Addtional Inquiries with Government Responses - Barracks.pdf

PDF 468 KB Posted

Attached to
Three Story Barracks Federal contract opportunity
Solicitation number
W912DW23R2001
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

This document contains inquiries and responses regarding a solicitation for construction of three story barracks at Joint Base Lewis McChord in Washington. Elastomeric cellular insulation is allowed on heating hot water supply and return pipes and domestic water pipes according to the government's response. The related federal contract opportunity is solicitation number W912DW23R2001 for the Three Story Barracks project, with a description and attachments provided. This is a construction project with a solicitation closing date of April 13, 2023. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Seattle.

View the file

Other files for this federal contract opportunity

Other files attached to Three Story Barracks, newest first.
File Type Posted
Amendment 06_Three Story Barracks.pdf PDF
Amendment 05 -Barracks.pdf PDF
Specs- Amendment R0004.pdf PDF
Attachment A - Index of Drawings- Amendment R0004.docx DOCX document
Amendment R0004 - Barracks.pdf PDF
Plans- Amendment R0004.pdf PDF
Summary of changes in Amendment 4 (R0004).docx DOCX document
Specs.pdf PDF
00 72 00-A.docx DOCX document
Drawings.pdf PDF
Summary of Changes in Amendment 0003 - Drawings and Specs.pdf PDF
Amendment 03- Barracks.pdf PDF
signin sheet.pdf PDF
Site Visit Slides - Barracks_sfn.pptx PPTX presentation
Amendment 0002 - Barracks.pdf PDF
Amendment 0001 - Barracks.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inquiries and Government Responses: Three Story Barracks, Joint Base Lewis McChord (JBLM), WA.

1) In the insulation spec 230700: 2.3.2.2 and 2.3.3.3 narratives both allow elastomeric rubber on both cold and hot piping. But 3.2.1.6 Table 1 does not show rubber on the heating hot water and domestic hot water. Table 2 does not show rubber on the heating hot and line 1 does not show the material type on the 1.5” and 2” wall thickness line item. And then table 2 shows rubber on the domestic hot contradicting table 1. How did you interpret when deciding on inserts on the heating hot?

Government Response:

Elastomeric cellular insulation is allowed on the Heating Hot Water Supply & return and Domestic Water pipes.