W912DY-16-R-0003_Amendment_0003_24_June_2016.pdf

PDF 310 KB Posted

Attached to
International Remediation and Environmental Services
Solicitation number
W912DY-16-R-0003
Issued by

About this file

W912DY-16-R-0003 Amendment 0003

View the file

Other files

File Type Posted
W912DY-16-R-0003_FINALAmendment_0004_29_June_2016.pdf PDF
AttachmentH_FINALSeedTOTaskTable_29June2016.xlsx XLSX spreadsheet
AttachmentH_SeedTOTaskTable_29June2016.xlsx XLSX spreadsheet
W912DY-16-R-0003_Amendment_0004_29_June_2016.pdf PDF
AttachmentG_RateTable_22June2016.xls XLS spreadsheet
AttachmentH_SeedTOTaskTable_22June2016.xlsx XLSX spreadsheet
AttachmentC_SeedTO_PWS_16June16.pdf PDF
Att_4_to_Seed_TO_PWS_1.pdf PDF
Att_4_to_Seed_TO_PWS_2.pdf PDF
W912DY-16-R-0003_Amendment_0002_17_June_2016.pdf PDF
W912DY-16-R-0003_Amendment_0001_2_June_2016.pdf PDF
Pre-Proposal_Workshop_Sign-In_Sheet.pdf PDF
IRES_PreProposal_4_May_16.pdf PDF
Exhibit5_CDRL_1of3.pdf PDF
AttachmentG_RateTable.xls XLS spreadsheet
EXHIBIT4-Profit-FeeCalcWorksheet.doc DOC document
EXHIBIT1-DIDs.pdf PDF
AttachmentA_PPQ.doc DOC document
EXHIBIT2-PRS.doc DOC document
AttE_LetterofComm-KeyPersonnel.doc DOC document
AttF_LetterofCommofKeySub.doc DOC document
AttachmentD_KeyPersonnelResume.doc DOC document
W912DY-16-R-0003_20April2016.pdf PDF
AttachmentC_SeedTO_PWS_13Apr16.docx DOCX document
EXHIBIT6-KeySubs Personnel.doc DOC document
AttachmentH_SeedTOTaskTable.xlsx XLSX spreadsheet
Exhibit5_CDLR_2of3.pdf PDF
Exhibit5_CDRL_3of3.pdf PDF
AttachmentB_EXPERIENCE_PP_REFERENCE.doc DOC document
EXHIBIT3-QASP.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. This amendment is issued revise the follow ing sections: A, C, L and M, and the follow ing attachments: C and G.

2. The proposal due date remains 2:00 pm CT on 1 July 2016.

3. All changes are identified in bold and highlighted text.

4. It is the Offeror's responsibility to review the amendment in its entirety to identify all changes.

5. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

U 1 52

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DY-16-R-0003

X 9B. DATED (SEE ITEM 11)

20-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2016

CODE

US ARMY ENGINEERING & SUPPORT CENTER

HUNTSVILLE ENGINEERING & SUPPORT CENTER

P.O. BOX 1600

HUNTSVILLE AL 35807-4301

W912DY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DY-16-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

EXECUTIVE SUMMARY

ALL ADMINISTRATION AND FUTURE TASK ORDERS UNDER THIS MATOC WILL BE

ISSUED BY U.S. ARMY CORPS OF ENGINEERS, HUNTSVILLE CENTER (CEHNC).

1. The objective of this contract is to provide services to safely locate, identify, recover, evaluate, manage and make final disposition of Munitions and Explosives of Concern (MEC), Munitions Constituents (MC), Chemical Warfare Materiel (CWM), Biological Waste and Biological Warfare Materiel (BWM) and Hazardous, Toxic and Radiological Waste (HTRW); implement Environmental Compliance measures; and other munitions related support services, reduce DoD Conventional Munitions Stockpile other federally controlled/owned sites, as well as other sites where the Corps of Engineers is tasked to include foreign jurisdictions.

2. A target MATOC pool consisting of a total of ten (10) contractors is planned to result from this acquisition, however the government reserves the right to award more, less, or none at all.

3. Task orders will be awarded against the basic ID/IQ contracts using the fair opportunity procedures discussed in

FAR 16.5 in addition to the competitive source selection procedures identified in Section 803 of Public Law 107-107 implemented in DFARS 216.505-70 and Public Law 110-181, Section 843. Each order exceeding $3,500.00 will be awarded on a competitive basis in accordance with FAR 16.505 and DFARS 216.505-70 (c), unless an exception described in FAR 16.505(b)(2)(i) through (iv) or DFARS 216.505-70(b)(1) applies. Task orders may be Firm-Fixed Price (FFP), Cost Plus Fixed Fee Completion Form (CPFF-CF), and/or Cost Plus Fixed Fee Term Form (CPFF-TF). Task orders may be issued on a CPFF basis for work of an indefinite nature or to support an urgent need. Individual task orders may contain a combination of FFP, CPFF-CF, and/or CPFF-TF; e.g., planning and characterization may be FFP while fieldwork may be CPFF.

4. The capacity for the MATOC pool is $950 Million. The MATOC pool total capacity will be shared among all awardees in the MATOC pool. The ID/IQ awardees in each the MATOC pool will only compete among the other ID/IQ awardees in the MATOC pool for task order awards. Prior to task order award, the Government will provide all members of the selected MATOC pool a fair opportunity to be considered for each order exceeding $3,500 (FAR 16.505(b)(1)(i)) unless an exception to fair opportunity under FAR 16.505(b)(2) applies.

5. The ordering period shall commence upon the date of award and may continue for a period of five years, if the option is exercised. Labor rates may be escalated at the beginning of each option period as provided in the Schedule; however, the labor rates in effect at the time a task order is awarded will remain in effect through completion of the task order. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the rates effective in the current ordering period will be utilized during this extension period.

6. The Government will evaluate the market once at the 18 month mark, within the one-year base period of the

MATOC to determine if it is in the Government’s best interest to open a contract “on-ramp” or “off-ramp”.

During a contract on-ramp the Government will accept and evaluate new proposals with the intention of adding additional contracts to the MATOC pool. These proposals shall be subject to the same proposal instructions and evaluation procedures as contained in the original solicitation. The “on-ramp” firm must be qualified for award. to replace the displaced firm. In the event a particular nation requires local firms to perform the labor, local contractors may be on-ramped at any time. During a contract “off-ramp”, the Contracting Officer may elect to remove firms from the MATOC pool that have poor performance records or have not submitted a proposal for any of the projects in which they were qualified.

7. When request for proposals (RFPs) for task order requirements are issued, offerors must provide sufficient detail with regard to labor categories and hours, material, and travel to allow an evaluation of the proposed cost.

Travel costs shall not exceed the amounts allowed under the Joint Travel Regulation. Profit/fee is not allowable on travel costs.

8. For CPFF orders, all hours for direct labor shall be supported by individual daily job cards or time records signed by the individual thereof.

9. The U.S. Army Engineering and Support Center, Huntsville (USAESCH) will remain the Procurement

Contracting Office and no other agency can make changes to the Base Contract. Other USACE offices, upon authorization from the US Army Engineering and Support Center, may issue task orders. The US Army Engineering and Support Center may also transfer task orders to other USACE offices for administration.

10. The minimum guaranteed order for each awardee shall be $5,000 for the base period only.

11. THE FOLLOWING ELEMENTS OF insert PROPOSAL SUBMITTED IN RESPONSE TO SOLICITATION

W912DY-16-R-0003 ARE HEREBY INCORPORATED INTO THIS CONTRACT.

A. The fixed price and cost rates proposed by the contractor in Attachment G are binding cost elements. For fixed price rates, these rates shall be the maximum allowable rates for task orders issued during the ordering period of this contract. Thus, the fixed price rates proposed on a task order may be less than those proposed in the contractor’s Attachment G of the ID/IQ contract, but may not exceed the maximum rates included in the basic ID/IQ contract. For Cost Reimbursement rates, the lesser of actual rates or the capped rates in the basic ID/IQ contract shall be the maximum allowable rates for task orders issued during the order period of this contract.

B. Technical Exhibit 6, “Key Subcontractors and Key Personnel”.

NOTE: The pricing from the last option year shall remain binding for the duration of the term of the contract extended by exercising option FAR 52.217-8.

12. Pre-Proposal Workshop. The Government will hold a pre-proposal workshop for potential offerors to ensure an understanding of the Government’s objectives with this solicitation. All interested firms are encouraged to attend, but participation will not be a prerequisite for submitting a proposal.

Information regarding the date, time, and location for the workshop is forthcoming, and will be provided in a separate attachment posted on fbo.gov. The workshop will be held within 2 weeks of the solicitation posting date.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

DESCRIPTION/WORK STATEMENT

MILITARY MUNITIONS RESPONSE; ENVIRONMENTAL COMPLIANCE AND REMEDIATION

SERVICES; AND OTHER MUNITIONS RELATED SERVICES

AT SITES OCONUS

13 April 2016

1.0 OBJECTIVE.

1.1 The objective of this Multiple Award Task Order Contract (MATOC) is for Contractors to perform Military Munitions Response (MMR) services involving Munitions and Explosives of Concern (MEC), Material Potentially Presenting an Explosive Hazard (MPPEH), Chemical Warfare Materiel (CWM), and Biological Warfare Materiel (BWM); Environmental Compliance and Remediation Services (ECRS) involving primarily Hazardous, Toxic and Radioactive Waste (HTRW) including Biological Waste and Munitions Constituents (MC); and Other Munitions- Related Services (OMRS) as necessary to permit lands and waters to be safely and efficiently used for their intended purpose.

1.2 This work may occur at sites located Outside Continental United States (OCONUS), i.e., outside the United States and Outlying Areas as defined by FAR 2.101 primarily at international locations to include, but not limited to, Iraq and Afghanistan. Work may involve International Operations (IOP) supporting US Army missions in Afghanistan and other OCONUS locations. The services provided under this contract will be used in support of various Department of Defense Commands and Installations, other federal agencies, or foreign governments/agencies where sponsored by an appropriate U.S. Government agency.

1.3 The Contractor will provide services to safely locate, identify, recover, evaluate, manage, and make final disposition of MEC (including MC), CWM, Depleted Uranium (DU), and BWM under MMR; safely locate, identify, recover, evaluate, manage, and make final disposition of HTRW including Biological Waste; implement and conduct ECRS involving primarily HTRW and MC; provide OMRS involving military munitions not accounted for under MMR (e.g., anomaly avoidance, construction support, etc.); reduce munitions stockpiles wherever they exist to include foreign jurisdictions at locations specified by Paragraph 1.2, herein, as required by task orders.

Work may involve the Contractor providing range MEC and MPPEH clearances, post-battlefield MEC and MPPEH clearances, demining operations, booby trap clearance in non-combat situations, anomaly avoidance, construction support and non-DoD ammunition depot management. With the exception of CWM, the Contractor may be required to assess, package, transport, manage and make final disposition of the above mentioned materials. Work performed under this contract may include: project planning; assessments; inspections; surveys; investigations;

studies; engineering evaluations; cost analyses; remedial or removal actions; spill response; sampling and analysis;

engineering containment; recovery; storage; treatment; transportation; and disposal of MEC (including MC), HTRW, and BWM. Work may include: monitoring; data management; training; permitting; public involvement;

and logistical, medical, and security support. Work efforts may require use of robotic technology where feasible and practicable.

1.4 Specific services and task activities are listed in Paragraph 3 and subparagraphs, herein. The listed descriptions of services to be provided and task activities to be performed portray a general understanding of various functions to be performed by the Contractor via task orders which will contain specific performance-based requirements.

2.0 GENERAL.

2.1 The Contractor shall perform MMR services which generally include response actions which may include investigations, removal actions and/or remedial actions to address the explosives safety, human health, or environmental risks or hazards presented by MEC, CWM, and BWM, primarily associated with military actions and training. The Contractor shall perform Environmental Compliance and Remediation Services to protect human health and the environment from risks primarily associated with HTRW and MC. Additionally, the Contractor shall perform OMRS which pertains to work involving military munitions not accounted for under MMR such as anomaly avoidance, on-call construction support, vegetation removal in a MEC contaminated area, etc.

2.2 Overseas Response. To facilitate potential expedited responses the Contractor shall maintain current passports for the following personnel: site supervisory and management personnel, Unexploded Ordnance (UXO) personnel, environmental personnel, and geophysical personnel.

2.2.1 Technical specialists based on project requirements may include but are not limited to: chemists, health physicists, risk assessors, engineers, biologists, hazardous waste coordinator, transportation and disposal coordinator, geologist/hydrogeologist, etc.

2.2.2 The Contractor must comply with applicable entry and exit requirements of the country where the work will be performed to include work visa, medical screening, and other specific OCONUS requirements (see Section 2.4 and subsections below). The Contracting Officer may identify additional requirements for overseas travel on a site-specific basis.

2.3 Permits and Licenses. The Contractor shall obtain the permits and licenses necessary to conduct work required by this contract. The Contractor shall comply with all applicable in country laws and regulations. Task orders will have the specific standards applicable.

2.4 Applicable Laws and Regulations. The Contractor shall perform this work in accordance with all applicable laws and regulations including in-country laws and regulations. The Contractor shall be responsible for acquiring the latest version of applicable regulatory or agency guidance including those referenced herein, and those included in task orders.

2.4.1 Work performed by the Contractor may be subject to other requirements or restrictions such as those issued by a U.S. Department of Defense theater-level Unified Combatant Commander (COCOM), e.g., CENTCOM Clauses, which are provided under this contract with revisions provided under separate task orders, as applicable.

2.4.2 Entry and exit requirements to countries within the CENTCOM AOR, including Iraq and Afghanistan, are contained within CENTCOM Clauses, specifically, 252.225-79995 Contractor Personnel Performing in the United States Central Command Area of Responsibility. Additional entry and exit requirements as well as requirements for other countries can be found at: https://www.fcg.pentagon.mil/fcg.cfm.

2.4.3 Predeployment training requirements for Contractor personnel deploying to Iraq and Afghanistan (and other countries as applicable) can be found at: https://www.bliss.army.mil/crc/contractors.html.

2.4.4 Access to bases and installations within Iraq and Afghanistan (and other countries as applicable) will be subject to varying operational, security, and force protection conditions. The Contractor shall coordinate with the CENTCOM (or other COCOM as applicable) LNO for the current status of such conditions for the bases and installations of interest. Granting access to bases and installations within Iraq and Afghanistan may take up to 30 calendar days following request or notification of intent to enter.

2.4.5 Antiterrorism/Operational Security. The Contactor will be required to fill out an Antiterrorism (AT)/Operational Security (OPSEC) review cover sheet which will document Contractor review of: (1) PWS language pertaining to OPSEC, information assurance (IA), physical security, law enforcement, and foreign disclosure, and (2) Additional PWS language relating to the above provided by the review cover sheet.

2.5 Defense Base Act (DBA) Insurance shall be required for OCONUS work for US citizens and nationals, including short-term travel in country. LNs and TCNs must also be covered by DBA unless there is a waiver from the Department of Labor (DoL).The Continental Insurance Company (CNA) single-provider, DBA requirements contract, that supported the United States Corps of Engineers (USACE), the U.S. Central Command Joint Theater Support Contracting Command (C-JTSCC), and the 408th Contracting Command, expired on 30 September 2013.

No additional options or extensions are available. USACE did not replace its requirement contract. Therefore, the Contractors shall obtain DBA insurance from either a DoL authorized insurance carrier or utilize a self-insurance program to conduct OCONUS work unless subject to a waiver. The DoL has approved multiple insurance carriers which promote a competitive market environment. The DoL approved carriers and self insured employers are available at http://www.dol.gov/owcp/dlhwc/lscarrier.htm.

2.6 Publications and References. All work under this contract shall be in accordance with the applicable publications referenced herein and those included in task orders.

2.7 Data Ownership and Data Rights. All reports, data, technical information, designs, including electronic data and software, generated under this contract will have unrestricted use by the Government. For task orders the Contractor will be required to specifically identify in accordance with (IAW) DFARS 252.227-7017 to the extent known all technical data or software that will be generated or delivered with restrictions on its use, release, or disclosure.

Proprietary restrictions placed on deliverables, information, data, designs, or drawings after award of task order shall not be binding unless addressed in writing in the proposal and accepted by the Government.

2.8 Safety and Health Program. The Contractor shall develop and implement a written Safety and Health Program IAW guidelines specified in EM 385-1-1. The Contractor shall develop Accident Prevention Plans (APP) for task order work in accordance with EM 200-1-15 Section 4.5 for non-CWM sites, or Data Item Description (DID) HNC- 002 for CWM projects. The Contractor shall ensure that its subcontractors, suppliers, and support personnel follow all safety and health provisions established in the approved Accident Prevention Plan (APP) for the site. A Site Safety and Health Plan (SSHP) shall be included in the APP. No work shall be undertaken at a project site by a Contractor without an approved APP/SSHP. The Government reserves the right to stop work under this contract for any violations at no additional cost to the Government. The Government will verify that the Contractor has implemented corrective action before allowing continued performance under the contract.

2.8.1 Medical Surveillance. All personnel performing onsite activities shall participate in an ongoing medical surveillance program minimally meeting the requirements of 29 CFR 1910.120. More stringent surveillance requirements may be required while conducting work at certain location as required by task order.

2.8.2 Personal Protective Equipment. The Contractor shall have a written Personal Protective Equipment (PPE) program (including respiratory protection) minimally conforming to the requirements of EM 385-1-1. More stringent PPE requirements may be required while conducting work at certain location as required by task order.

2.9 Munitions with Unknown Liquid Filler. During conventional munitions or other munitions related operations, if the Contractor identifies or suspects an unknown liquid filled munition, the Contractor shall immediately withdraw upwind from the work area and contact the responsible Contracting Officer and the appropriate point of contact in their Work Plan or UFP-QAPP. The Contractor shall secure the area and provide two personnel located upwind of the suspect unknown liquid filled munition to secure the site until relieved by the Department of the Army emergency response personnel. Additional support may be required by the emergency response personnel, e.g., construction of blast mitigation controls. Additional reporting instructions are contained in the Interim Guidance Chemical Warfare Materiel Responses and Related Activities, dated 1 April 2009.

2.10 Improved Conventional Munitions. (ICM). Prior to entering areas/ranges contaminated with non-practice Improved Conventional Munitions (ICMs) or submunitions either a Department of the Army (DA) Certificate of Risk Acceptance (CoRA) or a Deviation Approval and Risk Acceptance Document (DARAD) prepared in accordance with DA Pam 385-30 as determined at the task order level must have been prepared and approved by the affected installation. If an ICM or submunition which cannot be confirmed to be practice is found at a site not previously known to contain ICMs or submunitions, work shall cease, the Contractor shall evacuate the affected area, and the Contractor shall contact the responsible Contracting Officer and the appropriate point of contact in their Work Plan or UFP-QAPP for direction.

2.11 HTRW Encounter During MMR/OMRS. While conducting MMR or OMRS the Contractor may encounter HTRW material containers, landfills, Open Burning/Open Detonation (OB/OD) areas, ground spills, contaminated surface water, or contaminated groundwater. If suspected HTRW of unknown origin and nature is encountered, the Contractor shall immediately stop work in the affected area, and notify the responsible Contracting Officer and the appropriate point of contact in their Work Plan or UFP-QAPP for direction.

2.12 HTRW. In the absence of other requirements work performed at HTRW locations may generally follow the RCRA Corrective Action process for U.S. installations or applicable host nation requirements depending on the location. If HTRW disposal is required under a task order, the Contractor shall ensure that all hazardous waste is properly transported to and disposed of at a permitted Treatment Storage and Disposal Facility (TSDF) or international equivalent in compliance with all applicable regulations and requirements, unless specified otherwise by the task order PWS. Specific manifesting and associated signature requirements will be as specified by the task order PWS.

2.13 Laboratory Capabilities.

2.13.1 Laboratories must demonstrate compliance with the DoD Quality Systems Manual (DoD QSM) (latest version in affect when sampling begins) through accreditation by the DoD Environmental Laboratory Accreditation Program (DoD ELAP) for all project-required parameters. A list of laboratories accredited under DoD ELAP can be found at the DoD ELAP Denix web site at http://www.denix.osd.mil/edqw/Accreditation/AccreditedLabs.cfm. The laboratory used shall have experience handling media potentially contaminated with munitions constituents and shall be identified early in the project planning (at the proposal stage). For additional details on laboratory requirements, see DID HNC-005.01 and EM 200-1-15.

2.13.2 Any laboratory performing chemical analysis must provide its DoD ELAP accreditation certificate and supporting documentation to the applicable Military Munitions Design Center (MM DC) in order to be approved by that MM DC. If the laboratory fails to meet project-specific requirements, the Contracting Officer may require the Contractor to stop using this laboratory and obtain analytical services from another qualified laboratory that can meet project-specific requirements. The contract laboratory may not subcontract analytical services to another laboratory without the approval of the Contracting Officer. The subcontracted laboratory must meet all requirements for the contract laboratory.

2.13.3 Geotechnical Testing Laboratories. Geotechnical testing shall be conducted in accordance with the requirements of ER 1110-1-8157, Geotechnical Data Quality Management for Hazardous Waste Remedial Activities, to include laboratory requirements specified in ASTM D-3740. The laboratory shall have experience performing physical testing of materials potentially contaminated with HTRW or MC. The types of laboratory services anticipated under this contract include, but are not limited to, mechanical analysis (sieve analysis), hydrometer analysis, Atterberg Limits, soils classifications, permeability, standard and modified proctor tests and relative density tests.

2.13.4 The Contractor may be required to identify the primary laboratory and secondary laboratory (ies) to be used for geotechnical laboratories and laboratories performing chemical analysis under task order proposals.

2.14 Performance-Based Milestones/Objectives: The Government defines Performance Based Milestones/Objectives as the desired outcome(s) that have been defined in the Performance Work Statement in clear, simple, concise, results-oriented, measurable and legally enforceable terms. The Government defines the completion of a Performance Based Milestone/Objective as: an outcome that has been completed and approved and accepted by the Government. Simply meeting the Milestone/Objective, (i.e., submittal of a document for review) is not the same as completion of the Milestone/Objective. Only upon the completion and approval and acceptance by the Government will the Government pay for that Milestone/Objective.

2.15 A Performance Work Statement (PWS) for a task order will to every extent possible:

- Define desired results/outcomes.

- Define what level of performance is expected and use performance standards and Quality Assurance Surveillance Plans (QASP).

- Provide all information known about the site(s), or where it can be located and accessed by the Contractor.

- Define incentives and disincentives.

- Define requirements using clear and concise language avoiding vague or broad statements.

3.0 SPECIFIC SERVICES.

3.1 Task Orders. Task Orders issued under this Contract may be Firm-Fixed Price and/or Cost-Reimbursable depending on the type of work being performed in each individual task order. For each task order under this contract, the Government will provide a specific PWS describing, at a minimum, the work required to be performed, performance metrics, schedule requirements, and types and numbers of submittals. At no time will there be any FFP labor and CPFF labor performed at the same site. The Contractor shall, upon award of a task order, supply all personnel, tools, equipment, communications, transportation, materials and supervision to integrate, manage, and execute all specified aspects of the task order. If GFP/GFE is to be provided to the Contractor under a task order the Contractor will be required to develop and submit for Contracting Officer approval a Property Control Plan and the property shall be accounted for in accordance with the plan. If property is acquired by the Contractor under a Cost- Reimbursable task/task order in the performance of the work, the Contractor acquired property (CAP) will also be accounted for in the same manner.

3.2 Site Visit.

3.2.1 Pre-proposal. A site visit may be authorized by the Contracting Officer to assist in the preparation of the Contractor’s proposal. Cost for this site visit will be at the Contractor’s own expense. The Government strongly encourages, but does not require, the Contractor to prepare an Abbreviated Accident Prevention Plan (AAPP) to ensure extra safety precautions are taken to avoid an accident. No intrusive activities shall be conducted during the site visit and site access restrictions may apply.

3.2.2 Post Task Order award. A site visit may be authorized by the Contracting Officer to assist in the preparation of the initial Work Plan or Uniform Federal Policy for Quality Assurance Project Plan (UFP-QAPP) for field activities as required by the task order PWS. Contractor incurred cost for this site visit will be covered under the task order. The Contractor shall prepare an Abbreviated Accident Prevention Plan (AAPP) and submit it to the responsible Contracting Officer for acceptance before the conducting the site visit. The format of the AAPP shall comply with current USACE guidance. The Contractor will not be permitted to conduct any intrusive activities during the site visit.

3.3 Work Plan/UFP-QAPP. The Contractor shall prepare and submit, for Contracting Officer acceptance, either a Work Plan or a UFP-QAPP as required by the task order PWS describing how the required effort will be accomplished. Work Plans shall be prepared in accordance DID HNC-001.02, EM 200-1-15, and other guidance as specified by the task order PWS. When required, a UFP-QAPP shall be prepared and submitted in accordance with EM 385-1-97, EM 200-1-15, and other guidance specified by the task order PWS. Additionally, work for International Operations (IOP) projects may require a Physical Security Plan as specified in the task order PWS.

The Contractor may not mobilize to the site or begin working until the Contracting Officer has accepted the Work Plan or UFP-QAPP, as applicable and issued a Notice to Proceed (NTP). When applicable, MEC-related operations may not begin until applicable explosives safety plans (i.e., Explosive Safety Submission (ESS), Explosive Siting Plan (ESP), Chemical Safety Submission (CSS), Chemical Siting Plan (CSP), Interim Holding Facility Siting Plan (IHFSP) have been approved.

3.4 Task Activities. Typical activities under task orders to this contract may include, but may not be limited to:

3.4.1 Administrative and Permanent Record Files. Establish and maintain Administrative and Permanent Record files for projects in formats required in the project task order.

3.4.2 Air Monitoring. Conduct on-site work area and site perimeter air monitoring for protecting workers, visitors, the public, and the environment.

3.4.3 Anomaly Avoidance. Provide support to field operations as necessary to avoid buried anomalies and surface munitions.

3.4.4 Anomaly Investigation. Excavate and evaluate target anomalies to determine their identity, size, composition, depth, location and condition.

3.4.5 Blast-Effects Engineering Analysis. Perform complex engineering analyses of the effects of the overpressure, heat, fragmentation, and related factors resulting from detonations and effective mitigation measures.

3.4.6 Chemical Sampling and Analysis. Perform chemical sampling and analyses (both on-site and off-site) for MC, CWM, HTRW, BWM, and other target compound list chemicals as required.

3.4.7 Conduct hazardous building materials surveys. Conduct surveys for hazardous building materials to include but not limited to lead, asbestos and PBCs, analyze surveys to develop operation and maintenance report or remediation reports. Perform abatement with personnel certified in abatement when certification is required.

Surveys may include explosives, CWM, or BWM contaminated facilities.

3.4.8 Construct/deploy and maintain waste incinerators. Construct/deploy and maintain short term waste incinerators for compliance/remediation response.

3.4.9 Construction Support. Provide either onsite or on-call construction support at ground intrusive or construction sites to ensure safety of working personnel as defined by, and in accordance with DoDM 6055.09-M and EM 385-1- 97.

3.4.10 Cost Analysis. Perform cost analyses for various responses, service and support activities.

3.4.11 Cost Engineering Support. Develop cost-to-complete estimates that support the environmental liability reporting for the Army Installation Restoration Program and other USACE customers. Provide ancillary services such as review of cost estimating products, maintenance of the unit price book, review of Remedial Action Cost Engineering and Requirements (RACER) cost models and assemblies, and other related tasks.

3.4.12 Dig and Haul. Properly recover, treat, store, transport, and dispose of contaminated environmental media.

3.4.13 Engineering Evaluations. Perform engineering evaluations for various responses, service and support activities.

3.4.14 Environmental Master Planning. Develop Environmental Master Plans for various responses, service and support activities.

3.4.15 Environmental Restoration. Environmental Restoration to include but not limited to: bioremediation, chemical treatment, neutralization, incineration, stabilization, fixation or encapsulation.

3.4.16 Evacuations. Perform necessary coordination with property owners to evacuate the public from areas within exclusion zones during various responses, service and support activities as required.

3.4.17 Explosive Ordnance Support. Perform Explosive Ordnance operations to include but not limited to range maintenance and emergency response.

3.4.18 Field Reconnaissance. Verify or substantiate past usage of specific areas as well as presence of MEC (including MC), BWM, or HTRW by conducting field reconnaissance.

3.4.19 Feasibility Studies. Perform feasibility studies for various responses, service and support activities.

3.4.20 Geologic and Hydrogeologic Support. Provide geological and hydrogeological support, including but not limited to: the design, oversight, and installation of soil/rock borings, monitoring wells and/or extraction wells; the proper development and sampling of such wells; the analysis and interpretation of collected samples; the analysis of ground water flow; borehole or trench logging and sampling for geotechnical and chemical analysis; and the oversight and logging for the abandonment of wells.

3.4.21 Geographic Information System. Develop Geographic Information System (GIS) databases; create and manage a computerized GIS for various responses, service and support activities.

3.4.22 Geophysical Surveys and Mapping. Perform digital and analog geophysical surveys using instruments capable of detecting, locating, and identifying underground features for various response, service and support activities.

3.4.23 Groundwater Wells. Perform the design of, drilling, installation and development of groundwater monitoring wells, production wells, extraction wells, piezometers or other instrumentation. The use of licensed well drillers will be as specified by the task order PWS or local regulation, as applicable. Abandon wells per local regulation, as applicable.

3.4.24 Historical Data Analysis. Conduct witness interviews, collect, and analyze historical information such as photographs, records, data, and documents to identify past use of a site.

3.4.25 Hydrogeological Studies. Conduct hydrogeological field-testing and perform analyses and data interpretation. This may include aquifer testing by pumping or slug test methods.

3.4.26 Innovative Technology. Investigate, develop, demonstrate, validate, and apply emerging technology tools, techniques, methodologies, and equipment for various responses, service and support activities.

3.4.27 Instructional Support. Provide instruction, training, and/or develop training materials and training aids, for various responses, services, and support activities.

3.4.28 Landfill Liners and Covers. Design, construct, install and/or monitor temporary and permanent liners and covers for landfills.

3.4.29 Logistical, Medical and Engineering Management. Provide logistical (e.g., food services, lodging, transportation, and other necessary equipment and supplies), medical and other services to sustain field operations for various response, service and support activities.

3.4.30 MEC-related operations or other munitions related operations. Provide the necessary personnel and equipment for any operation with the purpose of intentional work in areas contaminated with MEC, CWM, or BMW including the removal or disposal of such.

3.4.31 Monitoring (Short and Long term). Monitor environmental treatment processes for various responses, service and support activities. These activities may include sampling and analysis of treatment process influent, effluent, and residuals; soil; air emissions, ground water; or other environmental media.

3.4.32 Operation and Maintenance (Short and Long term). Operate and maintain environmental treatment processes for HTRW, CWM, or BWM remediation projects.

3.4.33 Personnel and Convoy Security. Provide security personnel and equipment for non-security personnel, fixed and temporary locations, and convoys, as necessary to safely and securely perform various response, service and support activities.

3.4.34 Potentially Responsible Party (PRP) Support. Provide technical review and assistance for PRP claims resolution for various responses, service and support activities.

3.4.35 Waste Collection and Control. Provide process Control (i.e. waste management from point of origin to controlled final disposition) for various waste streams to include but not limited to: lithium batteries, asbestos, waste oils, DFAC oils, antifreeze, hydrocarbon contaminated soils, and sewage sludge via standardized safe disposal practices, environmental laws, and regulations.

3.4.36 Programmatic Studies and Documentation. Prepare programmatic studies, documentation, and technical guidance in support of USACE's management activities in support of various responses, service and support activities.

3.4.37 Range Clearance/Maintenance. Provide support at operational ranges as necessary to MEC, MPPEH to include munitions debris (MD), and range-related debris (RRD).

3.4.38 Remote Sensing. Collect and/or analyze remote sensing data (e.g., aerial and satellite imagery, hyperspectral data, LIDAR, or other stand-off sensors) to determine physical characteristics and/or current and past use of a site.

3.4.39 Risk Assessment. Perform quantitative and/or qualitative risk assessments and/or impact analyses and/or hazard assessment to support various response, service and support activities.

3.4.40 Remedial Investigations. Perform remedial investigations to support various response service and support activities.

3.4.41 Remedial and Removal Response Actions. Perform short-term, long-term, and permanent actions as necessary to achieve clean-up of media contaminated with materials including but not limited to MEC (including MC), HTRW, BWM, CWM, or other environmental contamination. Response actions may include sorting, sampling and analysis, decontamination, neutralization, recycling, consolidation, disposal, and removal of drums, tanks, structural and other materials.

3.4.42 Site Inspections. Perform site inspections for various responses, service and support activities.

3.4.43 Site Security. Provide site physical security (e.g., security plans, fencing, barriers, signage, intrusion detection systems, or guard service) as required by each individual task order for various response, service and support activities. At a minimum, the Contractor shall maintain all areas to minimize the risk of injury or accident and prevent unauthorized access and theft of property.

3.4.44 Support Facilities. Install and operate support facilities (e.g., site project office, command post, decontamination facilities, roads, and utilities) and establish exclusion, contamination reduction, and support zones.

The site project office shall include space for one or more Government representatives. The Contractor shall locate staging and demolition areas, subject to Government approval.

3.4.45 Surveying. Provide location surveys along with conventional and global positioning system (GPS) mapping to support various responses, service and support activities.

3.4.46 Technical Project Planning. Participate in and/or facilitate, meetings with DoD personnel, regulatory agencies, and other stakeholders to determine appropriate approaches to project implementation.

3.4.47 Treatability Studies. Perform laboratory, bench-scale, and field trials of process approaches to optimize clean-up of contaminated media.

3.4.48 Groundwater/Surface Water Treatment. Design, permit, construct, upgrade, maintain, and/or operate facilities to remove contaminants from groundwater or surface water.

3.4.49 Antiterrorism Compliance. The Contractor shall ensure contracts comply with Integrating Antiterrorism (AT) and Operations Security (OPSEC) provisions of the FAR, DFARS, Army, and USACE specific contracting policy guidance.

3.5 Other DoD and Federal Agencies Support. Provide MMR, OMRS, BWM, CWM, and HTRW investigations, evaluations, remediation, and response assistance on an as-needed basis to other DoD and Federal Agencies.

Perform other MMR, OMRS, BWM, CWM, and HTRW related work for foreign governments/agencies, where appropriately sponsored by DoD or other Federal Agency.

4.0 CONTRACT MANAGEMENT AND DELIVERABLES.

4.1 Program Management. The Contractor shall provide a Program Manager that provides a single Point of Contact (POC) for the Contracting Officer, provides programmatic reporting to USACE, and who can address overall management and contracting issues.

4.2 Project Management. The Contractor shall execute each task under the direction of a Project Manager (PM), meeting the qualification requirements specified herein.

4.3 Quality Management. The Contractor is responsible for the control of product quality and for offering to the Government for acceptance only those products/services that conform to the contractual requirements. Site specific quality control plans shall be prepared in accordance with EM 200-1-15.

4.4 Presentations and Meetings. The frequency and locations of presentations and meetings will be identified in each task order.

4.5 Contract Deliverables. Contract deliverables shall be prepared and submitted as required by individual task orders.

4.6 Logs, Reports, and Record keeping. The Contractor shall maintain safety inspection reports, accident/incident reports, medical certifications, training logs, monitoring results, QC records, etc. The Contractor shall maintain all exposure and medical monitoring records in accordance with OSHA Standard 29 CFR 1910 and 1926.

4.7 Review Comments. Various reviewers shall have the opportunity to review submittals made by the Contractor.

The Contractor shall review all comments received and evaluate their appropriateness based upon their merit and the requirements of the individual task order. The Contractor shall provide written responses to all comments and incorporate comments as appropriate. The Contractor shall not non-concur with a comment without discussing with the comment maker.

4.8 Meeting Minutes/ Telephone Conversations/Correspondence Records. The Contractor shall keep a record of meeting minutes and phone conversations and written correspondence concerning individual task orders in accordance with EM 200-1-15, Section 13.1.2.6, and EM 200-1-15, Section 13.1.2.7, respectively.

4.9 Periodic Status Reports. The Contractor shall prepare and submit project Periodic Status Reports concerning individual task orders in accordance with DID HNC-009.01 and include any other items required in the individual task order.

4.10 Government Furnished Property and Services.

4.10.1 In accordance with the “Government Property (Fixed-Price Contracts)” and the “Government Property (Cost- Reimbursement)” clauses, the Government may provide certain materials for exclusive use by the Contractor as deemed appropriate for the Contractor to perform the requirements of each task order. The Government makes no representation that the materials furnished by the Government are completely sufficient to accomplish the requirements of a particular task order. Government materials necessary for the performance of requirements of a task order which have not been previously delivered to the Contractor will be provided when a task order is issued.

The Contractor shall check the items furnished for adequacy and accuracy prior to utilization. The Contractor is not authorized to distribute Government-supplied materials without the express approval of the Contracting Officer.

4.10.2 Upon completion or termination of the contract, all Government owned property shall be returned to the Government in the same condition as received, except for normal wear and tear. The Contractor shall be responsible for the cost of any repairs or replacement caused by the negligence or abuse by the Contractor, Contractor employees, or subcontractors.

4.10.3 Property. The Contractor shall not use property provided by the Government for any purpose other than in the performance of this contract.

4.10.4 Joint Inventory for Government Furnished Property Provided Under task orders. Prior to start of a task order, the losing and gaining Contractors, in conjunction with the Contracting Officer or designated representative and other Government personnel deemed necessary, shall jointly inventory the property to be furnished to the gaining Contractor, to determine the exact condition and serviceability of Government furnished property. Upon completion of the inventory, the gaining Contractor shall then certify the findings of this inventory, assume accounting responsibility, and shall take over the property via hand receipt. The Contractor shall control and maintain all property receipted as required by this contract. Physical shortages and detailed circumstances relative to loss and/or extensive damage will be documented at the time of the inventory to provide the appropriate adjustment of records.

Inventory procedures for property accountability will be in accordance with ARs 710-2 and 735-5, the FAR and all other applicable regulations and publications.

4.10.5 Administration of Government Furnished Property. When assigned Government Furnished Property (GFP) the Contractor shall prepare a detailed plan for management IAW FAR, Subpart 45.5, DFARS Part 245, and DoD Manual 4161.2-M. The Contractor shall provide for the maintenance and repair of all equipment in his possession IAW FAR Clause 52.245-1. The Contractor shall maintain a purchasing and distribution system at the Administrative Office to provide the contractor-acquired property to the site and associated housing areas. The Contractor shall designate a Project Property Manager whom shall, in conjunction with designated Government representatives, be required to maintain up-to-date Government Property Records and inventory of property for all Program Government-Furnished Property, Government Furnished Equipment, and Contractor-Acquired Property

(GFP, GFE, CAP).

4.11 Files. The Contractor shall maintain complete and accurate files of documentation, records, and reports required under the terms of the contract. The Contractor shall not allow access to the files by any Government agency, non-Government agency, or individual unless specifically authorized by the Contracting Officer or designated representative. Files shall be made available to the Contracting Officer or designated representative upon request. All files are the property of the Government and shall be turned over to the Contracting Officer or designated representative at the completion or termination of this contract. All briefings, reports, and other files produced by the Contractor for the Government under the terms of this contract shall be property of the Government.

5.0 PERSONNEL QUALIFICATIONS.

5.1 The minimum qualifications of contract personnel shall be as listed below unless host nation educational and experience requirements for work of specific applicable task orders conflict, or are more stringent, in which case host nation requirements would govern. The Contractor shall submit a Personnel Qualifications Certification Letter as required by the Contracting Officer and shall maintain personnel résumés in accordance with EM 200-1-15, Section 13.1.2.8. At the request of the Contracting Officer the Contractor shall certify in writing to the Contracting Officer that all personnel with access to Contractor acquired explosives are in compliance with 18 U.S.C. § 842.

The Contractor shall not employ current Federal employees, military or civilian, in performance of any work under the contract without prior written approval of the Contracting Officer.

5.2 Qualifications of Scientific, Engineering, and Surveyor Staff. The Contractor shall utilize only personnel who meet or exceed the minimum qualifications specified herein on projects that will be executed under this contract unless host nation educational and experience requirements for work of specific applicable task orders conflict, or are…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .