The file's text, extracted by GovTribe without its formatting.
| FY23 PN94756 UEPH | 21010 |
| Joint Base Lewis-McChord, WA | W912DW-23-R-2001 |
ATTACHMENT 00 72 00-A
INDEX OF DRAWINGS
DRAWING NO. 20s/721-12-11, DATED 21 November 2022
| SHEET NUMBER |
| PLATE NUMBER |
| TITLE |
01 GENERAL
| 1 |
| G-001 |
| TITLE, LOCATION AND VICINITY MAPS |
| 4 |
| G-003 |
| LIFE SAFETY CODE SUMMARY |
| 5 |
| G-004 |
| LIFE SAFETY PLAN – BASE BID |
| 6 |
| G-004A |
| LIFE SAFETY PLAN – OPTION |
| 7 |
| G-005A |
| LIFE SAFETY PLAN – OPTION |
| 8 |
| G-006 |
| FIRESTOPPING DETAILS |
| 9 |
| G-007 |
| FIRESTOPPING DETAILS |
| 10 |
| G-008 |
| FIRESTOPPING DETAILS |
04 GEOTECHNICAL
| 11 |
| B-001 |
| SITE AND GEOTECHNICAL EXPLORATION LOCATION PLAN |
| 12 |
| B-002 |
| GEOTECHNICAL EXPLORATION LOGS BH-1 TO BH-3 |
| 13 |
| B-003 |
| GEOTECHNICAL EXPLORATION LOGS BH-4 TO BH-6 |
| 14 |
| B-004 |
| GEOTECHNICAL EXPLORATION LOGS TP-1 TO TP-3 |
| 15 |
| B-005 |
| GEOTECHNICAL EXPLORATION LOGS TP-4 TO TP-6 |
| 16 |
| B-006 |
| GEOTECHNICAL EXPLORATION LOGS TP-7 TO TP-9 |
05 CIVIL
| 17 |
| C-001 |
| LEGEND AND ABBREVIATIONS |
| 18 |
| C-002 |
| CIVIL GENERAL NOTES 1 |
| 19 |
| C-003 |
| CIVIL GENERAL NOTES 2 |
| 20 |
| C-004 |
| ACCESS AND HAUL ROUTE |
| 21 |
| C-005 |
| GENERAL SITE PLAN - BASE |
| 22 |
| C-005A |
| GENERAL SITE PLAN – OPTION |
| 23 |
| C-006 |
| FIRE CODE COMPLIANCE SITE PLAN - BASE |
| 24 |
| CL100 |
| LEED SITE PLAN – BASE |
| 25 |
| CL101 |
| LEED SITE PLAN – OPTION |
| 26 |
| CT101 |
| TRAFFIC CONTROL PLAN 1 |
| 27 |
| CT102 |
| TRAFFIC CONTROL PLAN 2 |
| 28 |
| CE100 |
| EXISTING CONDITIONS PLAN |
| 29 |
| CE101 |
| EXISTING CONDITIONS PLAN 1 |
| 30 |
| CE102 |
| EXISTING CONDITIONS PLAN 2 |
| 31 |
| CE103 |
| EXISTING CONDITIONS PLAN 3 |
| 32 |
| CE104 |
| EXISTING CONDITIONS STORM DRAIN TABLE |
| 33 |
| CD101 |
| ROADWAY DEMOLITION PLAN 1 – BENNETT AVENUE |
| 34 |
| CD102 |
| ROADWAY DEMOLITION PLAN 2 – BENNETT AVENUE |
| 35 |
| CD103 |
| ROADWAY DEMOLITION PLAN 3 – BENNETT AVENUE |
| 36 |
| CD104 |
| ROADWAY DEMOLITION PLAN 4 – 2ND DIVISION DRIVE |
| 37 |
| CD105 |
| ROADWAY DEMOLITION PLAN 5 – 2ND DIVISION DRIVE |
| 38 |
| CD106 |
| ROADWAY DEMOLITION PLAN 6 – 2ND DIVISION DRIVE |
| 39 |
| CD107 |
| SITE DEMOLITION PLAN 1 |
| 40 |
| CD108 |
| SITE DEMOLITION PLAN 2 |
| 41 |
| CD109 |
| SITE DEMOLITION PLAN 3 |
| 42 |
| CD110 |
| SITE DEMOLITION PLAN 4 |
| 43 |
| CS101 |
| ROADWAY SITE PLAN 1 – BENNETT AVENUE |
| 44 |
| CS102 |
| ROADWAY SITE PLAN 2 – BENNETT AVENUE |
| 45 |
| CS103 |
| ROADWAY SITE PLAN 3 – BENNETT AVENUE |
| 46 |
| CS104 |
| ROADWAY SITE PLAN 4 – 2ND DIVISION DRIVE |
| 47 |
| CS105 |
| ROADWAY SITE PLAN 5 – 2ND DIVISION DRIVE |
| 48 |
| CS106 |
| ROADWAY SITE PLAN 6 – 2ND DIVISION DRIVE |
| 49 |
| CS107 |
| DETAILED SITE PLAN 1 |
| 50 |
| CS108 |
| DETAILED SITE PLAN 2 |
| 51 |
| CS109 |
| DETAILED SITE PLAN 3 |
| 52 |
| CS109A |
| DETAILED SITE PLAN 3A – OPTION |
| 53 |
| CS110 |
| DETAILED SITE PLAN 4 |
| 54 |
| CS110A |
| DETAILED SITE PLAN 4A – OPTION |
| 55 |
| CS111 |
| ROADWAY STRIPING PLAN 1 – BENNETT AVENUE |
| 56 |
| CS112 |
| ROADWAY STRIPING PLAN 2 – BENNETT AVENUE |
| 57 |
| CS113 |
| ROADWAY STRIPING PLAN 3 – BENNETT AVENUE |
| 58 |
| CS114 |
| ROADWAY STRIPING PLAN 4 – 2ND DIVISION DRIVE |
| 59 |
| CS115 |
| ROADWAY STRIPING PLAN 5 – 2ND DIVISION DRIVE |
| 60 |
| CS116 |
| ROADWAY STRIPING PLAN 6 – 2ND DIVISION DRIVE |
| 61 |
| CI101 |
| INTERSECTION DETAIL PLAN 1 |
| 62 |
| CI102 |
| INTERSECTION DETAIL PLAN 2 |
| 63 |
| CI103 |
| INTERSECTION DETAIL PLAN 3 |
| 64 |
| CI104 |
| INTERSECTION DETAIL PLAN 4 |
| 65 |
| CR101 |
| ROADWAY PLAN AND PROFILE 1 – BENNETT AVENUE |
| 66 |
| CR102 |
| ROADWAY PLAN AND PROFILE 2 – BENNETT AVENUE |
| 67 |
| CR103 |
| ROADWAY PLAN AND PROFILE 3 – BENNETT AVENUE |
| 68 |
| CR104 |
| ROADWAY PLAN AND PROFILE 4 – 2ND DIVISION DRIVE |
| 69 |
| CR105 |
| ROADWAY PLAN AND PROFILE 5 – 2ND DIVISION DRIVE |
| 70 |
| CR106 |
| ROADWAY PLAN AND PROFILE 6 – 2ND DIVISION DRIVE |
| 74 |
| CG103A |
| GRADING PLAN 3A – OPTION |
| 76 |
| CG104A |
| GRADING PLAN 4A – OPTION |
| 77 |
| CU101 |
| UTILITY PLAN 1 – BENNETT AVENUE |
| 78 |
| CU102 |
| UTILITY PLAN 2 – BENNETT AVENUE |
| 79 |
| CU103 |
| UTILITY PLAN 3 – BENNETT AVENUE |
| 80 |
| CU104 |
| UTILITY PLAN 4 – 2ND DIVISION DRIVE |
| 81 |
| CU105 |
| UTILITY PLAN 5 – 2ND DIVISION DRIVE |
| 82 |
| CU106 |
| UTILITY PLAN 6 – 2ND DIVISION DRIVE |
| 87 |
| CU110A |
| UTILITY PLAN 10A – OPTION |
| 89 |
| CU112 |
| STORM DRAIN PLAN 1 – BENNETT AVENUE |
| 90 |
| CU113 |
| STORM DRAIN PLAN 2 – BENNETT AVENUE |
| 91 |
| CU114 |
| STORM DRAIN PLAN 3 – BENNETT AVENUE |
| 92 |
| CU115 |
| STORM DRAIN PLAN 4 – 2ND DIVISION DRIVE |
| 93 |
| CU116 |
| STORM DRAIN PLAN 5 – 2ND DIVISION DRIVE |
| 94 |
| CU117 |
| STORM DRAIN PLAN 6 – 2ND DIVISION DRIVE |
| 95 |
| CU118 |
| STORM DRAIN PLAN 7 |
| 96 |
| CU119 |
| STORM DRAIN PLAN 8 |
| 97 |
| CU120 |
| STORM DRAIN PLAN 9 |
| 98 |
| CU120A |
| STORM DRAIN PLAN 9A |
| 99 |
| CU121 |
| STORM DRAIN AND GRADING PLAN 10 |
| 100 |
| CU121A |
| STORM DRAIN AND GRADING PLAN 10A |
| 101 |
| CJ102 |
| JOINT LAYOUT PLAN 2 – ACCESS ROAD AND BASKETBALL COURT |
| 102 |
| C-301 |
| SANITARY SEWER PROFILE |
| 103 |
| C-302 |
| STORM DRAIN PROFILE 1 |
| 104 |
| C-303 |
| STORM DRAIN PROFILE 2 |
| 105 |
| C-501 |
| TYPICAL PAVEMENT SECTIONS 1 |
| 106 |
| C-502 |
| TYPICAL PAVEMENT SECTIONS 2 |
| 107 |
| C-503 |
| PAVEMENT JOINT DETAILS |
| 108 |
| C-504 |
| PAVEMENT REINFORCEMENT DETAILS |
| 109 |
| C-505 |
| UTILITY DETAILS 1 |
| 110 |
| C-506 |
| UTILITY DETAILS 2 |
| 111 |
| C-507 |
| UTILITY DETAILS 3 |
| 112 |
| C-508 |
| UTILITY DETAILS 4 |
| 113 |
| C-509 |
| BASKETBALL COURT DETAILS |
| 114 |
| C-510 |
| BOCCE BALL COURT DETAILS |
| 117 |
| C-513 |
| MISCELLANEOUS DETAILS 1 |
| 118 |
| C-514 |
| MISCELLANEOUS DETAILS 2 |
| 120 |
| C-516 |
| RETAINING WALL DETAILS |
| 121 |
| C-517 |
| TYPICAL ROADWAY CROSS SECTIONS |
06 LANDSCAPE
| 122 |
| LG001 |
| LANDSCAPE PLANT SCHEDULE |
| 123 |
| LG002 |
| LANDSCAPE ABBREVIATIONS & NOTES |
| 124 |
| LG003 |
| LANDSCAPE SHEET KEY PLAN |
| 125 |
| LP001 |
| OVERALL LANDSCAPE SITE PLAN – BASE BID |
| 126 |
| LP101 |
| LANDSCAPE SITE PLAN – BASE BID GROUND TREATMENT |
| 127 |
| LP102 |
| LANDSCAPE SITE PLAN – BASE BID TREE & SHRUB PLANTING PLAN |
| 128 |
| LP103 |
| LANDSCAPE SITE PLAN – BASE BID GROUND TREATMENT |
| 129 |
| LP104 |
| LANDSCAPE SITE PLAN – BASE BID TREE & SHRUB PLANTING PLAN |
| 130 |
| LP105 |
| LANDSCAPE SITE PLAN – BASE BID GROUND TREATMENT |
| 131 |
| LP106 |
| LANDSCAPE SITE PLAN – BASE BID TREE & SHRUB PLANTING PLAN |
| 132 |
| LE411 |
| LANDSCAPE ENLARGEMENTS |
| 133 |
| LD501 |
| LANDSCAPE DETAILS 1 |
| 134 |
| LD502 |
| LANDSCAPE DETAILS 2 |
| 135 |
| LD503 |
| LANDSCAPE DETAILS 3 |
07 STRUCTURAL
| 136 |
| S-001 |
| STRUCTURAL GENERAL NOTES |
| 137 |
| S-002 |
| STRUCTURAL GENERAL NOTES |
| 138 |
| S-003 |
| STRUCTURAL LOADING DIAGRAMS |
| 139 |
| S-003A |
| STRUCTURAL LOADING DIAGRAMS |
| 140 |
| S-100 |
| OVERALL PLAN – BASE BID |
| 141 |
| S-100B |
| OVERALL PLAN – BASE BID |
| 142 |
| S-100C |
| OVERALL PLAN – OPTION |
| 143 |
| S-100D |
| OVERALL PLAN – OPTION |
| 144 |
| S-101 |
| FOUNDATION PLAN – AREA A – BASE BID |
| 145 |
| S-102 |
| FOUNDATION PLAN – AREA B – BASE BID |
| 146 |
| S-102A |
| FOUNDATION PLAN – AREA B - OPTION |
| 147 |
| S-111 |
| SECOND FLOOR FRAMING PLAN – AREA A – BASE BID |
| 148 |
| S-112 |
| SECOND FLOOR FRAMING PLAN – AREA B – BASE BID |
| 149 |
| S-112A |
| SECOND FLOOR FRAMING PLAN AREA B - OPTION |
| 150 |
| S-121 |
| THIRD FLOOR FRAMING PLAN – AREA A – BASE BID |
| 151 |
| S-122 |
| THIRD FLOOR FRAMING PLAN – AREA B – BASE BID |
| 152 |
| S-122A |
| THIRD FLOOR FRAMING PLAN – AREA B - OPTION |
| 153 |
| S-131 |
| ROOF FRAMING PLAN – AREA A – BASE BID |
| 154 |
| S-132 |
| ROOF FRAMING PLAN – AREA B – BASE BID |
| 155 |
| S-132A |
| ROOF FRAMING PLAN – AREA B – OPTION |
| 156 |
| S-201 |
| FRAMING ELEVATIONS |
| 157 |
| S-202 |
| FRAMING ELEVATIONS |
| 158 |
| S-203 |
| FRAMING ELEVATIONS |
| 159 |
| S-301 |
| FRAMING SECTIONS |
| 160 |
| S-302 |
| ROOF FRAMING SECTIONS |
| 161 |
| S-303 |
| ROOF FRAMING SECTIONS |
| 162 |
| S-501 |
| FOUNDATION DETAILS |
| 163 |
| S-502 |
| FOUNDATION DETAILS |
| 164 |
| S-510 |
| FRAMING DETAILS |
| 165 |
| S-511 |
| FRAMING DETAILS |
| 166 |
| S-512 |
| FRAMING DETAILS |
| 167 |
| S-513 |
| FRAMING DETAILS |
| 168 |
| S-520 |
| ROOF FRAMING DETAILS |
| 169 |
| S-521 |
| ROOF FRAMING DETAILS |
08 ARCHITECTURAL
| 170 |
| A-001 |
| ABBREVIATIONS, SYMBOLS & GENERAL NOTES |
| 171 |
| A-011 |
| AIR BARRIER PLANS – BASE BID |
| 172 |
| A-011A |
| AIR BARRIER PLANS – OPTION |
| 173 |
| A-012 |
| AIR BARRIER PLANS & SECTIONS – BASE BID |
| 174 |
| A-012A |
| AIR BARRIER PLANS & SECTIONS - OPTION |
| 175 |
| A-013 |
| AIR BARRIER DETAILS |
| 176 |
| AS101 |
| ARCHITECTURE SITE PLAN |
| 177 |
| A-101 |
| FIRST FLOOR PLAN OVERALL – BASE BID |
| 178 |
| A-101A |
| FIRST FLOOR PLAN OVERAL – OPTION |
| 179 |
| A-101S |
| FIRST FLOOR SLAB PLAN – BASE BID |
| 180 |
| A-101SA |
| FIRST FLOOR SLAB PLAN – OPTION |
| 181 |
| A-102 |
| SECOND FLOOR PLAN OVERALL – BASE BID |
| 182 |
| A-102A |
| SECOND FLOOR PLAN OVERALL – OPTION |
| 183 |
| A-103 |
| THIRD FLOOR PLAN OVERALL – BASE BID |
| 184 |
| A-103A |
| THIRD FLOOR PLAN OVERALL – OPTION |
| 185 |
| A-104 |
| FIRST FLOOR RCP OVERALL – BASE BID |
| 186 |
| A-104A |
| FIRST FLOOR RCP OVERALL – OPTION |
| 187 |
| A-105 |
| SECOND FLOOR RCP OVERALL – BASE BID |
| 188 |
| A-105A |
| SECOND FLOOR RCP OVERALL - OPTION |
| 189 |
| A-106 |
| THIRD FLOOR RCP OVERALL – BASE BID |
| 190 |
| A-106A |
| THIRD FLOOR RCP OVERALL – OPTION |
| 191 |
| A-107 |
| FIRST FLOOR PLAN – AREA A – BASE BID |
| 192 |
| A-108 |
| FISRT FLOOR PLAN – AREA B – BASE BID |
| 193 |
| A-108A |
| FIRST FLOOR PLAN – AREA B – OPTION |
| 194 |
| A-109 |
| SECOND FLOOR PLAN – AREA A – BASE BID |
| 195 |
| A-110 |
| SECOND FLOOR PLAN – AREA B – BASE BID |
| 196 |
| A-110A |
| SECOND FLOOR PLAN – AREA B – OPTION |
| 197 |
| A-111 |
| THIRD FLOOR PLAN – AREA A – BASE BID |
| 198 |
| A-112 |
| THIRD FLOOR PLAN – AREA B – BASE BID |
| 199 |
| A-112A |
| THIRD FLOOR PLAN – AREA B – OPTION |
| 200 |
| A-113 |
| FIRST FLOOR RCP – AREA A – BASE BID |
| 201 |
| A-114 |
| FIRST FLOOR RCP – AREA B – BASE BID |
| 202 |
| A-114A |
| FIRST FLOOR RCP – AREA B – OPTION |
| 203 |
| A-115 |
| SECOND FLOOR RCP – AREA A – BASE BID |
| 204 |
| A-116 |
| SECOND FLOOR RCP – AREA B – BASE BID |
| 205 |
| A-116A |
| SECOND FLOOR RCP – AREA B - OPTION |
| 206 |
| A-117 |
| THIRD FLOOR RCP – AREA A – BASE BID |
| 207 |
| A-118 |
| THIRD FLOOR RCP – AREA B – BASE BID |
| 208 |
| A-118A |
| THIRD FLOOR RCP – AREA B - OPTION |
| 209 |
| A-120 |
| ROOF PLAN – BASE BID |
| 210 |
| A-120A |
| ROOF PLAN – OPTION |
| 211 |
| A-201 |
| EXTERIOR ELEVATIONS (NORTH/SOUTH) – BASE BID |
| 212 |
| A-202 |
| EXTERIOR ELEVATIONS (EAST/WEST) – BASE BID |
| 213 |
| A-203 |
| ENLARGED EXTERIOR ELEVATIONS |
| 214 |
| A-204A |
| EXTERIOR ELEVATIONS (NORTH/SOUTH) – OPTION |
| 215 |
| A-205A |
| EXTERIOR ELEVATIONS (EAST/WEST) – OPTION |
| 216 |
| A-301 |
| BUILDING SECTIONS – BASE BID |
| 217 |
| A-301A |
| BUILDING SECTIONS – OPTION |
| 220 |
| A-401 |
| FIRST FLOOR ENLARGED CORE PLAN |
| 221 |
| A-402 |
| SECOND FLOOR ENLARGED CORE PLAN |
| 222 |
| A-403 |
| THIRD FLOOR ENLARGED CORE PLAN |
| 223 |
| A-404 |
| FIRST FLOOR ENLARGED CORE RCP |
| 224 |
| A-405 |
| SECOND FLOOR ENLARGED CORE RCP |
| 225 |
| A-406 |
| THIRD FLOOR ENLARGED CORE RCP |
| 226 |
| A-407 |
| ENLARGED UNIT PLAN & RCP |
| 227 |
| A-408 |
| ENLARGED STAIR PLANS/SECTION – STAIR 1 |
| 228 |
| A-409 |
| ENLARGED STAIR PLANS/SECTION – STAIR 2 |
| 229 |
| A-410 |
| ENLARGED STAIR PLANS – STAIR 3 – BASE |
| 230 |
| A-410A |
| ENLARGED STAIR PLANS – STAIR 3 – OPTION |
| 231 |
| A-411 |
| ENLARGED STAIR SECTIONS |
| 232 |
| A-501 |
| EXTERIOR DETAILS |
| 233 |
| A-502 |
| EXTERIOR DETAILS |
| 236 |
| A-505 |
| ROOF/CANOPY DETAILS |
| 238 |
| A-507 |
| STOREFRONT AND CURTAINWALL DETAILS |
| 239 |
| A-508 |
| EXTERIOR DOOR DETAILS |
| 240 |
| A-509 |
| EXTERIOR LOUVER DETAILS |
| 241 |
| A-510 |
| INTERIOR DOOR & WINDOWS DETAILS |
| 243 |
| A-512 |
| CEILING DETAILS |
| 244 |
| A-513 |
| INTERIOR DETAILS |
| 245 |
| A-601 |
| EXTERIOR ASSEMBLIES |
| 246 |
| A-602 |
| INTERIOR ASSEMBLIES |
| 247 |
| A-603 |
| DOOR & LOUVER SCHEDULE – BASE BID |
| 248 |
| A-603A |
| DOOR & LOUVER SCHEDULE – OPTION |
| 249 |
| A-604 |
| WINDOW & CURTAINWALL SCHEDULE – BASE BID |
| 250 |
| A-604A |
| WINDOW & CURTAINWALL SCHEDULE - OPTION |
| 251 |
| A-801 |
| PERSPECTIVE VIEWS – BASE BID |
| 252 |
| A-801A |
| PERSPECTIVE VIEWS - OPTION |
| 253 |
| A-802 |
| IMPORTANT INTERIOR VIEWS |
| 254 |
| A-901 |
| AUXILIARY STRUCTURES |
09 INTERIORS
| 256 |
| IF101 |
| FIRST FLOOR OVERALL FURNITURE PLAN |
| 257 |
| IF101A |
| FIRST FLOOR OVERALL FURNITURE PLAN – OPTION |
| 258 |
| IF102 |
| SECOND FLOOR OVERALL FURNITURE PLAN |
| 259 |
| IF102A |
| SECOND FLOOR OVERALL FURNITURE PLAN – OPTION |
| 260 |
| IF103 |
| THIRD FLOOR OVERALL FURNITURE PLAN |
| 261 |
| IF103A |
| THIRD FLOOR OVERALL FURNITURE PLAN – OPTION |
| 262 |
| IF401 |
| ENLARGED TYPICAL UNIT FURNITURE PLAN |
| 263 |
| IF402 |
| ENLARGED FURNITURE PLAN |
| 264 |
| IN101 |
| FIRST FLOOR OVERALL ELEMENTS PLAN |
| 265 |
| IN101A |
| FIRST FLOOR OVERALL ELEMENTS PLAN – OPTION A |
| 266 |
| IN102 |
| SECOND FLOOR OVERALL ELEMENTS PLAN |
| 267 |
| IN102A |
| SECOND FLOOR OVERALL ELEMENTS PLAN – OPTION A |
| 268 |
| IN103 |
| THIRD FLOOR OVERALL ELEMENTS PLAN |
| 269 |
| IN103A |
| THIRD FLOOR OVERALL ELEMENTS PLAN – OPTION |
| 270 |
| IN201 |
| INTERIOR ELEVATIONS |
| 271 |
| IN202 |
| INTERIOR ELEVATIONS |
| 272 |
| IN203 |
| INTERIOR ELEVATIONS |
| 273 |
| IN401 |
| ENLARGED FLOOR PLAN |
| 274 |
| IN402 |
| ENLARGED FLOOR PLAN |
| 275 |
| IN501 |
| INTERIOR RESTROOM DETAILS |
| 276 |
| IN502 |
| INTERIOR DETAILS |
| 277 |
| IN503 |
| INTERIOR CASEWORK DETAILS |
| 278 |
| IN504 |
| INTERIOR CASEWORK DETAILS |
| 279 |
| IN505 |
| INTERIOR CASEWORK DETAILS |
| 280 |
| IN601 |
| INTERIOR FINISH SCHEDULE |
| 281 |
| IN602 |
| INTERIOR FINISH MATERIALS LEGEND |
| 282 |
| IN701 |
| FIRST FLOOR OVERALL FINISH PLAN |
| 283 |
| IN701A |
| FIRST FLOOR OVERALL FINISH PLAN – OPTION |
| 284 |
| IN702 |
| SECOND FLOOR OVERALL FINISH PLAN |
| 285 |
| IN702A |
| SECOND FLOOR OVERALL FINISH PLAN – OPTION |
| 286 |
| IN710 |
| ENLARGED FIRST FLOOR FINISH PLAN |
| 287 |
| IN800 |
| SIGNAGE DETAILS |
| 288 |
| IN801 |
| SIGNAGE DETAILS |
| 289 |
| IN802 |
| FIRST FLOOR OVERALL SIGNAGE PLAN |
| 290 |
| IN802A |
| FIRST FLOOR OVERALL SIGNAGE PLAN – OPTION |
| IN803 |
| SECOND FLOOR OVERALL SIGNAGE PLAN |
| 291 |
| IN803A |
| SECOND FLOOR OVERALL SIGNAGE PLAN – OPTION |
11 FIRE PROTECTION
| 293 |
| F001 |
| FIRE ALARM/PROTECTION GENERAL NOTES & LEGEND |
| 294 |
| FA101 |
| FIRST FLOOR FIRE ALARM OVERALL PLAN – BASE BID |
| 295 |
| FA101A |
| FIRST FLOOR FIRE ALARM OVERALL PLAN – OPTION |
| 296 |
| FA102 |
| SECOND FLOOR FIRE ALARM OVERALL PLAN – BASE BID |
| 297 |
| FA102A |
| SECOND FLOOR FIRE ALARM OVERALL PLAN – OPTION |
| 298 |
| FA103 |
| THIRD FLOOR FIRE ALARM OVERALL PLAN – BASE BID |
| 299 |
| FA103A |
| THIRD FLOOR FIRE ALARM OVERALL PLAN – OPTION |
| 300 |
| FA401 |
| FIRST FLOOR FIRE ALARM PLAN AREA A -BASE BID |
| 301 |
| FA402 |
| FIRST FLOOR FIRE ALARM PLAN AREA B – BASE BID |
| 302 |
| FA402A |
| FIRST FLOOR FIRE ALARM PLAN AREA B – OPTION |
| 303 |
| FA403 |
| SECOND FLOOR FIRE ALARM PLAN AREA A – BASE BID |
| 304 |
| FA404 |
| SECOND FLOOR FIRE ALARM PLAN AREA B – BASE BID |
| 305 |
| FA404A |
| SECOND FLOOR FIRE ALARM PLAN AREA B – OPTION |
| 306 |
| FA405 |
| THIRD FLOOR FIRE ALARM PLAN AREA A – BASE BID |
| 307 |
| FA406 |
| THIRD FLOOR FIRE ALARM PLAN AREA B – BASE BID |
| 308 |
| FA406A |
| THIRD FLOOR FIRE ALARM PLAN AREA B - OPTION |
| 309 |
| FA501 |
| FIRE ALARM DETAILS |
| 310 |
| FA502 |
| FIRE ALARM MATRIX |
| 311 |
| FX111 |
| FIRST FLOOR FIRE PROTECTION OVERALL PLAN – BASE BID |
| 312 |
| FX111A |
| FIRST FLOOR FIRE PROTECTION OVERALL PLAN – OPTION |
| 313 |
| FX112 |
| SECOND FLOOR FIRE PROTECTION OVERALL PLAN – BASE BID |
| 314 |
| FX112A |
| SECOND FLOOR FIRE PROTECTION OVERALL PLAN – OPTION |
| 315 |
| FX113 |
| THIRD FLOOR FIRE PROTECTION OVERALL PLAN – BASE BID |
| 316 |
| FX113A |
| THIRD FLOOR FIRE PROTECTION OVERALL PLAN – OPTION |
| 317 |
| FX301 |
| FIRE PROTECTION STAIRWELL SECTION |
| 318 |
| FX302 |
| FIRE PROTECTION BARRACK SECTION VIEW |
| 319 |
| FX303 |
| FIRE PROTECTION RISER SECTION VIEW |
| 320 |
| FX401 |
| FIRST FLOOR FIRE PROTECTION PLAN AREA A – BASE BID |
| 321 |
| FX402 |
| FIRST FLOOR FIRE PROTECTION PLAN AREA B – BASE BID |
| 322 |
| FX402A |
| FIRST FLOOR FIRE PROTECTION PLAN AREA B – OPTION |
| 323 |
| FX403 |
| SECOND FLOOR FIRE PROTECTION PLAN AREA A – BASE BID |
| 324 |
| FX404 |
| SECOND FLOOR FIRE PROTECTION PLAN AREA B – BASE BID |
| 325 |
| FX404A |
| SECOND FLOOR FIRE PROTECTION PLAN AREA B – OPTION |
| FX405 |
| THIRD FLOOR FIRE PROTECTION PLAN AREA A – BASE BID |
| 326 |
| FX406 |
| THIRD FLOOR FIRE PROTECTION PLAN AREA B – BASE BID |
| 327 |
| FX406A |
| THIRD FLOOR FIRE PROTECTION PLAN AREA B – OPTION |
12 PLUMBING
| 329 |
| P-001 |
| PLUMBING LEGEND |
| 330 |
| P-101 |
| FIRST FLOOR DOMESTIC OVERALL PLAN |
| 331 |
| P-102 |
| SECOND FLOOR DOMESTIC OVERALL PLAN |
| 332 |
| P-103 |
| THIRD FLOOR DOMESTIC OVERALL PLAN |
| 333 |
| P-104 |
| FIRST FLOOR DOMESTIC PLAN – AREA A |
| 334 |
| P-105 |
| FIRST FLOOR DOMESTIC PLAN – AREA B |
| 335 |
| P-105A |
| FIRST FLOOR DOMESTIC PLAN – OPTION |
| 336 |
| P-106 |
| SECOND FLOOR DOMESTIC PLAN – AREA A |
| 337 |
| P-107 |
| SECOND FLOOR DOMESTIC PLAN – AREA B |
| 338 |
| P-107A |
| SECOND FLOOR DOMESTIC PLAN – OPTION |
| 339 |
| P-108 |
| THIRD FLOOR DOMESTIC PLAN – AREA A |
| 340 |
| P-109 |
| THIRD FLOOR DOMESTIC PLAN – AREA B |
| 341 |
| P-109A |
| THIRD FLOOR DOMESTIC PLAN – OPTION |
| 342 |
| P-110 |
| FIRST FLOOR SANITARY OVERALL PLAN |
| 343 |
| P-111 |
| SECOND FLOOR SANITARY OVERALL PLAN |
| 344 |
| P-112 |
| THIRD FLOOR SANITARY OVERALL PLAN |
| 345 |
| P-113 |
| FIRST FLOOR SANITARY PLAN – AREA A |
| 346 |
| P-114 |
| FIRST FLOOR SANITARY PLAN – AREA B |
| 347 |
| P-114A |
| FIRST FLOOR SANITARY PLAN – OPTION |
| 348 |
| P-115 |
| SECOND FLOOR SANITARY PLAN – AREA A |
| 349 |
| P-116 |
| SECOND FLOOR SANITARY PLAN – AREA B |
| 350 |
| P-116A |
| SECOND FLOOR SANITARY PLAN – OPTION |
| 351 |
| P-117 |
| THIRD FLOOR SANITARY PLAN – AREA A |
| 352 |
| P-118 |
| THIRD FLOOR SANITARY PLAN – AREA B |
| 353 |
| P-118A |
| THIRD FLOOR SANITARY PLAN – OPTION |
| 354 |
| P-301 |
| DOMESTIC BUILDING SECTION |
| 355 |
| P-302 |
| DOMESTIC SECTION MECH ROOMS |
| 356 |
| P-303 |
| SANITARY SECTION – LAUNDRY ROOM STACK |
| 357 |
| P-304 |
| SANITARY SECTION – SIDE BY SIDE K&B STACK |
| 358 |
| P-305 |
| SANITARY SECTION – SIDE BY SIDE DWELLING UNIT STACK |
| 359 |
| P-305A |
| SANITARY SECTION VIEWS 4 – OPTION |
| 360 |
| P-306A |
| SANITARY SECTION VIEWS 5 – OPTION |
| 361 |
| P-307 |
| NATURAL GAS SECTION MECH ROOMS |
| 362 |
| P-401 |
| ENLARGED PIPE PLANS |
| 363 |
| P-402 |
| SANITARY ENLARGED PLANS |
| 364 |
| P-403 |
| LAUNDRY ROOM ENLARGED |
| 365 |
| P-501 |
| PLUMBING DETAILS 1 |
| 366 |
| P-502 |
| PLUMBING DETAILS 2 |
| 367 |
| P-503 |
| PLUMBING DETAILS 3 |
| 368 |
| P-601 |
| PLUMBING SCHEDULES 1 |
| 369 |
| P-602 |
| PLUMBING SCHEUDLES 2 |
| 370 |
| P-701 |
| HOT WATER CONTROLS SCHEMATIC |
| 371 |
| P-702 |
| HOT WATER CONTROLS SEQUENCE OF OPERATIONS |
| 372 |
| P-703 |
| HOT WATER POINTS SCHEDULE |
| 373 |
| P-901 |
| OVERALL DOMESTIC ISOMETRIC PLUMBING ISOMETRIC |
| 374 |
| P-901A |
| DOMESTIC ISOMETRIC – OPTION |
| 375 |
| P-902 |
| DOMESTIC ISOMETRIC – BATHROOM & KITCHEN RISER TYPICAL |
| 376 |
| P-903 |
| DOMESTIC ISOMETRIC – BATHROOM & KITCHEN RISER END OF |
| 377 |
| P-904 |
| DOMESTIC ISOMETRIC – LAUNDRY ROOM DOMESTIC RISER |
| 378 |
| P-905 |
| DOMESTIC ISOMETRIC VIEW 4 |
| 379 |
| P-906 |
| FLUE & NG LINES ISOMETRIC VIEW 5 |
| 380 |
| P-907 |
| OVERALL SANITARY ISOMETRIC |
| 381 |
| P-907A |
| OVERALL SANITARY ISOMETRIC – OPTION |
| 382 |
| P-908 |
| SANITARY ISOMETRIC – SIDE BY SIDE BATHROOM STACK & |
| P-909 |
| SANITARY ISOMETRIC – SIDE BY SIDE K&B STACK, OFFEST KITCHEN |
| 383 |
| P-910 |
| SANITARY ISOMETRIC – MUD ROOM |
| 384 |
| P-911 |
| SANITARY ISOMETRIC – PUBLIC BATHROOM & MECH ROOMS STACK |
14 MECHANICAL
| 386 |
| M-001 |
| MECHANICAL LEGEND AND ABBREVIATIONS |
| 387 |
| M-101 |
| FIRST FLOOR HVAC PLAN OVERALL – BASE BID |
| 388 |
| M-101A |
| FIRST FLOOR HVAC PLAN OVERALL – OPTION |
| 389 |
| M-102 |
| SECOND FLOOR HVAC PLAN OVERALL – BASE BID |
| 390 |
| M-102A |
| SECOND FLOOR HVAC PLAN OVERALL – OPTION |
| 391 |
| M-103 |
| THIRD FLOOR HVAC PLAN OVERALL – BASE BID |
| 392 |
| M-103A |
| THIRD FLOOR HVAC PLAN OVERALL – OPTION |
| 393 |
| M-104 |
| FIRST FLOOR HVAC PLAN – AREA A – BASE BID |
| 394 |
| M-105 |
| FIRST FLOOR HVAC PLAN – AREA B – BASE BID |
| 395 |
| M-105A |
| FIRST FLOOR HVAC PLAN – AREA B – OPTION |
| 396 |
| M-106 |
| SECOND FLOOR HVAC PLAN – AREA A – BASE BID |
| 397 |
| M-107 |
| SECOND FLOOR HVAC PLAN – AREA B – BASE BID |
| 398 |
| M-107A |
| SECOND FLOOR HVAC PLAN – AREA B – OPTION |
| 399 |
| M-108 |
| THIRD FLOOR HVAC PLAN – AREA A – BASE BID |
| 400 |
| M-109 |
| THIRD FLOOR HVAC PLAN – AREA B – BASE BID |
| 401 |
| M-109A |
| THIRD FLOOR HVAC PLAN – AREA B – OPTION |
| 402 |
| M-110 |
| FIRST FLOOR HYDRONIC PLAN OVERALL – BASE BID |
| 403 |
| M-110A |
| FIRST FLOOR HYDRONIC PLAN OVERALL – OPTION |
| 404 |
| M-111 |
| SECOND FLOOR HYDRONIC PLAN OVERALL – BASE BID |
| 405 |
| M-111A |
| SECOND FLOOR HYDRONIC PLAN OVERALL – OPTION |
| 406 |
| M-112 |
| THIRD FLOOR HYDRONIC PLAN OVERALL – BASE BID |
| 407 |
| M-112A |
| THIRD FLOOR HYDRONIC PLAN OVERALL – OPTION |
| 408 |
| M-113 |
| FIRST FLOOR HYDRONIC PLAN – AREA A – BASE BID |
| 409 |
| M-114 |
| FIRST FLOOR HYDRONIC PLAN – AREA B – BASE BID |
| 410 |
| M-114A |
| FIRST FLOOR HYDRONIC PLAN – AREA B – OPTION |
| 411 |
| M-115 |
| SECOND FLOOR HYDRONIC PLAN – AREA A – BASE BID |
| 412 |
| M-116 |
| SECOND FLOOR HYDRONIC PLAN – AREA B – BASE BID |
| 413 |
| M-116A |
| SECOND FLOOR HYDRONIC PLAN – AREA B – OPTION |
| 414 |
| M-117 |
| THIRD FLOOR HYDRONIC PLAN – AREA A – BASE BID |
| 415 |
| M-118 |
| THIRD FLOOR HYDRONIC PLAN – AREA B – BASE BID |
| 416 |
| M-118A |
| THIRD FLOOR HYDRONIC PLAN – AREA B – OPTION |
| 417 |
| M-119 |
| ROOF HVAC PLAN – OVERALL – BASE BID |
| 418 |
| M-119A |
| ROOF HVAC PLAN – OVERALL – OPTION |
| 419 |
| M-301 |
| HVAC BUILDING SECTION |
| 420 |
| M-401 |
| DWELLING UNIT HVAC ENLARGED PLANS |
| 421 |
| M-402 |
| MECH ROOMS ENLARGED VIEWS |
| 422 |
| M-403 |
| LAUNDRY ROOM ENLARGED VIEWS |
| 423 |
| M-404 |
| FIRST FLOOR COMMON AREA ENLARGED PLAN |
| 424 |
| M-405 |
| COMMON AREA 2ND & 3RD FLOOR |
| 427 |
| M-601 |
| HVAC SCHEDULES – BASE BID |
| 428 |
| M-601A |
| HVAC SCHEDULES – OPTION |
| 429 |
| M-602 |
| CONTROL AND BALANCE VALVE SCHEDULE |
| 430 |
| M-700 |
| CONTROLS LEGEND |
| 431 |
| M-701 |
| CONTROLS POINT SCHEDULE INSTRUCTIONS |
| 432 |
| M-702 |
| HVAC CONTROLS DOAS |
| 433 |
| M-703 |
| HVAC CONTROLS FCU – DORM ROOM |
| 434 |
| M-704 |
| HVAC CONTROLS HYDRONIC BOILER - I |
| 435 |
| M-705 |
| HVAC CONTROLS HYDRONIC BOILER - II |
| 436 |
| M-706 |
| HVAC CONTROLS FCU – COMMON AREA |
| 437 |
| M-707 |
| HVAC NETWORK CONTROLS |
| 438 |
| M-708 |
| HVAC CONTROLS CHILLED WATER SYSTEM |
| 439 |
| M-709 |
| HVAC CONTROLS LAUNDRY ROOM EXHAUST & MAKE UP AIR |
| 440 |
| M-710 |
| HVAC CONTROLS UNIT HEATER |
15 ELECTRICAL
| 442 |
| E-001 |
| ELECTRICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES |
| 443 |
| ED-100 |
| OVERALL PLAN ELECTRICAL DEMOLITION |
| 444 |
| ED-101 |
| PLAN 1 ELECTRICAL DEMOLITION |
| 445 |
| ED-102 |
| SITE PLAN 2 ELECTRICAL DEMOLITION |
| 446 |
| ED-103 |
| SITE PLAN 3 ELECTRICAL DEMOLITION |
| 447 |
| ES-100 |
| OVERALL SITE PLAN ELECTRICAL |
| 448 |
| ES-101 |
| SITE PLAN 1 ELECTRICAL |
| 449 |
| ES-102 |
| SITE PLAN 2 ELECTRICAL |
| 450 |
| ES-103 |
| SITE PLAN 3 ELECTRICAL |
| 451 |
| EG101 |
| GROUNDING PLAN – BASE BID |
| 452 |
| EG101A |
| GROUNDING PLAN – OPTION |
| 453 |
| E-101 |
| FIRST FLOOR LIGHTING PLAN OVERALL – BASE BID |
| 454 |
| E-101A |
| FIRST FLOOR LIGHTING PLAN OVERALL – OPTION |
| 455 |
| E-102 |
| SECOND FLOOR LIGHTING PLAN OVERALL – BASE BID |
| 456 |
| E-102A |
| SECOND FLOOR LIGHTING PLAN OVERALL – OPTION |
| 457 |
| E-103 |
| THIRD FLOOR LIGHTING PLAN OVERALL – BASE BID |
| 458 |
| E-103A |
| THIRD FLOOR LIGHTING PLAN OVERALL – OPTION |
| 459 |
| E-104 |
| FIRST FLOOR LIGHTING PLAN – AREA A |
| 460 |
| E-105 |
| FIRST FLOOR LIGHTING PLAN – AREA B |
| 461 |
| E-105A |
| FIRST FLOOR LIGHTING PLAN - OPTION |
| 462 |
| E-106 |
| SECOND FLOOR LIGHTING PLAN – AREA A |
| 463 |
| E-107 |
| SECOND FLOOR LIGHTING PLAN – AREA B |
| 464 |
| E-107A |
| SECOND FLOOR LIGHTING PLAN – OPTION |
| 465 |
| E-108 |
| THIRD FLOOR LIGHTING PLAN – AREA A |
| 466 |
| E-109 |
| THIRD FLOOR LIGHTING PLAN – AREA B |
| 467 |
| E-109A |
| THIRD FLOOR LIGHTING PLAN – OPTION |
| 468 |
| E-110 |
| FIRST FLOOR POWER PLAN OVERALL – BASE BID |
| 469 |
| E-110A |
| FIRST FLOOR POWER PLAN OVERALL – OPTION |
| 470 |
| E-111 |
| SECOND FLOOR POWER PLAN OVERALL – BASE BID |
| 471 |
| E-111A |
| SECOND FLOOR POWER PLAN OVERALL – OPTION |
| 472 |
| E-112 |
| THIRD FLOOR POWER PLAN OVERALL – BASE BID |
| 473 |
| E-112A |
| THIRD FLOOR POWER PLAN OVERALL – OPTION |
| 474 |
| E-113 |
| FIRST FLOOR POWER PLAN – AREA A |
| 475 |
| E-114 |
| FIRST FLOOR POWER PLAN – AREA B |
| 476 |
| E-114A |
| FIRST FLOOR POWER PLAN – OPTION |
| 477 |
| E-115 |
| SECOND FLOOR POWER PLAN – AREA A |
| 478 |
| E-116 |
| SECOND FLOOR POWER PLAN – AREA B |
| 479 |
| E-116A |
| SECOND FLOOR POWER PLAN - OPTION |
| 480 |
| E-117 |
| THIRD FLOOR POWER PLAN – AREA A |
| 481 |
| E-118 |
| THIRD FLOOR POWER PLAN – AREA B |
| 482 |
| E-118A |
| THIRD FLOOR POWER PLAN – OPTION |
| 483 |
| E-119 |
| FIRST FLOOR MECHANICAL POWER PLAN OVERALL – BASE BID |
| 484 |
| E-119A |
| FIRST FLOOR MECHANICAL POWER PLAN OVERALL – OPTION |
| 485 |
| E-120 |
| SECOND FLOOR MECHANICAL POWER PLAN OVERALL – BASE BID |
| 486 |
| E-120A |
| SECOND FLOOR MECHANICAL POWER PLAN OVERALL – OPTION |
| 487 |
| E-121 |
| THIRD FLOOR MECHANICAL POWER PLAN OVERALL – BASE BID |
| 488 |
| E-121A |
| THIRD FLOOR MECHANICAL POWER PLAN OVERALL – OPTION |
| 489 |
| E-122 |
| FIRST FLOOR MECHANICAL POWER PLAN – AREA A |
| 490 |
| E-123 |
| FIRST FLOOR MECHANICAL POWER PLAN – AREA B |
| 491 |
| E-123A |
| FIRST FLOOR MECHANICAL POWER PLAN – OPTION |
| 492 |
| E-124 |
| SECOND FLOOR MECHANICAL POWER PLAN – AREA A |
| 493 |
| E-125 |
| SECOND FLOOR MECHANICAL POWER PLAN – AREA B |
| 494 |
| E-125A |
| SECOND FLOOR MECHANICAL POWER PLAN – OPTION |
| 495 |
| E-126 |
| THIRD FLOOR MECHANICAL POWER PLAN – AREA A |
| 496 |
| E-127 |
| THIRD FLOOR MECHANICAL POWER PLAN – AREA B |
| 497 |
| E-127A |
| THIRD FLOOR MECHANICAL POWER PLAN – OPTION |
| 499 |
| E-401 |
| ENLARGED LIVING UNIT |
| 500 |
| E-501 |
| LIGHTING DETAILS |
| 501 |
| E-502 |
| LIGHTING DETAILS 2 |
| 502 |
| E-503 |
| LIGHT POLE DETAILS |
| 503 |
| E-504 |
| ELECTRICAL CONTROLS |
| 504 |
| E-505 |
| ELECTRICAL SYSTEM GROUNDING DETAILS |
| 505 |
| E-506 |
| DUCT BANK DETAILS |
| 506 |
| E-507 |
| LIGHTING CONTROL STRATEGIES |
| 507 |
| E-600 |
| ONE-LINE DIAGRAM |
| 508 |
| E-601 |
| PANEL SCHEDULES 1 |
| 509 |
| E-602 |
| PANEL SCHEDULES 2 |
| 510 |
| E-603 |
| PANEL SCHEDULES 3 |
| 511 |
| E-604 |
| PANEL SCHEDULES 4 |
| 512 |
| E-605 |
| PANEL SCHEDULES 5 |
| 513 |
| E-606 |
| PANEL SCHEDULES 6 |
| 514 |
| E-607 |
| PANEL SCHEDULES 7 |
| 515 |
| E-608 |
| PANEL SCHEDULES 8 |
| 516 |
| E-609 |
| PANEL SCHEDULES 9 |
| 517 |
| E-611 |
| PANEL SCHEDULES 11 |
| 518 |
| E-612 |
| PANEL SCHEDULES 12 |
16 TELECOMMUNICATIONS
| 521 |
| TD-100 |
| OVERALL PLAN TELECOMMUNICATIONS DEMOLITION |
| 522 |
| TD-101 |
| DEMO PLAN 1 UEPH TELECOMMUNICATION |
| 523 |
| TD-102 |
| DEMO PLAN 2 UEPH TELECOMMUNICATION |
| 524 |
| TD-103 |
| DEMO PLAN 3 UEPH TELECOMMUNICATION |
| 525 |
| TS-100 |
| TELECOMMUNICATION SITE OVERALL |
| 526 |
| TS-101 |
| SITE PLAN 1 UEPH TELECOMMUNICATION |
| 527 |
| TS-102 |
| SITE PLAN 2 UEPH TELECOMMUNICATION |
| 528 |
| TS-103 |
| SITE PLAN 3 UEPH TELECOMMUNICATION |
| 529 |
| T-100 |
| FIRST FLOOR TELECOMMUNICATIONS PLAN OVERALL – BASE BID |
| 530 |
| T-100A |
| FIRST FLOOR TELECOMMUNICATIONS PLAN OVERALL – OPTION |
| 531 |
| T-101 |
| SECOND FLOOR TELECOMMUNICATIONS PLAN OVERALL – BASE BID |
| 532 |
| T-101A |
| SECOND FLOOR TELECOMMUNICATIONS PLAN OVERALL – OPTION |
| 533 |
| T-102 |
| THIRD FLOOR TELECOMMUNICATIONS PLAN OVERALL – BASE BID |
| 534 |
| T-102A |
| THIRD FLOOR TELECOMMUNICATIONS PLAN OVERALL – OPTION |
| 535 |
| T-103 |
| FIRST FLOOR TELECOMMUNICATIONS PLAN – AREA A – BASE BID |
| 536 |
| T-104 |
| FIRST FLOOR TELECOMMUNICATIONS PLAN – AREA B – BASE BID |
| 537 |
| T-104A |
| FIRST FLOOR TELECOMMUNICATIONS PLAN – OPTION |
| 538 |
| T-105 |
| SECOND FLOOR TELECOMMUNICATIONS PLAN – AREA A – BASE BID |
| 539 |
| T-106 |
| SECOND FLOOR TELECOMMUNICATIONS PLAN – AREA B – BASE BID |
| 540 |
| T-106A |
| SECOND FLOOR TELECOMMUNICATIONS PLAN – OPTION |
| 541 |
| T-107 |
| THIRD FLOOR TELECOMMUNICATIONS PLAN – AREA A – BASE BID |
| 542 |
| T-108 |
| THIRD FLOOR TELECOMMUNICATIONS PLAN – AREA B – BASE BID |
| 543 |
| T-108A |
| THIRD FLOOR TELECOMMUNICATIONS PLAN – OPTION |
| 544 |
| T-111 |
| FIRST FLOOR CABLE TRAY – AREA A – BASE BID |
| 545 |
| T-112 |
| FIRST FLOOR CABLE TRAY – AREA B – BASE BID |
| 546 |
| T-112A |
| FIRST FLOOR CABLE TRAY – OPTION |
| 547 |
| T-113 |
| SECOND FLOOR CABLE TRAY – AREA A – BASE BID |
| 548 |
| T-114 |
| SECOND FLOOR CABLE TRAY – AREA B – BASE BID |
| 549 |
| T-114A |
| SECOND FLOOR CABLE TRAY – OPTION |
| 550 |
| T-115 |
| THIRD FLOOR CABLE TRAY – AREA A – BASE BID |
| 551 |
| T-116 |
| THIRD FLOOR CABLE TRAY – AREA B – BASE BID |
| 552 |
| T-116A |
| THIRD FLOOR CABLE TRAY – OPTION |
| 555 |
| T-401 |
| TELECOMMUNICATION DUCT BANK DETAILS |
| 556 |
| T-402 |
| TELECOMMUNICATIONS VAULT DETAILS |
| 557 |
| T-403 |
| EXISTING BUTTERFLY DIAGRAM MH-215 |
| 558 |
| T-404 |
| EXISTING BUTTERFLY DIAGRAM MH-300 |
| 559 |
| T-405 |
| EXISTING BUTTERFLY DIAGRAM MH-302 |
| 560 |
| T-406 |
| EXISTING BUTTERFLY DIAGRAM MH-306 |
| 561 |
| T-407 |
| TELECOMMUNICATIONS DETAILS |
| 562 |
| T-408 |
| TELECOMMUNICATIONS CABLE DETAILS |
| 563 |
| T-409 |
| TELECOMMUNICATIONS CABLE TRAY DETAILS |
| 564 |
| T-501 |
| TELECOMMUNICATIONS DIAGRAMS |
| 565 |
| T-502 |
| TELECOMMUNICATIONS RISER DIAGRAM LOCAL BUILDING |
| 566 |
| T-503 |
| CATV RISER DIAGRAM LOCAL BUILDING |
| 567 |
| T-504 |
| TELECOMMUNICATIONS GROUNDING DETAILS |
End of Attachment 00 72 00-A 00 72 00-A 4 R0003