Amendment R0008.pdf
PDF 2 MB Posted
- Attached to
- FY20 SOF 22 STS Operations Facility at JBLM WA Federal contract opportunity
- Solicitation number
- W912DW20R0001
About this file
This solicitation requests proposals for the construction of a Special Tactics Squadron operations facility and parachute drying tower at Joint Base Lewis-McChord in Washington. The project includes construction of an 85,000 square foot operations building with functional areas for operations, logistics, medical, team rooms, vehicle maintenance, storage, and an integrated 12,000 square foot parachute drying tower. Additional site work consists of covered storage, demolition of five existing buildings and structures, utilities, parking for 150 vehicles, communications infrastructure, security features, and landscaping. Special requirements include potential asbestos abatement during demolition and multiple retaining walls to accommodate site grading. Proposals are due by January 31, 2020. The U.S. Army Corps of Engineers Engineering District Seattle is the contracting agency responsible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Roster_1-27-2020.pdf | ||
| Amendment R0007.pdf | ||
| Amendment R0006_2nd Site Visit.pdf | ||
| Amendment R0005.pdf | ||
| Amendment R0004.pdf | ||
| Amendment_R0003.pdf | ||
| Amendment R0002.pdf | ||
| Site Visit PPT Slides_12-20-2019.pdf | ||
| Interested Vendors List_1-8-2020.pdf | ||
| Site Visit Roster_12-20-2019.pdf | ||
| Amendment R0001_12-18-2019.pdf | ||
| Drawings_Vol 2.pdf | ||
| Drawings_Vol 4.pdf | ||
| Drawings_Vol 1.pdf | ||
| specifications_Part1 of 3.pdf | ||
| beta.sam.gov.txt | TXT text file | |
| specifications_Part2 of 3.pdf | ||
| W912DW20R0001.pdf | ||
| Attachment 1.docx | DOCX document | |
| Drawings_Vol 3.pdf | ||
| specifications_Part3 of 3.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD991420214
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP W912DW20R0001
Amendment R0008
(Please see Continuation Page for more details)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW20R0001
X 9B. DATED (SEE ITEM 11)
13-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jan-2020
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text: R0008
1. This amendment eight (0008) provides for the following:
Revision to Price Schedule.
Revision to Attachment 00 72 00-A, “Index of Drawings.”
Revision to Drawing E-405, “Drying Tower Enlarged Power Plan.”
2. The proposal submittal time and date of 1:00:00 PM LOCAL TIME, 31 January 2020 remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments including this amendment by number and date on your proposal.
Encl:
Price Schedule (revised) Attachment 00 72 00-A (revised) Drawing E-405 (revised)
SECTION 00 10 00 - SOLICITATION
The following have been modified: PRICE SCHEDULE
FY19 JBLM 22nd STS Operations Facility 19004 Joint Base Lewis‐McChord, WA W912DW20R0001
R0008
PRICE SCHEDULE
CONTRACT
LINE ITEM
NUMBER
(CLIN) DESCRIPTION OF ITEM QTY UNIT
UNIT
PRICE AMOUNT
BASE ITEMS
#0001 All work for construction of the 22nd STS Operations Facility including all associated site work within five feet of the building.
1 JOB N/A $_______________
#0002 Other than Base Item #0003 and Optional Items #0007 through #0013 below; all work for site preparation including site demolition and complete demolition of Buildings #305 and #310, abatement of hazardous materials (see note #6 below), and construction of site work, site utilities, and all other improvements from the construction limits to five feet from the building.
1 JOB N/A $_______________
#0003 All work for trenching and backfilling of gas line to be installed by Puget Sound Energy.
1 JOB N/A $_______________
#0004 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $30,000
#0005 All work for O&M Manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE DATA from preparation to final approval.
1 JOB N/A $75,000
#0006 All work for Form DD 1354 Checklist and Equipment in Place List as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $15,000
Subtotal Base CLINS #0001 - #0006 = $__________________
OPTIONAL ITEMS
#0007 All work for demolition of Building #304 superstructure, abatement of associated hazardous materials (see note #6 below), and capping of all utilities at remaining building slab-on-grade.
1 JOB N/A $_______________
R0008
CONTRACT
LINE ITEM
NUMBER
(CLIN) DESCRIPTION OF ITEM QTY UNIT
UNIT
PRICE AMOUNT
#0008 All work for demolition of Building #304 slab-on-grade and footings, abatement of associated hazardous materials (see note #6 below), and site utilities to nearest valve, main, or tee.
1 JOB N/A $_______________
#0009 All work for demolition of Building #341 superstructure, abatement of associated hazardous materials (see note #6 below), and capping of all utilities at remaining building slab-on-grade.
1 JOB N/A $_______________
#0010 All work for demolition of Building #341 slab-on-grade and footings, abatement of associated hazardous materials (see note #6 below), and site utilities to nearest valve, main, or tee.
1 JOB N/A $_______________
#0011 All work for demolition of Building #306 and adjacent canopy structure; slab-on-grade and footings for both structures; site utilities to nearest valve, main, or tee; and abatement of associated hazardous materials (see note #6 below).
1 JOB N/A $_______________
#0012 All work for construction of Covered Storage delineated on sheet CS103.
1 JOB N/A $_______________
#0013 All work for construction of North driveway delineated on sheets CS101 and CS105 including demolition delineated on sheets CD101 and CD105.
1 JOB N/A $_______________
#0014 All work for construction of jump platform, platform stairway, and stairway fence.
1 JOB N/A $_______________
#0015 All work for providing and testing Intrusion Detection System (IDS).
1 JOB N/A $_______________
#0015 All work for installation of Furniture, Fixtures, and Equipment (FF&E).
1 JOB N/A $_______________
Subtotal Optional CLINS #0007 - #0015 = $__________________
TOTAL Base + Optional CLINS #0001 - #0015 = $__________________
NOTES:
1. 100% Design projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2. To better facilitate the receipt and proposal process, all revisions to proposals are to be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto.
3. Offerors must insert a price on all numbered items of the Price Schedule. Failure to do so will result in the offer being unacceptable.
4. The dollar amount established in Contract Line Item #0004, #0005, and #0006 shall not be revised by the Offerors.
5. Award of optional items will be exercised in accordance with FAR 52.217-7 Option for Increased Quantity - Separately Priced Line Item.
6. See Estimate of Hazardous Materials & Unit Price List beginning on the next page for a list of hazardous materials associated with each building and its site to be abated before demolition. Provide unit pricing for each. Award of unit priced items will be made in accordance with FAR 52.211-18 Variation in Estimated Quantity.
R0008
ESTIMATE OF HAZARDOUS MATERIALS & UNIT PRICE LIST
BLDG# MATL DESCRIPTION
ESTIMATED
QUANTITY UNIT PRICE PER UNIT
304 ACM 4", 6", & 8" DIA PIPE INSULATION 3,200 LF LF $_______________
ACM CEILING PANELS 22,000 SF SF $_______________
ACM ELEC PANELS 8 UNITS EACH $_______________
ACM FIRE DOOR 1 UNIT EACH $_______________
LCP PAINT 22,220 SF SF $_______________
PCB LIGHT FIXTURES 3 UNITS EACH $_______________
Hg FLUORESCENT TUBES 500 UNITS EACH $_______________
SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________
ACM JOINT SEALANT 1 1,000 LF LF $_______________
305 ACM AIR HANDLING UNITS 4 UNITS EACH $_______________
ACM ELEC PANELS 5 UNITS EACH $_______________
ACM BOILERS 2 UNITS EACH $_______________
LCP PAINT 13,088 SF SF $_______________
ACM EXTERIOR WALL SEALANT 5,700 LF LF $_______________
ACM DEBRIS 2 10 CY CY $_______________
ACM
4" to 6" DIA THERMAL SYSTEM
INSULATION
500 LF LF $_______________
Hg FLUORESCENT TUBES 300 UNITS EACH $_______________
PCB LIGHT FIXTURES 3 UNITS EACH $_______________
ACM FLOOR TILES 100 SF SF $_______________
ACM WINDOW GLAZING 3,000 SF LF $_______________
SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________
306 ACM ELEC PANEL 1 UNIT EACH $_______________
Hg FLUORESCENT TUBES 30 UNITS EACH $_______________
SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________
310 ACM SEALANT 3 30 LF LF $_______________
R0008
BLDG# MATL DESCRIPTION
ESTIMATED
QUANTITY UNIT PRICE PER UNIT
LCP PAINT 140 SF SF $_______________
Hg FLUORESCENT TUBES 2 UNITS EACH $_______________
SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________
341 ACM FIRE DOORS 7 UNITS EACH $_______________
ACM ELEC PANELS 5 UNITS EACH $_______________
ACM AIR HANDLING UNIT 1 UNIT EACH $_______________
LCP PAINT 11,050 SF SF $_______________
ACM SEALANT 4 210 LF LF $_______________
ACM FLOOR TILES & MASTIC 15,000 SF SF $_______________
ACM WINDOW GLAZING 1,000 LF LF $_______________
Hg FLUORESCENT TUBES 150 UNITS EACH $_______________
Hg THERMOMETER & SWITCH 1 UNIT EACH $_______________
SITE ACM 18-INCH DIA PIPE 100 LF LF $_______________
1 described in report as "black fibrous tar joint sealant on ground north of building" 2 described in report as "under/within baseboard heaters" 3 interior north wall around doors 4 includes sealant on windows & doors ACM = asbestos containing material LCP = lead containing paint PCB = polychlorinated biphenyl containing ballast
Hg = mercury containing material SF = square feet LF = linear feet
END OF PRICE SCHEDULE
W912DW20R0001
(End of Summary of Changes)
00 72 00-A - 1 R0008
ATTACHMENT 00 72 00‐A
INDEX OF DRAWINGS
DRAWING RECORD FILE NO. 20s/141‐83‐04, DATED: 4 OCT 2019
PAGE# SHEET# SHEET TITLE REVISION DATE
1 G‐001 COVER ‐ VOLUME I R0005 15 JAN 2020
2 G‐002 SHEET INDEX ‐ VOLUME I
CIVIL
3 GC001 CIVIL LEGEND & ABBREVIATIONS
4 GC002 LOCATION & VICINITY PLAN
5 GC003 CIVIL GENERAL NOTES 1 R0005 15 JAN 2020
6 GC004 CIVIL GENERAL NOTES 2
7 GC005 ACCESS & SAFETY NOTES
8 GC006 ACCESS & LAYDOWN AREA
9 GC010 PHASE 1 CONSTRUCTION PHASING
10 GC011 PHASE 2A CONSTRUCTION PHASING
11 GC012 PHASE 2B CONSTRUCTION PHASING
12 GC013 PHASE 3A CONSTRUCTION PHASING
13 GC014 PHASE 3B CONSTRUCTION PHASING
14 V‐100 OVERALL EXISTING CONDITIONS PLAN
15 V‐101 EXISTING CONDITIONS PLAN 1
16 V‐102 EXISTING CONDITIONS PLAN 2
17 V‐103 EXISTING CONDITIONS PLAN 3
18 V‐104 EXISTING CONDITIONS PLAN 4
19 V‐105 EXISTING CONDITIONS PLAN 5
20 V‐106 EXISTING CONDITIONS PLAN 6
21 V‐107 EXISTING CONDITIONS PLAN 7
22 V‐108 EXISTING CONDITIONS PLAN 8
23 CD100 OVERALL DEMOLITION PLAN
24 CD101 DEMOLITION PLAN 1
25 CD102 DEMOLITION PLAN 2
26 CD103 DEMOLITION PLAN 3
27 CD104 DEMOLITION PLAN 4
28 CD105 DEMOLITION PLAN 5
29 CD106 DEMOLITION PLAN 6
30 CD107 DEMOLITION PLAN 7
31 CD108 DEMOLITION PLAN 8
32 CS100 OVERALL SITE PLAN
33 CS101 SITE PLAN 1
34 CS102 SITE PLAN 2
35 CS103 SITE PLAN 3
36 CS104 SITE PLAN 4
37 CS105 SITE PLAN 5
00 72 00-A - 2 R0008
38 CS106 SITE PLAN 6
39 CS107 SITE PLAN 7
40 CS108 SITE PLAN 8
41 CS501 SITE DETAILS 1
42 CS502 SITE DETAILS 2
43 CS503 SITE DETAILS 3
44 CS504 SITE DETAILS 4
45 CS505 SITE DETAILS 5
46 CS506 SITE DETAILS 6
47 CS507 SITE DETAILS 7
48 CS508 SITE DETAILS 8
49 CS509 SITE DETAILS 9
50 CS510 SITE DETAILS 10
51 CP101 JOINTING & ELEVATION PLAN
52 CP102 BID OPTION & JOINTING & ELEVATION PLAN
53 CG100 OVERALL GRADING PLAN
54 CG101 GRADING PLAN 1
55 CG102 GRADING PLAN 2
56 CG103 GRADING PLAN 3
57 CG104 GRADING PLAN 4
58 CG105 GRADING PLAN 5
59 CG106 GRADING PLAN 6 R0005 15 JAN 2020
60 CG107 GRADING PLAN 7 R0005 15 JAN 2020
61 CG108 GRADING PLAN 8 R0005 15 JAN 2020
62 CG201 ROADWAY PROFILES ‐ BID OPTION
63 CG202 ROADWAY 2 PROFILE
64 CG203 PARKING LOT PROFILE
65 CU100 OVERALL UTILITY PLAN
66 CU101 UTILITY PLAN 1
67 CU102 UTILITY PLAN 2
68 CU103 UTILITY PLAN 3
69 CU104 UTILITY PLAN 4
70 CU105 UTILITY PLAN 5
71 CU106 UTILITY PLAN 6 R0005 15 JAN 2020
72 CU107 UTILITY PLAN 7 R0005 15 JAN 2020
73 CU108 UTILITY PLAN 8 R0005 15 JAN 2020
74 CU201 STORM PROFILES
75 CU202 STORM PROFILES
76 CU203 STORM PROFILES
77 CU210 SANITARY PROFILE
78 CU231 ELECTRICAL DUCTBANK PROFILES
79 CU232 ELECTRICAL DUCTBANK PROFILES
00 72 00-A - 3 R0008
80 CU233 ELECTRICAL DUCTBANK PROFILES
81 CU234 ELECTRICAL DUCTBANK PROFILES
82 CU241 COMMUNICATIONS DUCTBANK PROFILES
83 CU242 COMMUNICATIONS DUCTBANK PROFILES
84 CU243 COMMUNICATIONS DUCTBANK PROFILES
85 CU501 UTILITY DETAILS 1
86 CU502 UTILITY DETAILS 2
87 CU503 UTILITY DETAILS 3
88 CU504 UTILITY DETAILS 4
89 CU505 UTILITY DETAILS 5
90 CU506 UTILITY DETAILS 6
91 CU510 CATHODIC PROTECTION DETAILS 1
92 CU511 CATHODIC PROTECTION DETAILS 2
LANDSCAPE
93 LP100 LEGEND & NOTES
94 LP101 LANDSCAPE PLAN
95 LP102 LANDSCAPE PLAN
96 LP103 LANDSCAPE PLAN
97 LP104 LANDSCAPE PLAN R0005 15 JAN 2020
98 LP105 LANDSCAPE DETAILS
99 LP106 PLANTING DETAILS & PLANTING SCHEDULE
STRUCTURAL
100 S‐001 GENERAL NOTES
101 S‐002 GENERAL NOTES
102 S‐003 LEGENDS & ABBREVIATIONS
103 S‐004 WIND ISOMETRIC
104 S‐005 WIND ISOMETRIC
105 S‐006 SNOW LOADING DIAGRAM
106 S‐007 STANDARD CONCRETE DETAILS
107 S‐008 STANDARD CONCRETE DETAILS
108 S‐009 STANDARD CONCRETE DETAILS
109 S‐010 STANDARD MASONRY DETAILS
110 S‐011 STANDARD MASONRY DETAILS
111 S‐012 STANDARD STEEL DETAILS
112 S‐013 STANDARD COMPOSITE STEEL DETAILS
113 S‐014 STANDARD ROOF DECK & JOIST DETAILS
114 S‐015 STANDARD ROOF DECK & JOIST DETAILS
115 S‐100 OVERALL FOUNDATION PLAN
116 S‐101 FOUNDATION PLAN ‐ AREA A
117 S‐102 FOUNDATION PLAN ‐ AREA B
118 S‐103 FOUNDATION PLAN ‐ AREA C
119 S‐104 FOUNDATION PLAN ‐ AREA D
00 72 00-A - 4 R0008
120 S‐105 FOUNDATION PLAN ‐ AREA E
121 S‐110 OVERALL SLAB ON GROUND PLAN
122 S‐111 SLAB ON GROUND PLAN ‐ AREA A
123 S‐112 SLAB ON GROUND PLAN ‐ AREA B
124 S‐113 SLAB ON GROUND PLAN ‐ AREA C
125 S‐114 SLAB ON GROUND PLAN ‐ AREA D
126 S‐115 SLAB ON GROUND PLAN ‐AREA E
127 S‐120 OVERALL SECOND FLOOR & LOW ROOF FRAMING PLAN
128 S‐121 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA A
129 S‐122 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA B
130 S‐123 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA C
131 S‐124 SECOND FLOOR & LOW ROOF FRAMING PLAN ‐ AREA D
132 S‐130 MECHANICAL PLATFORM FRAMING
133 S‐131 STEEL JUMP PLATFORM PLANS ‐ OPTION
134 S‐132 STEEL DRYING TOWER PLATFORM FRAMING
135 S‐140 OVERALL ROOF FRAMING PLAN
136 S‐141 HIGH ROOF FRAMING PLAN ‐ AREA A
137 S‐142 HIGH ROOF FRAMING PLAN ‐ AREA B
138 S‐143 HIGH ROOF FRAMING PLAN ‐ AREA C
139 S‐144 HIGH ROOF FRAMING PLAN ‐ AREA D
140 S‐150 COVERED STORAGE FOUNDATION PLAN‐OPTION
141 S‐200 FRAMING ELEVATIONS
142 S‐210 GIRT FRAMING ELEVATIONS
143 S‐220 MASONRY WALL ELEVATIONS
144 S‐221 MASONRY WALL ELEVATIONS
145 S‐222 MASONRY WALL ELEVATIONS
146 S‐223 MASONRY WALL ELEVATIONS
147 S‐224 MASONRY WALL ELEVATIONS
148 S‐225 MASONRY WALL ELEVATIONS
149 S‐226 MASONRY WALL ELEVATIONS
150 S‐227 MASONRY WALL ELEVATIONS
151 S‐228 MASONRY WALL ELEVATIONS
152 S‐229 MASONRY WALL ELEVATIONS
153 S‐230 CONCRETE WALL ELEVATIONS
154 S‐231 CONCRETE WALL ELEVATIONS
155 S‐500 FOUNDATION DETAILS
156 S‐501 FOUNDATION DETAILS
157 S‐502 FOUNDATION DETAILS
158 S‐503 FOUNDATION DETAILS
159 S‐504 FOUNDATION DETAILS
160 S‐505 FOUNDATION DETAILS
161 S‐506 FOUNDATION DETAILS
00 72 00-A - 5 R0008
162 S‐507 FOUNDATION DETAILS
163 S‐508 FOUNDATION DETAILS
164 S‐509 FOUNDATION DETAILS
165 S‐510 FOUNDATION DETAILS
166 S‐511 FOUNDATION DETAILS
167 S‐512 FOUNDATION DETAILS
168 S‐513 FOUNDATION DETAILS
169 S‐514 FOUNDATION DETAILS
170 S‐515 FOUNDATION DETAILS
171 S‐516 FOUNDATION DETAILS
172 S‐517 EXTERIOR STAIR FOUNDATION DETAILS ‐ OPTION
173 S‐518 PATIO TRENCH ELEVATIONS
174 S‐520 SECOND FLOOR & LOW ROOF DETAILS
175 S‐521 SECOND FLOOR & LOW ROOF DETAILS
176 S‐522 SECOND FLOOR & LOW ROOF DETAILS
177 S‐530 ROOF FRAMING DETAILS
178 S‐531 ROOF FRAMING DETAILS
179 S‐532 ROOF FRAMING DETAILS
180 S‐533 ROOF FRAMING DETAILS
181 S‐534 ROOF FRAMING DETAILS
182 S‐535 ROOF FRAMING DETAILS
183 S‐536 ROOF FRAMING DETAILS
184 S‐537 ROOF FRAMING DETAILS
185 S‐538 ROOF FRAMING DETAILS
186 S‐539 ROOF FRAMING DETAILS
187 S‐540 ROOF FRAMING DETAILS
188 S‐550 STEEL BRACING CONNECTIONS
189 S‐551 STEEL BRACING CONNECTIONS
190 S‐552 STEEL BRACING CONNECTIONS
191 S‐553 STEEL BRACING CONNECTIONS
192 S‐560 JUMP PLATFORM DETAILS
193 S‐561 JUMP PLATFORM DETAILS
194 S‐580 DRYING TOWER DETAILS
195 S‐581 DRYING TOWER DETAILS
196 S‐590 GIRT DETAILS
197 S‐591 GIRT DETAILS
198 S‐600 COLUMN SCHEDULE & DETAILS
199 S‐601 POST‐INSTALLED ANCHOR SCHEDULE
200 G‐003 COVER VOLUME II R0005 15 JAN 2020
201 G‐004 SHEET INDEX ‐ VOLUME II
ARCHITECTURAL
202 A‐001 ARCHITECTURAL LEGEND & ABBREVIATIONS
00 72 00-A - 6 R0008
203 A‐002 ARCHITECTURAL GENERAL NOTES
204 A‐003 ABA INFORMATION
205 A‐004 ABA INFORMATION
206 A‐005 EXPANSION JOINT AXONOMETRICS
207 A‐010 OVERALL GROUND FLOOR AIR BARRIER PLAN
208 A‐011 OVERALL SECOND FLOOR AIR BARRIER PLAN
209 A‐012 OVERALL AIR BARRIER SECTIONS
210 A‐110 OVERALL GROUND FLOOR PLAN
211 A‐111 GROUND FLOOR PLAN AREA ‐ A
212 A‐112 GROUND FLOOR PLAN AREA ‐ B
213 A‐113 GROUND FLOOR PLAN AREA ‐ C
214 A‐114 GROUND FLOOR PLAN AREA ‐ D
215 A‐115 GROUND FLOOR PLAN AREA ‐ E
216 A‐120 OVERALL SECOND FLOOR PLAN
217 A‐121 SECOND FLOOR PLAN AREA ‐ C
218 A‐122 SECOND FLOOR PLAN AREA ‐ D
219 A‐130 OVERALL GROUND FLOOR REFLECTED CEILING PLAN
220 A‐131 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ A
221 A‐132 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ B
222 A‐133 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ C
223 A‐134 GROUND FLOOR REFLECTED CEILING PLAN AREA ‐ D
224 A‐140 OVERALL SECOND FLOOR REFLECTED CEILING PLAN
225 A‐141 SECOND FLOOR REFLECTED CEILING PLAN AREA ‐ C
226 A‐142 SECOND FLOOR REFLECTED CEILING PLAN AREA ‐ D
227 A‐150 OVERALL ROOF PLAN
228 A‐151 ENLARGED ROOF PLAN AREA ‐ A
229 A‐152 ENLARGED ROOF PLAN AREA ‐ B
230 A‐153 ENLARGED ROOF PLAN AREA ‐ C
231 A‐154 ENLARGED ROOF PLAN AREA ‐ D
232 A‐160 OVERALL BRICK LEDGE PLAN
233 A‐201 EXTERIOR BUILDING ELEVATIONS
234 A‐202 RECESSED VENEER ELEVATIONS
235 A‐211 ENLARGED EXTERIOR ELEVATIONS
236 A‐212 ENLARGED EXTERIOR ELEVATIONS
237 A‐213 ENLARGED EXTERIOR ELEVATIONS
238 A‐214 ENLARGED EXTERIOR ELEVATIONS
239 A‐215 ENLARGED EXTERIOR ELEVATIONS
240 A‐216 ENLARGED ELEVATION (TYP)
241 A‐301 BUILDING SECTIONS
242 A‐302 BUILDING SECTIONS
243 A‐303 BUILDING SECTIONS
244 A‐304 BUILDING SECTIONS
00 72 00-A - 7 R0008
245 A‐305 BUILDING SECTIONS
246 A‐306 BUILDING SECTIONS
247 A‐307 BUILDING SECTIONS
248 A‐308 BUILDING SECTIONS
249 A‐310 ENLARGED BUILDING SECTIONS
250 A‐311 ENLARGED BUILDING SECTIONS
251 A‐312 ENLARGED BUILDING SECTIONS
252 A‐313 ENLARGED BUILDING SECTIONS
253 A‐314 ENLARGED BUILDING SECTIONS
254 A‐315 ENLARGED BUILDING SECTIONS
255 A‐316 ENLARGED BUILDING SECTIONS
256 A‐317 ENLARGED BUILDING SECTIONS
257 A‐318 ENLARGED BUILDING SECTIONS
258 A‐321 WALL SECTIONS
259 A‐322 WALL SECTIONS
260 A‐323 WALL SECTIONS
261 A‐324 WALL SECTIONS
262 A‐325 WALL SECTIONS
263 A‐326 WALL SECTIONS
264 A‐327 WALL SECTIONS
265 A‐328 WALL SECTIONS
266 A‐329 WALL SECTIONS
267 A‐330 WALL SECTIONS
268 A‐401 COVERED EXTERIOR STORAGE FLOOR PLAN
269 A‐402 COVERED EXTERIOR STORAGE REFLECTED CEILING PLAN
270 A‐403 COVERED EXTERIOR STORAGE ROOF PLAN
271 A‐404 COVERED EXTERIOR STORAGE ELEVATIONS
272 A‐405 COVERED EXTERIOR STORAGE SECTIONS
273 A‐406 COVERED EXTERIOR STORAGE DETAILS
274 A‐411 STAIR PLANS & SECTIONS
275 A‐412 STAIR PLANS & SECTIONS
276 A‐413 STAIR PLANS & SECTIONS
277 A‐414 STAIR PLANS & SECTIONS
278 A‐415 STAIR PLANS & SECTIONS
279 A‐416 STAIR PLANS & SECTIONS
280 A‐417 STAIR DETAILS
281 A‐418 ELEVATOR PLANS & SECTIONS
282 A‐419 ELEVATOR PLANS & SECTIONS
283 A‐421 TOILET PLANS & ELEVATIONS
284 A‐422 TOILET PLANS & ELEVATIONS
285 A‐423 TOILET PLANS & ELEVATIONS
286 A‐424 TOILET PLANS & ELEVATIONS
00 72 00-A - 8 R0008
287 A‐425 TOILET PLANS & ELEVATIONS
288 A‐426 TOILET PLANS & ELEVATIONS
289 A‐427 TOILET PLANS & ELEVATIONS
290 A‐431 ENLARGED DRYING TOWER & PLATFORM PLAN
291 A‐432 ENLARGED DRYING TOWER & PLATFORM PLAN
292 A‐433 ENLARGED DRYING TOWER & PLATFORM PLAN
293 A‐434 ENLARGED PLANS
294 A‐435 ENLARGED PLANS
295 A‐462 CASEWORK ELEVATIONS
296 A‐471 MECHANICAL PLATFORM PLANS & DETAILS
297 A‐501 PARTITION TYPES
298 A‐502 PARTITION TYPES
299 A‐503 PARTITION TYPE DETAILS R0007 23 JAN 2020
300 A‐504 PARTITION TYPE DETAILS
301 A‐505 PENETRATION DETAILS
302 A‐506 PENETRATION DETAILS
303 A‐511 CASEWORK DETAILS
304 A‐521 CEILING DETAILS
305 A‐531 GENERAL EXTERIOR DETAILS
306 A‐532 GENERAL EXTERIOR DETAILS
307 A‐533 GENERAL EXTERIOR WALL DETAILS
308 A‐541 EXPANSION JOINT DETAILS
309 A‐542 EXPANSION JOINT DETAILS
310 A‐543 EXPANSION JOINT DETAILS
311 A‐544 EXPANSION JOINT DETAILS
312 A‐545 EXPANSION JOINT SECTIONS ‐ DRYING TOWER
313 A‐546 EXPANSION JOINT DETAILS ‐ DRYING TOWER
314 A‐547 EXPANSION JOINT DETAILS
315 A‐560 ROOF DETAILS
316 A‐561 SECTION DETAILS
317 A‐562 SECTION DETAILS
318 A‐563 SECTION DETAILS
319 A‐564 SECTION DETAILS
320 A‐565 SECTION DETAILS
321 A‐566 SECTION DETAILS
322 A‐567 SECTION DETAILS
323 A‐568 SECTION DETAILS
324 A‐569 ROOF HATCH DETAILS
325 A‐570 ROOF HATCH DETAILS
326 A‐571 CANOPY DETAILS
327 A‐572 CANOPY DETAILS
328 A‐573 MISCELLANEOUS DETAILS
00 72 00-A - 9 R0008
329 A‐601 DOOR SCHEDULE
330 A‐602 DOOR SCHEDULE
331 A‐621 DOOR DETAILS
332 A‐622 DOOR DETAILS
333 A‐623 DOOR DETAILS
334 A‐624 DOOR DETAILS
335 A‐625 DOOR DETAILS
336 A‐651 WINDOW SCHEDULE & TYPES &
LOUVER SCHEDULE & TYPES
337 A‐661 WINDOW DETAILS
338 A‐662 WINDOW DETAILS
339 A‐663 WINDOW DETAILS
340 A‐664 CURTAIN WALL DETAILS
341 A‐665 CURTAIN WALL DETAILS
342 A‐666 TRANSLUCENT WALL PANEL DETAILS
343 A‐671 LOUVER DETAILS
344 A‐701 ROOM FINISH SCHEDULE
345 A‐702 ROOM FINISH LEGEND & GENERAL NOTES
346 A‐711 GROUND WALL FINISH PLAN AREA ‐ A
347 A‐712 GROUND WALL FINISH PLAN AREA ‐ B
348 A‐713 GROUND WALL FINISH PLAN AREA ‐ C
349 A‐714 GROUND WALL FINISH PLAN AREA ‐ D
350 A‐715 SECOND WALL FINISH PLAN AREA ‐ C
351 A‐716 SECOND WALL FINISH PLAN AREA ‐ D
352 A‐720 OVERALL FLOOR FINISH PLAN GROUND FLOOR
353 A‐721 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ A
354 A‐722 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ B
355 A‐723 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ C
356 A‐724 FLOOR FINISH PLAN GROUND FLOOR AREA ‐ D
357 A‐725 OVERALL FLOOR FINISH PLAN SECOND FLOOR
358 A‐726 FLOOR FINISH PLAN SECOND FLOOR AREA ‐ C
359 A‐727 FLOOR FINISH PLAN SECOND FLOOR AREA ‐ D
360 A‐731 GROUND FLOOR SIGNAGE PLAN AREA ‐ A
361 A‐732 GROUND FLOOR SIGNAGE PLAN AREA ‐ B
362 A‐733 GROUND FLOOR SIGNAGE PLAN AREA ‐ C
363 A‐734 GROUND FLOOR SIGNAGE PLAN AREA ‐ D
364 A‐735 SECOND FLOOR SIGNAGE PLAN AREA ‐ C
365 A‐736 SECOND FLOOR SIGNAGE PLAN AREA ‐ D
366 A‐741 SIGNAGE SCHEDULE & DETAILS
367 A‐742 SIGNAGE GENERAL NOTES & TYPES
368 A‐743 SIGNAGE GENERAL NOTES & TYPES
369 A‐744 SIGNAGE GENERAL NOTES & TYPES
370 A‐745 SIGNAGE GENERAL NOTES & TYPES
00 72 00-A - 10 R0008
371 A‐746 SIGNAGE GENERAL NOTES & TYPES
LIFE SAFETY
372 F‐001 LIFE SAFETY CODE & CRITERIA
373 F‐002 GROUND FLOOR LIFE SAFETY PLAN
374 F‐003 SECOND FLOOR LIFE SAFETY PLAN
375 F‐004 CODE COMPLIANCE PLAN
376 F‐011 ENLARGED LIFE SAFETY PLAN ‐
GROUND FLOOR AREA A & B
377 F‐012 ENLARGED LIFE SAFETY PLAN ‐
GROUND FLOOR AREA C & D
378 F‐013 ENLARGED LIFE SAFETY PLAN ‐ SECOND FLOOR AREA C & D
379 G‐005 COVER ‐ VOLUME III R0005 15 JAN 2020
380 G‐006 SHEET INDEX ‐ VOLUME III
FIRE
381 FA001 FIRE ALARM NOTES, LEGEND, & ABBREVIATIONS
382 FA101 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA A
383 FA102 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA B
384 FA103 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA C
385 FA104 FIRE ALARM & MNS GROUND FLOOR PLAN ‐ AREA D
386 FA121 FIRE ALARM & MNS SECOND FLOOR PLAN ‐ AREA C
387 FA122 FIRE ALARM & MNS SECOND FLOOR PLAN ‐ AREA D
388 FA501 FIRE ALARM DETAILS
389 FA601 FIRE ALARM ONE‐LINE DIAGRAM
390 FA602 FIRE ALARM MATRIX
391 FX001 FIRE SUPPRESSION NOTES, LEGEND, & ABBREVIATIONS
392 FX101 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA A
393 FX102 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA B
394 FX103 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA C
395 FX104 FIRE SUPPRESSION GROUND FLOOR PLAN ‐ AREA D
396 FX121 FIRE SUPPRESSION SECOND FLOOR PLAN ‐ AREA C
397 FX122 FIRE SUPPRESSION SECOND FLOOR PLAN ‐ AREA D
398 FX601 FIRE SUPPRESSION RISER DIAGRAM
INTERIORS
399 I‐100 FF&E GENERAL NOTES, LEGEND, & EQUIPMENT SCHEDULE
400 I‐101 FF&E NOTES & TYPES
401 I‐102 FF&E NOTES & TYPES
402 I‐103 FF&E NOTES & TYPES
403 I‐110 OVERALL GROUND FLOOR FURNITURE PLAN
404 I‐111 GROUND FLOOR FURNITURE PLAN AREA ‐ A
405 I‐112 GROUND FLOOR FURNITURE PLAN AREA ‐ B
406 I‐113 GROUND FLOOR FURNITURE PLAN AREA ‐ C
407 I‐114 GROUND FLOOR FURNITURE PLAN AREA ‐ D
408 I‐120 OVERALL SECOND FLOOR FURNITURE PLAN
00 72 00-A - 11 R0008
409 I‐121 SECOND FLOOR FURNITURE PLAN AREA ‐ C
410 I‐122 SECOND FLOOR FURNITURE PLAN AREA ‐ D
PLUMBING
411 P‐001 PLUMBING NOTES, LEGEND, SYMBOLS, & ABBREVIATIONS
412 P‐100 UNDERGROUND PLUMBING PLAN ‐ OVERALL
413 P‐101 UNDERGROUND PLUMBING PLAN ‐ AREA A
414 P‐102 UNDERGROUND PLUMBING PLAN ‐ AREA B
415 P‐103 UNDERGROUND PLUMBING PLAN ‐ AREA C
416 P‐110 ABOVEGROUND PLUMBING PLAN ‐ OVERALL
417 P‐111 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA A
418 P‐112 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA B R0005 15 JAN 2020
419 P‐113 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA C
420 P‐114 ABOVEGROUND ‐ PLUMBING PLAN ‐ AREA D
421 P‐120 ABOVEGROUND ‐ SECOND FLOOR PLUMBING PLAN ‐ OVERALL
422 P‐121 ABOVEGROUND ‐ SECOND FLOOR PLUMBING PLAN ‐
AREA C
423 P‐122 ABOVEGROUND SECOND FLOOR PLUMBING PLAN ‐ AREA D
424 P‐401 UNDERGROUND ENLARGED PLUMBING PLAN
425 P‐402 FIRST FLOOR ENLARGED PLUMBING PLAN R0005 15 JAN 2020
426 P‐403 SECOND FLOOR ENLARGED PLUMBING PLAN
427 P‐404 SECOND FLOOR PLUMBING PLAN
428 P‐501 PLUMBING DETAILS
429 P‐502 PLUMBING DETAILS
430 P‐503 PLUMBING DETAILS
431 P‐601 PLUMBING SCHEDULES R0005 15 JAN 2020
432 P‐602 PLUMBING SCHEDULES
433 P‐901 WASTE & VENT RISER DIAGRAM
434 P‐902 WASTE & VENT RISER DIAGRAM
435 P‐903 WASTE & VENT RISER DIAGRAM ‐ SECOND FLOOR
436 P‐904 DOMESTIC WATER RISER DIAGRAM
437 P‐905 DOMESTIC WATER RISER DIAGRAM
438 P‐906 DOMESTIC WATER RISER DIAGRAM ‐ SECOND FLOOR
439 P‐907 NATURAL GAS RISER DIAGRAM R0005 15 JAN 2020
440 P‐908 COMPRESSED AIR DIAGRAM
MECHANICAL
441 M‐001 MECHANICAL NOTES, LEGEND, SYMBOLS, & ABBREVIATIONS
442 M‐100 MECHANICAL PLAN ‐ OVERALL
443 M‐101 MECHANICAL ‐ HVAC PLAN ‐ AREA A
444 M‐102 MECHANICAL ‐ HVAC PLAN ‐ AREA B R0005 15 JAN 2020
445 M‐103 MECHANICAL ‐ HVAC PLAN ‐ AREA C R0005 15 JAN 2020
446 M‐104 MECHANICAL ‐ HVAC PLAN ‐ AREA D R0005 15 JAN 2020
447 M‐105 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA A
448 M‐106 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA B R0005 15 JAN 2020
00 72 00-A - 12 R0008
449 M‐107 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA C
450 M‐108 MECHANICAL ‐ HVAC PIPING PLAN ‐ AREA D
451 M‐120 MECHANICAL ‐ SECOND FLOOR PLAN R0005 15 JAN 2020
452 M‐121 MECHANICAL ‐ SECOND FLOOR HVAC PLAN ‐ AREA C R0005 15 JAN 2020
453 M‐122 MECHANICAL ‐ SECOND FLOOR HVAC PLAN ‐ AREA D R0005 15 JAN 2020
454 M‐131 MECHANICAL ‐ SECOND FLOOR HVAC PIPING PLAN ‐
AREA C
455 M‐132 MECHANICAL ‐ SECOND FLOOR HVAC PIPING PLAN ‐ AREA D
456 M‐301 MECHANICAL SECTIONS R0005 15 JAN 2020
457 M‐302 MECHANICAL SECTIONS
458 M‐303 MECHANICAL SECTIONS R0005 15 JAN 2020
459 M‐304 MECHANICAL SECTIONS
460 M‐305 MECHANICAL SECTIONS R0005 15 JAN 2020
461 M‐401 ENLARGED PLAN ‐ FIRST FLOOR R0005 15 JAN 2020
462 M‐402 ENLARGED PLAN ‐ SECOND FLOOR R0005 15 JAN 2020
463 M‐501 MECHANICAL DETAILS
464 M‐502 MECHANICAL DETAILS
465 M‐503 MECHANICAL DETAILS
466 M‐504 MECHANICAL DETAILS
467 M‐505 MECHANICAL DETAILS
468 M‐506 MECHANICAL DETAILS R0005 15 JAN 2020
469 M‐507 MECHANICAL DETAILS
470 M‐508 MECHANICAL DETAILS
471 M‐509 MECHANICAL DETAILS
472 M‐510 MECHANICAL DETAILS
473 M‐601 MECHANICAL SCHEDULES R0005 15 JAN 2020
474 M‐602 MECHANICAL SCHEDULES R0005 15 JAN 2020
475 M‐603 MECHANICAL SCHEDULES
476 M‐604 MECHANICAL SCHEDULES R0005 15 JAN 2020
477 M‐605 MECHANICAL SCHEDULES R0005 15 JAN 2020
478 M‐606 MECHANICAL SCHEDULES R0005 15 JAN 2020
479 M‐610 CHILLED WATER FLOW DIAGRAM
480 M‐611 HEATING WATER FLOW DIAGRAM (1/5)
481 M‐612 HEATING WATER FLOW DIAGRAM (2/5)
482 M‐613 HEATING WATER FLOW DIAGRAM (3/5)
483 M‐614 HEATING WATER FLOW DIAGRAM (4/5)
484 M‐615 HEATING WATER FLOW DIAGRAM (5/5)
485 M‐701 CONTROL LEGEND
486 M‐702 SYSTEM ARCHITECTURE & MISCELLANEOUS CONTROLS
487 M‐703 VAV AHU CONTROL SCHEMATIC
488 M‐704 VAV AHU SEQUENCE OF OPERATION
489 M‐705 VAV AHU POINTS LIST
490 M‐706 HVAC CONTROLS SHUT‐OFF VAV BOX
00 72 00-A - 13 R0008
491 M‐707 HVAC CONTROLS FAN POWERED VAV BOX
492 M‐708 HVAC CONTROLS PARALLEL FAN POWERED VAV BOX
493 M‐709 VEHICLE MAINTENANCE BAY SCHEMATIC R0005 15 JAN 2020
494 M‐710 HVAC CONTROLS MAU‐101 SEQUENCE OF OPERATION R0005 15 JAN 2020
495 M‐711 HVAC CONTROLS MAU‐101 ‐ POINTS LIST
496 M‐712 HVAC CONTROLS MAU‐102 R0005 15 JAN 2020
497 M‐713 HVAC CONTROLS AHU‐102
498 M‐714 CONTROLS SCHEMATIC ‐ AIR COOLED CHILLED WATER SYSTEM
499 M‐715 CONTROLS POINTS ‐ AIR COOLED CHILLED WATER SYSTEM
500 M‐716 HVAC CONTROLS SCHEMATIC HEATING HOT WATER SYSTEM R0005 15 JAN 2020
501 M‐717 HVAC CONTROLS POINTS LIST HEATING HOT WATER SYSTEM
502 M‐718 HVAC CONTROLS CRAC‐201 R0005 15 JAN 2020
503 M‐719 HVAC CONTROLS CRAC‐202 R0005 15 JAN 2020
504 M‐720 HVAC CONTROLS DUCTLESS SPLIT SYSTEM
505 M‐721 HVAC CONTROLS UNIT HEATERS
506 M‐722 HVAC CONTROLS TEMP CONTROLLED EF‐101
507 M‐723 HVAC CONTROLS EF‐102 R0005 15 JAN 2020
508 M‐724 HVAC CONTROLS ‐ DOMESTIC WATER HEATER
509 G‐007 COVER VOLUME IV R0005 15 JAN 2020
510 G‐008 SHEET INDEX ‐ VOLUME IV
ELECTRICAL
511 E‐001 ELECTRICAL SYMBOLS & LEGEND NOTES
512 E‐002 ELECTRICAL GENERAL NOTES & ABBREVIATIONS
513 ED100 OVERALL ELECTRICAL SITE DEMOLITION PLAN
514 ED101 ELECTRICAL SITE DEMO POWER PLAN ‐ AREA 1
515 ED102 ELECTRICAL SITE DEMO POWER PLAN ‐ AREA 2
516 ES100 OVERALL ELECTRICAL SITE NEW WORK PLAN
517 ES101 ELECTRICAL SITE NEW WORK POWER PLAN ‐ AREA 1
518 ES102 ELECTRICAL SITE NEW WORK POWER PLAN ‐ AREA 2
519 ES501 ELECTRICAL SITE DETAILS
520 ES502 ELECTRICAL SITE DETAILS
521 ES503 ELECTRICAL SITE DETAILS
522 ES504 ELECTRICAL SITE DETAILS
523 ES505 ELECTRICAL SITE DETAILS
524 E‐101 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA A
525 E‐102 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA B
526 E‐103 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA C
527 E‐104 ELECTRICAL LIGHTING PLAN ‐ GROUND FLOOR ‐ AREA D
528 E‐105 ELECTRICAL LIGHTING PLAN ‐ SECOND FLOOR ‐ AREA C
529 E‐106 ELECTRICAL LIGHTING PLAN ‐SECOND FLOOR ‐ AREA D
530 E‐107 ELECTRICAL LIGHTING PLAN ‐ COVERED STORAGE
531 E‐108 DRYING TOWER ROOF LIGHTING PLAN
00 72 00-A - 14 R0008
532 E‐111 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA A
533 E‐112 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA B
534 E‐113 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA C
535 E‐114 ELECTRICAL POWER PLAN ‐ GROUND FLOOR ‐ AREA D
536 E‐115 ELECTRICAL POWER PLAN ‐ SECOND FLOOR ‐ AREA C
537 E‐116 ELECTRICAL POWER PLAN ‐ SECOND FLOOR ‐ AREA D
538 E‐117 ELECTRICAL POWER PLAN ‐ COVERED STORAGE
539 E‐121 ELECTRICAL GROUNDING PLAN ‐ AREA A & AREA B
540 E‐122 ELECTRICAL GROUNDING PLAN ‐ AREA C & AREA D
541 E‐123 ELECTRICAL GROUNDING PLAN ‐ COVERED STORAGE
542 E‐131 LIGHTNING PROTECTION ROOF PLAN ‐ AREA A & AREA B
543 E‐132 LIGHTNING PROTECTION ROOF PLAN ‐ AREA C & AREA D
544 E‐133 LIGHTNING PROTECTION ROOF PLAN ‐ COVERED STORAGE
545 E‐201 LIGHTING ELEVATION PLAN
546 E‐202 LIGHTING ELEVATION PLAN
547 E‐203 LIGHTING ELEVATION PLAN
548 E‐204 LIGHTING ELEVATION PLAN
549 E‐205 LIGHTING ELEVATION PLAN
550 E‐206 LIGHTING ELEVATION PLAN
551 E‐207 POWER ELEVATION PLAN
552 E‐401 ENLARGED ELECTRICAL ROOM PLAN ‐ GROUND LEVEL
553 E‐402 ENLARGED ELECTRICAL ROOM PLAN ‐ SECOND FLOOR
554 E‐403 ENLARGED COMMUNICATIONS ROOM PLAN ‐
GROUND LEVEL
555 E‐404 ENLARGED COMMUNICATIONS ROOM PLAN ‐
SECOND FLOOR
556 E‐405 DRYING TOWER ENLARGED POWER PLAN R0008 24 JAN 2020
557 E‐501 CONTROLLED RECEPTACLE SCHEDULE & DIAGRAMS
558 E‐502 LIGHTING DETAILS
559 E‐503 ELECTRICAL DETAILS
560 E‐504 ELECTRICAL GROUNDING DETAILS
561 E‐601 MECHANICAL EQUIPMENT SCHEDULE
562 E‐602 ELECTRICAL PANELBOARD SCHEDULES
563 E‐603 ELECTRICAL PANELBOARD SCHEDULES
564 E‐604 ELECTRICAL PANELBOARD SCHEDULES
565 E‐605 ELECTRICAL PANELBOARD SCHEDULES
566 E‐606 ELECTRICAL PANELBOARD SCHEDULES
567 E‐607 ELECTRICAL PANELBOARD SCHEDULES
568 E‐608 ELECTRICAL PANELBOARD SCHEDULES
569 E‐609 ELECTRICAL PANELBOARD SCHEDULES
570 E‐611 LIGHT FIXTURE SCHEDULE
571 E‐612 LIGHTING CONTROLS SCHEDULE & DIAGRAMS
572 E‐701 ONE‐LINE DIAGRAM
00 72 00-A - 15 R0008
573 E‐702 15KV ONE‐LINE DIAGRAM ‐ PHASE 1
574 E‐703 15KV ONE‐LINE DIAGRAM ‐ PHASE 2
TELECOMMUNICATIONS
575 T0001 TELECOMMUNICATIONS GENERAL NOTES & LEGEND
576 T0002 TELECOMMUNICATIONS ABBREVIATIONS
577 TD100 OVERALL TELECOMMUNICATIONS SITE DEMOLITION PLAN
578 TD101 TELECOMMUNICATIONS SITE DEMO PLAN ‐ AREA
579 TD102 TELECOMMUNICATIONS SITE DEMO PLAN ‐ AREA 2
580 TD501 TELECOMMUNICATIONS OSP DEMOLITION LOGICAL
CONNECTION DIAGRAM
581 T0100 OVERALL TELECOMMUNICATIONS SITE NEW WORK PLAN
582 T0101 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 1
583 T0102 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 2
584 T0103 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 3
585 T0104 TELECOMMUNICATIONS SITE NEW WORK PLAN ‐ AREA 4
586 T0501 TELECOMMUNICATIONS SITE DETAILS
587 T0502 TELECOMMUNICATIONS SITE DETAILS
588 T0503 SPLICING CONNECTION DIAGRAM
589 T0504 TELECOMMUNICATIONS OSP CABLE SCHEDULE
590 T0505 TELECOMMUNICATIONS LOGICAL CONNECTION DIAGRAM
591 T0601 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐
EXISTING
592 T0602 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐
593 T0603 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐
594 T0604 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐
595 T0605 TELECOMMUNICATIONS MAINTENANCE HOLE BUTTERFLY ‐ NEW
596 T1101 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA A
597 T1102 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA B
598 T1103 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA C
599 T1104 TELECOMMUNICATIONS PLAN ‐ GROUND FLOOR ‐ AREA D
600 T1105 TELECOMMUNICATIONS PLAN ‐ SECOND FLOOR ‐ AREA C
601 T1106 TELECOMMUNICATIONS PLAN ‐ SECOND FLOOR ‐ AREA D
602 T1107 TELECOMMUNICATIONS PLAN ‐ ROOF LEVEL ‐ AREA C
603 T3401 ENLARGED TELECOMM ROOM 141 PLAN ‐ 1 OF 2
604 T3402 ENLARGED TELECOMM ROOM 141 PLAN ‐ 2 OF 2
605 T3403 ENLARGED TELECOMM ROOM 124 PLAN ‐ 1 OF 2
606 T3404 ENLARGED TELECOMM ROOM 124 PLAN ‐ 2 OF 2
607 T3405 ENLARGED TELECOMM ROOM 163 PLAN ‐ 1 OF 2
608 T3406 ENLARGED TELECOMM ROOM 163 PLAN ‐ 2 OF 2
609 T3407 ENLARGED TELECOMM ROOM 226 PLAN ‐ 1 OF 2
610 T3408 ENLARGED TELECOMM ROOM 226 PLAN ‐ 2 OF 2
00 72 00-A - 16 R0008
611 T3409 ENLARGED TELECOMM ROOM 264 PLAN ‐ 1 OF 2
612 T3410 ENLARGED TELECOMM ROOM 264 PLAN ‐ 2 OF 2
613 T3411 ENLARGED CABLE TV ROOM 137 PLAN
614 T3412 ENLARGED VAULT 235 PLAN
615 T4501 TELECOMMUNICATIONS FACEPLATE DETAILS
616 T4502 TELECOMMUNICATIONS DETAILS
617 T4503 TELECOMMUNICATIONS DETAILS
618 T4504 TELECOMMUNICATIONS PDS DETAILS
619 T4703 TELECOMMUNICATIONS BACKBONE RISER DIAGRAM
620 TY100 OVERALL SECURITY PLAN
621 TY101 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA A
622 TY102 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA B
623 TY103 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA C
624 TY104 SECURITY PLAN ‐ GROUND FLOOR ‐ AREA D
625 TY105 SECURITY PLAN ‐ SECOND FLOOR ‐ AREA C
626 TY106 SECURITY PLAN ‐ SECOND FLOOR ‐ AREA D
627 TY501 SECURITY DETAILS
628 TY506 SECURITY DETAILS
G3ENDRDN
Text Box
SEE SECTION 41 22 23.23 PARACHUTE DRYING TOWER LIFT SYSTEM.
G3ENDRDN
Rectangle
G3ENDRDN
Polygon
G3ENDRDN
Text Box
G3ENDRDN
Text Box R0008
G3ENDRDN
Text Box
1 REVISION IN ACCORDANCE WITH AMENDMENT #R0008 24 JAN 2020
| Amendment R0008 Narrative |
| SF30_R0008 |
| Price Schedule (Revised) |
| 00 72 00-A (Revised) |
| E-405 (Revised) |
File details come from the government source that posted it. Updated .