Amendment 0003 to Solicitation W912EE26RA015

This is Amendment 0003 to an Indefinite Delivery Indefinite Quantity (IDIQ) solicitation issued by the U.S. Army Corps of Engineers (USACE), Vicksburg District, for facilities support, operations and maintenance services at three Arkansas lakes: DeGray Lake, Lake Greeson, and Ouachita Lake. The effective date of this amendment is October 21, 2026, and the solicitation closing date is extended through October 30, 2026. The amendment modifies the scope of work in Section B and related attachments, revises the bid schedule for both the Parent IDIQ and Seed Task Order, and makes changes to contract term provisions and pricing policies. The contract will be a five-year ordering period beginning at award with an additional six-month option for potential award delay, replacing the previous structure of a base period with four one-year options.

The solicitation encompasses seven technical provisions: janitorial and custodial services; grass mowing and landscaping; welcome/visitor center staffing; dumpster services; natural resource management; maintenance and repair of buildings and structures; and labor and material support for dam, spillway, and navigation facilities. Services will be priced using two mechanisms: pre-priced CLINs with unit rates established at award for routine services, and negotiated CLINs for specialized work scoped individually per task order. Key amendments include clarifications that the contractor must furnish a computer for welcome center operations (rather than the government), revisions to Lake Greeson trash collection procedures, modifications to escalation rate application to fully burdened labor categories and fixed-price CLINs, and deletion of specific option-year line items. The minimum guarantee is $1,500.00, with task order limitations of $2,500.00 minimum and $9,000,000.00 maximum per order. Award will be made using best value tradeoff methodology with evaluation factors for technical approach, staffing, management, past performance, and price.

View the file

Other files

File Type Posted
Amendment 0003_Ark Lakes OM_Parent IDIQ Bid Schedule.xlsx XLSX spreadsheet
Amendment 0003_Ark Lakes_SeedTaskOrder BidSchedule.xlsx XLSX spreadsheet
Amendment 0003_Attachment_1___Facilities_by_Area___2026.xlsx XLSX spreadsheet
Amendment 3_Seed Task Order SOW_Ark Lakes.pdf PDF
Amended_Ark Lakes_SeedTaskOrder BidSchedule.xlsx XLSX spreadsheet
Amended Attachment 3_Dumpster Maps.pdf PDF
Solicitation Amendment_W912EE26RA0150002.pdf PDF
Amended Attachment 2_Mowing.pdf PDF
Amended_Ark Lakes OM_Parent IDIQ Bid Schedule_Amendment 0002.xlsx XLSX spreadsheet
Amended_Seed Task Order SOW_Ark Lakes.pdf PDF
Ark Lakes Operations Presentation.pptx PPTX presentation
Ark Lakes Site Visit Sign in Sheet.pdf PDF
Ark Lakes Site Visit_PP.pptx PPTX presentation
Solicitation Amendment W912EE26RA0150001 SF 30.pdf PDF
Attachment 3 Trash Collection Maps-OUACHITA.pdf PDF
Ark Lakes_SeedTaskOrder_BidSchedule.xlsx XLSX spreadsheet
Attachment 2 Mowing.pdf PDF
Attachment 4 Debris Dump Sites.pdf PDF
Sample Insurance Certificate.pdf PDF
__Attachment_1___Facilities_by_Area___2026.xlsx XLSX spreadsheet
Seed Task Order SOW_Ark Lakes.pdf PDF
Wage Rates for Ark Lakes OM.pdf PDF
CBA for Ark Lakes.pdf PDF
Ark Lakes OM_Parent IDIQ Bid Schedule.xlsx XLSX spreadsheet
Attachment 5 Past Performance Questionaire.pdf PDF
Solicitation - W912EE26RA015.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912EE

4. REQUISITION/PURCHASE REQUISITION NUMBER 3. EFFECTIVE DATE

21 OCT 2026

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 46

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE

W07V ENDIST VICKSBURG

KO CONTRACTING DIVISION, 4155 CLAY STREET

VICKSBURG, MS 39183-3435

UNITED STATES

GENNA WOOTEN, EMAIL: GENNA.W.WOOTEN@USACE.ARMY.MIL TELEPHONE:

601-631-5826

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6) CODE

SCD: PAS:

9A. AMENDMENT OF SOLICITATION NUMBER

W912EE26RA015

9B. DATED (SEE ITEM 11)

31 AUG 2026

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

SEE CONTINUATION

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment serves to change and remove language in the scope of work. Please see the changes to the scope of work, Section B, and Attachments 1, as well as the bid schedule for the Parent IDIQ and the Seed Task Order. No other changes have been made. The solicitation closing date is hereby extended through 30 October 2026. All terms and conditions remain the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

DUSTIN G. CANNADA

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

21 OCT 2026

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

(X)

1. CONTRACT ID CODE

J mailto:GENNA.W.WOOTEN@USACE.ARMY.MIL

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Supplies or Services and Prices/Costs

Miscellaneous text in this section has been added to:

The escalation rate will be applied to all fully burdened labor categories and fixed priced CLINs at the anniversary of the contract start date.

The fully burdened labor rate will be used for negotiating work under negotiated CLINS. Requests for equitable adjustments (REA) will be applied only to the base labor rates. The REA calculation will equate to the fully burdened labor rate plus increases/descreases in the Service Contract Act or Collective Bargaining Agreement (if applicable).

Overtime must be calculated using the base rate only.

The following CLIN(s) / SLIN(s) / ELIN(s) were deleted:

W912EE26RA0150003

Continuation of Description

Miscellaneous text in this section has been modified to:

Revised via Amendment 0003

(Changed text is red and highlighted in yellow, removed text is red and struckthrough)

Performance Work Statement

1.1.0 General Statement of Work: The purpose of this contract is to provide for the operation, maintenance and repair of Government-owned facilities and equipment at Ouachita, Greeson, and DeGray Lakes. This work shall include planning, programming, administration, management, supervision, maintenance of accurate and complete records and files, quality control inspection, facilities, and personnel necessary to operate and maintain Government-owned facilities. The Contractor shall personally supervise the work or always have a competent representative on the site. The representative shall possess full authority to act on behalf of the Contractor and to legally bind the Contractor. The work will be performed in recreation and operational areas, as well as various remote locations, in and around the Ouachita, Greeson, and DeGray Lake projects. Work under this contract will be performed as orders are placed. Ouachita, Greeson, and DeGray Lakes are located in Southwest Arkansas. The projects are split over 5 counties including Garland, Montgomery, Pike, Clark, and Hot Spring County, AR. Cities around the projects include Hot Springs, Murfreesboro, Caddo Valley, and Arkadelphia, AR.

1.1.1 Government-Furnished Equipment, Materials, and Supplies: The Government shall not be responsible for providing any equipment, materials, or supplies associated with the performance of any work to be done by the Contractor.

1.1.2 Contractor-Furnished Equipment, Materials, and Supplies: The Contractor shall provide all labor, materials, supplies, and other items necessary for the operation, maintenance, repair, and replacement requirements as specified in each technical provision, or as negotiated via task orders.

1.1.3 Industry Standards/Quality of Product: It is the intent of this requirement to ensure that all work is performed in accordance with appropriate industry standards to obtain quality products.

Replacement parts and facilities will be equal or better than those being replaced. Replacement of parts with lower quality parts will result in the work being determined as non-compliant with this contract and shall be re-done at the Contractors expense. Work which does not meet industry standards or is otherwise not in accordance with contract requirements will be re-done at the Contractor's expense.

1.1.4 Term: This contract will have a base ordering period with four options and a 6-month ordering period. This contract will be a five year ordering period from the date of award, with a 6 month option. This contract will be subject to the binding rates and escalation rates established at the award of the base IDIQ contract.

1.1.5 Other Contracts: Other contractors may be on site performing other work for USACE. The Contractor shall cooperate with such other Contractors, its employees and/or Government employees. The Contractor shall not commit or permit any act of interference in the performance of work of other Contractors or Government forces. If there appears to be a conflict, the contractor shall notify the COR and Contracting Officer to deconflict.

1.1.6 Pre-work Conference: The Contractor shall attend a pre-work conference as soon after task order award as practical, depending on when actual performance is to begin. The intent is to conduct the conference prior to work and start no later than 15 days after award of a task order.

During this conference, USACE shall establish the line of authority and Government procedures for contractual, administrative, and work matters. The schedule of required submittals and reports will also be discussed.

1.1.7 Coordination Meeting: The coordination meeting will be separate from the Pre-work Conference as required in the previous paragraph. Before work commences, the Contractor and its staff shall meet with the COR. Discussion will be held to develop a mutual understanding of quality control requirements, details of the reporting requirements, implementation of the accident prevention plan, the interrelationship of the Government's inspection system to the Contractor Quality Control (CQC) plan, and all other aspects of the contract. A record of the proceedings will be furnished to all attendees.

1.1.8 Criteria and Publications: The Contractor shall perform all work in accordance with applicable publications to include, but not limited to, List 1 below:

List 1

Safety: EM 385-1-1 (Corps of Engineer's Safety Manual)

Sign Standards: EP 310-1-6a and EP 310-1-6b (U. S. Army Corps of Engineers' Sign Standards Manual)

Environmental Compliance: Environmental Review Guide for Operations, U. S. Army Corps of Engineers

Operating Manuals: Equipment Manufacturers

Repair Manuals: Equipment Manufacturers

Industrial Standards and Codes (Latest Editions): Air Moving and Conditioning Association, American Association of Nurserymen, Inc., American Concrete Institute, American Institute of Steel Construction, American Society of Heating, Air-Conditioning, and Air- Conditioning and Refrigeration Institute, American Society of Heating, Refrigeration and Air- Conditioning Engineers, American Society for Testing and Materials, American National Standards Institute, American

Welding Society, Architectural Aluminum Manufacturers Association, Architectural Graphics Standards, Asphalt Institute, Consumer Products Safety Commissions Handbook for Public Playground Safety, International Building Code, National Association of Architectural Metal Manufacturers National Association of Fan Manufacturers, National Electrical Code, National Fire Protection Association, National Plumbing Codes Standards Illustrated, National Warm Air and Air Conditioning Association, Portland Cement Association, Sheet Metal Manufacturers, The Aluminum Association, Underwriters Laboratories, Inc.

Other: General Services Administration (GSA) guidelines and schedules for vehicle maintenance, EM 1110-1-400 Engineering and Design -Recreation Facility and Customer Services and Standards

1.1.9 Communication Devices and Responsibilities: The Contractor must provide reliable contact information for an authorized representative able to speak and make decisions on behalf of the company for all work performed on this contract. The contractor will be responsible for providing sufficient communication devices to support adequate communications with its employees while they are working out on the Project (radios, phones, push-to-talk radio, etc.). The

1.2.0 Government Furnished Facilities: The Government shall not provide any office, storage, or operational facilities for the Contractor. The Government may provide access to Government facilities for the performance of maintenance and repair related duties to be performed by the Contractor.

1.2.1 Safety Program Support: The Contractor shall fully implement a safety program that is in accordance with USACE Safety Manual EM 385-1-1.

1.2.2 Experience and Qualifications of Personnel: The Contractor shall provide an adequate and efficient number of trained and fully qualified personnel to accomplish tasks at Ouachita, Greeson, and DeGray Lakes in accordance with these specifications. All employees shall be subject to such Government regulations as are applicable during the time spent on Government property. The Contractor shall inform the COR of any personnel changes.

Subcontractors may be utilized to perform highly specialized or one-time type repair work. The Contractor shall provide an adequate number of fully qualified personnel at Ouachita, Greeson, and DeGray Lakes to comply with these specifications efficiently and effectively. In some instances, and for some duties, contract employees will be required to undergo background investigations prior to performing the duties.

1.2.3 Background Checks: The Contractor shall be required to provide background checks on all employees performing services under this contract.

General Requirement

Prior to onboarding any employee, subcontractor, or agent for performance under this contract, and strictly prior to initiating any U.S. Army Corps of Engineers (USACE) security requirements (including but not limited to background investigations, e-QIP/NBIS submissions, or Common Access Card (CAC) processing), the Contractor shall conduct an independent, comprehensive pre-employment security and suitability screening. The Contractor is solely responsible for ensuring that only individuals of sound character and conduct are proposed for work on USACE facilities or systems.

Scope of Contractor-Conducted Screening

The Contractor's internal pre-employment screening must be completed at the Contractor's expense. At a minimum, the screening shall include the elements detailed in the table below:

Screening Component and Minimum Requirements:

Criminal History Check: National and local jurisdiction criminal record searches covering a minimum of the past seven (7) years.

Sex Offender Registry: Verification against the Department of Justice National Sex Offender Public Website (NSOPW).

Employment Verification: Confirmation of the previous five (5) years of employment, including inquiries into any terminations for cause or workplace misconduct.

Reference Checks: Minimum of two (2) professional references to assess general character, reliability, and past behavioral conduct.

Suitability and Disqualifying Factors

The Contractor shall review the results of the screening to determine the candidate's suitability for performance under this contract. The Contractor shall not present any candidate for USACE security processing if the pre-employment screening reveals "bad behavior" or derogatory information that would logically preclude the individual from obtaining federal facility or network access.

Disqualifying Category and Description of Derogatory Information:

Criminal Conduct: Felony convictions, pending felony charges, or recent (within 5 years) misdemeanor convictions involving violence, theft, fraud, or drug-related offenses.

Domestic Violence: Any conviction of a misdemeanor crime of domestic violence (Lautenberg Amendment compliance).

Workplace Misconduct: Documented history of workplace violence, sexual harassment, gross negligence, or insubordination.

Suitability and Disqualifying Factors

Prior to submitting any candidate's information to the USACE Security Office or the Contracting Officer's Representative (COR) for official government background processing, the Contractor must provide a written certification.

The certification must state: "The Contractor certifies that a comprehensive pre-employment background and conduct screening has been completed for [Candidate Name] in accordance with contract requirements. No derogatory information or criminal history was identified that would preclude the candidate from performing duties under this contract or meeting USACE security standards."

Government Right of Refusal Compliance with this pre-screening requirement does not guarantee that the individual will successfully pass the official USACE security adjudication process. The Government retains the absolute right to deny access to USACE facilities, networks, or information to any Contractor employee based on the results of the official government investigation, regardless of the Contractor's preliminary screening results.

1.2.4 Removal of Contractor's Employee(s): All contract employees shall always conduct themselves in a proper manner. The Contractor shall remove or reassign from work under this contract any employee who, in the opinion of the COR, is objectionable or incompetent. The COR may require the Contractor to immediately remove from the work site any employee of the Contractor who is considered incompetent, or who endangers people or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work. Contractor employees found to be under the influence of any drug or alcohol, mental or physical impairment, negligent in the use of personal safety equipment or established safety policies or procedures, may be subject to immediate removal from the Ouachita, Greeson, and DeGray Lakes Site, depending on the nature of incident. Repeated or continual ongoing safety infractions shall be grounds for removal from all Government facilities related to this solicitation.

Notification of objection by the COR will be made promptly to the Contractor in writing if time or circumstances permit. Otherwise, notification shall be made by telephone and shall be confirmed in writing as soon as possible. These requirements shall not be the basis of any claim for compensation and/or damages against the United States and/or any of its officers or agents. In addition, no such removal will reduce the Contractor's obligation to perform all the work under this contract, and immediate replacement will be made as required.

1.2.5 Management and Administrative Personnel Scope of Work: The Contractor shall provide adequate personnel to conduct appropriate management and administrative duties for all work performed under this contract. Multiple responsibilities can be held by single employees.

1.3.0 Identification of Contractor Employees: Employees (whether Prime or Subcontractor) must wear some type of visible work identification at all times during the performance of services under this contract. For example, photo id badge, company shirts, vests, etc. Subcontractors working on the project full-time shall also be appropriately identified. All workers are to be fully clothed in accordance with EM 385-1-1 and maintain a neat and clean appearance. Vehicles and equipment shall be identified with company name or logo. No shirt tails hanging outside of pants and no unbuttoned shirts shall be worn while working on the project. Violations will be brought to the attention of the representative; continued violations will be documented in COR reports and in the Contracting Performance Assessment Reporting System (CPARS). Name plates are required for Welcome/ Visitor Center Attendants (on desk).

1.3.1 Personal Hygiene and Health: The Contractor shall insure that all employees involved in the performance of services under this contract maintain their personal hygiene in such a manner so as not to be offensive to the public. Also, under no circumstances shall the Contractor allow any employee to work if they have a communicable disease or infection, or if they are intoxicated or under the influence of alcohol or drugs. In addition, the Contractor shall ensure that all employees are physically and mentally capable of performing within their position description.

1.3.2 Unauthorized Activities by the Contractor and Employees: Within the limits of Government- owned property, the Contractor and his employees shall not engage in any activities with members of the public or private business which would be extracurricular to the services required under this contract. Specifically included in this prohibition is the sale of any goods or services to the public. The Contractor shall not accept or solicit any gratuities or favors from members of the public for any reason or under any circumstances.

1.3.3 Plans: The Contractor shall furnish the following plans within 30 days after award date for approval by the Contracting Officer (unless noted otherwise).

1. Contractor Quality Control Plan (CQC)

2. Accident Prevention/Hazardous Analysis Plan

1.3.4 Contractor Quality Control (CQC) Plan: The Contractor shall establish a comprehensive quality control program in accordance with the contract clause entitled "Inspection of Services".

This plan shall be submitted within 10 days after award and should address in detail the proposed Quality Control Program to be used to ensure compliance with the contract specifications. The plan should describe quality control concepts, purpose, and provide a general program overview. It should address the methods to be utilized to ensure that the CQC program is effective and efficient, including the inspection program to be utilized to ensure quality control goals are met. It should also include the frequency and schedule for inspecting significant project facilities and how corrective measures will be applied. The plan should address the interaction and coordination efforts that will occur between the Contractor and Government personnel involved in Quality Assurance (QA). The plan will be in sufficient detail to indicate to the Government that the Contractor is cognizant of the contract requirements. In addition to the above, the plan should address the following areas of concern:

1. Employee performance and evaluation.

2. Identification of declines in quality of product and how substandard performance and deficiencies will be corrected.

3. Employee health and hygiene.

4. Maintenance of facilities.

5. Preparation and submission of required reports to appropriate Government personnel.

Inspections shall also include subcontractor performance. Government QA inspectors will assure that the CQC plan is being implemented and is effective, but the presence or absence of a Government inspector shall not relieve the Contractor of responsibility for the proper execution of work in accordance with the specifications.

Compliance inspections shall be documented, and records of deficiencies observed, and corrective actions taken shall be furnished to the Government. If recurrent deficiencies indicate that the quality control system is inadequate, corrective action will be taken. The COR must approve any proposed changes to the plan prior to its implementation.

1.3.5 Accident Prevention/Hazardous Analysis Plan to include Hazard Control Plan and Confined Space Entry Plan in compliance with EM 385-1-1.

The Contractor shall develop, submit, and maintain a comprehensive Accident Prevention Plan (APP) and Activity Hazard Analyses (AHA) in strict accordance with the USACE Safety and Occupational Health Requirements Manual (EM 385-1-1). This safety plan must be tailored to the specific operation, maintenance, and repair activities conducted at Ouachita, Greeson, and DeGray Lakes. The Contractor shall submit the APP to the Contracting Officer Representative (COR) for review and acceptance prior to the initiation of any on-site work. It is the Contractor's sole responsibility to ensure all personnel, subcontractors, and visitors strictly adhere to the accepted plan.

Accident Notification: The Contractor shall provide immediate notification to the COR of any accident which involves personal injury, death, and/or any property damage (to include Government property, Contractor property, and Privately Owned property). Initial notification will be verbal with follow-up in writing. All accidents involving on-the-job injuries or property damage will be telephonically reported to the COR as soon as reasonably possible after the accident, but no later than the end of shift on the day of the accident. The Contractor shall also be required to complete all appropriate reports and submit them within 24 hours of the accident or 48 hours under unusual circumstances. The COR will provide the Contractor with guidance regarding the proper forms to submit for each type of accident which might occur on the job.

The Contractor shall submit accident exposure and experience incidental to this work in accordance with Section 2, EM-385-1-1.

The Contractor shall be responsible for safeguarding all work sites in all areas. Appropriate signs, warning devices, and barriers will be used to protect the public, Contractor employees, and Government employees where work is being accomplished.

1.3.6 Invoicing: Will be in accordance with the instructions provided in each task order.

1.3.7 Seasonal Dates:

Shoulder Season 1: 1 MARCH - 1 MAY

Peak Season: 1 MAY - 31 JULY

Shoulder 2: 1 AUGUST - 30- SEPTEMBER

Off-season: 30 SEPTEMBER - 1 MARCH

1.3.8 ANTITERRORISM AND OPERATIONS SECURITY (AT/OPSEC)

In accordance with OPORD 2013-74, Annex A, the following paragraphs apply to this requirement:

a. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures, to include identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

b. Antiterrorism (AT) Level 1 training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

c. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as "NCIC-III") and Terrorist Screening Database (commonly referred to as "TSDB"). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall https://jko.jten.mil/ coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

d. Contract personnel requiring a common access card (CAC): Contract personnel will be issued a common access card (CAC) only if duties involve one of the following: (1) both physical access to a DoD facility and access to DoD information systems or networks; (2) remote access to a DoD information system or network using DoD-approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. Before CAC issuance, contract personnel must have at a minimum, a favorably adjudicated Tier 1 investigation or an equivalent or higher investigation in accordance with applicable Army regulations and Homeland Security Presidential Directive-12 (HSPD-12). At the discretion of the RA, an initial CAC may be issued based on a favorable review of a fingerprint check and a successfully scheduled Tier 1 investigation with the National Background Investigations Bureau. The RA provides contract personnel with additional information and forms to initiate the CAC issuance process, and/or to initiate background investigations, when required. Contract personnel shall complete these processes within established timelines to avoid delays.

e. Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

f. Contract personnel requiring access to Government information systems: All contract personnel with access to a government information system (including USACE business systems and CAC-enabled websites) shall comply with applicable DoD and Army regulations and shall use the organization's UserID-Password Administration and Security System (U-PASS) at commencement of services to request network user accounts. Contract personnel shall complete DoD Information Assurance Awareness training prior to accessing information systems, and annually thereafter.

g. Training requirements for the protection of sensitive information: All contract personnel with access to critical information (as identified in the RA's OPSEC Program) shall complete initial and annual refresher OPSEC Level I Awareness training, which is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html (websites subject to change). All contract personnel with access to Controlled Unclassified Information (CUI) shall complete initial and annual refresher CUI training in accordance with applicable Army policy.

h. Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

https://www.iad.gov/ioss/ http://www.cdse.edu/catalog/operations-security.html

i. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1 (i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

j. Non-U.S. Citizens working on Government Contracts: Government Approval MUST be obtained PRIOR to any non-U.S. Citizen being permitted to work on a government contract. The Contractor must submit a letter requesting approval via the Contracting Officer/Contracting Officer Representative to the Vicksburg District Security Officer. The letter must include the contract number, period of performance, location(s) of work performance and attach a copy of the individual's passport and visa/work authorization documents.

TECHNICAL PROVISIONS

TP-1 Janitorial and Custodial Services

TP-2 Grass Mowing, Brush Hogging, Weeding, Trimming, Landscaping

TP-3 Welcome/Visitor Center

TP-4 Dumpster Services

TP-5 Natural Resource Management

TP-6 Maintenance and Repair of Buildings, Structures, Facilities, Mechanical, Plumbing, Electrical

TP-7 Labor, Equipment and Material Support for Dam, Spillway and Aids to Navigation

Technical Provision 1

Janitorial and Custodial Services https://www.e-verify.gov/)

PRICED CLIN: Task orders will be issued on an as needed basis and will be priced in accordance with unit prices for each CLIN agreed to at time of award. Ordered CLINs, Quantities, and period of performance will be specified for each task order.

2.1.0 General Statement of Work: The work shall include scheduling and providing janitorial and custodial services of government facilities and public use facilities identified in Attachment 1 of this Solicitation. The Contractor shall be flexible and capable of adjusting performance to satisfactorily clean, remove waste, and maintain facilities including work on weekends and holidays when the areas are open to the public. The contractor shall dry all recently cleaned surfaces before use of the facility by the public. Ensure that facilities are clean, free of objectionable odors, and maintain a continuous supply of toilet tissue, hand soap and paper/hand towels.

Inspect, deodorize, and clean inside fixtures, partitions, floors, walls, ceilings, doors, counter tops, and windows. Remove all insects, insect nests, and webs, from louvers, screens, doors, windows, inside and outside walls, floors, ceilings, recesses, and eaves. All interior areas subject to wet or damp conditions shall be kept free of mold, mildew, fungi, and other biological formations.

On occasion, the Contractor shall be required to clean and sanitize Blood Borne Pathogens from facilities or grounds. As such, cleaning personnel must be trained in the handling of Blood Borne Pathogens and be provided with the proper safety equipment.

Clean outside grounds adjacent to facilities and replace inoperable light bulbs in both interior and exterior fixtures. Unclog sinks, toilets, and water fountains. Remove drawing, writing, and graffiti.

Water fountains, sinks, and toilets shall be kept clean, free from foreign matters and in a sanitary condition.

Clean operational areas including offices, conference rooms, reception areas, kitchen/break rooms, storage rooms, and restrooms.

2.1.1 Government Furnished Equipment, Materials, and Supplies: The Government shall not be responsible for providing any equipment, materials, or supplies associated with the performance of any work in this TP. The Contractor may obtain water for cleaning from existing Government water supply systems, but the Contractor shall be responsible for transporting water for cleaning to areas where water is not available.

2.1.2 Contractor Furnished Equipment, Materials, and Supplies: The Contractor shall furnish all labor, supplies and materials and other direct costs for accomplishing this TP including, but not limited to, detergents/soaps, disinfectants, deodorizers, enzymes or bacterial agents, deodorant cakes, toilet paper, paper towels, odor control chemicals, stain and/or graffiti remover, "out of order" signs, "closed for cleaning" signs, sanitary napkins, receptacle liners, mops, brooms, toilet brushes, cleaning rags, squeegees, wire brushes with scrapers, sponges, buckets, brushes, plungers, towels, and any other supplies, materials, or cleaning utensils required to clean, service, and maintain sanitary conditions as stated in this contract. For all cleaners, disinfectants, and deodorizers, the manufacturer's instructions for use and mixing shall be followed. The Contractor shall use appropriately sized liners and will be thick enough to prevent breakage during normal use and handling. Shower curtains shall be new, mildew resistant, heavy duty, 10-gauge, white vinyl with rust-proof grommets and reinforced hems/seams of sufficient length and width to prevent water from flowing out of shower stalls. Non-corrosive hooks for each curtain grommet will be provided by the contractor. The curtains shall be changed or cleaned frequently to prevent mold, mildew, and soap build up. The Contractor shall always provide an adequate supply of paper products at all locations. At offices and administrative buildings, occasional meetings or conferences with visitors will require additional products.

2.1.3 Cleaning Hours: The Contractor shall provide cleaning of areas according to the schedules outlined in the task order scope of work. Offerors may propose minor deviations to these frequencies. However, Offerors must provide justification that adequately demonstrates efficiency to the Government if they propose a deviation.

Work in Recreation Areas shall not begin prior to 6:00 a.m. or continue past 8:00p.m. (local time)

Work in operations areas (except Powerhouse) shall be between the hours of 8:00a.m. and 4:30 p.

m. (local time), Monday through Friday.

2.1.4 Operations Areas: Ouachita Project Management Office/Lake Ouachita Field Office, Lake Greeson Field Office, DeGray Lake Field Office, Blakely Powerhouse (Lake Ouachita), Narrows Dam/Powerhouse (Greeson), DeGray Powerhouse.

2.1.5 Water and Electricity: All water and electricity required in the performance of this contract can be obtained from Government sources within the area or from other sources with the approval of the COR.

2.1.6 Solid Waste Disposal Tracking: Per DOD INSTRUCTION 4715.23 INTEGRATED RECYCLING AND SOLID WASTE MANAGEMENT and USACE Non-Hazardous Solid Waste Diversion and Materials Management Policy (19 Sep 2017), the Contractor shall accurately quantify solid waste and recycled waste quantities monthly and report those to USACE Project personnel.

THE FOLLOWING TASKS COINCIDE WITH THE JANITORIAL SERVICES CLINS ON THE BID

SCHEDULE AND WILL BE PERFORMED ON A PER CLEANING BASIS. (Paragraphs 2.1.7, 2.1.8, 2.1.9, 2.2.0, 2.2.1, 2.2.2, 2.2.3, 2.2.4, 2.2.5, 2.2.6)

Services to be performed per cleaning will include, at a minimum, cleaning floors, walls, windows, and ceilings, removing trash, replacing trash bags, restocking soap, hand towels, paper towels, and toilet paper, cleaning toilets, showers, sinks, countertops, and all surfaces and fixtures.

2.1.7 Impact Sites (Picnic Sites, Day Use Areas, and Camp Sites): Clean all picnic tables, including seats, tops, and base slabs. Pick up litter from the grounds and facilities in developed and maintained areas of all day use parks and campgrounds including parking areas, steps, around bathrooms and shower houses, in and around picnic areas, around shelters, along the wood line on the edge of mowed areas, around sport fields and courts, around playground areas, along the shoreline on the edge of the mowed areas, fishermen's trails inside parks, and in riprap areas of the dam and parks. Clean all shelters, benches, and playground equipment. Remove leaves, pine straw/needles, and soil from all sidewalks, picnic tables, walking surfaces, shelters, benches, and playgrounds equipment.

2.1.8 Refuse Trash Removal, Trash Cans, and Receptacles: Pick up litter from the grounds and facilities in developed and maintained areas of all day use parks and campgrounds including parking areas, steps, around bathrooms and shower houses, in and around picnic areas, around shelters, along the wood line on the edge of mowed areas, around sport fields and courts, around playground areas, along the shoreline on the edge of the mowed areas, fishermen's trails inside parks, and in riprap areas of the dam and parks. Remove the contents of trashcans and trash /debris on the ground within 20 feet of the container. Clean and disinfect cans and replace liners.

Generally, trashcans will be emptied, and liners will be replaced only when they become half-full or produce an odor. Advise the COR promptly when any household or other outside garbage or debris is found at project areas. Trash collected from all grounds and trashcans at Lake Ouachita will be bagged and placed into dumpsters at collection points designated in Attachment 3. Trash collected from all grounds and trashcans at DeGray Lake will be bagged and placed into dumpsters at the DeGray Maintenance Shop. The contractor will be responsible for gathering all trash from the trash cans/recepitcles at Lake Greeson in Attachment 3 and transferring them to the county collection point to be picked up. A location for the collection points are listed in Attachment 3.

2.1.9 Gate House Cleaning Services: Contractor shall clean each gatehouse according to the schedules outlined in the task order scope of work. The contractor shall provide toilet tissue, paper towels, and cleaning supplies for each gatehouse during the recreation season.

2.2.0 Fish Cleaning Stations: Remove all trash, paper, plastic, debris, fish remains and any other refuse matter and clean the fish cleaning stations so there is no residue or smell after cleaning.

Fish stations are listed under Attachment 0001. Stations shall be cleaned daily from 01 March through 31 October. Stations are closed to the public during the interim months.

2.2.1 Removal of Litter and Debris from Operations Areas, Public Use Areas, and Non- Public Use Areas: Pick up trash, paper, plastic, debris, bottles, dead fish, limbs, cans, gravel, mud, animal carcasses, driftwood, and any other foreign material and dispose of properly. Litter shall be removed from all areas within 20 feet outside the perimeter of defined mowing limits or established wood lines, whichever is greater. Debris and foreign material removal will be limited to what can be removed by hand. Items too large to remove by hand shall be reported to the COR.

Perform this work also in hard-to-reach areas, such as steep slopes and rip-rap areas and to water edge. Keep beaches and water edge areas free of debris, glass, pop tops, cigarette butts, trash, litter, animal waste, animal carcasses, and all such undesirable material.

All sand will be removed from concrete walkways in beach areas, including but not limited to, sidewalks, showers, and fountains, each time the beaches are serviced.

2.2.2 Grills and Fire Rings: Remove ashes and debris from within and around grills and dispose of properly. Hot ashes shall be contained in OSHA approved safety cans to prevent spillage and fire. Clean all grill cooking surfaces.

2.2.3 Sanitary Dump Stations and Drains: Clean concrete slabs, wood, and metal surfaces, attempt to unclog clogged drains, and disinfect.

2.2.4 Fishing Decks/Piers and Floating Docks: Clean concrete slabs, wood/metal decks, rails, walkways, benches, steps, and sidewalks. Remove litter and refuse.

2.2.5 Picnic Shelters/Pavilions: Clean structures including tables, benches, eaves, floors, and grills. Clean outside grounds and facilities including walks, steps, water fountains, and benches, to water's edge.

2.2.6 Oak Bower Event Site: The Contractor shall provide all labor, supervision, equipment, and materials necessary to perform comprehensive custodial and cleaning services at the Oak Bower Event Site at DeGray Lake, Arkansas, immediately following each reservation and prior to the start of the subsequent reservation.

The Contractor shall establish and maintain a user profile/access (as coordinated with the COR) to monitor the active Recreation.gov public schedule for the Oak Bower Event Site. The Contractor is solely responsible for checking the reservation calendar at least once every twelve (12) hours (e.

g., once by 0800 and once by 2000 daily) to capture any newly booked, modified, or last-minute reservations. The Contractor must maintain operational flexibility to accommodate these short-notice occurrences; due to the automated, real-time nature of Recreation.gov, last-minute bookings may occur up to the day of the event. The Contractor shall use the visible schedule to forecast service frequency weekly.

Standard check-in time for reservations is 1000 hours, and check-out time is 1500 hours local time. The Contractor shall not mobilize to the site prior to the scheduled reservation check-out time of 1500 hours (unless a reservation ends early and early entry is coordinated/confirmed). Any early arrival and subsequent waiting or "idle" time is entirely at the Contractor's own expense. The Contractor must complete all cleaning services within the 1500 to 1000 hour window prior to the next scheduled check-in.

THE FOLLOWING TASKS WILL BE PRICED ON A PER TASK ORDER BASIS. (Paragraph 2.2.7, 2.2.8, 2.2.9, 2.3.0, 2.3.1)

2.2.7 Rooftops and Gutters: The roofs and gutters of all buildings and structures on the project will be cleaned of all leaves, pine needles, and other debris at a minimum of twice per year.

2.2.8 Shampoo Carpet: Carpets shall be cleaned, with services includes pre- inspection, vacuuming, pre-treatment of stains, hot water extraction, post-cleaning spot treatments, air movers for faster drying, and final walk-trough inspection for quality assurance. This work will only be performed at the request of the COR, and will be noted in task orders.

2.2.9 Strip and Wax Floors: Floors shall be stripped and waxed, as orders are placed. Service includes removing old wax and dirt, cleaning the surface, and applying new wax to restore shine and protection. Work typically includes stripping the floor, scrubbing, cleaning, rinsing, drying, applying multiple floor coats and final walk-through inspection for quality assurance. This work will only be performed at the request of the COR and will be noted in task orders.

2.3.0 Pressure Wash Sidewalks, Decks, Walkways, Patios, and Buildings: Sidewalks, decks, walkways, patios, and buildings shall be pressure washed, as orders are placed. Service includes high pressure water to clean surfaces, and final walk-through inspection for quality assurance. This work will only be performed at the request of the COR and will be noted in task orders.

2.3.1 Portable Restroom Facilities: Heavy use during holiday periods, or special events, may require additional portable restrooms and/or more frequent servicing of existing portable restrooms. The contractor shall be responsible for all procurement, cleaning, sewage removal /pumping services and placement or moving of portable restrooms.

Technical Provision 2

Grass Mowing, Brush Hogging, Weeding, Trimming, Pruning, Blowing and Landscaping performance will be specified for each task order.

3.1.0 General Statement of Work: The Contractor shall provide all labor, supplies, materials, equipment, and any other items necessary to satisfy the requirements of this TP. The Contractor shall perform maintenance including mowing, trimming, and weeding of all portions of parks that are currently maintained as provided in Attachment 2-Mowing of this Solicitation. Remove limbs, debris, and litter from recreation parks and shoreline areas where mowing and landscaping is conducted prior to mowing occurring. Mow, edge, and trim grass at designated operational areas, parks, dikes, and along access roads at Ouachita, Greeson, and DeGray Lakes. Approximate acreages to be mowed and mowing frequencies are listed in Attachment 2-Mowing.

3.1.1 Government Furnished Equipment, Materials, and Supplies: The Government shall not be responsible for providing any equipment, materials, or supplies associated with the performance of any work to be done by the Contractor to accomplish this TP.

3.1.2 Contractor Furnished Equipment, Materials, and Supplies: The Contractor shall furnish all labor, equipment, materials, and supplies necessary for the completion of this technical provision. Contractor Furnished Equipment will include at a minimum: tractors, brush mowers, grass mowers, weed eaters, edgers, blowers, hand tools, safety equipment, PPE, tools for in the field repairs, fuel cans, and fuel for all equipment. The Contractor shall provide all parts and labor for repairs and maintenance of the Contractor Furnished Equipment in this TP.

3.1.3 Damage Responsibility: The Contractor shall be responsible for any damage to Government or private property, facilities, structures, or landscape features occurring because of its operation. The Contractor shall be required to satisfactorily rectify notices of damage from the public and to protect the Government from claims resulting from damage caused by its activities, and to make immediate notification to the COR concerning said damage or injury to any person.

3.1.4 Schedule: Mow grass in all parks and operational areas listed in…