Amend 0001 - 01 22 00.00 28
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract.pdf | ||
| 16-B-0004_0003.pdf | ||
| Amend-0002_Section_02_82_14.00_28.pdf | ||
| 16-B-0004_0002.pdf | ||
| Amend-0001_SUBMITTAL_REGISTER.pdf | ||
| 16-B-0004_0001.pdf | ||
| Amend-0001_Plans.pdf | ||
| Amend-0001_Section_07_72_00.10_28.pdf | ||
| Site_Visit_Attendance_8-9-2016.pdf | ||
| Site_Visit_Information.pdf | ||
| Solicitation_16-B-0004.pdf | ||
| Specs.pdf | ||
| Plans.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McNary Levee Pumping Stations Hatches and Roofing W912EF-16-B-0004
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 ITEM 0001 PUMPING STATION 15C
1.3 ITEM 0002 PUMPING STATION 15D
1.4 ITEM 0003 PUMPING STATION 15E
1.5 ITEM 0004 PUMPING STATION 15E-1
1.6 ITEM 0005 PUMPING STATION 5D
1.7 ITEM 0006 PUMPING STATION 6B
1.8 ITEM 0007 PUMPING STATION 12-1
1.9 ITEM 0008 PUMPING STATION 12-1A
1.10 ITEM 0009 PUMPING STATION 2C
1.11 ITEM 0010 PUMPING STATION 4A
1.12 ITEM 0011 PUMPING STATION 12-2
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 28 - Page 1
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all pumping stations, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 RETAINAGE OF PAYMENT
Retainage in the amount of 10% of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. RETAINAGE OF PAYMENT will commence when the Contractor has earned 90% of the original contract value. See SECTION 01 78 00.00 28 "CLOSEOUT SUBMITTALS" for additional information.
a. Preliminary Version of the Contractor Prepared Drawings
b. Final Approved Versions of the Contractor Prepared Drawings
c. Preliminary As-Built Contract Drawings
d. As-Built Contract Drawing and FIO Drawings
e. Government Issued Items
CLUSTER GROUP 1
1.2 ITEM 0001 PUMPING STATION 15C
Pumping station 15C will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0001, "PUMPING STATION 15C," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.3 ITEM 0002 PUMPING STATION 15D
Pumping station 15D will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0002, "PUMPING STATION 15D," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.4 ITEM 0003 PUMPING STATION 15E
Pumping station 15E will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0003, "PUMPING STATION 15E," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
SECTION 01 22 00.00 28 - Page 2
1.5 ITEM 0004 PUMPING STATION 15E-1
Pumping station 15E-1 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0004, "PUMPING STATION 15E-1," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
CLUSTER GROUP 2
1.6 ITEM 0005 PUMPING STATION 5D
Pumping station 5D will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0005, "PUMPING STATION 5D," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.7 ITEM 0006 PUMPING STATION 6B
Pumping station 6B will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0006, "PUMPING STATION 6B," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.8 ITEM 0007 PUMPING STATION 12-1
Pumping station 12-1 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0007, "PUMPING STATION 12-1," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.9 ITEM 0008 PUMPING STATION 12-1A
Pumping station 12-1A will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0008, "PUMPING STATION 12-1A," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
CLUSTER GROUP 3
1.10 ITEM 0009 PUMPING STATION 2C
Pumping station 2C will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0009, "PUMPING STATION 2C," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.11 ITEM 0010 PUMPING STATION 4A
Pumping station 4A will be measured for payment as a complete pay item
SECTION 01 22 00.00 28 - Page 3
(JOB). Payment will be made at the lump sum price for Item No. 0010, "PUMPING STATION 4A," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
1.12 ITEM 0011 PUMPING STATION 12-2
Pumping station 12-2 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0011, "PUMPING STATION 12-2," which price and payment shall be full compensation for all work required for construction of the work specified and approved herein.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --