| 88th MECS Operations & Support | |
| Replacement for MECS Storage and Maintenance Operations | |
| W912DY-17-C-XXXX |
Offeror:
Date:
| Signature of authorized corporate officer | |
| FOUO |
Instructions Instructions for Pricing Worksheet:
| Fill in the yellow shaded blanks on the Buildup Tab |
| The applicable Wage Determination for this effort is: |
| WD 15-5484 (Rev -1); Revised 17 Jan 2017; Utah Counties of: Box Elder, Davis, Morgan, Weber |
| The four categories for which the Wage Determination is applicable have the Labor Category number listed. |
| BMET Rates reflect the commercial market identified in: |
| http://www.24x7mag.com/2015/11/htm-salary-survey-2015-nearing-tipping-point/ |
| Standard Operations: | |
| LOE: |
| Enter the number of individuals being proposed in the LOE column for each year. |
| The Administrative requirements for this effort include the Key Position of Site Manager and call for two personnel in Production Control and two personnel as Supply Technicians. The level of Admin support is expected to remain constant for the life of the effort. |
| Storage/Warehouse requirements; It is expected that the warehouse effort will continue to require one of each category for the duration of the effort. |
| Technical requirements; The Key personnel of Lead Biomedical Equipment Technician and Medical Equipment QA Specialist fall within this group with eight BMETs the base year, nine in option year 01, ten in option year 02 through option year 04. |
| Burdened Rate: |
| For each Labor category, enter the annual rate for one LOE. The table will calcualte for the number of LOE enterd to give the extended rate. |
| Hands-On-Training (HOT) Weekend Support | |
| LOE: |
| The LOE for the Hands-On-Training (HOT) Weekend Support shall be staffed consistent with PWS 3.5.5. |
| Burdened Rate: |
| The rates for the individuals working this support would be for two 8 hour days above a normal 40 hour week. |
| Pricing will be for one weekend, with a not-to-exceed ceiling of 20 weekends (per FY) possible. Billing will occur for weekend support as delivered. HOT support will not exceed 20 weekends annually. |
| Mobilization/OPTEMPO | |
| The Contracting Officer shall, through the Contracting Officer Representative, notify the contractor when to implement these hours. |
| LOE: |
| Mobilization/OPTEMPO; 3.5.6, This will be priced in two parts; Weekdays and Weekends/Holidays. The Weekday rate will be for four (4) hours in addition to the eight (8) hours already priced for a day in CLIN 0001 pricing. Weekend/Holiday pricing is for a single (1) twelve hour day. The pricing template will calculate for a maximum of thirty (30) weekdays and fifteen (15) Weekend/holidays. This allows all submissions to be compared fairly. |
| Burdened Rate: |
| Mobilization/OPTEMPO work shall be priced in compliance with Department of Labor, and Service Contract Act stipulations. The Schedule of Values shall descibe the method identifying/invoicing for these hours if/when they occur. |
| The labor categories included in the pricing template are recommendations and not mandatory. It is at the contractor's discretion to elect which type labor categories to propose |
Roll-up
| 88th MECS Operations & Support | | | | | | | |
| Offeror: | 0 | | | | | |
| Base Year | | Option Year 01 | Option Year 02 | Option Year 03 | Option Year 04 | 52.217-8 |
| Operations | | | | | | | |
| Admin | $0.00 | | $0.00 | $0.00 | $0.00 | $0.00 | |
| Warehouse | $0.00 | | $0.00 | $0.00 | $0.00 | $0.00 | |
| Technical | $0.00 | | $0.00 | $0.00 | $0.00 | $0.00 | |
| CLIN 0001 | $0.00 | | $0.00 | $0.00 | $0.00 | $0.00 | |
| Repair Parts CLIN 0002 | $200,000.00 | $200,000.00 | $200,000.00 | $200,000.00 | $200,000.00 |
| Tools/Equipment CLIN 0003 | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 |
| HOT Weekends | | | | | |
| Cost for one weekend | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 Weekend CLIN 0004 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
CLINs 0001-4 Total $300,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00
| Mobilization/OPTEMPO | | | | | |
| 1 weekday extended hours schedule | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| NTE 30 Days | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Mobilization/OPTEMPO | | | | | |
| 1 weekend/holiday extended hours schedule | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| NTE 15 Days | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Mobilization/OPTEMPO Totals $0.00 $0.00 $0.00 $0.00 $0.00
| Total Contract Price: | $1,500,000.00 |
| (Excluding Mobilization/OPTEMPO) | |
Buildup
| 88th MECS Operations & Support | | | | | | | | | | | | | | | | |
| Offeror: | 0 | | | | | | | | | | | | | | |
| Standard Operations | | | | | | | | | | | | | | | | |
| Estimated Staff | DoL | Base Year | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option Year 4 | | |
| | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended |
| Site Manager | | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Production Control | 1270 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Supply Tech | 1410 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Forklift Driver | 21410 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Equipment Operator | 23440 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
CLIN 0001 Total $0.00 $0.00 $0.00 $0.00 $0.00
| CLIN 0002 | $200,000.00 | $200,000.00 | $200,000.00 | $200,000.00 | $200,000.00 |
| CLIN 0003 | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 |
$0.00 $300,000.00 $0.00 $300,000.00 $0.00 $300,000.00 $0.00 $300,000.00 $0.00 $300,000.00
| HOT Mission Support | | | | | | | | | | | | | | | | |
| Estimated Staff | | Base Year | | | | | | | | | | | | | | |
| | LOE | Burdened Rate/hour | Extended | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended | LOE | Burdened Rate/Hour | Extended |
| Site Manager | | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Production Control | 1270 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Supply Tech | 1410 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Forklift Driver | 21410 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Equipment Operator | 23440 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Pricing for one weekend $0.00 $0.00 $0.00 $0.00 $0.00
CLIN 0004 (Not to exceed 20 Weekends) $0.00 $0.00 $0.00 $0.00 $0.00
| Mobilization/OPTEMPO | | | | | | | | | | | | | | | |
| 1 weekday extended hours schedule (hours not already covered in CLIN 0001) | Base Year | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option Year 4 | | |
| LOE | Burdened OT Rate/Hour | Extended | LOE | Burdened OT Rate/Hour | Extended | LOE | Burdened OT Rate/Hour | Extended | LOE | Burdened OT Rate/Hour | Extended | LOE | Burdened OT Rate/Hour | Extended |
| Site Manager | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Production Control | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Supply Tech | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Forklift Driver | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Equipment Operator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Mobilization 1 weekdayday | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Pricing for 30 weekdays | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Mobilization/OPTEMPO | | | | | | | | | | | | | | | |
| 1 weekend/holiday extended hours schedule | Base Year | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option Year 4 | | |
| LOE | Burdened OT Rate | Extended | LOE | Burdened OT Rate | Extended | LOE | Burdened OT Rate | Extended | LOE | Burdened OT Rate | Extended | LOE | Burdened OT Rate | Extended |
| Site Manager | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Production Control | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Supply Tech | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 | | | $0.00 |
| Forklift Driver | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Equipment Operator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| BMET I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Mobilization 1 week Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Pricing for 15 weekends/holidays | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |