Amendment 0001 - W912DY25QA101 Navy Multi. Location - Appliances.pdf

PDF 4 MB Posted

Attached to
Amendment 0004 - RFQ W912DY-25-Q-A101 Navy Multi. Location - Appliances
Solicitation number
W912DY-25-Q-A101
Issued by

About this file

This is an amendment to a Request for Quote (RFQ) for Navy Multi-Location Appliances procurement, solicitation number W912DY-25-Q-A101. The amendment includes a comprehensive Statement of Work (SOW) for removal and installation of furnishings across multiple Navy locations, including sites in Rota, Newport, Sigonella, Dahlgren, Guam, Great Lakes, Pensacola, Norfolk, NBVC, Gulfport, Lakeside, Meridian, and Sasebo.

The SOW details specific requirements for furniture and appliance delivery, installation, and removal, with each location having unique access, security, and logistical parameters. Key contractor responsibilities include coordinating delivery, removing existing furniture, installing new furnishings, cleaning and preparing spaces, disposing of packaging materials, and ensuring compliance with base-specific security protocols. The amendment provides granular instructions for each location, including the number of microwaves to be removed (ranging from 85-275 per site), delivery hours, building access procedures, and technical representative contact information. Quotes are due by 12:00 PM Central Time on 28 August 2025, with a 120-day quote validity period.

View the file

Other files

File Type Posted
REV 8-20-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 839 Microwaves.xlsx XLSX spreadsheet
Amendment 0003 - W912DY-25-Q-A101 Navy Multi. Location - Appliances.pdf PDF
REV 8-20-2025 ATT 2 - FID - Navy Multiple Locations Microwaves Dehumidifiers.pdf PDF
REV 8-20-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 836 Microwaves.xlsx XLSX spreadsheet
REV 8-20-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 832 Microwaves.xlsx XLSX spreadsheet
REV 8-20-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 835 Microwaves.xlsx XLSX spreadsheet
REV 8-20-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 831 Microwaves.xlsx XLSX spreadsheet
REV 8-14-2025 ATT 2 - FID - Navy Multiple Locations Microwaves Dehumidifiers.docx DOCX document
REV 8-14-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 838 Microwaves.xlsx XLSX spreadsheet
REV 8-14-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 832 Microwaves.xlsx XLSX spreadsheet
REV 8-14-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 831 Microwaves.xlsx XLSX spreadsheet
REV 8-14-25 ATT 1 - RFQ - CFAY Yokosuka Bldg 3333 Microwaves.xlsx XLSX spreadsheet
Amendment 0002 - W912DY-25-Q-A101 Navy Multi. Location - Appliances.pdf PDF
Combined Synopsis Solicitation RFQ Document - W912DY-25-Q-A101 Navy Multi. Locations - Appliances_ 19 Aug.pdf PDF
REV 8-14-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 839 Microwaves.xlsx XLSX spreadsheet
REV 8-14-25 ATT 1 - RFQ - Naval Station Great Lakes Bldg 830 Microwaves.xlsx XLSX spreadsheet
Combined Synopsis Solicitation RFQ Document - W912DY-25-Q-A101 Navy Multi. Locations - Appliances_ 28 July.pdf PDF
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 23 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Fallon NV - Valleys Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Dahlgren Bldg 962 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 25 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Gulfport Bldg. N306 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Lakeside Pascagoula - Building B Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 241 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 358 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 354 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 214 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Pensacola Bldg 3703 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 355 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 356 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAVSTA Great Lakes Bldg 6301 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Sigonella Bldg 170 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 353 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 359 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 24 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Guam Naval Hospital Corral Ridge Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Pensacola Bldg 1094 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Pensacola Bldg 3901 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Pensacola Bldg 4146 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 21 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Gulfport Bldg N306 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 251-261 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Sasebo PW63 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Sasebo Bldgs 98 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NS Newport Bldg 689 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - Lakeside Pascagoula - Building A Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NBVC Hueneme Mugu Bldg 22 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAS Meridian Bldg 360 Microwaves.xlsx XLSX spreadsheet
ATT 1 - RFQ - NAVSTA Rota Warehouse Bldg 590 Dehumidifiers.xlsx XLSX spreadsheet
ATT 1 - RFQ - Norfolk Naval Shipyard Bldg 1585 Microwaves.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Vendor Questions – W912DY-25-Q-A101 Navy Multi. Locations – Appliances

1. For Sigonella, Catania region, they have mentioned that extra furniture from building will need to be taken to warehouse. They haven’t specified what furniture or the QTY of it

HNC RESPONSE: See AMD SOW for this location

2. For Pensacola region, ATT1 shows three buildings as Offload Only, but the SOW has different building numbers as compared to ATT1 and SOW only shows Installation and Removal. No Offload SOW.

HNC RESPONSE: See amended SOW for this location

UH Furnishings Program Statement of Work - Delivery of Furnishings

Navy, Multi Locations, Appliances

Attachment 3 Page 1 of 13

1. GENERAL

1.1 Contractor has the option to provide a representative at time of delivery to inspect items for damage as the Government representative offloads those items into the specified locations in Table 1. Failure to quote price for oversight of delivery will be considered that the installation personnel will be responsible for reporting of any damages to items delivered. Contractor will agree to replace/repair those damages as reported by the Government TR.

1.2 Awarded Contractor is responsible for verifying all existing field conditions, i.e., electrical power including but not limited to voltage, hertz, amperage, and outlets at each building through the Technical Representative identified in the SOW, Table 1.

1.3 The Technical Representative (TR) for this project is as shown in Table 1 of this document.

1.4 The contractor shall provide a digital color board of all furniture finishes and fabrics to the TR for reference, prior to manufacturing.

1.5 Upon final approval of the customer, the vendor shall reserve adequate quantities of fabrics from the manufacturer as soon as possible to avoid delays due to “out of stock” and/or “discontinued” fabrics.

1.6 If the awarded fabric is discontinued after award, the vendor shall contact the HNC PM to develop a path forward.

2. DELIVERY

2.1 The Contractor shall contact the TR at least 15 working days prior to shipping.

The Contractor shall coordinate item delivery from all sub-contractors to minimize the number of deliveries.

2.2 In the event that a delay in delivery is requested by the TR, the Contractor shall notify the Contracting Officer within 1 working day.

2.3 The Contractor shall provide the TR with a minimum of 48-hour notification as to the date and time that the trucks will be arriving. The Contractor shall also provide email notification as to the date and time the trucks will be arriving to:

furnishinginvoices@usace.army.mil at least 48 hours prior to scheduled arrival time.

mailto:furnishinginvoices@usace.army.mil

Attachment 3 Page 2 of 13

2.4 Contractor must ensure that the driver of the delivery vehicle has copies of the Delivery Order (contract) for the items being delivered in order to gain entry to the facility.

2.5 Drivers of the delivery vehicles shall not attempt to deliver any items before the scheduled delivery date. In the event the delivery date falls on a Saturday, Sunday, or federally recognized holiday, the delivery date shall be the next workday after the Saturday, Sunday, or holiday.

2.6 Shipping Label shall read as specified in Table 1 of this document.

2.7 Items shall be labeled with the building number(s) provided in Contract Line Item (CLIN) 0001, unless otherwise noted in this paragraph.

2.8 The Contractor shall complete delivery of furnishings under this Statement of Work in the time period specified in Table 1.

3. RECEIVE

3.1 Contractor shall deliver items between the hours specified in Table 1.

3.2 If the Contractor opts to provide oversight of delivery, the Contractor shall maintain a complete file of all documents relating to each discrepancy. Copies of discrepancy reports shall be forwarded to the TR on a daily basis.

3.3 The Contractor shall repair or coordinate for replacement of damaged, defective, or missing items.

4. PRODUCT DOCUMENTATION

4.1 The Contractor shall ensure that all owner’s manuals, warranty information assembly instructions, maintenance and care instructions, operating instructions, and any other information is provided to the TR upon completion of delivery of items in CLIN0001. Documentation that is packed in boxes with the item may remain in the box.

It is not necessary to open the boxes to retrieve the product documentation.

5. Safety

5.1 Safety Compliance Requirements. Contractor shall comply with FAR 52.236-13 Accident Prevention and execute all work in accordance with (IAW) the latest version of Safety Manual EM 385-1-1 per base contract.

Attachment 3 Page 3 of 13

5.2 Site Visit Accident Prevention Plan (SVAPP). A SVAPP is required if an APP with a site/survey activity hazard analysis (AHA) has not been provided and accepted by the furnishings program CEHNC KO in coordination with (ICW) CEHNC Safety and Occupational Health Office (SOHO). The SVAPP is intended and necessary for any site visit not covered by an APP and these site visits shall be for visual inspection/observation or office type work only. If work must be performed (i.e., metering, work on energized equipment), an Accident Prevention Plan (APP) must be submitted and accepted.

5.3 Accident Prevention Plan. The APP shall follow the minimum requirements of EM 385-1-1 Chapter 2-7 and this PWS. Follow the mandatory ENG Form 6293 (Accident Prevention Plan Worksheet). The APP must be submitted and accepted by the CEHNC KO ICW CEHNC SOHO prior to starting any work at the site. The contractor is responsible for preparing an APP per EM 385-1-1 for all work that goes beyond the scope of a site. The completed APP shall be submitted to the KO Furnishings Invoice box at least thirty (30) business days prior to field work performance. Field work shall not take place until the APP has been submitted, reviewed, and accepted by the CEHNC Safety Office.

5.4 Contractor shall verify with the controlling installation, the applicability, and requirements for emergency procedures, permit required work procedures, and hazardous environments and waste disposal. These findings shall be incorporated into the APP.

5.5 Activity Hazard Analysis (AHA). All AHAs shall be written in accordance with section 6 in each applicable chapter in EM 385-1-1. The identification and proof of qualification for competent/qualified persons (e.g., Confined Space, Electrician, Crane Operator, etc.) and proof of qualification shall be included IAW EM 385-1-1 Chapter 2-6.

d(4)(g). Define the steps to be performed for the activity/task/DFOW and the work sequences (for example, site conditions, materials, personnel) needed. Job steps should be detailed so that the reader clearly understands how that job will be accomplished (for example, how the part will be installed or removed, anticipated voltages, quantities of chemicals utilized, equipment utilized to accomplish the task, heights being accessed).

5.6 Site-Specific Addendum (SSA). SSAs are required for each site if work will be conducted on two or more distinct sites. The SSAs shall be submitted to the KO Furnishings invoice box for review and acceptance by the CEHNC Safety Office prior to work starting. Each SSA shall contain detailed site-specific information only applicable to a specific location. It shall be attached to the APP as an appendix and be readily available on the jobsite.

Attachment 3 Page 4 of 13

5.7 Safety document resubmittal shall include the original local SOHO comments with detailed responses (Form 7 or 4025) and highlight all changes.

5.8 Any Proposals, Change Orders, and Contract Modifications shall be verified that they are covered under the current accepted APP. If the pending work effort is NOT covered under the initial task order APP, the contractor shall submit, for government review and acceptance, an addendum to the APP.

5.9 Notifications and Reports. All accidents and near misses will be reported in accordance with EM 385-1-1 Table 2-1. Most current version of the ENG Form 3394 Aug 2021 shall be used for all reporting measures. Failure to comply with these requirements will be reflected on CPARS (If applicable).

5.10 Monthly Exposure Hours Report. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractors. Hours associated with administrative activities such as payroll, human resource, service order managers/technicians, etc., are not counted. Exposure hours shall be submitted to HNC Contracting Office (CT). The data must be posted/submitted not later than 10 calendar days after the end of each month. Exposure data consists of man-hours expended in direct performance of the work performed on the jobsite. The monthly submission shall be broken down by Contract and identify exposure hours for each Contract. If no hours are worked on the project/task, a report showing zero (0) is required. Contractors should report monthly exposure hours by using the Excel Exposure Hour Report via email to *either contract specialist or PgM.

5.11 Prime Contractor Corporate Safety Official / Corporate Official (CSO/CO). This contract requires a minimum of one Corporate Safety Official / Corporate Official to manage and oversee the implementation of the Prime Contractor’s Safety Program.

The CSO or CO shall conduct roles and responsibilities listed in EM 385-1-1 (2024) Chapter 2-4. f.

5.12 Site Safety and Health Officer (SSHO). No work shall be conducted at the site of the work until an SSHO (L2 / L3) is present as described and EM 385-1-1 (2024) Chapter 2-8. b. L2s are required for this project that include work that includes LOTO (208V or above), Fall Protection, Confined Space, Use of LHE, Scaffolding, or any other higher hazard activity. L3 is acceptable for any phases of work outside of what is listed above to include office work, providing furniture/equipment support, the receiving and unloading of materials/furniture, or any other low hazard activities. L2/L3 are only permitted on projects with a residual risk of low or medium.

5.13 The SSHO on site must be employed by the prime contractor unless otherwise approved by the KO/COR ICW CEHNC SOHO. If a subcontractor employee is allowed, SSHOs must work under direction of the prime contractors CSO or CO equivalent (CSO

Attachment 3 Page 5 of 13 or CO does not need to be onsite) from the Prime Contractor. The APP shall include discussion as to how the CSO or CO will ensure the L2 and/or L3 is/are implementing the requirements of the prime contractor’s safety program, EM 385-1-1, OSHA, consensus standards, any additional local laws and regulations, and all accepted safety plans. This shall include but is not limited to the review of site documentation, site audits, training, meetings, and accident reports.

5.14 After Hours Work/Multiple Shifts. Planned after hours work or multiple shifts like dual shifts or scheduled work designed to not impact the customer is considered normal shift operations and shall still ensure that an SSHO, as required by scope of work, is on-site while work is being performed.

5.15 Multiple sites / Locations outside of 45 minutes: shall still ensure that an L2 is on the main site while work is being performed but would additionally need an L3 or L2 (depending on scope of work) for each location, however processes and procedures must be identified in the APP how communication and reporting will be established between the L3 and L2 for these evolutions.

6. AT-OPSEC

6.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting

Attachment 3 Page 6 of 13 performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

6.2 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

6.3 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

6.4 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E- Verify system. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i).

An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

6.5 All contractor and all associated sub-contractors’ employees shall comply with applicable installation or facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation and MEDOCM access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor

Attachment 3 Page 7 of 13 workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition at any installation or facility change, the Government may require changes in contractor security matters or processes.

Attachment 3 Page 8 of 13

TABLE 1. Project specific information.

Rota 590

Technical Representative: JOSE VILLANUEVA

Tech. Rep. Phone: COMM: +34-956-82-1749

Tech. Rep. Email: josemanuel.villanuevagarcia.ln@us.navy.mil

Will the Building be Occupied During Install

No

Delivery Type

Not Staged

If this is a staged delivery, how many rooms will be accessible per day? NA

Acceptable Hours of Delivery: 0800-1600

Number of floors: 1

Elevator Available for Use During Install NA

Elevator Dimensions

NA

DRMO: It is the responsibility of the TR to coordinate with DRMO to ensure they are aware of the project

DRMO Location:

Point of Contact Name: NA Phone/Email: NA Address:

Building Number NA Street Address

City, State, Zip Code

Business Hours: NA Do they accept mattresses?: NA DRMO Special Requirements

(Pallets, Shrink Wrap):

All recyclable cardboard products to be delivered to:

Building Number

Attachment 3 Page 9 of 13

Street Address NA

City, State, Zip Code

Phone:

Access & Delivery Information:

Security Requirements: BASE ACCESS WILL ONLY BE GRANTED

TO U.S. CITIZENS OR SPANISH

NATIONALS. 30 DAY NOTICE REQUIRED

FOR ACCESS PASSES TO THE BASE.

U.S. CITIZEN MUST GO THRU ODC

(OFFICE OF DEFENSE COOPERATION)

FOR BASE PASS AUTHORIZATION.

Shipping Label for Furniture:

Physical Address:

Street Address

City, State, Zip Code

NAVAL BASE ROTA, SPAIN

HOUSING DEPT.

BLDG. 590

11530 ROTA-CADIZ (SPAIN)

Shipping Label for Soft Goods (If different from furniture)

Warehouse information:

Street Address NA

Items stored at warehouse location noted above, to be installed under this contract: example: if you have mattresses in your warehouse and the vendor needs to pick them up and install with the new furnishings. Provide list of items and how many there are.

Attachment 3 Page 10 of 13

Building Specific Information:

Other Information such as truck parking, how close the truck can get to the building, can a vendor provided forklift be used on location, are the rooms accessible from the outside via a catwalk or the inside.

TRUCK CAN PARK AND UNLOAD NEXT

TO THE WAREHOUSE. FORKLIFT

AVAILABLE FOR UNLOADING. SPACE

AVAILABLE FOR FORKLIFT TO UNLOAD

TRUCK. NO LOADING DOCK AVAILABLE.

The fields required if furnishings/window treatments/hardware are being removed as part of this contract.

Old furnishing to be delivered to: If DRMO/DLA is being used, state that in this box. If the vendor needs to dispose of, please say so here.

N/A

List ALL furnishings to be removed: Be specific and list the item and how many there are. If Captains beds are being removed, list the size and number of drawers: If drop lid desk or Armoires are being removed, list dimensions.

Old window treatments and hardware to be delivered to: If vendor needs to dispose of, please say so here.

List ALL window treatment and hardware to be removed: List how many draperies or blinds. List type of blinds being removed.

Attachment 3 Page 11 of 13

Technical Representative: Bruce W. Slaymaker

Tech. Rep. Phone: 775-426-2909

Tech. Rep. Email: bruce.w.slaymaker.civ@us.navy.mil rooms will be accessible per day? 0

Acceptable Hours of Delivery: 0700-1500

Number of floors: 1

Elevator Available for Use During Install

Phone/Email:

Address:

Building Number Street Address

City, State, Zip Code

Business Hours:

Do they accept mattresses?:

4755 Pasture Road bldg 59 Fallon NV 89496

Attachment 3 Page 12 of 13

Security Requirements: Pre-register through the DBIDS site. For access to NAS Fallon.

https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

Once the pre-reg is complete you will receive a confirmation code it will be a QR code and above it will be an alpha-numeric code.

We will need this information provided to us so we can complete the registration and vettingon our side. Information should be emailed to jennifer.m.leclaire3.civ@us.navy.mil.

Drivers will enter via NAS Fallon South Gate utilizing Berney Road via Hwy 95.

Street Address

City, State, Zip Code

NAS Fallon Housing Servie Center Attn: Bruce Slaymaker 4755 Pasture Road bldg 120 Fallon NV 89496

Items stored at warehouse location noted above, to be installed under this contract: example: if you have mattresses in your warehouse and the vendor needs to pick them up and install

Attachment 3 Page 13 of 13 how close the truck can get to the building, can a vendor provided forklift be used on location, are the rooms accessible from the outside via a catwalk or the inside.

Truck can back up to double doors of bldg

120. Will require lift gate for offloading and pallet jack to move items into warehouse.

There is no local loading dock.

there are. If Captains beds are being removed, list the size and number of drawers: If drop lid desk or Armoires are

Old window treatments and hardware to be delivered to: If vendor needs to dispose of, please say so here.

List ALL window treatment and hardware to be removed: List how many draperies or blinds. List type of blinds being removed.

END OF SOW

Statement of Work - Installation of Furnishings

Attachment 3 Page 1 of 17

1.1 The Contractor shall provide all necessary materials, equipment, labor, supervision, and management to: (1) coordinate delivery; (2) load and unload; (3) place/install in designated rooms; (4) assemble items as required; (5) secure and store, as designated; and (6) properly dispose of all associated packaging/crating materials.

1.2 Awarded Contractor is responsible for verifying all existing field conditions, i.e., electrical power including, but not limited to, voltage, hertz, amperage and outlets, at each building.

1.3 The contractor shall provide a color board or binder of all furnishings, finishes and fabrics for customer’s approval, prior to manufacturing. This documentation will become the property of the customer. Upon final approval of the customer, the vendor shall reserve adequate quantities of fabrics from the manufacturer at the earliest possible date to avoid delays due to “out of stock” and/or “discontinued” fabrics.

1.4 The Technical Representative (TR) for this project is as shown in Table 1 of this document.

1.5 The contractor shall provide a digital color board of all furniture finishes and fabrics to the TR for reference, prior to manufacturing.

1.6 Upon final approval of the customer, the vendor shall reserve adequate quantities of fabrics from the manufacturer as soon as possible to avoid delays due to “out of stock” and/or “discontinued” fabrics.

1.7 If the awarded fabric is discontinued after award, the vendor shall contact the HNC PM to develop a path forward.

2. DELIVERY

DELIVERY TYPES:

• Staged Delivery – This type of delivery is selected for occupied buildings whereby the rooms must be emptied of old furnishings and reinstalled with the new furnishings by the end of each workday. The number of rooms that must be completed per day will be stated in the Table 1 of the Statement of Work (SOW). If there is a limited space for containers in the staging area, this will also be noted in the Table 1 of the Statement of Work. This information is important as it may dictate how the containers are loaded for delivery.

Attachment 3 Page 2 of 17

• Non-Staged Delivery – This type of delivery is selected typically for empty buildings whereby the entire building is accessible during the install dates listed in the contract. This is important because it will dictate how the items are loaded into the containers for shipment.

2.1 The Contractor shall contact the TR at least 15 working days prior to shipping to ensure that the building is ready. The Contractor shall coordinate item delivery from all sub-contractors and ship the goods only if the TR confirms that the building is ready. At this time, the Contractor shall also ensure they fully understand all security regulations for the installation and have started any required procedures so as to minimize the impact on the installation personnel.

2.2 In the event that a delay in delivery is requested by the TR, or if the Contractor is unable to confirm that the building is ready, the Contractor shall immediately notify the Contracting Officer and Project Manager for further direction.

2.3 The Contractor shall provide the TR with a minimum of 48-hour notification as to the date and time that the trucks will be arriving. The Contractor shall also provide email notification as to the date and time the trucks will be arriving to:

furnishinginvoices@usace.army.mil at least 48 hours prior to scheduled arrival time.

2.4 Contractor must ensure that the driver of the delivery vehicle has copies of the Delivery Order (DD Form 1155) for the items being delivered in order to gain entry to the facility.

2.5 Drivers of the delivery vehicles shall not attempt to deliver any items before the scheduled delivery date. In the event the delivery date falls on a Saturday, Sunday, or federally recognized holiday, the delivery date shall be the next workday after the Saturday, Sunday, or holiday.

2.6 Shipping Label shall read as specified in Table 1 of this document.

2.7 Items shall be labeled with the building number(s) provided in Contract Line Item (CLIN) 0001, unless otherwise noted in this paragraph.

3. RECEIVE AND UNLOAD

3.1 Contractor shall start assembling and installing items in rooms upon delivery between the hours specified in Table 1. The Contractor may work outside this time frame with prior approval of the TR.

3.2 If the Contractor is unable to complete the assembly and placement of all unloaded items before end of the workday, the contractor will transport those items to a

Attachment 3 Page 3 of 17 location designated by the TR for storage until the next workday. The Contractor will be responsible for moving the items from the overnight storage site to its designated position in the building.

3.3 The Contractor shall verify and inspect all items. Any deficiencies (damage/overage/shortage) shall be brought to the attention of the TR. The Contractor shall store damaged items in the location designated by the TR.

3.4 The Contractor shall maintain a complete file of all documents relating to each discrepancy. Copies of discrepancy reports shall be forwarded to the TR on a daily basis.

3.5 The Contractor shall repair or coordinate for replacement of damaged, defective, or missing items.

3.6 Additional items identified in Table 1 shall be picked up from location specified in Table 1, on the date and time specified by the TR, and installed. If these items have been picked up, but not installed, they must be handled in accordance with paragraph

3.2. above. If no items are identified in Table 1, then there are no items in storage that must be installed under this contract.

3.7 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.

4. PLACE AND INSTALL

4.1 Contractor shall place items in building(s) noted in CLIN 0001 of the contract.

Items shall be placed in the rooms in accordance with the drawings attached to this Statement of Work. If no drawings are provided herein, the furniture shall be placed as directed by the TR. Information about the building may be found in Table 1.

4.2 The Contractor shall complete installation of furnishings under this Statement of Work in the time period specified in Table 1.

4.3 The contractor shall clean and polish all items that have been installed.

4.4 The Contractor shall ensure all light fixtures have the appropriate bulbs as identified in the contract as well as ensure they are in working order.

4.5 The Contractor shall remove all protective coverings off of electronics such as protective film on the microwaves, TVs, and lamp shades, etc.

Attachment 3 Page 4 of 17

4.6 The Contractor shall ensure that all stickers and labels are removed, and no adhesive residue remains on the surface.

4.7 The Contractor shall ensure that items which require batteries have been provided with new alkaline batteries, and that they are working properly.

4.8 If recreational equipment is provided in this procurement, the Contractor shall install the recreational equipment. In addition, the Contractor shall be responsible for providing equipment, material, and expertise needed to place, assemble, and level pool tables, soccer tables, table tennis, and dart boards as identified in the contract.

4.9 If electric appliances are provided in this procurement, the Contractor shall install the appliances. In addition, the Contractor shall be responsible for providing all equipment and material to install the ice machines, refrigerators, electric ranges, microwaves, clothes washers, and electric dryers as identified in the contract. The contractor shall provide power cords for all electrical items, which are appropriate for the item and the building’s electrical service, as well as hoses, vent kits, and/or other accessories required to have a fully functioning unit. Vendor is not responsible for connecting gas appliances to the gas supply.

4.10 If artwork is provided in this procurement, the Contractor shall install the artwork.

In addition, the Contractor shall be responsible for providing equipment and material needed to install artwork in TV rooms, dayrooms, game rooms, etc. of each building as identified in the contract. The TR will provide locations for placement of artwork. Mount artwork at standing eye-level height of 5’-6” on center above finished floor or at seated eye-level height of 4’-4” on center above finished floor, per direction from TR.

4.11 If floor cleaning equipment is provided in this procurement, the Contractor shall uncrate, assemble, and provide all materials and equipment necessary to ensure the buffer, shampooers, and vacuum cleaners are in operational condition, and locate equipment within the building per direction from the TR.

4.12 The Contractor shall be responsible for installing other items that have been shipped to and/or stored at the installation as noted in Table 1. If no items are identified in these blocks, then there are no other items that must be installed under this contract.

4.13 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.

5. ASSEMBLY

Attachment 3 Page 5 of 17

5.1 The Contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers' instructions.

5.2 All furniture, equipment and accessories shall be level, plumb, square, and in proper alignment with adjoining furniture. Furnishings shall be securely attached to the building where applicable.

5.3 The Contractor shall inspect to ensure that the furniture is free of surface dirt and defects, that the installation is complete, and the furniture is ready to use.

5.4 If required, the Contractor shall reverse doors and handles on the refrigerators in sleeping rooms.

6. PROTECTION OF PROPERTY

6.1 The Contractor shall perform an inspection of the buildings and grounds with the TR prior to starting work. The Contractor shall protect all items from damage during both removal and installation. The Contractor shall take precaution against damage to the building, grounds, and other furnishings. The Contractor shall perform a final inspection of the buildings and grounds after completing work. A corrective action plan shall be provided by the Contractor that details type, source, and schedule of repairs.

6.2 The Contractor shall repair or replace any items, building components, or grounds damaged due to negligence and/or direct action by the Contractor using materials of the same quality, size, texture, and color to match adjacent existing work.

All repairs beyond simple surface cleaning require concurrence of the TR before the Contractor or anyone other than the facility construction contractor (or its subcontractors) may perform any significant repair work. Use of the facility construction contractor (or appropriate subcontractor) is required for all significant repairs so that the building warranty is maintained.

6.3 The Contractor shall be responsible for security of the area in which work is being performed and prior to completion and transfer to the Government. The Contractor shall maintain accountability and control of any keys provided, and shall return them to the TR upon completion of work.

6.4 Material-handling equipment shall have rubber wheels.

7. PRODUCT DOCUMENTATION

Attachment 3 Page 6 of 17

7.1 The Contractor shall ensure that all owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, and any other information is provided to the TR upon completion of the installation.

7.2 The Contractor shall collect special assembly tools, the security hardware wrench, and any spare parts provided with the furnishings and turn them over to the TR.

8. CLEANUP

8.1 The Contractor will be responsible for the removal and disposal of all trash connected with uncrating and assembling furniture and other items installed under this contract. Final acceptance of the furniture (Technical Representative signing acceptance on Delivery Order/contract), from the contractor will not occur until all trash connected with the furniture installation is removed from the site.

8.2 Recyclable cardboard products shall be disposed of in accordance with Table 1.

8.3 Packing materials will not be stored in the buildings for any period exceeding 24 hours.

8.4 Personal trash (food wrappers, drinks, etc.) shall be removed from the site on a daily basis by the contractor.

9. EXCESS ITEMS

9.1 Once equipment is installed as shown on the furniture layout, the Contractor shall coordinate with the TR as to where any excess items are to be stored. Contractor will be responsible for delivery of excess items to storage area designated by TR.

10. Safety

10.1 Safety Compliance Requirements. Contractor shall comply with FAR 52.236-13 Accident Prevention and execute all work in accordance with (IAW) the latest version of Safety Manual EM 385-1-1 per base contract.

10.2 Site Visit Accident Prevention Plan (SVAPP). A SVAPP is required if an APP with a site/survey activity hazard analysis (AHA) has not been provided and accepted by the furnishings program CEHNC KO in coordination with (ICW) CEHNC Safety and Occupational Health Office (SOHO). The SVAPP is intended and necessary for any site visit not covered by an APP and these site visits shall be for visual inspection/observation or office type work only. If work must be performed (i.e., metering, work on energized equipment), an Accident Prevention Plan (APP) must be submitted and accepted.

Attachment 3 Page 7 of 17

10.3 Accident Prevention Plan. The APP shall follow the minimum requirements of EM 385-1-1 Chapter 2-7 and this PWS. Follow the mandatory ENG Form 6293 (Accident Prevention Plan Worksheet). The APP must be submitted and accepted by the CEHNC KO ICW CEHNC SOHO prior to starting any work at the site. The contractor is responsible for preparing an APP per EM 385-1-1 for all work that goes beyond the scope of a site. The completed APP shall be submitted to the KO Furnishings Invoice box at least thirty (30) business days prior to field work performance. Field work shall not take place until the APP has been submitted, reviewed, and accepted by the CEHNC Safety Office.

10.4 Contractor shall verify with the controlling installation, the applicability, and requirements for emergency procedures, permit required work procedures, and hazardous environments and waste disposal. These findings shall be incorporated into the APP.

10.5 Activity Hazard Analysis (AHA). All AHAs shall be written in accordance with section 6 in each applicable chapter in EM 385-1-1. The identification and proof of qualification for competent/qualified persons (e.g., Confined Space, Electrician, Crane Operator, etc.) and proof of qualification shall be included IAW EM 385-1-1 Chapter 2-6.

d(4)(g). Define the steps to be performed for the activity/task/DFOW and the work sequences (for example, site conditions, materials, personnel) needed. Job steps should be detailed so that the reader clearly understands how that job will be accomplished (for example, how the part will be installed or removed, anticipated voltages, quantities of chemicals utilized, equipment utilized to accomplish the task, heights being accessed).

10.6 Site-Specific Addendum (SSA). SSAs are required for each site if work will be conducted on two or more distinct sites. The SSAs shall be submitted to the KO Furnishings invoice box for review and acceptance by the CEHNC Safety Office prior to work starting. Each SSA shall contain detailed site-specific information only applicable to a specific location. It shall be attached to the APP as an appendix and be readily available on the jobsite.

10.7 Safety document resubmittal shall include the original local SOHO comments with detailed responses (Form 7 or 4025) and highlight all changes.

10.8 Any Proposals, Change Orders, and Contract Modifications shall be verified that they are covered under the current accepted APP. If the pending work effort is NOT covered under the initial task order APP, the contractor shall submit, for government review and acceptance, an addendum to the APP.

Attachment 3 Page 8 of 17

10.9 Notifications and Reports. All accidents and near misses will be reported in accordance with EM 385-1-1 Table 2-1. Most current version of the ENG Form 3394 Aug 2021 shall be used for all reporting measures. Failure to comply with these requirements will be reflected on CPARS (If applicable).

10.10 Monthly Exposure Hours Report. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractors. Hours associated with administrative activities such as payroll, human resource, service order managers/technicians, etc., are not counted. Exposure hours shall be submitted to HNC Contracting Office (CT). The data must be posted/submitted not later than 10 calendar days after the end of each month. Exposure data consists of man-hours expended in direct performance of the work performed on the jobsite. The monthly submission shall be broken down by Contract and identify exposure hours for each Contract. If no hours are worked on the project/task, a report showing zero (0) is required. Contractors should report monthly exposure hours by using the Excel Exposure Hour Report via email to *either contract specialist or PgM.

10.11 Prime Contractor Corporate Safety Official / Corporate Official (CSO/CO). This contract requires a minimum of one Corporate Safety Official / Corporate Official to manage and oversee the implementation of the Prime Contractor’s Safety Program.

The CSO or CO shall conduct roles and responsibilities listed in EM 385-1-1 (2024) Chapter 2-4. f.

10.12 Site Safety and Health Officer (SSHO). No work shall be conducted at the site of the work until an SSHO (L2 / L3) is present as described and EM 385-1-1 (2024) Chapter 2-8. b. L2s are required for this project that include work that includes LOTO (208V or above), Fall Protection, Confined Space, Use of LHE, Scaffolding, or any other higher hazard activity. L3 is acceptable for any phases of work outside of what is listed above to include office work, providing furniture/equipment support, the receiving and unloading of materials/furniture, or any other low hazard activities. L2/L3 are only permitted on projects with a residual risk of low or medium.

10.13 The SSHO on site must be employed by the prime contractor unless otherwise approved by the KO/COR ICW CEHNC SOHO. If a subcontractor employee is allowed, SSHOs must work under direction of the prime contractors CSO or CO equivalent (CSO or CO does not need to be onsite) from the Prime Contractor. The APP shall include discussion as to how the CSO or CO will ensure the L2 and/or L3 is/are implementing the requirements of the prime contractor’s safety program, EM 385-1-1, OSHA, consensus standards, any additional local laws and regulations, and all accepted safety plans. This shall include but is not limited to the review of site documentation, site audits, training, meetings, and accident reports.

Attachment 3 Page 9 of 17

10.14 After Hours Work/Multiple Shifts. Planned after hours work or multiple shifts like dual shifts or scheduled work designed to not impact the customer is considered normal shift operations and shall still ensure that an SSHO, as required by scope of work, is on-site while work is being performed.

10.15 Multiple sites / Locations outside of 45 minutes: shall still ensure that an L2 is on the main site while work is being performed but would additionally need an L3 or L2 (depending on scope of work) for each location, however processes and procedures must be identified in the APP how communication and reporting will be established between the L3 and L2 for these evolutions.

11. AT-OPSEC

11.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract

Attachment 3 Page 10 of 17 personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

11.2 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

11.3 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

11.4 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E- Verify system. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i).

An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

11.5 All contractor and all associated sub-contractors’ employees shall comply with applicable installation or facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation and MEDOCM access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .