EXHIBIT3-QASP.docx

DOCX document 15 KB Posted

Attached to
International Remediation and Environmental Services
Solicitation number
W912DY-16-R-0003
Issued by

About this file

Exhibit 3 QASP

View the file

Other files

File Type Posted
W912DY-16-R-0003_FINALAmendment_0004_29_June_2016.pdf PDF
AttachmentH_FINALSeedTOTaskTable_29June2016.xlsx XLSX spreadsheet
AttachmentH_SeedTOTaskTable_29June2016.xlsx XLSX spreadsheet
W912DY-16-R-0003_Amendment_0004_29_June_2016.pdf PDF
AttachmentG_RateTable_22June2016.xls XLS spreadsheet
AttachmentH_SeedTOTaskTable_22June2016.xlsx XLSX spreadsheet
AttachmentC_SeedTO_PWS_16June16.pdf PDF
Att_4_to_Seed_TO_PWS_1.pdf PDF
Att_4_to_Seed_TO_PWS_2.pdf PDF
W912DY-16-R-0003_Amendment_0003_24_June_2016.pdf PDF
W912DY-16-R-0003_Amendment_0002_17_June_2016.pdf PDF
W912DY-16-R-0003_Amendment_0001_2_June_2016.pdf PDF
Pre-Proposal_Workshop_Sign-In_Sheet.pdf PDF
IRES_PreProposal_4_May_16.pdf PDF
Exhibit5_CDRL_1of3.pdf PDF
AttachmentG_RateTable.xls XLS spreadsheet
EXHIBIT4-Profit-FeeCalcWorksheet.doc DOC document
EXHIBIT1-DIDs.pdf PDF
AttachmentA_PPQ.doc DOC document
EXHIBIT2-PRS.doc DOC document
AttE_LetterofComm-KeyPersonnel.doc DOC document
AttF_LetterofCommofKeySub.doc DOC document
AttachmentD_KeyPersonnelResume.doc DOC document
W912DY-16-R-0003_20April2016.pdf PDF
AttachmentC_SeedTO_PWS_13Apr16.docx DOCX document
EXHIBIT6-KeySubs Personnel.doc DOC document
AttachmentH_SeedTOTaskTable.xlsx XLSX spreadsheet
Exhibit5_CDLR_2of3.pdf PDF
Exhibit5_CDRL_3of3.pdf PDF
AttachmentB_EXPERIENCE_PP_REFERENCE.doc DOC document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 3

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

MILITARY MUNITIONS RESPONSE; ENVIRONMENTAL COMPLIANCE AND REMEDIATION SERVICES; AND OTHER MUNITIONS RELATED SERVICES

AT SITES OCONUS

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is a general discussion of Quality Assurance (QA) Surveillance that may be performed in each Task Order. A QASP will be created for each Task Order under this contract. The QASP is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective in the services contract.

The QASP is based on the premise that the Government desires to maintain a quality standard in Military Munitions Response; Environmental Compliance and Remediation Services; and Other Munitions Related Services at Sites at sites located Outside Continental United States (OCONUS), i.e., outside the United States and Outlying Areas as defined by FAR 2.101 primarily at international locations to include, but not limited to, Iraq and Afghanistan. Work may involve International Operations (IOP) supporting US Army missions in Afghanistan and other OCONUS locations.

The Contractor, not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

In the contract, the quality control program is the driver for product quality. The Contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program accepted at the beginning of the contract provides the measures needed to lead the Contractor to success.

Once the quality control program is accepted, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

The oversight provided for in the contract and in this plan shall ensure service levels reach and maintain the required levels throughout the contract term. The task order QASP shall provide the Contracting Officer, or their designated representative, with a proactive way to avoid unacceptable or deficient performance, and provide verifiable input for the required annual past performance evaluations.

RESPONSIBILITIES

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Project Manager - The Project Manager is responsible for overall project direction, including technical, contracting and customer-related issues and assures proper Government surveillance of the Contractor’s performance. The Project Manager is not authorized to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

Project Delivery Team – The Project Delivery Team (PDT) may include but is not limited to the Technical Manager, Chemist, Geophysicist, and Safety Specialist, etc. The PDT will provide detailed technical oversight of the Contractor’s performance and reports his or her findings to the Project Manager in a timely, complete and impartial fashion to support the Project Manager’s technical administration activities. While the PDT may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, he or she is not authorized to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

METHODS OF QA SURVEILLANCE

The following list provides methods of surveillance that may be used in the administration of this contract. In addition to specific instructions that may be mentioned, the appropriate and standardized form that is to be used for documentation of QA surveillance may include but is not limited to the Quality Assurance Surveillance Table and the Surveillance Activity Check list prepared on a task order basis.

Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the Project Manager. The Project Manager shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file. The Project Manager shall also keep the tabulated results of all customer satisfaction surveys on file and shall enter the summary results into the Contractor Performance Assessment Reporting System (CPARS).

100% Inspection - This level of inspection shall be accomplished by monitoring and documentation. The Project Manager, or if so designated the appropriate Technical Monitor, shall review the generated documentation and enter summary results into the CPARS at the mid-point and the end of each task.

Periodic Inspection - Periodic inspections shall be conducted if and when specified in individual task orders in the Quality Assurance Surveillance Table or as shown in the Performance Response Summary (PRS). For the potential tasks that have been identified so far and included in this QASP, the appropriate Technical Monitor typically performs the periodic inspection on a daily, weekly or monthly basis.

Random Monitoring - Random monitoring shall be conducted if and when specified in individual task orders. For the potential tasks that have been identified so far and included in this QASP, the random monitoring shall be performed by the Project Manager or by the appropriate designated PDT member.

IDENTIFIED QA SURVEILLANCE TASKS

The Performance-Based Service Contract surveillance tasks are identified within the QASP for each task order. General Performance Metrics are provided in Section C, Paragraph 6.0 and subparagraphs. Specific performance metrics will be provided by the task order.

STANDARD: The performance thresholds established for each of the performance objectives are the number of defects permitted before the Contracting Officer’s Representative (COR) notifies the Contracting Officer for appropriate action in accordance with 52.246-5 Inspection of Services - Cost or FAR 52.246-4, Inspection of Services – Fixed Price, as appropriate.

File details come from the government source that posted it. Updated .