AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See SECTION SF 30 BLOCK 14 CONTINUATION PAGE.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW19B0003
X 9B. DATED (SEE ITEM 11)
27-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2019
CODE
USACE SEATTLE CONTRACTING
SPECIAL PROJECTS BRANCH
BLDG 2015 4TH & PENDLETON 3RD FLOOR
JOINT BASE LEWIS-MCCHORD WA 98433
960580 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW19B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0005
The purpose of this Amendment 0005 to Solicitation W912DW19B0003 is to:
1. Extend the bid opening date to 6 May 2019. The bid opening time remains unchanged at 02:00 PM local time.
2. Add and correct/clarify paragraphs to Section 01 11 00 Statement of Work of the Solicitation. See highlighted items. The final date of the Statement of Work is changed from 10 April 2019 to 26 April 2019. Section 01 11 00 Statement of Work dated 26 April 2019 is provided under separate cover. The Statement of Work dated 26 April 2019 provided with this amendment supersedes and replaces the Statement of Work as issued with the original Solicitation and any preceding amendments.
3. Add Option CLIN 0004 - Repair Cantonment Fence Line, FENC2, DQA000283J, Fabric Screen:
CLIN 0004 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job OPTION Repair Cantonment Fence Line, FENC2
Contractor shall provide all supervision, labor, equipment and materials necessary to Repair Cantonment Fence Line, FENC2 (DQA000283J) Fabric Screen, as outlined in paragraph 1.5.4 of the Statement of Work. All work shall be performed under the terms and conditions of this Contract and in strict accordance with the Statement of Work, specifications and drawings incorporated into this Contract.
FOB: Destination
FFP
NET AMT
An updated copy of the complete CLIN Schedule, including Base CLINs 0001- 0002 and Option CLINs 0003
– 0004 is provided under separate cover. Bidders shall use this updated CLIN Schedule when submitting their bid in response to the Solicitation.
4. Correct Attachment A2 - FE6 Security Fence Detail (26 April 2019) and Attachment A4 - FE7 Security Fence Detail (26 April 2019). The final date of the Attachment A2 and A4 is changed from 18 December 2018 to 26 April 2019. Section 00 01 10 – TABLE OF CONTENTS is revised to reflect the update of Attachments A2 and A4 (see SECTION 00 01 10 - TABLE OF CONTENTS below). Updated Attachments A2 and A4 are provided under separate cover.
5. Add Attachment A18 - Privacy Screen Site Plan (26 April 2019). Section 00 01 10 – TABLE OF CONTENTS is updated to reflect the addition of Attachment A18 (see SECTION 00 01 10 - TABLE OF CONTENTS below).
Attachment A18 is provided under separate cover.
6. Update the Wage Determination for use during the performance of this Contract. SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS – Davis Bacon and Related Acts Wage Determination is updated from WA190072 02/15/2019 WA72, Modification 1 to WA190072 04/12/2019 WA72, Modification 2. See SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS below
The following have been modified:
SECTION 00 01 10 - TABLE OF CONTENTS
Section 00 10 00 Solicitation
- Contract Line Item Number (CLIN) Schedule
- Authority to Bind
Section 00 21 13 Instructions to Bidders
Section 00 22 00 Supplementary Instructions
- Provisions
Section 00 45 00 Representations and Certifications
- Pre-Award Information
Section 00 72 00 General Conditions -Contract Clauses
Section 00 73 00 Supplementary Conditions
- Davis Bacon and Related Acts Wage Determination
Specifications (PROVIDED UNDER SEPARATE COVER) Section 01 11 00 Statement of Work Section 01 22 00.00 10 Measurement and Payment Section 01 30 00 Administrative Requirements Section 01 33 00 Submittal Procedures Section 01 35 26 Government Safety Requirements Section 01 45 00.00 10 Quality Control Section 01 50 00 Temporary Construction Facilities and Controls Section 01 57 20.00 10 Environmental Protection Section 01 57 23 Temporary Stormwater Pollution Control Section 01 74 19 Construction and Demolition Waste Management Section 01 78 00 Closeout Submittals Section 01 78 23 Operation and Maintenance Data Section 02 41 00 Demolition Section 02 42 91 Removal and Salvage of Historic Building Materials Section 02 61 13 Excavation and Handling of Contaminated Materials Section 02 61 23 Removal and Disposal of PCB Contaminated Soils Section 02 81 00 Transportation and Disposal of Hazardous Materials Section 02 82 14.00 10 Asbestos Hazard Control Activities Section 02 83 13.00 20 Lead in Construction
Section 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing & Child Occupied Facilities
Section 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) Section 03 20 01.00 10 Concrete Reinforcement Section 05 05 23 Welding, Structural Section 06 10 00 Rough Carpentry Section 10 14 01 Exterior Signage Section 31 00 00 Earthwork Section 31 11 00 Clearing and Grubbing Section 32 05 33 Landscape Establishment Section 32 31 13.53 High-Security Chain Link Fences and Gates
Section 32 92 19 Seeding Section 32 93 00 Exterior Plants
Submital Register (PROVIDED UNDER SEPARATE COVER) “Report Suspicious Activity” Flyer (PROVIDED UNDER SEPARATE COVER)
Attachments (PROVIDED UNDER SEPARATE COVER) A1 Cantonment Fence (dated 18 Dec 2018) A2 FE6 Security Fence Details (dated 26 April 2019) A3 FE6 Security Gate Details (dated 18 Dec 2018) A4 FE7 Security Fence Details (dated 26 April 2019) A5 FE7 Security Gate Details (dated 18 Dec 2018) A6 Caution Areas (dated 18 Dec 2018) A7 Earthworks Acceptance Criteria (dated 18 Dec 2018) A8 Earthworks Location Map (dated 18 Dec 2018) A9 White Oak Planting Plan (dated 18 Dec 2018) A10 Tree Trimming Diagram (dated 18 Dec 2018) A11 Vancover Log Deck (dated 18 Dec 2018) A12 Family Housing Notification Checklist (dated 18 Dec 2018) A13 Sample Family Housing Notification Letter (dated 18 Dec 2018) A14 Exempted Work Area (dated 18 Dec 2018) A15 Exempted Work Area (dated 18 Dec 2018) A16 Log Pile (dated 18 Dec 2018) A17 Fence Removal (dated 18 Dec 2018) A18 Privacy Screen Site Plan (26 April 2019)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
General Decision Number: WA190072 04/12/2019 WA72
Superseded General Decision Number: WA20180097
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Pierce County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 02/15/2019 2 04/12/2019
ASBE0007-001 01/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Pipe and Duct Insulation)......................$ 53.62 15.87
CARP0770-030 06/01/2018
Rates Fringes
CARPENTER (Including Formwork)...$ 43.92 16.12
MILLWRIGHT.......................$ 45.42 16.12
PILEDRIVERMAN....................$ 44.17 16.12
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
ELEC0076-005 08/31/2018
Rates Fringes
ELECTRICIAN......................$ 43.69 23.10
ELEC0077-001 02/01/2018
Rates Fringes
Line Construction:
LINEMEN.....................$ 51.73 1%+17.50
ENGI0612-020 09/28/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1A...................$ 44.44 19.97
GROUP 1AA..................$ 45.09 19.97
GROUP 1AAA.................$ 45.73 19.97
GROUP 1.....................$ 43.79 19.97
GROUP 2.....................$ 43.23 19.97
GROUP 3.....................$ 42.74 19.97
GROUP 4.....................$ 40.01 19.97
Zone Differential (Add to Zone 1 rates):
Zone 2 (26-45 radius miles) = $1.00 Zone 3 (Over 45 radius miles) - $1.30
BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments);Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments);Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over;
excavator/Trackhoe: over 50 metric tons to 90 metric tons;
Backhoe- 6 yards and over with attachments
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments);Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;
Excavator/Trackhoe: over 30 metric tons to 50 metric tons;
Loader- overhead 6 yards to, but not including 8 yards;
Dozer D-10; Screedman; Scrapers: 45 yards and over;
Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;Crane-overhead, bridge type-20 tons through 44 tons; Drilling machine; Excavator/Trackhoe: 15 to 30 metric tons; Horizontal/directional drill operator;
Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Scraper: under 45 tons; Backhoe- 3 yards and under;
Mechanic; Piledriver; Boring Machine
GROUP 3 - Cranes-thru 19 tons with attachments;A-frame crane over 10 tons; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Excavator/Trackhoe: under 15 metric tons; Service Oiler; Conveyors; Backhoe 75 hp and under; Forklift-3,000 lbs. and over with attachments; Boom Truck over 10 tons
GROUP 4 - Cranes-A frame-10 tons and under; Roller-other than plant mix; Rigger/Bellman; Grade Checker; Drill Assistant;
Forklift-under3,000 lbs. with attachments: Boom Truck 10 tons and under
IRON0086-010 07/01/2018
Rates Fringes
IRONWORKER (Reinforcing, Structural and Ornamental).......$ 40.81 28.22
LABO0252-011 06/01/2018
Rates Fringes
Laborers:
GROUP 2.....................$ 29.83 11.49
GROUP 3.....................$ 37.27 11.49
GROUP 4.....................$ 38.19 11.49
GROUP 5.....................$ 38.80 11.49
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00
ZONE 3 - $1.30
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON
ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: General Laborer; Mason Tender-Cement/Concrete; Form Stripping;Sign Erector/Installer
GROUP 4: Grade Checker; Pipe Layer; Handheld Drill; High Scaler; Jackhammer
GROUP 5: Mason Tender-Brick
PAIN0005-008 07/01/2018
Rates Fringes
PAINTER (Brush, Roller and Spray)...........................$ 22.94 11.61
PLAS0528-004 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 42.63 17.44
* PLUM0026-003 01/01/2019
Rates Fringes
Plumbers and Pipefitters.........$ 46.72 24.90
* TEAM0174-003 01/01/2018
Rates Fringes
Truck drivers:
ZONE A:
GROUP 1:...................$ 35.63 18.67
GROUP 2:...................$ 34.79 18.67
ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.
ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates.
*Zone pay will be calculated from the city center of the following listed cities:
BELLINGHAM CENTRALIA RAYMOND OLYMPIA
EVERETT SHELTON ANACORTES BELLEVUE
SEATTLE PORT ANGELES MT. VERNON KENT
TACOMA PORT TOWNSEND ABERDEEN BREMERTON
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Dump Trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment.; Water Truck-3,000 gallons and over; Semi-Trailer Truck
GROUP 2 - Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with less than 16 yards capacity; Water Truck- less than 3,000 gallons
HAZMAT PROJECTS
Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A: +$.75 per hour - This level utilizes a fully-encapsulated suit with a self-contained breathing apparatus or a supplied air line.
SUWA2009-063 08/07/2009
Rates Fringes
LABORER: Landscape & Irrigation.......................$ 11.44 1.80
OPERATOR: Asphalt Plant.........$ 34.14 0.68
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 0.00
OPERATOR: Broom/Sweeper.........$ 30.39 3.77
OPERATOR: Power Shovel..........$ 25.12 7.83
TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29
TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION