Amendment R0008.pdf

PDF 2 MB Posted

Attached to
FY20 SOF 22 STS Operations Facility at JBLM WA Federal contract opportunity
Solicitation number
W912DW20R0001
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

This solicitation requests proposals for the construction of a Special Tactics Squadron operations facility and parachute drying tower at Joint Base Lewis-McChord in Washington. The project includes construction of an 85,000 square foot operations building with functional areas for operations, logistics, medical, team rooms, vehicle maintenance, storage, and an integrated 12,000 square foot parachute drying tower. Additional site work consists of covered storage, demolition of five existing buildings and structures, utilities, parking for 150 vehicles, communications infrastructure, security features, and landscaping. Special requirements include potential asbestos abatement during demolition and multiple retaining walls to accommodate site grading. Proposals are due by January 31, 2020. The U.S. Army Corps of Engineers Engineering District Seattle is the contracting agency responsible for award.

View the file

Other files for this federal contract opportunity

Other files attached to FY20 SOF 22 STS Operations Facility at JBLM WA, newest first.
File Type Posted
Site Visit Roster_1-27-2020.pdf PDF
Amendment R0007.pdf PDF
Amendment R0006_2nd Site Visit.pdf PDF
Amendment R0005.pdf PDF
Amendment R0004.pdf PDF
Amendment_R0003.pdf PDF
Amendment R0002.pdf PDF
Site Visit PPT Slides_12-20-2019.pdf PDF
Interested Vendors List_1-8-2020.pdf PDF
Site Visit Roster_12-20-2019.pdf PDF
Amendment R0001_12-18-2019.pdf PDF
Drawings_Vol 2.pdf PDF
Drawings_Vol 4.pdf PDF
Drawings_Vol 1.pdf PDF
specifications_Part1 of 3.pdf PDF
beta.sam.gov.txt TXT text file
specifications_Part2 of 3.pdf PDF
W912DW20R0001.pdf PDF
Attachment 1.docx DOCX document
Drawings_Vol 3.pdf PDF
specifications_Part3 of 3.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD991420214

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP W912DW20R0001

Amendment R0008

(Please see Continuation Page for more details)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jan-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW20R0001

X 9B. DATED (SEE ITEM 11)

13-Dec-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jan-2020

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text: R0008

1. This amendment eight (0008) provides for the following:

Revision to Price Schedule.

Revision to Attachment 00 72 00-A, “Index of Drawings.”

Revision to Drawing E-405, “Drying Tower Enlarged Power Plan.”

2. The proposal submittal time and date of 1:00:00 PM LOCAL TIME, 31 January 2020 remains the same.

3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments including this amendment by number and date on your proposal.

Encl:

Price Schedule (revised) Attachment 00 72 00-A (revised) Drawing E-405 (revised)

SECTION 00 10 00 - SOLICITATION

The following have been modified: PRICE SCHEDULE

FY19 JBLM 22nd STS Operations Facility 19004 Joint Base Lewis‐McChord, WA W912DW20R0001

R0008

PRICE SCHEDULE

CONTRACT

LINE ITEM

NUMBER

(CLIN) DESCRIPTION OF ITEM QTY UNIT

UNIT

PRICE AMOUNT

BASE ITEMS

#0001 All work for construction of the 22nd STS Operations Facility including all associated site work within five feet of the building.

1 JOB N/A $_______________

#0002 Other than Base Item #0003 and Optional Items #0007 through #0013 below; all work for site preparation including site demolition and complete demolition of Buildings #305 and #310, abatement of hazardous materials (see note #6 below), and construction of site work, site utilities, and all other improvements from the construction limits to five feet from the building.

1 JOB N/A $_______________

#0003 All work for trenching and backfilling of gas line to be installed by Puget Sound Energy.

1 JOB N/A $_______________

#0004 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

1 JOB N/A $30,000

#0005 All work for O&M Manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE DATA from preparation to final approval.

1 JOB N/A $75,000

#0006 All work for Form DD 1354 Checklist and Equipment in Place List as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

1 JOB N/A $15,000

Subtotal Base CLINS #0001 - #0006 = $__________________

OPTIONAL ITEMS

#0007 All work for demolition of Building #304 superstructure, abatement of associated hazardous materials (see note #6 below), and capping of all utilities at remaining building slab-on-grade.

1 JOB N/A $_______________

R0008

CONTRACT

LINE ITEM

NUMBER

(CLIN) DESCRIPTION OF ITEM QTY UNIT

UNIT

PRICE AMOUNT

#0008 All work for demolition of Building #304 slab-on-grade and footings, abatement of associated hazardous materials (see note #6 below), and site utilities to nearest valve, main, or tee.

1 JOB N/A $_______________

#0009 All work for demolition of Building #341 superstructure, abatement of associated hazardous materials (see note #6 below), and capping of all utilities at remaining building slab-on-grade.

1 JOB N/A $_______________

#0010 All work for demolition of Building #341 slab-on-grade and footings, abatement of associated hazardous materials (see note #6 below), and site utilities to nearest valve, main, or tee.

1 JOB N/A $_______________

#0011 All work for demolition of Building #306 and adjacent canopy structure; slab-on-grade and footings for both structures; site utilities to nearest valve, main, or tee; and abatement of associated hazardous materials (see note #6 below).

1 JOB N/A $_______________

#0012 All work for construction of Covered Storage delineated on sheet CS103.

1 JOB N/A $_______________

#0013 All work for construction of North driveway delineated on sheets CS101 and CS105 including demolition delineated on sheets CD101 and CD105.

1 JOB N/A $_______________

#0014 All work for construction of jump platform, platform stairway, and stairway fence.

1 JOB N/A $_______________

#0015 All work for providing and testing Intrusion Detection System (IDS).

1 JOB N/A $_______________

#0015 All work for installation of Furniture, Fixtures, and Equipment (FF&E).

1 JOB N/A $_______________

Subtotal Optional CLINS #0007 - #0015 = $__________________

TOTAL Base + Optional CLINS #0001 - #0015 = $__________________

NOTES:

1. 100% Design projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.

2. To better facilitate the receipt and proposal process, all revisions to proposals are to be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto.

3. Offerors must insert a price on all numbered items of the Price Schedule. Failure to do so will result in the offer being unacceptable.

4. The dollar amount established in Contract Line Item #0004, #0005, and #0006 shall not be revised by the Offerors.

5. Award of optional items will be exercised in accordance with FAR 52.217-7 Option for Increased Quantity - Separately Priced Line Item.

6. See Estimate of Hazardous Materials & Unit Price List beginning on the next page for a list of hazardous materials associated with each building and its site to be abated before demolition. Provide unit pricing for each. Award of unit priced items will be made in accordance with FAR 52.211-18 Variation in Estimated Quantity.

R0008

ESTIMATE OF HAZARDOUS MATERIALS & UNIT PRICE LIST

BLDG# MATL DESCRIPTION

ESTIMATED

QUANTITY UNIT PRICE PER UNIT

304 ACM 4", 6", & 8" DIA PIPE INSULATION 3,200 LF LF $_______________

ACM CEILING PANELS 22,000 SF SF $_______________

ACM ELEC PANELS 8 UNITS EACH $_______________

ACM FIRE DOOR 1 UNIT EACH $_______________

LCP PAINT 22,220 SF SF $_______________

PCB LIGHT FIXTURES 3 UNITS EACH $_______________

Hg FLUORESCENT TUBES 500 UNITS EACH $_______________

SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________

ACM JOINT SEALANT 1 1,000 LF LF $_______________

305 ACM AIR HANDLING UNITS 4 UNITS EACH $_______________

ACM ELEC PANELS 5 UNITS EACH $_______________

ACM BOILERS 2 UNITS EACH $_______________

LCP PAINT 13,088 SF SF $_______________

ACM EXTERIOR WALL SEALANT 5,700 LF LF $_______________

ACM DEBRIS 2 10 CY CY $_______________

ACM

4" to 6" DIA THERMAL SYSTEM

INSULATION

500 LF LF $_______________

Hg FLUORESCENT TUBES 300 UNITS EACH $_______________

PCB LIGHT FIXTURES 3 UNITS EACH $_______________

ACM FLOOR TILES 100 SF SF $_______________

ACM WINDOW GLAZING 3,000 SF LF $_______________

SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________

306 ACM ELEC PANEL 1 UNIT EACH $_______________

Hg FLUORESCENT TUBES 30 UNITS EACH $_______________

SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________

310 ACM SEALANT 3 30 LF LF $_______________

R0008

BLDG# MATL DESCRIPTION

ESTIMATED

QUANTITY UNIT PRICE PER UNIT

LCP PAINT 140 SF SF $_______________

Hg FLUORESCENT TUBES 2 UNITS EACH $_______________

SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________

341 ACM FIRE DOORS 7 UNITS EACH $_______________

ACM ELEC PANELS 5 UNITS EACH $_______________

ACM AIR HANDLING UNIT 1 UNIT EACH $_______________

LCP PAINT 11,050 SF SF $_______________

ACM SEALANT 4 210 LF LF $_______________

ACM FLOOR TILES & MASTIC 15,000 SF SF $_______________

ACM WINDOW GLAZING 1,000 LF LF $_______________

Hg FLUORESCENT TUBES 150 UNITS EACH $_______________

Hg THERMOMETER & SWITCH 1 UNIT EACH $_______________

SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________

1 described in report as "black fibrous tar joint sealant on ground north of building" 2 described in report as "under/within baseboard heaters" 3 interior north wall around doors 4 includes sealant on windows & doors ACM = asbestos containing material LCP = lead containing paint PCB = polychlorinated biphenyl containing ballast

Hg = mercury containing material SF = square feet LF = linear feet

END OF PRICE SCHEDULE

W912DW20R0001

(End of Summary of Changes)

00 72 00-A - 1 R0008

ATTACHMENT 00 72 00‐A

INDEX OF DRAWINGS

DRAWING RECORD FILE NO. 20s/141‐83‐04, DATED: 4 OCT 2019

PAGE# SHEET# SHEET TITLE REVISION DATE

1 G‐001 COVER ‐ VOLUME I R0005 15 JAN 2020

2 G‐002 SHEET INDEX ‐ VOLUME I

CIVIL

3 GC001 CIVIL LEGEND & ABBREVIATIONS

4 GC002 LOCATION & VICINITY PLAN

5 GC003 CIVIL GENERAL NOTES 1 R0005 15 JAN 2020

6 GC004 CIVIL GENERAL NOTES 2

7 GC005 ACCESS & SAFETY NOTES

8 GC006 ACCESS & LAYDOWN AREA

9 GC010 PHASE 1 CONSTRUCTION PHASING

10 GC011 PHASE 2A CONSTRUCTION PHASING

11 GC012 PHASE 2B CONSTRUCTION PHASING

12 GC013 PHASE 3A CONSTRUCTION PHASING

13 GC014 PHASE 3B CONSTRUCTION PHASING

14 V‐100 OVERALL EXISTING CONDITIONS PLAN

15 V‐101 EXISTING CONDITIONS PLAN 1

16 V‐102 EXISTING CONDITIONS PLAN 2

17 V‐103 EXISTING CONDITIONS PLAN 3

18 V‐104 EXISTING CONDITIONS PLAN 4

19 V‐105 EXISTING CONDITIONS PLAN 5

20 V‐106 EXISTING CONDITIONS PLAN 6

21 V‐107 EXISTING CONDITIONS PLAN 7

22 V‐108 EXISTING CONDITIONS PLAN 8

23 CD100 OVERALL DEMOLITION PLAN

24 CD101 DEMOLITION PLAN 1

25 CD102 DEMOLITION PLAN 2

26 CD103 DEMOLITION PLAN 3

27 CD104 DEMOLITION PLAN 4

28 CD105 DEMOLITION PLAN 5

29 CD106 DEMOLITION PLAN 6

30 CD107 DEMOLITION PLAN 7

31 CD108 DEMOLITION PLAN 8

32 CS100 OVERALL SITE PLAN

33 CS101 SITE PLAN 1

34 CS102 SITE PLAN 2

35 CS103 SITE PLAN 3

36 CS104 SITE PLAN 4

37 CS105 SITE PLAN 5

00 72 00-A - 2 R0008

38 CS106 SITE PLAN 6

39 CS107 SITE PLAN 7

40 CS108 SITE PLAN 8

41 CS501 SITE DETAILS 1

42 CS502 SITE DETAILS 2

43 CS503 SITE DETAILS 3

44 CS504 SITE DETAILS 4

45 CS505 SITE DETAILS 5

46 CS506 SITE DETAILS 6

47 CS507 SITE DETAILS 7

48 CS508 SITE DETAILS 8

49 CS509 SITE DETAILS 9

50 CS510 SITE DETAILS 10

51 CP101 JOINTING & ELEVATION PLAN

52 CP102 BID OPTION & JOINTING & ELEVATION PLAN

53 CG100 OVERALL GRADING PLAN

54 CG101 GRADING PLAN 1

55 CG102 GRADING PLAN 2

56 CG103 GRADING PLAN 3

57 CG104 GRADING PLAN 4

58 CG105 GRADING PLAN 5

59 CG106 GRADING PLAN 6 R0005 15 JAN 2020

60 CG107 GRADING PLAN 7 R0005 15 JAN 2020

61 CG108 GRADING PLAN 8 R0005 15 JAN 2020

62 CG201 ROADWAY PROFILES ‐ BID OPTION

63 CG202 ROADWAY 2 PROFILE

64 CG203 PARKING LOT PROFILE

65 CU100 OVERALL UTILITY PLAN

66 CU101 UTILITY PLAN 1

67 CU102 UTILITY PLAN 2

68 CU103 UTILITY PLAN 3

69 CU104 UTILITY PLAN 4

70 CU105 UTILITY PLAN 5

71 CU106 UTILITY PLAN 6 R0005 15 JAN 2020

72 CU107 UTILITY PLAN 7 R0005 15 JAN 2020

73 CU108 UTILITY PLAN 8 R0005 15 JAN 2020

74 CU201 STORM PROFILES

75 CU202 STORM PROFILES

76 CU203 STORM PROFILES

77 CU210 SANITARY PROFILE

78 CU231 ELECTRICAL DUCTBANK PROFILES

79 CU232 ELECTRICAL DUCTBANK PROFILES

00 72 00-A - 3 R0008

80 CU233 ELECTRICAL DUCTBANK PROFILES

81 CU234 ELECTRICAL DUCTBANK PROFILES

82 CU241 COMMUNICATIONS DUCTBANK PROFILES

83 CU242 COMMUNICATIONS DUCTBANK PROFILES

84 CU243 COMMUNICATIONS DUCTBANK PROFILES

85 CU501 UTILITY DETAILS 1

86 CU502 UTILITY DETAILS 2

87 CU503 UTILITY DETAILS 3

88 CU504 UTILITY DETAILS 4

89 CU505 UTILITY DETAILS 5

90 CU506 UTILITY DETAILS 6

91 CU510 CATHODIC PROTECTION DETAILS 1

92 CU511 CATHODIC PROTECTION DETAILS 2

LANDSCAPE

93 LP100 LEGEND & NOTES

94 LP101 LANDSCAPE PLAN

95 LP102 LANDSCAPE PLAN

96 LP103 LANDSCAPE PLAN

97 LP104 LANDSCAPE PLAN R0005 15 JAN 2020

98 LP105 LANDSCAPE DETAILS

99 LP106 PLANTING DETAILS & PLANTING SCHEDULE

STRUCTURAL

100 S‐001 GENERAL NOTES

101 S‐002 GENERAL NOTES

102 S‐003 LEGENDS & ABBREVIATIONS

103 S‐004 WIND ISOMETRIC

104 S‐005 WIND ISOMETRIC

105 S‐006 SNOW LOADING DIAGRAM

106 S‐007 STANDARD CONCRETE DETAILS

107 S‐008 STANDARD CONCRETE DETAILS

108 S‐009 STANDARD CONCRETE DETAILS

109 S‐010 STANDARD MASONRY DETAILS

110 S‐011 STANDARD MASONRY DETAILS

111 S‐012 STANDARD STEEL DETAILS

112 S‐013 STANDARD COMPOSITE STEEL DETAILS

113 S‐014 STANDARD ROOF DECK & JOIST DETAILS

114 S‐015 STANDARD ROOF DECK & JOIST DETAILS

115 S‐100 OVERALL FOUNDATION PLAN

116 S‐101 FOUNDATION PLAN ‐ AREA A

117 S‐102 FOUNDATION PLAN ‐ AREA B

118 S‐103 FOUNDATION PLAN ‐ AREA C

119 S‐104 FOUNDATION PLAN ‐ AREA D

00 72 00-A - 4 R0008

120 S‐105 FOUNDATION PLAN ‐ AREA E

121 S‐110 OVERALL SLAB ON GROUND PLAN

122 S‐111 SLAB ON GROUND PLAN ‐ AREA A

123 S‐112 SLAB ON GROUND PLAN ‐ AREA B

124 S‐113 SLAB ON GROUND PLAN ‐ AREA C

125 S‐114 SLAB ON GROUND PLAN ‐ AREA D

126 S‐115 SLAB ON GROUND PLAN ‐AREA E

127 S‐120 OVERALL SECOND FLOOR & LOW ROOF FRAMING PLAN

128 S‐121 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA A

129 S‐122 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA B

130 S‐123 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA C

131 S‐124 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA D

132 S‐130 MECHANICAL PLATFORM FRAMING

133 S‐131 STEEL JUMP PLATFORM PLANS ‐ OPTION

134 S‐132 STEEL DRYING TOWER PLATFORM FRAMING

135 S‐140 OVERALL ROOF FRAMING PLAN

136 S‐141 HIGH ROOF FRAMING PLAN ‐ AREA A

137 S‐142 HIGH ROOF FRAMING PLAN ‐ AREA B

138 S‐143 HIGH ROOF FRAMING PLAN ‐ AREA C

139 S‐144 HIGH ROOF FRAMING PLAN ‐ AREA D

140 S‐150 COVERED STORAGE FOUNDATION PLAN‐OPTION

141 S‐200 FRAMING ELEVATIONS

142 S‐210 GIRT FRAMING ELEVATIONS

143 S‐220 MASONRY WALL ELEVATIONS

144 S‐221 MASONRY WALL ELEVATIONS

145 S‐222 MASONRY WALL ELEVATIONS

146 S‐223 MASONRY WALL ELEVATIONS

147 S‐224 MASONRY WALL ELEVATIONS

148 S‐225 MASONRY WALL ELEVATIONS

149 S‐226 MASONRY WALL ELEVATIONS

150 S‐227 MASONRY WALL ELEVATIONS

151 S‐228 MASONRY WALL ELEVATIONS

152 S‐229 MASONRY WALL ELEVATIONS

153 S‐230 CONCRETE WALL ELEVATIONS

154 S‐231 CONCRETE WALL ELEVATIONS

155 S‐500 FOUNDATION DETAILS

156 S‐501 FOUNDATION DETAILS

157 S‐502 FOUNDATION DETAILS

158 S‐503 FOUNDATION DETAILS

159 S‐504 FOUNDATION DETAILS

160 S‐505 FOUNDATION DETAILS

161 S‐506 FOUNDATION DETAILS

00 72 00-A - 5 R0008

162 S‐507 FOUNDATION DETAILS

163 S‐508 FOUNDATION DETAILS

164 S‐509 FOUNDATION DETAILS

165 S‐510 FOUNDATION DETAILS

166 S‐511 FOUNDATION DETAILS

167 S‐512 FOUNDATION DETAILS

168 S‐513 FOUNDATION DETAILS

169 S‐514 FOUNDATION DETAILS

170 S‐515 FOUNDATION DETAILS

171 S‐516 FOUNDATION DETAILS

172 S‐517 EXTERIOR STAIR FOUNDATION DETAILS ‐ OPTION

173 S‐518 PATIO TRENCH ELEVATIONS

174 S‐520 SECOND FLOOR & LOW ROOF DETAILS

175 S‐521 SECOND FLOOR & LOW ROOF DETAILS

176 S‐522 SECOND FLOOR & LOW ROOF DETAILS

177 S‐530 ROOF FRAMING DETAILS

178 S‐531 ROOF FRAMING DETAILS

179 S‐532 ROOF FRAMING DETAILS

180 S‐533 ROOF FRAMING DETAILS

181 S‐534 ROOF FRAMING DETAILS

182 S‐535 ROOF FRAMING DETAILS

183 S‐536 ROOF FRAMING DETAILS

184 S‐537 ROOF FRAMING DETAILS

185 S‐538 ROOF FRAMING DETAILS

186 S‐539 ROOF FRAMING DETAILS

187 S‐540 ROOF FRAMING DETAILS

188 S‐550 STEEL BRACING CONNECTIONS

189 S‐551 STEEL BRACING CONNECTIONS

190 S‐552 STEEL BRACING CONNECTIONS

191 S‐553 STEEL BRACING CONNECTIONS

192 S‐560 JUMP PLATFORM DETAILS

193 S‐561 JUMP PLATFORM DETAILS

194 S‐580 DRYING TOWER DETAILS

195 S‐581 DRYING TOWER DETAILS

196 S‐590 GIRT DETAILS

197 S‐591 GIRT DETAILS

198 S‐600 COLUMN SCHEDULE & DETAILS

199 S‐601 POST‐INSTALLED ANCHOR SCHEDULE

200 G‐003 COVER VOLUME II R0005 15 JAN 2020

201 G‐004 SHEET INDEX ‐ VOLUME II

ARCHITECTURAL

202 A‐001 ARCHITECTURAL LEGEND & ABBREVIATIONS

00 72 00-A - 6 R0008

203 A‐002 ARCHITECTURAL GENERAL NOTES

204 A‐003 ABA INFORMATION

205 A‐004 ABA INFORMATION

206 A‐005 EXPANSION JOINT AXONOMETRICS

207 A‐010 OVERALL GROUND FLOOR AIR BARRIER PLAN

208 A‐011 OVERALL SECOND FLOOR AIR BARRIER PLAN

209 A‐012 OVERALL AIR BARRIER SECTIONS

210 A‐110 OVERALL GROUND FLOOR PLAN

211 A‐111 GROUND FLOOR PLAN AREA ‐ A

212 A‐112 GROUND FLOOR PLAN AREA ‐ B

213 A‐113 GROUND FLOOR PLAN AREA ‐ C

214 A‐114 GROUND FLOOR PLAN AREA ‐ D

215 A‐115 GROUND FLOOR PLAN AREA ‐ E

216 A‐120 OVERALL SECOND FLOOR PLAN

217 A‐121 SECOND FLOOR PLAN AREA ‐ C

218 A‐122 SECOND FLOOR PLAN AREA ‐ D

219 A‐130 OVERALL GROUND FLOOR REFLECTED CEILING PLAN

220 A‐131 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ A

221 A‐132 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ B

222 A‐133 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ C

223 A‐134 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ D

224 A‐140 OVERALL SECOND FLOOR REFLECTED CEILING PLAN

225 A‐141 SECOND FLOOR REFLECTED CEILING PLAN AREA ‐ C

226 A‐142 SECOND FLOOR REFLECTED CEILING PLAN AREA ‐ D

227 A‐150 OVERALL ROOF PLAN

228 A‐151 ENLARGED ROOF PLAN AREA ‐ A

229 A‐152 ENLARGED ROOF PLAN AREA ‐ B

230 A‐153 ENLARGED ROOF PLAN AREA ‐ C

231 A‐154 ENLARGED ROOF PLAN AREA ‐ D

232 A‐160 OVERALL BRICK LEDGE PLAN

233 A‐201 EXTERIOR BUILDING ELEVATIONS

234 A‐202 RECESSED VENEER ELEVATIONS

235 A‐211 ENLARGED EXTERIOR ELEVATIONS

236 A‐212 ENLARGED EXTERIOR ELEVATIONS

237 A‐213 ENLARGED EXTERIOR ELEVATIONS

238 A‐214 ENLARGED EXTERIOR ELEVATIONS

239 A‐215 ENLARGED EXTERIOR ELEVATIONS

240 A‐216 ENLARGED ELEVATION (TYP)

241 A‐301 BUILDING SECTIONS

242 A‐302 BUILDING SECTIONS

243 A‐303 BUILDING SECTIONS

244 A‐304 BUILDING SECTIONS

00 72 00-A - 7 R0008

245 A‐305 BUILDING SECTIONS

246 A‐306 BUILDING SECTIONS

247 A‐307 BUILDING SECTIONS

248 A‐308 BUILDING SECTIONS

249 A‐310 ENLARGED BUILDING SECTIONS

250 A‐311 ENLARGED BUILDING SECTIONS

251 A‐312 ENLARGED BUILDING SECTIONS

252 A‐313 ENLARGED BUILDING SECTIONS

253 A‐314 ENLARGED BUILDING SECTIONS

254 A‐315 ENLARGED BUILDING SECTIONS

255 A‐316 ENLARGED BUILDING SECTIONS

256 A‐317 ENLARGED BUILDING SECTIONS

257 A‐318 ENLARGED BUILDING SECTIONS

258 A‐321 WALL SECTIONS

259 A‐322 WALL SECTIONS

260 A‐323 WALL SECTIONS

261 A‐324 WALL SECTIONS

262 A‐325 WALL SECTIONS

263 A‐326 WALL SECTIONS

264 A‐327 WALL SECTIONS

265 A‐328 WALL SECTIONS

266 A‐329 WALL SECTIONS

267 A‐330 WALL SECTIONS

268 A‐401 COVERED EXTERIOR STORAGE FLOOR PLAN

269 A‐402 COVERED EXTERIOR STORAGE REFLECTED CEILING PLAN

270 A‐403 COVERED EXTERIOR STORAGE ROOF PLAN

271 A‐404 COVERED EXTERIOR STORAGE ELEVATIONS

272 A‐405 COVERED EXTERIOR STORAGE SECTIONS

273 A‐406 COVERED EXTERIOR STORAGE DETAILS

274 A‐411 STAIR PLANS & SECTIONS

275 A‐412 STAIR PLANS & SECTIONS

276 A‐413 STAIR PLANS & SECTIONS

277 A‐414 STAIR PLANS & SECTIONS

278 A‐415 STAIR PLANS & SECTIONS

279 A‐416 STAIR PLANS & SECTIONS

280 A‐417 STAIR DETAILS

281 A‐418 ELEVATOR PLANS & SECTIONS

282 A‐419 ELEVATOR PLANS & SECTIONS

283 A‐421 TOILET PLANS & ELEVATIONS

284 A‐422 TOILET PLANS & ELEVATIONS

285 A‐423 TOILET PLANS & ELEVATIONS

286 A‐424 TOILET PLANS & ELEVATIONS

00 72 00-A - 8 R0008

287 A‐425 TOILET PLANS & ELEVATIONS

288 A‐426 TOILET PLANS & ELEVATIONS

289 A‐427 TOILET PLANS & ELEVATIONS

290 A‐431 ENLARGED DRYING TOWER & PLATFORM PLAN

291 A‐432 ENLARGED DRYING TOWER & PLATFORM PLAN

292 A‐433 ENLARGED DRYING TOWER & PLATFORM PLAN

293 A‐434 ENLARGED PLANS

294 A‐435 ENLARGED PLANS

295 A‐462 CASEWORK ELEVATIONS

296 A‐471 MECHANICAL PLATFORM PLANS & DETAILS

297 A‐501 PARTITION TYPES

298 A‐502 PARTITION TYPES

299 A‐503 PARTITION TYPE DETAILS R0007 23 JAN 2020

300 A‐504 PARTITION TYPE DETAILS

301 A‐505 PENETRATION DETAILS

302 A‐506 PENETRATION DETAILS

303 A‐511 CASEWORK DETAILS

304 A‐521 CEILING DETAILS

305 A‐531 GENERAL EXTERIOR DETAILS

306 A‐532 GENERAL EXTERIOR DETAILS

307 A‐533 GENERAL EXTERIOR WALL DETAILS

308 A‐541 EXPANSION JOINT DETAILS

309 A‐542 EXPANSION JOINT DETAILS

310 A‐543 EXPANSION JOINT DETAILS

311 A‐544 EXPANSION JOINT DETAILS

312 A‐545 EXPANSION JOINT SECTIONS ‐ DRYING TOWER

313 A‐546 EXPANSION JOINT DETAILS ‐ DRYING TOWER

314 A‐547 EXPANSION JOINT DETAILS

315 A‐560 ROOF DETAILS

316 A‐561 SECTION DETAILS

317 A‐562 SECTION DETAILS

318 A‐563 SECTION DETAILS

319 A‐564 SECTION DETAILS

320 A‐565 SECTION DETAILS

321 A‐566 SECTION DETAILS

322 A‐567 SECTION DETAILS

323 A‐568 SECTION DETAILS

324 A‐569 ROOF HATCH DETAILS

325 A‐570 ROOF HATCH DETAILS

326 A‐571 CANOPY DETAILS

327 A‐572 CANOPY DETAILS

328 A‐573 MISCELLANEOUS DETAILS

00 72 00-A - 9 R0008

329 A‐601 DOOR SCHEDULE

330 A‐602 DOOR SCHEDULE

331 A‐621 DOOR DETAILS

332 A‐622 DOOR DETAILS

333 A‐623 DOOR DETAILS

334 A‐624 DOOR DETAILS

335 A‐625 DOOR DETAILS

336 A‐651 WINDOW SCHEDULE & TYPES &

LOUVER SCHEDULE & TYPES

337 A‐661 WINDOW DETAILS

338 A‐662 WINDOW DETAILS

339 A‐663 WINDOW DETAILS

340 A‐664 CURTAIN WALL DETAILS

341 A‐665 CURTAIN WALL DETAILS

342 A‐666 TRANSLUCENT WALL PANEL DETAILS

343 A‐671 LOUVER DETAILS

344 A‐701 ROOM FINISH SCHEDULE

345 A‐702 ROOM FINISH LEGEND & GENERAL NOTES

346 A‐711 GROUND WALL FINISH PLAN AREA ‐ A

347 A‐712 GROUND WALL FINISH PLAN AREA ‐ B

348 A‐713 GROUND WALL FINISH PLAN AREA ‐ C

349 A‐714 GROUND WALL FINISH PLAN AREA ‐ D

350 A‐715 SECOND WALL FINISH PLAN AREA ‐ C

351 A‐716 SECOND WALL FINISH PLAN AREA ‐ D

352 A‐720 OVERALL FLOOR FINISH PLAN GROUND FLOOR

353 A‐721 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ A

354 A‐722 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ B

355 A‐723 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ C

356 A‐724 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ D

357 A‐725 OVERALL FLOOR FINISH PLAN SECOND FLOOR

358 A‐726 FLOOR FINISH PLAN SECOND FLOOR AREA ‐ C

359 A‐727 FLOOR FINISH PLAN SECOND FLOOR AREA ‐ D

360 A‐731 GROUND FLOOR SIGNAGE PLAN AREA ‐ A

361 A‐732 GROUND FLOOR SIGNAGE PLAN AREA ‐ B

362 A‐733 GROUND FLOOR SIGNAGE PLAN AREA ‐ C

363 A‐734 GROUND FLOOR SIGNAGE PLAN AREA ‐ D

364 A‐735 SECOND FLOOR SIGNAGE PLAN AREA ‐ C

365 A‐736 SECOND FLOOR SIGNAGE PLAN AREA ‐ D

366 A‐741 SIGNAGE SCHEDULE & DETAILS

367 A‐742 SIGNAGE GENERAL NOTES & TYPES

368 A‐743 SIGNAGE GENERAL NOTES & TYPES

369 A‐744 SIGNAGE GENERAL NOTES & TYPES

370 A‐745 SIGNAGE GENERAL NOTES & TYPES

00 72 00-A - 10 R0008

371 A‐746 SIGNAGE GENERAL NOTES & TYPES

LIFE SAFETY

372 F‐001 LIFE SAFETY CODE & CRITERIA

373 F‐002 GROUND FLOOR LIFE SAFETY PLAN

374 F‐003 SECOND FLOOR LIFE SAFETY PLAN

375 F‐004 CODE COMPLIANCE PLAN

376 F‐011 ENLARGED LIFE SAFETY PLAN ‐

GROUND FLOOR AREA A & B

377 F‐012 ENLARGED LIFE SAFETY PLAN ‐

GROUND FLOOR AREA C & D

378 F‐013 ENLARGED LIFE SAFETY PLAN ‐ SECOND FLOOR AREA C & D

379 G‐005 COVER ‐ VOLUME III R0005 15 JAN 2020

380 G‐006 SHEET INDEX ‐ VOLUME III

FIRE

381 FA001 FIRE ALARM NOTES, LEGEND, & ABBREVIATIONS

382 FA101 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA A

383 FA102 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA B

384 FA103 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA C

385 FA104 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA D

386 FA121 FIRE ALARM & MNS SECOND FLOOR PLAN ‐ AREA C

387 FA122 FIRE ALARM & MNS SECOND FLOOR PLAN ‐ AREA D

388 FA501 FIRE ALARM DETAILS

389 FA601 FIRE ALARM ONE‐LINE DIAGRAM

390 FA602 FIRE ALARM MATRIX

391 FX001 FIRE SUPPRESSION NOTES, LEGEND, & ABBREVIATIONS

392 FX101 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA A

393 FX102 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA B

394 FX103 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA C

395 FX104 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA D

396 FX121 FIRE SUPPRESSION SECOND FLOOR PLAN ‐ AREA C

397 FX122 FIRE SUPPRESSION SECOND FLOOR PLAN ‐ AREA D

398 FX601 FIRE SUPPRESSION RISER DIAGRAM

INTERIORS

399 I‐100 FF&E GENERAL NOTES, LEGEND, & EQUIPMENT SCHEDULE

400 I‐101 FF&E NOTES & TYPES

401 I‐102 FF&E NOTES & TYPES

402 I‐103 FF&E NOTES & TYPES

403 I‐110 OVERALL GROUND FLOOR FURNITURE PLAN

404 I‐111 GROUND FLOOR FURNITURE PLAN AREA ‐ A

405 I‐112 GROUND FLOOR FURNITURE PLAN AREA ‐ B

406 I‐113 GROUND FLOOR FURNITURE PLAN AREA ‐ C

407 I‐114 GROUND FLOOR FURNITURE PLAN AREA ‐ D

408 I‐120 OVERALL SECOND FLOOR FURNITURE PLAN

00 72 00-A - 11 R0008

409 I‐121 SECOND FLOOR FURNITURE PLAN AREA ‐ C

410 I‐122 SECOND FLOOR FURNITURE PLAN AREA ‐ D

PLUMBING

411 P‐001 PLUMBING NOTES, LEGEND, SYMBOLS, & ABBREVIATIONS

412 P‐100 UNDERGROUND PLUMBING PLAN ‐ OVERALL

413 P‐101 UNDERGROUND PLUMBING PLAN ‐ AREA A

414 P‐102 UNDERGROUND PLUMBING PLAN ‐ AREA B

415 P‐103 UNDERGROUND PLUMBING PLAN ‐ AREA C

416 P‐110 ABOVEGROUND PLUMBING PLAN ‐ OVERALL

417 P‐111 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA A

418 P‐112 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA B R0005 15 JAN 2020

419 P‐113 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA C

420 P‐114 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA D

421 P‐120 ABOVEGROUND ‐ SECOND FLOOR PLUMBING PLAN ‐ OVERALL

422 P‐121 ABOVEGROUND ‐ SECOND FLOOR PLUMBING PLAN ‐

AREA C

423 P‐122 ABOVEGROUND SECOND FLOOR PLUMBING PLAN ‐ AREA D

424 P‐401 UNDERGROUND ENLARGED PLUMBING PLAN

425 P‐402 FIRST FLOOR ENLARGED PLUMBING PLAN R0005 15 JAN 2020

426 P‐403 SECOND FLOOR ENLARGED PLUMBING PLAN

427 P‐404 SECOND FLOOR PLUMBING PLAN

428 P‐501 PLUMBING DETAILS

429 P‐502 PLUMBING DETAILS

430 P‐503 PLUMBING DETAILS

431 P‐601 PLUMBING SCHEDULES R0005 15 JAN 2020

432 P‐602 PLUMBING SCHEDULES

433 P‐901 WASTE & VENT RISER DIAGRAM

434 P‐902 WASTE & VENT RISER DIAGRAM

435 P‐903 WASTE & VENT RISER DIAGRAM ‐ SECOND FLOOR

436 P‐904 DOMESTIC WATER RISER DIAGRAM

437 P‐905 DOMESTIC WATER RISER DIAGRAM

438 P‐906 DOMESTIC WATER RISER DIAGRAM ‐ SECOND FLOOR

439 P‐907 NATURAL GAS RISER DIAGRAM R0005 15 JAN 2020

440 P‐908 COMPRESSED AIR DIAGRAM

MECHANICAL

441 M‐001 MECHANICAL NOTES, LEGEND, SYMBOLS, & ABBREVIATIONS

442 M‐100 MECHANICAL PLAN ‐ OVERALL

443 M‐101 MECHANICAL ‐ HVAC PLAN ‐ AREA A

444 M‐102 MECHANICAL ‐ HVAC PLAN ‐ AREA B R0005 15 JAN 2020

445 M‐103 MECHANICAL ‐ HVAC PLAN ‐ AREA C R0005 15 JAN 2020

446 M‐104 MECHANICAL ‐ HVAC PLAN ‐ AREA D R0005 15 JAN 2020

447 M‐105 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA A

448 M‐106 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA B R0005 15 JAN 2020

00 72 00-A - 12 R0008

449 M‐107 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA C

450 M‐108 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA D

451 M‐120 MECHANICAL ‐ SECOND FLOOR PLAN R0005 15 JAN 2020

452 M‐121 MECHANICAL ‐ SECOND FLOOR HVAC PLAN ‐ AREA C R0005 15 JAN 2020

453 M‐122 MECHANICAL ‐ SECOND FLOOR HVAC PLAN ‐ AREA D R0005 15 JAN 2020

454 M‐131 MECHANICAL ‐ SECOND FLOOR HVAC PIPING PLAN ‐

AREA C

455 M‐132 MECHANICAL ‐ SECOND FLOOR HVAC PIPING PLAN ‐ AREA D

456 M‐301 MECHANICAL SECTIONS R0005 15 JAN 2020

457 M‐302 MECHANICAL SECTIONS

458 M‐303 MECHANICAL SECTIONS R0005 15 JAN 2020

459 M‐304 MECHANICAL SECTIONS

460 M‐305 MECHANICAL SECTIONS R0005 15 JAN 2020

461 M‐401 ENLARGED PLAN ‐ FIRST FLOOR R0005 15 JAN 2020

462 M‐402 ENLARGED PLAN ‐ SECOND FLOOR R0005 15 JAN 2020

463 M‐501 MECHANICAL DETAILS

464 M‐502 MECHANICAL DETAILS

465 M‐503 MECHANICAL DETAILS

466 M‐504 MECHANICAL DETAILS

467 M‐505 MECHANICAL DETAILS

468 M‐506 MECHANICAL DETAILS R0005 15 JAN 2020

469 M‐507 MECHANICAL DETAILS

470 M‐508 MECHANICAL DETAILS

471 M‐509 MECHANICAL DETAILS

472 M‐510 MECHANICAL DETAILS

473 M‐601 MECHANICAL SCHEDULES R0005 15 JAN 2020

474 M‐602 MECHANICAL SCHEDULES R0005 15 JAN 2020

475 M‐603 MECHANICAL SCHEDULES

476 M‐604 MECHANICAL SCHEDULES R0005 15 JAN 2020

477 M‐605 MECHANICAL SCHEDULES R0005 15 JAN 2020

478 M‐606 MECHANICAL SCHEDULES R0005 15 JAN 2020

479 M‐610 CHILLED WATER FLOW DIAGRAM

480 M‐611 HEATING WATER FLOW DIAGRAM (1/5)

481 M‐612 HEATING WATER FLOW DIAGRAM (2/5)

482 M‐613 HEATING WATER FLOW DIAGRAM (3/5)

483 M‐614 HEATING WATER FLOW DIAGRAM (4/5)

484 M‐615 HEATING WATER FLOW DIAGRAM (5/5)

485 M‐701 CONTROL LEGEND

486 M‐702 SYSTEM ARCHITECTURE & MISCELLANEOUS CONTROLS

487 M‐703 VAV AHU CONTROL SCHEMATIC

488 M‐704 VAV AHU SEQUENCE OF OPERATION

489 M‐705 VAV AHU POINTS LIST

490 M‐706 HVAC CONTROLS SHUT‐OFF VAV BOX

00 72 00-A - 13 R0008

491 M‐707 HVAC CONTROLS FAN POWERED VAV BOX

492 M‐708 HVAC CONTROLS PARALLEL FAN POWERED VAV BOX

493 M‐709 VEHICLE MAINTENANCE BAY SCHEMATIC R0005 15 JAN 2020

494 M‐710 HVAC CONTROLS MAU‐101 SEQUENCE OF OPERATION R0005 15 JAN 2020

495 M‐711 HVAC CONTROLS MAU‐101 ‐ POINTS LIST

496 M‐712 HVAC CONTROLS MAU‐102 R0005 15 JAN 2020

497 M‐713 HVAC CONTROLS AHU‐102

498 M‐714 CONTROLS SCHEMATIC ‐ AIR COOLED CHILLED WATER SYSTEM

499 M‐715 CONTROLS POINTS ‐ AIR COOLED CHILLED WATER SYSTEM

500 M‐716 HVAC CONTROLS SCHEMATIC HEATING HOT WATER SYSTEM R0005 15 JAN 2020

501 M‐717 HVAC CONTROLS POINTS LIST HEATING HOT WATER SYSTEM

502 M‐718 HVAC CONTROLS CRAC‐201 R0005 15 JAN 2020

503 M‐719 HVAC CONTROLS CRAC‐202 R0005 15 JAN 2020

504 M‐720 HVAC CONTROLS DUCTLESS SPLIT SYSTEM

505 M‐721 HVAC CONTROLS UNIT HEATERS

506 M‐722 HVAC CONTROLS TEMP CONTROLLED EF‐101

507 M‐723 HVAC CONTROLS EF‐102 R0005 15 JAN 2020

508 M‐724 HVAC CONTROLS ‐ DOMESTIC WATER HEATER

509 G‐007 COVER VOLUME IV R0005 15 JAN 2020

510 G‐008 SHEET INDEX ‐ VOLUME IV

ELECTRICAL

511 E‐001 ELECTRICAL SYMBOLS & LEGEND NOTES

512 E‐002 ELECTRICAL GENERAL NOTES & ABBREVIATIONS

513 ED100 OVERALL ELECTRICAL SITE DEMOLITION PLAN

514 ED101 ELECTRICAL SITE DEMO POWER PLAN ‐ AREA 1

515 ED102 ELECTRICAL SITE DEMO POWER PLAN ‐ AREA 2

516 ES100 OVERALL ELECTRICAL SITE NEW WORK PLAN

517 ES101 ELECTRICAL SITE NEW WORK POWER PLAN ‐ AREA 1

518 ES102 ELECTRICAL SITE NEW WORK POWER PLAN ‐ AREA 2

519 ES501 ELECTRICAL SITE DETAILS

520 ES502 ELECTRICAL SITE DETAILS

521 ES503 ELECTRICAL SITE DETAILS

522 ES504 ELECTRICAL SITE DETAILS

523 ES505 ELECTRICAL SITE DETAILS

524 E‐101 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA A

525 E‐102 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA B

526 E‐103 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA C

527 E‐104 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA D

528 E‐105 ELECTRICAL LIGHTING PLAN ‐ SECOND FLOOR ‐ AREA C

529 E‐106 ELECTRICAL LIGHTING PLAN ‐SECOND FLOOR ‐ AREA D

530 E‐107 ELECTRICAL LIGHTING PLAN ‐ COVERED STORAGE

531 E‐108 DRYING TOWER ROOF LIGHTING PLAN

00 72 00-A - 14 R0008

532 E‐111 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA A

533 E‐112 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA B

534 E‐113 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA C

535 E‐114 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA D

536 E‐115 ELECTRICAL POWER PLAN ‐ SECOND FLOOR ‐ AREA C

537 E‐116 ELECTRICAL POWER PLAN ‐ SECOND FLOOR ‐ AREA D

538 E‐117 ELECTRICAL POWER PLAN ‐ COVERED STORAGE

539 E‐121 ELECTRICAL GROUNDING PLAN ‐ AREA A & AREA B

540 E‐122 ELECTRICAL GROUNDING PLAN ‐ AREA C & AREA D

541 E‐123 ELECTRICAL GROUNDING PLAN ‐ COVERED STORAGE

542 E‐131 LIGHTNING PROTECTION ROOF PLAN ‐ AREA A & AREA B

543 E‐132 LIGHTNING PROTECTION ROOF PLAN ‐ AREA C & AREA D

544 E‐133 LIGHTNING PROTECTION ROOF PLAN ‐ COVERED STORAGE

545 E‐201 LIGHTING ELEVATION PLAN

546 E‐202 LIGHTING ELEVATION PLAN

547 E‐203 LIGHTING ELEVATION PLAN

548 E‐204 LIGHTING ELEVATION PLAN

549 E‐205 LIGHTING ELEVATION PLAN

550 E‐206 LIGHTING ELEVATION PLAN

551 E‐207 POWER ELEVATION PLAN

552 E‐401 ENLARGED ELECTRICAL ROOM PLAN ‐ GROUND LEVEL

553 E‐402 ENLARGED ELECTRICAL ROOM PLAN ‐ SECOND FLOOR

554 E‐403 ENLARGED COMMUNICATIONS ROOM PLAN ‐

GROUND LEVEL

555 E‐404 ENLARGED COMMUNICATIONS ROOM PLAN ‐

SECOND FLOOR

556 E‐405 DRYING TOWER ENLARGED POWER PLAN R0008 24 JAN 2020

557 E‐501 CONTROLLED RECEPTACLE SCHEDULE & DIAGRAMS

558 E‐502 LIGHTING DETAILS

559 E‐503 ELECTRICAL DETAILS

560 E‐504 ELECTRICAL GROUNDING DETAILS

561 E‐601 MECHANICAL EQUIPMENT SCHEDULE

562 E‐602 ELECTRICAL PANELBOARD SCHEDULES

563 E‐603 ELECTRICAL PANELBOARD SCHEDULES

564 E‐604 ELECTRICAL PANELBOARD SCHEDULES

565 E‐605 ELECTRICAL PANELBOARD SCHEDULES

566 E‐606 ELECTRICAL PANELBOARD SCHEDULES

567 E‐607 ELECTRICAL PANELBOARD SCHEDULES

568 E‐608 ELECTRICAL PANELBOARD SCHEDULES

569 E‐609 ELECTRICAL PANELBOARD SCHEDULES

570 E‐611 LIGHT FIXTURE SCHEDULE

571 E‐612 LIGHTING CONTROLS SCHEDULE & DIAGRAMS

572 E‐701 ONE‐LINE DIAGRAM

00 72 00-A - 15 R0008

573 E‐702 15KV ONE‐LINE DIAGRAM ‐ PHASE 1

574 E‐703 15KV ONE‐LINE DIAGRAM ‐ PHASE 2

TELECOMMUNICATIONS

575 T0001 TELECOMMUNICATIONS GENERAL NOTES & LEGEND

576 T0002 TELECOMMUNICATIONS ABBREVIATIONS

577 TD100 OVERALL TELECOMMUNICATIONS SITE DEMOLITION PLAN

578 TD101 TELECOMMUNICATIONS SITE DEMO PLAN ‐ AREA

579 TD102 TELECOMMUNICATIONS SITE DEMO PLAN ‐ AREA 2

580 TD501 TELECOMMUNICATIONS OSP DEMOLITION LOGICAL

CONNECTION DIAGRAM

581 T0100 OVERALL TELECOMMUNICATIONS SITE NEW WORK PLAN

582 T0101 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 1

583 T0102 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 2

584 T0103 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 3

585 T0104 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 4

586 T0501 TELECOMMUNICATIONS SITE DETAILS

587 T0502 TELECOMMUNICATIONS SITE DETAILS

588 T0503 SPLICING CONNECTION DIAGRAM

589 T0504 TELECOMMUNICATIONS OSP CABLE SCHEDULE

590 T0505 TELECOMMUNICATIONS LOGICAL CONNECTION DIAGRAM

591 T0601 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐

EXISTING

592 T0602 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐

593 T0603 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐

594 T0604 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐

595 T0605 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐ NEW

596 T1101 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA A

597 T1102 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA B

598 T1103 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA C

599 T1104 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA D

600 T1105 TELECOMMUNICATIONS PLAN ‐ SECOND FLOOR ‐ AREA C

601 T1106 TELECOMMUNICATIONS PLAN ‐ SECOND FLOOR ‐ AREA D

602 T1107 TELECOMMUNICATIONS PLAN ‐ ROOF LEVEL ‐ AREA C

603 T3401 ENLARGED TELECOMM ROOM 141 PLAN ‐ 1 OF 2

604 T3402 ENLARGED TELECOMM ROOM 141 PLAN ‐ 2 OF 2

605 T3403 ENLARGED TELECOMM ROOM 124 PLAN ‐ 1 OF 2

606 T3404 ENLARGED TELECOMM ROOM 124 PLAN ‐ 2 OF 2

607 T3405 ENLARGED TELECOMM ROOM 163 PLAN ‐ 1 OF 2

608 T3406 ENLARGED TELECOMM ROOM 163 PLAN ‐ 2 OF 2

609 T3407 ENLARGED TELECOMM ROOM 226 PLAN ‐ 1 OF 2

610 T3408 ENLARGED TELECOMM ROOM 226 PLAN ‐ 2 OF 2

00 72 00-A - 16 R0008

611 T3409 ENLARGED TELECOMM ROOM 264 PLAN ‐ 1 OF 2

612 T3410 ENLARGED TELECOMM ROOM 264 PLAN ‐ 2 OF 2

613 T3411 ENLARGED CABLE TV ROOM 137 PLAN

614 T3412 ENLARGED VAULT 235 PLAN

615 T4501 TELECOMMUNICATIONS FACEPLATE DETAILS

616 T4502 TELECOMMUNICATIONS DETAILS

617 T4503 TELECOMMUNICATIONS DETAILS

618 T4504 TELECOMMUNICATIONS PDS DETAILS

619 T4703 TELECOMMUNICATIONS BACKBONE RISER DIAGRAM

620 TY100 OVERALL SECURITY PLAN

621 TY101 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA A

622 TY102 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA B

623 TY103 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA C

624 TY104 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA D

625 TY105 SECURITY PLAN ‐ SECOND FLOOR ‐ AREA C

626 TY106 SECURITY PLAN ‐ SECOND FLOOR ‐ AREA D

627 TY501 SECURITY DETAILS

628 TY506 SECURITY DETAILS

G3ENDRDN

Text Box

SEE SECTION 41 22 23.23 PARACHUTE DRYING TOWER LIFT SYSTEM.

G3ENDRDN

Rectangle

G3ENDRDN

Polygon

G3ENDRDN

Text Box

G3ENDRDN

Text Box R0008

G3ENDRDN

Text Box

1 REVISION IN ACCORDANCE WITH AMENDMENT #R0008 24 JAN 2020

Amendment R0008 Narrative
SF30_R0008
Price Schedule (Revised)
00 72 00-A (Revised)
E-405 (Revised)

File details come from the government source that posted it. Updated .