This document summarizes the changes made in Amendment 4 to the solicitation for the construction of a three story barracks located at Joint Base Lewis McChord in Washington. The amendment revises 17 drawings related to specifications, demolition plans, site plans, mechanical plans, and panel schedules. It also adds two new specification sections covering requirements for sampling criteria at borrow source pits and subsurface drainage chambers. Responses to the solicitation are due by April 13, 2023 for the construction of the three story barracks at Joint Base Lewis McChord in Washington. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Seattle.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 06_Three Story Barracks.pdf | ||
| Addtional Inquiries with Government Responses - Barracks.pdf | ||
| Amendment 05 -Barracks.pdf | ||
| Amendment R0004 - Barracks.pdf | ||
| Plans- Amendment R0004.pdf | ||
| Attachment A - Index of Drawings- Amendment R0004.docx | DOCX document | |
| Specs- Amendment R0004.pdf | ||
| 00 72 00-A.docx | DOCX document | |
| Drawings.pdf | ||
| Summary of Changes in Amendment 0003 - Drawings and Specs.pdf | ||
| Amendment 03- Barracks.pdf | ||
| Specs.pdf | ||
| Site Visit Slides - Barracks_sfn.pptx | PPTX presentation | |
| signin sheet.pdf | ||
| Amendment 0002 - Barracks.pdf | ||
| Amendment 0001 - Barracks.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| FY23 PN94756 UEPH | 21010 | |
| Joint Base Lewis McChord, WA | W912DW23R2001 |
Summary of Changes in Amendment no. 4 (R0004)
1. SPECIFICATION ATTACHMENT 01 57 19-A – BORROW SOURCE PIT SOP 2022 WITH SAMPLING CRITERIA Changes: Added new attachment in its entirety.
2. SPECIFICATION 33 40 02 – SUBSURFACE DRAINAGE (LEACHING) CHAMBER
Changes: Added new specification section in its entirety.
3. PLAN Drawing C501 TYPICAL PAVEMENT SECTIONS 1 Changes: Revised drawing with clouded area of Revision 1.
4. PLAN Drawing C508 UTILITY DETAILS 4 Changes: Revised drawing with clouded area of Revision 1.
5. PLAN Drawing A-404 FIRST FLOOR ENLARGED CORE RCP Changes: Revised drawing with clouded area of Revision 1.
6. PLAN Drawing IN601 INTERIOR FINISH SCHEDULE Changes: Revised drawing with clouded area of Revision 2.
7. PLAN Drawing M-001 MECHANICAL LEGEND AND ABBREVIATIONS Changes: Revised drawing with clouded area of Revision 2.
8. PLAN Drawing M-402 MECH ROOMS ENLARGED VIEWS Changes: Revised drawing with clouded area of Revision 2.
9. PLAN Drawing ED100 OVERALL PLAN ELECTRICAL DEMOLITION Changes: Revised drawing with clouded area of Revision 3.
10. PLAN Drawing ED101 PLAN 1 ELECTRICAL DEMOLITION Changes: Revised drawing with clouded area of Revision 3.
11. PLAN Drawing ED102 SITE PLAN 2 ELECTRICAL DEMOLITION Changes: Revised drawing with clouded area of Revision 3.
12. PLAN Drawing ED103 SITE PLAN 3 ELECTRICAL DEMOLITION Changes: Revised drawing with clouded area of Revision 3.
13. PLAN Drawing ES100 OVERALL SITE PLAN ELECTRICAL Changes: Revised drawing with clouded area of Revision 3.
14. PLAN Drawing ES101 SITE PLAN 1 ELECTRICAL Changes: Revised drawing with clouded area of Revision 3.
15. PLAN Drawing ES102 SITE PLAN 2 ELECTRICAL Changes: Revised drawing with clouded area of Revision 3.
16. PLAN Drawing ES103 SITE PLAN 3 ELECTRICAL Changes: Revised drawing with clouded area of Revision 3.
17. PLAN Drawing E612 PANEL SCHEDULES 12 Changes: Revised drawing with clouded area of Revision 3.