W912DY-16-R-0003_Amendment_0001_2_June_2016.pdf
PDF 176 KB Posted
- Solicitation number
- W912DY-16-R-0003
About this file
W912DY-16-R-0003 Amendment 0001
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. This amendment is issued revise the follow ing sections: A, G, I, L and M, and to extend the proposal due date.
2. The proposal due date is extended to 2:00 pm CT on 24 June 2016.
3. All changes are identified in bold and highlighted text.
4. It is the Offeror's responsibility to review the amendment in its entirety to identify all changes.
5. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DY-16-R-0003
X 9B. DATED (SEE ITEM 11)
20-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2016
CODE
US ARMY ENGINEERING & SUPPORT CENTER
HUNTSVILLE ENGINEERING & SUPPORT CENTER
P.O. BOX 1600
HUNTSVILLE AL 35807-4301
W912DY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DY-16-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Jun-2016 02:00 PM to 24-Jun-2016 02:00 PM.
The following have been modified:
EXECUTIVE SUMMARY
ALL ADMINISTRATION AND FUTURE TASK ORDERS UNDER THIS MATOC WILL BE
ISSUED BY U.S. ARMY CORPS OF ENGINEERS, HUNTSVILLE CENTER (CEHNC).
1. The objective of this contract is to provide services to safely locate, identify, recover, evaluate, manage and make final disposition of Munitions and Explosives of Concern (MEC), Munitions Constituents (MC), Chemical Warfare Materiel (CWM), Biological Waste and Biological Warfare Materiel (BWM) and Hazardous, Toxic and Radiological Waste (HTRW); implement Environmental Compliance measures; and other munitions related support services, reduce DoD Conventional Munitions Stockpile other federally controlled/owned sites, as well as other sites where the Corps of Engineers is tasked to include foreign jurisdictions.
2. A target MATOC pool consisting of a total of ten (10) contractors is planned to result from this acquisition, however the government reserves the right to award more, less, or none at all.
3. Task orders will be awarded against the basic ID/IQ contracts using the fair opportunity procedures discussed in FAR 16.5 in addition to the competitive source selection procedures identified in Section 803 of Public Law 107-107 implemented in DFARS 216.505-70 and Public Law 110-181, Section 843. Each order exceeding $3,500.00 will be awarded on a competitive basis in accordance with FAR 16.505 and DFARS 216.505-70 (c), unless an exception described in FAR 16.505(b)(2)(i) through (iv) or DFARS 216.505-70(b)(1) applies. Task orders may be Firm-Fixed Price (FFP), Cost Plus Fixed Fee Completion Form (CPFF-CF), and/or Cost Plus Fixed Fee Term Form (CPFF-TF). Task orders may be issued on a CPFF basis for work of an indefinite nature or to support an urgent need. Individual task orders may contain a combination of FFP, CPFF-CF, and/or CPFF-TF; e.g., planning and characterization may be FFP while fieldwork may be CPFF.
4. The capacity for the MATOC pool is $950 Million. The MATOC pool total capacity will be shared among all awardees in the MATOC pool. The ID/IQ awardees in each MATOC pool will only compete among the other ID/IQ awardees in the MATOC pool for task order awards. Prior to task order award, the Government will provide all members of the selected MATOC pool a fair opportunity to be considered for each order exceeding $3,500 (FAR 16.505(b)(1)(i)) unless an exception to fair opportunity under FAR 16.505(b)(2) applies.
5. The ordering period shall commence upon the date of award and may continue for a period of five years, if the option is exercised. Labor rates may be escalated at the beginning of each option period as provided in the Schedule; however, the labor rates in effect at the time a task order is awarded will remain in effect through completion of the task order. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the rates effective in the current ordering period will be utilized during this extension period.
6. The Government will evaluate the market once at the 18 month mark, within the one-year base period of the
MATOC to determine if it is in the Government’s best interest to open a contract “on-ramp” or “off-ramp”.
During a contract on-ramp the Government will accept and evaluate new proposals with the intention of adding additional contracts to the MATOC pool. These proposals shall be subject to the same proposal instructions and evaluation procedures as contained in the original solicitation. The “on-ramp” firm must be qualified to replace the displaced firm. In the event a particular nation requires local firms to perform the labor, local contractors may be on-ramped at any time. During a contract “off-ramp”, the Contracting Officer may elect to remove firms from the MATOC pool that have poor performance records or have not submitted a proposal for any of the projects in which they were qualified.
7. When request for proposals (RFPs) for task order requirements are issued, offerors must provide sufficient detail with regard to labor categories and hours, material, and travel to allow an evaluation of the proposed cost.
Travel costs shall not exceed the amounts allowed under the Joint Travel Regulation. Profit/fee is not allowable on travel costs.
8. For CPFF orders, all hours for direct labor shall be supported by individual daily job cards or time records signed by the individual thereof.
9. The U.S. Army Engineering and Support Center, Huntsville (USAESCH) will remain the Procurement
Contracting Office and no other agency can make changes to the Base Contract. Other USACE offices, upon authorization from the US Army Engineering and Support Center, may issue task orders. The US Army Engineering and Support Center may also transfer task orders to other USACE offices for administration.
10. The minimum guaranteed order for each awardee shall be $5,000 for the base period only.
11. THE FOLLOWING ELEMENTS OF insert PROPOSAL SUBMITTED IN RESPONSE TO SOLICITATION
W912DY-16-R-0003 ARE HEREBY INCORPORATED INTO THIS CONTRACT.
The fixed price and cost rates proposed by the contractor in Attachment G are binding cost elements. For fixed price rates, these rates shall be the maximum allowable rates for task orders issued during the ordering period of this contract. Thus, the fixed price rates proposed on a task order may be less than those proposed in the contractor’s Attachment G of the ID/IQ contract, but may not exceed the maximum rates included in the basic ID/IQ contract. For Cost Reimbursement rates, the lesser of actual rates or the capped rates in the basic ID/IQ contract shall be the maximum allowable rates for task orders issued during the order period of this contract.
Technical Exhibit 6, “Key Subcontractors and Key Personnel”.
NOTE: The pricing from the last option year shall remain binding for the duration of the term of the contract extended by exercising option FAR 52.217-8.
12. Pre-Proposal Workshop. The Government will hold a pre-proposal workshop for potential offerors to ensure an understanding of the Government’s objectives with this solicitation. All interested firms are encouraged to attend, but participation will not be a prerequisite for submitting a proposal.
Information regarding the date, time, and location for the workshop is forthcoming, and will be provided in a separate attachment posted on fbo.gov. The workshop will be held within 2 weeks of the solicitation posting date.
SECTION G - CONTRACT ADMINISTRATION DATA
CONTRACT ADMINISTRATION DATA
G.1 ORDERING
The following order placement procedures will be used in the administration of the contracts awarded as part of the MATOC pool:
Task Order Competition Within The Selected Pool - Once the competition pool has been selected by the Contracting Officer, task orders will be awarded against the basic ID/IQ contracts using the fair opportunity procedures discussed in FAR 16.5 in addition to the competitive source selection procedures identified in Section 803 of Public Law 107-107, Section 843 of Public Law 110-181, and DFARS 216.505-70. Each order exceeding $3,500.00 will be awarded on a competitive basis in accordance with FAR 16.505 and DFARS 216.505-70 (c), unless an exception described in FAR 16.505(b)(2)(i) through (iv) or DFARS 216.505-70(b)(1) applies. The unique selection criteria for each task order award will be provided in the task order request for proposal. However, the typical evaluation criteria utilized at the task order level will be:
1) technical approach (resourcing plan, personnel qualifications, work plan acceptance, clear understanding of work requirements, geographic experience, technical methodology, means and methods, technical competency, and/or overall strategy for work execution – some or all will be used in each task order competition as determined necessary),
2) past performance,
3) Price/cost/cost-related factors.
The evaluation will be conducted in strict accordance with the selection criteria identified in the task order request for proposal documents and documented in accordance with local policy and procedures.
G.2 TASK ORDER OMBUDSMAN
If the contractor believes it was not fairly considered for a particular task order, the contractor may present the matter to the contracting officer. The contractor may appeal the explanation or decision of the contracting officer to the USACE Ombudsman (USACE PARC – Winchester) at the following address:
U.S. Army Corps of Engineers Attn: CEPR-WIN 7701 Telegraph Rd.
Alexandria, VA 22315
The ombudsman will review the contractor’s complaint, and in coordination with the contracting officer, ensure that the contractor was afforded a fair opportunity to be considered for the task order.
G. 3 HAZARDOUS DUTY PAY DIFFERENTIAL INTERPRETATION BY CONTRACTING OFFICER
For 8% and 4% Hazardous Pay Differential
- Applicable to UXO personnel only.
- Differential will be applied to the nearest whole hours.
The 8% differential will apply to the following activities:
- Surface clearance activities.
- Subsurface clearance activities.
- Demolition operations.
- Initial OE inspection of scrap.
The 4% differential will apply to the following activities:
- Anomaly avoidance activities.
- Escort activities.
- Reconnaissance activities.
- Scrap re-inspection, certification (compound area).
- Explosives transportation and inspection.
There will be a 0% differential for the following activities:
- Office work.
- Safety Briefings.
- Travel to and from the site.
- Equipment maintenance.
- Rest breaks.
G.4 PAYMENT INSTRUCTIONS FOR SINGLE OR MULTIPLE ACCOUNTING CLASSIFICATION
CITATIONS:
For Tasks Performed under the Fixed Price CLIN:
The Payment Office shall not make payments based on sequential Accounting Classification Reference Number (ACRN) order, cancellation date, proration, or by fiscal year. Payments to the Contractor will only be made against the ACRN (alpha/alpha code) associated with the specific Task (to include Fiscal Year in which the work was performed) for which the Contractor is requesting payment. The Payment Office will only make payment to the Contractor within the CLIN based on the ACRN(s) associated with the CLIN.
If there is only one source of funding for the Contract Line Item Number (CLIN), the payment office shall make payments to the Contractor using the ACRN associated with the CLIN being billed. The Contractor however is required to clearly identify the CLIN, the ACRN (alpha/alpha code), and the amount billed against the Task within the Task Order on the payment request (invoice). If the ACRN is not identified, or is incorrectly identified, payment will not be made and the entire payment request (invoice) will be rejected.
If there are multiple ACRNs within the CLIN, the Contractor shall clearly identify the CLIN, the ACRNs (alpha/alpha codes), and the amounts associated with the Tasks being billed for on the payment request (invoice). If the ACRNs are not identified, or are incorrectly identified, payment will not be made and the entire payment request (invoice) will be rejected.
For Tasks Performed under the Cost Plus Fixed Fee CLIN:
The Payment Office shall not make payments based on sequential Accounting Classification Reference Number (ACRN) order, cancellation date, proration, or by fiscal year. Payments to the Contractor will only be made against the ACRN (alpha/alpha code) associated with the specific Task (to include Fiscal Year in which the work was performed) for which the Contractor is requesting payment. The Payment Office will only make payment to the Contractor within the CLIN based on the ACRN(s) associated with the CLIN.
If there is only one source of funding for the Contract Line Item Number (CLIN), the payment office shall make payments to the Contractor using the ACRN associated with the CLIN being billed. The Contractor however is required to clearly identify the CLIN, the ACRN (alpha/alpha code), and the amount billed against the Task within the Task Order on the payment request (invoice). If the ACRN is not identified, or is incorrectly identified, payment will not be made and the entire payment request (invoice) will be rejected.
If there are multiple ACRNs within the CLIN, the Contractor shall clearly identify the CLIN, the ACRNs (alpha/alpha codes), and the amounts associated with the Tasks being billed for on the payment request (invoice). If the ACRNs are not identified, or are incorrectly identified, payment will not be made and the entire payment request (invoice) will be rejected.
G.5 IDENTIFICATION OF CORRESPONDENCE
All correspondence and data submitted by the Contractor under this contract shall reference the Contract and Task Order Numbers.
G.6 ADMINISTRATION OF PAYMENTS
In accordance with FAR 52.232-37 "Multiple Payment Arrangement", the following procedures will be used for payment under this contract.
FFP CLINs or Sub-CLINs - The Government will make maximum use of discrete sub-CLINs for subtasks or project milestones. Work under FFP CLINS or sub-CLINs will be payable upon tender and acceptance under FAR 52.232-1 "Payments" and FAR 52.232-25 "Prompt Payment." The Government may, at its discretion, provide contract financing for individual task orders in the form of performance based payments in accordance with FAR 52.232-32 or progress payments in accordance with FAR 52.232-16 (but see conditions at FAR 32.104(d)).
Performance based payments will be preferred over progress payments.
CPFF - Completion Form (CF) CLINs or Sub-CLINs - Payment for completed and accepted CLINS or sub- CLINs will be at 100% of the allowable cost plus the fixed fee. While work is progressing under CPFF-CF items, the Government will make payments in accordance with FAR 52.216-7 "Allowable Cost and Payment" and FAR 52.232-25 ALT I "Prompt Payment". Fee will be paid in accordance with FAR 52.216-8 and the negotiated fee payment milestone schedule.
CPFF - Term Form (TF) CLINs or Sub-CLINs - See FAR 16.306(d)(2). While work is progressing under CPFF- TF items, the Government will make payments in accordance with FAR 52.216-7 "Allowable Cost and Payment" and FAR 52.232-25 ALT I "Prompt Payment". Fee will be paid in accordance with FAR 52.216-8 and the negotiated fee payment schedule up to 85% of the total fee. Payment of the remainder of the fee at the end of the term will be contingent upon the conditions of FAR 52.216-8 and upon certification by the Government of the level of effort. The Contractor shall demonstrate the level of effort expended during the term on its invoices by fully describing the actual labor hours, labor classes, and other direct costs incurred over the billing period or term. The contractor may also invoice for the fee upon acceptance of the completed item by the Government, if completed before expiration of the term.
The following have been deleted:
WAWF Army Electronic Invoicing MAY 2007
SECTION I - CONTRACT CLAUSES
The following have been deleted:
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.228-16 Alt I Performance and Payment Bonds--Other Than Construction
(Nov 2006) - Alternate I
JUL 2000
252.244-7001 Contractor Purchasing System Administration MAY 2014 252.247-7023 Transportation of Supplies by Sea APR 2014
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTIONS TO OFFERORS
PROPOSAL SUBMISSION
Copies of the solicitation are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the FedBizOpps (FBO) website. The website address is www.fedbizopps.gov. All amendments will be posted to FBO. It shall be the contractor’s responsibility to check the websites for any amendments or updates. The Offeror shall submit in the proposal all requested information specified in the Request for Proposal (RFP) solicitation.
a. The proposal shall be prepared clearly and concisely to demonstrate the Offeror has a complete understanding of the requirements. Offerors shall prepare proposals on the presumption that the Government has no previous knowledge of the Offeror’s capabilities. Proposals will be evaluated only on the information specifically presented in respective submittals, with the exception of the past performance evaluations. See FAR 52.215-1 for rules concerning submission of offers and late proposals. Proposals will not be returned (except for timely withdrawals), but will be retained by the Government for official record purposes. When applicable, the Offeror should cross reference to the solicitation by annotating solicitation reference in parenthesis, (i.e. Sec C, para 4.0).
b. Proposals shall be submitted to:
US Army Engineering and Support Center CEHNC-CT-A, ATTN: Ms. Jill Freeman 4820 University Square, Huntsville AL 35816-1822
Hand carried submissions shall be dropped off at the US Army Engineering & Support Center, Huntsville at 4820 University Square mailroom by the person delivering the package. The mailroom entrance is located at the North side of the building and is clearly marked from the outside. The mailroom personnel will receive the packages, date stamp, x-ray as appropriate and call the person identified on the package.
The mailroom hours for bid package deliveries are 0800-1500, Monday-Friday, excluding holidays. Hand carried submissions must be date stamped by the mailroom personnel by the specified proposal due date and time. Facsimile or email transmissions will not be accepted.
OFFEROR'S QUESTIONS AND COMMENTS.
Questions and/or comments relative to these documents shall be submitted no later than 4:00 PM CT, 10 May 2015, in order that they may be given adequate consideration or appropriate actions taken prior to receipt of offers. Questions and/or comments can be sent via email or mailed to the following; however, Bidder Inquiry is the preferred method in order to expedite responses:
Contract Specialist – Primary POC U.S. Army Corps of Engineers, Huntsville Engineering and Support Center ATTN: Jill Freeman 4820 University Square, Huntsville, AL 35816 Phone : 256-895-1789 Email : Jill.G.Freeman@usace.army.mil
Contracting Officer – Secondary POC U.S. Army Corps of Engineers, Huntsville Engineering and Support Center ATTN: Tonju Butler 4820 University Square, Huntsville, AL 35816 Phone: 256-895-1166 Email: Tonju.L.Butler@usace.army.mil
Bidder Inquiry Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page, you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is W912DY-16-R-0003 The Bidder Inquiry Key is 6FD78V-FT6E9V
The Bidder Inquiry System will be closed for new inquiries effective 4:00 PM CT, 10 May 2015, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
PROPOSAL FORMAT
Written materials: 8 ½” x 11” formats, using 12 point or larger font size, single spaced, in bound volumes, using 3-ring binders. Page Size spreadsheets, table, charts, etc. may be 11” x 17” but counts as two pages.
Volumes 1-3 should be submitted in a single binder. Volumes 4 and 5 should each be submitted in a separate binder. Files should be set up using the following page setup parameters:
Margins: Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
Each paragraph should be separated by at least one blank line. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 10-point and may be landscape.
Offerors are strongly discouraged from abusing tables, charts, etc. to incorporate extra content. Such abuse will be evaluated at the sole discretion of the Government, and could impact the overall page count if the Government chooses to extrapolate the content out at a font size of 12. Pages exceeding the allowable page count may be removed from the proposal volumes and will not be evaluated. Headers and footers may be increased to 14 or reduced to 10 font size. The use of hyperlinks in proposals is prohibited. Double sided printing is preferred.
Each bound volume should include the following:
• A cover page that includes the volume number, solicitation number, firm name and address, business size, CAGE code, names and CAGE codes of all key subcontractors and a point of contact for all correspondence related to proposal (include phone number and email address)
• Table of Contents
• List of tables/figures
• Solicitation number should appear on each page
• Volume number and page number should appear in the bottom right corner of each page
(along with the proposal revision number for the amended page, if amended).
It is the responsibility of the Offeror to ensure that the compact disk (CD) and all files contained therein are readable, complete, and accessible without password. The digital files shall be provided in a word searchable PDF format. Pricing worksheets shall be submitted in Microsoft Excel, Version 2010 compatible, with formulas accessible. If the electronic copy and hard copy of the proposal differ, the hard copy will govern. Zip disks are not permitted. Each disc should be externally labeled with the volume(s) number(s), date, solicitation number and the Offeror’s name.
***Please note – Self extracting exe files are not acceptable. ***
For Volumes I-IV, the Offeror shall submit one (1) original printed copy of their proposal with four (4) additional printed copies, for a total of five (5) printed copies. For Volume V, the Offeror shall submit one
(1) original printed copy of their proposal with two (2) additional printed copies for a total of three (3) printed copies. Each binder submitted shall include a CD containing a complete copy of the contents of that respective binder. Reference disc labeling instructions above.
The Proposal Volumes are as follows:
VOLUME I, FACTOR 1: TECHNICAL CAPABILITY (GATEKEEPER FACTOR)
VOLUME II, FACTOR 2: TECHNICAL APPROACH TO THE SEED TASK ORDER
Tab 1 - Discussion of Site, Assumptions, and Required Submittals Tab 2 – Staffing Plan Tab 3 – Field Work Tab 4 – Hazards and Safety Identification Tab 5 – Performance Based Milestones and Time Schedule
VOLUME III, FACTOR 3: ORGANIZATION/MANAGEMENT
Tab 1 – Quality Management/Quality Control Program and Corporate Business Practices Tab 2 – Contractor Safety and Health Program Tab 3 – Key Personnel and Other Resources Tab 4 - Organizational Structure
VOLUME IV, FACTOR 4: PAST PERFORMANCE
Tab 1 – Past Performance Project Narratives Tab 2 – Past Performance Questionnaires
VOLUME V, FACTOR 5: PRICE/COST AND OTHER COST RELATED INFORMATION
SECTION I
Tab 1 – SF33 Tab 2 – Representations and Certifications (Section K) Tab 3 – Joint Venture / Mentor-Protégé Agreements and approvals (if applicable)
SECTION II
Tab 1 – Supplies or Services and Prices/Cost Schedule Tab 2 – Supporting Documentation for Rates in Attachment G Tab 3 – Seed Task Order Costs Tab 4 – Cost Pool, Audit Information, and Other Information
Offerors must be registered in the system for award management (SAM) with their DUNS number under the appropriate NAICS code for this acquisition. To complete this registration, go to the SAM website at https://www.sam.gov. If assistance is needed with SAM registration, contact the SAM helpdesk at https://www.fsd.gov or (866)-606-8220.
Proposals must set forth full, accurate, and complete information as required by this solicitation (including exhibits and attachments). The penalty for making false statement in proposals is prescribed in 18 U.S.C.
1001.
Offerors should submit their best proposal initially as the Government intends to make awards without discussions (except clarifications, as described in FAR 15.306(a)). The Government reserves the right to conduct discussions, should the Contracting Officer deem it necessary.
Page Limitation – Only pages within the respective page limits as follows will be evaluated:
Volume I – shall not exceed 35 pages Volume II – shall not exceed 25 pages Volume III – shall not exceed 10 pages Volume IV – shall not exceed 7 pages Volume V – No page limitation
Note: Proposal cover; table of contents; title page; list of tables/figures, or acronyms; separator tabs; cross-reference to the solicitation paragraphs; key subcontractor letters of commitment; key personnel letters of commitment; PPQs and supporting past performance documents (to include eSRS reports); teaming arrangement documentation; proposal data form; personnel résumés; OSHA forms; signed certification sheet on the Safety and Health Program; and Volume V are excluded from page count.
Offerors should not parrot the Seed Task Order Performance Work Statement (PWS). Offerors should provide discussions in sufficient detail on how they will execute the tasks in the PWS. If it determined that the Offeror is parroting the PWS, this could result in a deficiency.
PROPOSAL CONTENT
Proposals must be responsive to and comply with the terms of the solicitation in order to be eligible to receive an award. The Government may reject any proposal determined to be deficient or that does not conform to the terms of the solicitation. To be eligible to receive an award, proposals submitted in response to this solicitation shall consist of the contents required in the sub-paragraphs described below:
(a) Volume I – Factor 1 (Gatekeeper), Technical Capability
The Offeror shall provide a narrative of its team’s [i.e., “team” meaning collectively the prime contractor consisting of a company or cooperation (or partnering companies or cooperations, e.g., partnership, joint venture, etc.) and key subcontractor(s)] capability. The narrative should address the team’s capability to perform the following services at diverse locations outside the United States and Outlying Areas as defined by FAR 2.101 primarily at international locations to include, but not limited to, Iraq and Afghanistan, as well as within the various COCOM regions, particularly CENTCOM:
Safely locate, identify, recover, evaluate, manage, and make final disposition of Munitions and Explosives of Concern (MEC), Munitions Constituents (MC), Chemical Warfare Materiel (CWM), Depleted Uranium (DU), and Biological Warfare Materiel (BWM) under Military Munitions Response (MMR);
Safely locate, identify, recover, evaluate, manage, and make final disposition of Biological Waste and Hazardous, Toxic, and Radioactive Waste (HTRW);
Implement and conduct Environmental Compliance and Remediation Services (ECRS) involving primarily HTRW and MC;
Provide Other Munitions-Related Services (OMRS) involving military munitions not accounted for under MMR (e.g., anomaly avoidance, construction support, etc.);
Reduce munitions stockpiles wherever they exist to include foreign jurisdictions.
The Offeror’s narrative should delineate the Offeror’s own capabilities and those capabilities that will be provided by team members (partnering members and key subcontractors, as applicable). It is not necessary that an Offeror address each service or service location outlined above but gaps in demonstrated capability may result in a lower rating.
The Offeror should provide a narrative describing up to ten examples of completed projects that demonstrate the Offeror's teams' breadth and depth managerial, technical, and contract administration capability as it relates to the requirements and locations as outlined above to include Firm Fixed Price and Cost Reimbursable contracts. Projects included shall have been completed no more than five years prior to the closing date of this solicitation. The following should be addressed in the proposal:
presentation of a wide array of completed or near complete projects demonstrating a wide breadth and depth of experience experience providing the types of munitions and environmental services and tasks typically associated with supporting contingency operation experience providing security, logistics, and life support in contingency operations environments experience demonstrating or substantiating the prime contractor’s role in performing services similar to those listed above. The extent to which the prime contractor/ key subcontractor(s) teams relied on the key subcontractor’(s) experience to provide such services.
experience demonstrating the financial capability to perform large projects experience working with the proposed team members providing services similar to those listed above experience navigating the maze of foreign country local customs, licensing, VISA, foreign taxes, import/export requirements, and international requirements such as international environmental regulations experience successfully executing work in contingency operations or third world areas using direct hire local or third country national labor and local subcontractors experience balancing the value of advanced technologies with the limitations associated with the experience of the available labor pool and logistical challenges of the location
A project is defined as:
1. Work performed pursuant to one specific task order of an Indefinite Delivery Vehicle (IDV) type contract at one or multiple sites; or
2. Work performed pursuant to a site-specific contract for one site or multiple sites; or
3. Work performed under multiple task orders issued against an IDV contract to accomplish the work effort on one or multiple sites.
Do not list an IDV contract as an example of a single completed project. Instead, list relevant completed task orders that fit within the definition above. If the Offeror provides a specific task order as its "project," it should provide the base contract number and the task order number for reference purposes. If the Offeror provides a site-specific/stand-alone “C-Type” contract as its "project," it should provide the contract number for reference purposes.
The types of information presented should include such information as to the scope of work (including project size, complexity, and any distinctive and/or unique features of the project); project location;
contract type (i.e., whether performance based and whether FFP or CPFF); period of performance; contract dollar value; team members and their roles, the approach to the field work; how the project was managed (i.e., oversight of production, schedule, cost, quality, property management, and safety); and how challenges related working in the area were handled (i.e., security, logistics, transportation, life support, local customs, licensing, VISA, foreign taxes, import/export requirements, international environmental requirements, etc.). The Offeror should discuss the technologies, means and methods, and equipment used on projects and should discuss corporate experience and not the experience of individual employees.
The Offeror is free to include more or less information as deemed necessary to communicate the team’s technical capability recognizing that a reading of Volume I should demonstrate the areas to be evaluated as listed in Section M and leave an evaluator with a complete understanding of all aspects of the team’s capability and experience to meet the terms and conditions of this solicitation throughout the contract term and recognizing that ambiguity or gaps in demonstrated capability may result in a lower rating.
(b) Volume II – Factor 2, Technical Approach to the Seed Task Order
Section I – See Section J, PWS for Seed Task Order
Tab 1 – Discussion of Site, Assumptions, and Required Submittals - The Offeror shall provide a discussion of the site and site location at which work is to be performed, the assumptions made, site challenges and risks and risk mitigation, and relevant site/work topics necessary for project execution. The Offeror shall identity any limiting factors and shall discuss risks to work production, schedule, and cost.
The Offeror shall provide a brief discussion of the contents of the submittals required by the PWS.
Tab 2 – Staffing Plan – The Offeror shall describe the teaming structure discussing the role and relevant experience of each corporate team member; the contractual relationship between corporate team members;
include an organizational chart showing each corporate team member, the lines of authority and communication, and the organizational position of personnel that are instrumental to task order execution, labor mix, and numbers of personnel. Résumés for personnel that are deemed by the Offeror to be instrumental to task order execution, i.e., Project Manager, etc., should be provided. The use of subcontractor(s), and whether other country nationals (OCN), and local and nationals (LN) are used shall be discussed. Personnel turnover should be addressed including a discussion of personnel turnover will be managed throughout the period of performance
Tab 3 – Field Work – The Offeror shall provide a discussion of the field work necessary to complete the Seed Task Order requirements including site mobilization and demobilization. The discussion shall address work technologies, means and methods, equipment used, as well as logistical, security, and life support requirements. Reporting requirements and data management should be addressed. A discussion of the Seed Task Order field work acceptance criteria and performance metric shall be included. The Offeror’s discussion shall address quality control management and should give specific quality control procedures and techniques which would be used during the field work to ensure that project requirements are met.
Tab 4 – Hazards and Safety Identification – The Offeror shall identify and provide a discussion of the hazards that may be encountered when performing the field work that is required under the Seed Task Order. The Offeror’s discussion should include site safety management and hazard mitigation.
Tab 5 – Performance Based Milestones and Time Schedule – The Offeror shall provide a Performance Based Milestone Chart and realistic time schedule for the work that would be performed under the Seed Task Order.
(c) Volume III – Factor 3, Organization/Management.
Tab 1 – Quality Management/Quality Control Program and Corporate Business Practices - The Offeror shall provide a narrative of its corporate Quality Management/Quality Control (QM/QC) Program and its business practices, which demonstrates adherence to the QM/QC Program. The Offeror shall also describe its data management practices and procedures used to maintain quality and accuracy of data from generation to reporting.
Tab 2 – Contractor Safety and Health Program -The Offeror shall provide a narrative to describe its ongoing and successful execution of its Accident Prevention/Safety and Health Program, addressing items such as training, the number of current Safety and Health professionals and the procedures used in the preparation and implementation of an Accident Prevention Plan (APP)/Site Safety and Health Plan (SSHP) for a MMR and/or HTRW site. The Offeror should explain how its programs have resulted in avoidance of accidents of hazards or a reduction of accidents or hazards. The Offeror shall provide a signed certification sheet stating that the Offeror has developed and implemented a Safety and Health Program in accordance with OSHA regulation 29 CFR 1926.65(b) and EM 385-1-1, and shall provide a Table of Contents of the required written Safety and Health Program. The Offeror shall provide the Corporation’s experience modifications rate (EMR).
Tab 3 – Key Personnel and Other Resources – The Offeror should demonstrate through a resource plan that it currently possesses, or has the ability to obtain and retain, the necessary personnel required to perform the services specified under Factor 1 "Technical Capability". The Offeror shall provide the résumés of the program level key personnel listed below. Offerors are expected at a minimum to employ the following key personnel positions during the performance of the contract. Résumés should include proposed job title, education, registrations/ certifications held and the states in which the individuals are registered/certified, special qualifications, and experience history showing title, specific duties, responsibilities, and assignments performed and associated dates.
Key Personnel:
a. Program Manager. Shall have at least 3 years of experience in general contract project management on programs providing the type of services specified by Factor 1 “Technical Capability” and on projects similar in size and complexity to those project examples provided by the Offeror under Factor 1 “Technical Capability”. Project Management certification is desired.
The Program Manager shall be responsible for the overall contract, provides a single Point of Contact (POC) for the Contracting Officer, provides programmatic reporting, and who can address overall management and contracting issues. This person should minimally have experience in services specified by Factor 1 “Technical Capabilities”.
b. Program Quality Control Manager. Shall minimally have 3 years of experience in directly related work, addresses overall quality management, quality auditing, or process improvement.
The Program Quality Manager assures overall quality of contract deliverables and general contract compliance.
c. Corporate Health and Safety Officer. Shall meet the Office of Personnel Management Standards for the Safety and Occupational Health Specialist/Manager Series GS-018; or alternatively be a Safety Engineer Series GS 803 with Board of Certified Safety Professionals certification (Professional Engineer registration with at least 5 years of safety related experience will suffice in lieu of Board of Certified Safety Professionals certification).
d. Program Property Manager. Shall at a minimum be a Certified Professional Property Administrator (CPPA) or a Certified Professional Property Manager (CPPM) (CPPM is preferred).
Will in conjunction with designated Government representatives be required to maintain up-to-date Government property records and inventory of property for all Government-Furnished Property, Government Furnished Equipment, and Contractor-Acquired Property (GFP/GFE/CAP).
Will maintain accounting documentation regarding the issuance of GFP/GFE/CAP to all Contractor employees or subcontractors IAW FAR Part 45. Will be required to coordinate with other Contractor property personnel, and designated Government representatives, as applicable, regarding the management and accounting of GFP/GFE/CAP.
e. Program Geophysicist. Shall have a degree in geophysics, geology, geological engineering, or a closely related field, and shall have a minimum of 5 years of experience directly related to the geophysical mapping, detection and discrimination of buried military munitions. The Program Geophysicist will have the overall responsibility for design, implementation, and management of all geophysical investigations required for the work effort related to military munitions.
f. Program Contracts Manager. Shall have experience in Firm Fixed Price (FFP) and Cost Plus Fixed Fee (CPFF), contracts and should have a minimum of 10 years of federal contracting experience (either working with the Government or for a DoD Contractor).
g. Program Chemist. Shall meet the more stringent of the requirements listed in Section 8.2.5.1.1.of EM 200-1-15, Technical Guidance For Military Munitions Response Actions and in Section 7 and 8 of the DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing.
Résumé information should be provided in the format identified in Section J, Attachment D, “Key Personnel Résumé”, of this solicitation. The Offeror shall submit unconditional letters of commitment for all key personnel in the format identified in Section J, Attachment E, “Letter of Commitment for Key Personnel” of this solicitation. NOTE: Offerors should consider one year equivalent to a period of 12 months. The Contractor should not count leave of absences towards total experience time, and should only count experience which qualifies them for the position. The Offeror shall complete Section J, Technical Exhibit 6 "Key Subcontractors and Key Personnel".
Tab 4 - Organizational Structure. The organizational structure of the Offeror’s proposed team (all key subcontractors shall be included in this organizational structure) for this contract should be outlined through a narrative and should be diagrammed using an organizational chart indicating the relationships, working arrangements, and lines of authority and communication with the Offeror and within the team. A key subcontractor is defined as a company proposed to perform any of the services listed in Volume I, Factor 1 “Technical Capability” or would perform 20% or more of the total price of a prime task order. The Offeror’s proposal should address the extent to which proposed organizational relationships have been used successfully in the past, i.e., over the course of multiple projects. The Offeror shall submit unconditional letters of commitment for key subcontractors that should be in the format identified in Attachment F, “Letter of Commitment of Key Subcontractor,” of this solicitation.
(d) Volume IV – Factor 4, Past Performance
Tab 1 – Past Performance Project Narratives - The Offeror shall provide relevant and recent past performance narrative information for each project listed in the Offeror's response to Section L, Volume I, Factor 1,”Technical Capability” of this solicitation. Past performance must have occurred within the five years prior to the closing date of this solicitation. Data concerning the prime Offeror should be provided first, followed by each proposed key subcontractor, in alphabetical order. The title of the project should be consistent with the project description as required in Section L, Volume I of this solicitation.
a. The Offeror may provide information on problems encountered on the contracts and subcontracts identified in the narratives above (to include cost growth and delays). Offerors are encouraged to disclose instances in which their past performance may be considered by previous customers or their representatives to have been less than fully satisfactory, and to tell their side of the story and/or describe corrective actions that they have taken. Contractor performance is rarely without some unanticipated disruption or trouble in conforming to all plans and requirements. Therefore, a history of successful, corrective action is an important consideration. For any contracts that did not/do not meet original schedule or technical performance requirements, Offerors may provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. Offerors should not provide general information on their performance on the identified contracts. General performance information will be obtained from references.
b. The Offeror may describe objectives achieved (include parameters), quality awards or certifications that indicate the Offeror possesses a high-quality process to simultaneously manage, develop and produce the service required. Such awards or certifications include ISO 9001, and private sector awards or certifications. The Offeror should identify the segment of the company (one division or the entire company) that received the award or certification. Describe when the award or certification was bestowed. If the award or certification is over three years old, provide evidence that the qualifications still apply.
c. The Offeror should also provide a narrative of its past performance in working with regulators with points of contact (POCs) for those projects listed under Section L Volume I, Factor 1, “Technical
Capability” of its proposal. Include information to demonstrate the Offeror’s ability to create and maintain a cooperative working environment with regulators. The Offeror should provide information, which demonstrates experience with submitting accurate and timely reporting/regulatory submittals in accordance with regulatory requirements and gaining the approvals for those submittals. The Offeror should provide to the Government environmental regulator POCs who are and who are familiar with the project and available so that the information provided can be independently verified. Regulatory POCs may be contacted to obtain safety and environmental compliance information.
d. In addition to its narrative, the Offeror shall submit one reference sheet per project in the format provided in Section J, Attachment B of this solicitation for all projects referenced in Volume I, Factor 1, “Technical Capability”. The Offeror may also include other Government and non-Government contracts/projects (prime and key subcontracts) completed during the past five years from the closing date of this solicitation. The Offeror shall at a minimum, provide references for all projects referenced in Volume I, Factor 1, “Technical Capability”. The Government may require an Offeror to provide additional past performance references if the references originally provided do not promptly respond to inquiries.
e. In addition to the project information requested in this section, the Offeror shall provide information on all environmentally reportable incident violations and environmental notice of violations in the past five years, or shall state that there were none.
f. In addition to the project information…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .