CRITICAL BARRIERS |
| 3.5 FINAL CLEANUP AND CLEARANCE CERTIFICATION |
| 3.6 TITLE TO MATERIALS |
| 3.7 ASBESTOS WASTE SHIPMENT RECORDS |
| 3.8 SITE INSPECTION |
File details come from the government source that posted it. Updated .