W912DW18R0019_Amendment_0003_SERE_Dorm.pdf

PDF 4 MB Posted

Attached to
FY17 SERE Pipeline Dormitory Federal contract opportunity
Solicitation number
W912DW18R0019
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

W912DW18R0019 Amendment 0003 SERE Dorm

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW18R0019, Survival, Evasion, Resistance, Escape (SERE) Pipeline Dormitory, Fairchild Air Force Base, Spokane, Washington

(See Continuation Page)

1. CONTRACT ID CODE PAGE OF PAGES

1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW-18-R-0019

X 9B. DATED (SEE ITEM 11)

10-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Sep-2018

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-18-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

CONTINUATION PAGE - 0003

1. This amendment three (0003) provides for the following changes:

a. Revision to General Wage Determination. WA180042, with 9 modifications, dated 21 September 2018 replaces in its entirety, WA180042, with 6 modifications.

b. Revise and replace in its entirety Section 00 11 00 Price Schedule.

c. Revise and reissue two (2) Sepcifications sections.

d. Revise and replace in its entirety twelve (12) modified drawings.

e. Revise and replace in its entirety Section 00 73 00-A Index of Drawings.

2. The proposal submittal time and date of 28 September 2018 at 2:00:00 p.m. LOCAL TIME remains the same.

3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.

SECTION 00 10 00 - SOLICITATION

The following have been modified:

PRICE SCHEDULE

PRICE SCHEDULE

CLIN

Item # Description of Item Quantity Unit Unit Price Amount

BASE ITEMS

0001 All work for construction of SERE Pipeline Dormitory including all associated site work within 5-feet of the building.

1 JOB N/A $____________________

0002 All work for site preparation including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.

0003 All work for O&M manuals as specified in

Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.

1 JOB N/A $75,000

0004 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

1 JOB N/A $30,000

All work for DD 1354 as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

1 JOB N/A $15,000

TOTAL ALL BASE ITEMS 0001 - 0005 $________________________

OPTIONAL ITEMS

0006 All work for construction of Optional Wing. See note #6.

0007 All work for construction of the drill pad.

See note #7.

CLIN

Item # Description of Item Quantity Unit Unit Price Amount 0008 All work for Furnishings, Fixtures, and

Equipment (FF&E) for Base Item #0001.

See note #8.

0009 All work for Furnishings, Fixtures, and

Equipment (FF&E) for Optional Item #0006. See note #8.

TOTAL ALL OPTION ITEMS 0006 - 0009 $________________________

TOTAL ALL ITEMS 0001 - 0009 $________________________

NOTES:

1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.

2) To better facilitate the receipt and proposal process, all amendments to proposals shall be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

3) Offerors must insert a price on all entry amount lines of numbered items of the Price Schedule. Failure to do so will result in the offer being unacceptable.

4) The dollar amounts established in Item #0003, #0004, and #0005 shall not be revised by Offerors.

5) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph OPTION FOR INCREASED QUANTITY.

6) See Section 01 23 00 ALTERNATES for more information and detailed descriptions of the work for Optional Item #0006.

7) Please refer to drawing CS101 for additional information.

8) Please refer to Interiors Drawings for additional information.

END PRICE SCHEDULE

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION WA42

General Decision Number: WA180042 09/21/2018 WA42

Superseded General Decision Number: WA20170042

State: Washington

Construction Type: Building

County: Spokane County in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/23/2018 3 03/16/2018 4 04/27/2018 5 06/29/2018 6 08/10/2018 7 08/24/2018 8 09/14/2018 9 09/21/2018

ASBE0082-001 08/01/2018

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 36.67 19.75

BRWA0001-002 06/01/2017

Rates Fringes

BRICKLAYER.......................$ 39.46 16.15

CARP0004-011 06/01/2017

Rates Fringes

CARPENTER (Excluding Acoustical ceiling, Drywall Hanging and Form Work)...........$ 27.76 16.14

ZONE PAY:

ZONE 1 0-45 MILES FREE

ZONE 2 46-65 MILES $2.00/PER HOUR

ZONE 3 66-100 MILES $3.00/PER HOUR

ZONE 4 OVER 100 MILES $4.50/PER HOUR

DISPATCH POINTS:

CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

HAZMAT PROJECTS:

Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:

LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.

LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."

LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.

ELEC0073-003 01/01/2018

Rates Fringes

ELECTRICIAN......................$ 33.25 18.40

ELEC0073-010 08/01/2018

Rates Fringes

ELECTRICIAN (Sound Equipment Installation Only)...............$ 26.74 15.89

ENGI0370-017 06/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 27.51 15.95

GROUP 2.....................$ 27.83 15.95

GROUP 3.....................$ 28.44 15.95

GROUP 4.....................$ 28.60 15.95

GROUP 5.....................$ 28.76 15.95

GROUP 6.....................$ 29.04 15.95

GROUP 7.....................$ 29.31 15.95

GROUP 8.....................$ 30.41 15.95

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Compactor; Drill Oiler; Rollers, all types on subgrade, including seal and chip coatings

GROUP 2: Fork Lift

GROUP 3: Bulldozer (up to D-6 or equivalent)

GROUP 4: Drills (churn, core, calyx or diamond); Oiler;

Loaders (overhead & front-end, under 4 yds. R/T); Vacuum

Drill (reverse circulation drill under 8 inch bit)

GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar)

GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.

incl. 8 yds.); Scrapers, all, rubber-tired; Screed Operator

GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers); Blade

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-012 07/01/2018

Rates Fringes

IRONWORKER (Ornamental, Reinforcing and Structural)......$ 33.18 27.82

* LABO0238-014 06/01/2018

Rates Fringes

LABORER: Mason Tender - Brick...$ 27.75 12.25

* LABO0238-024 06/01/2018

Rates Fringes

LABORER

GROUP 1.....................$ 24.74 12.45

GROUP 2.....................$ 26.84 12.45

GROUP 3.....................$ 27.11 12.45

GROUP 4.....................$ 27.38 12.45

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagman

GROUP 2: Common or General Laborer; Form-Stripping

GROUP 3: Chipping Guns; Concrete Saw; Pipelayer

GROUP 4: Asphalt Raker; Grade Checker; Gunite; Vibrating Plate

PAIN0054-001 06/01/2008

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 22.78 8.88

PAIN0054-002 07/01/2018

Rates Fringes

GLAZIER..........................$ 21.68 8.81

PAIN0054-004 10/01/2005

Rates Fringes

FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22

PLAS0072-006 06/01/2018

Rates Fringes

PLASTERER........................$ 29.07 14.13

Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0-45 radius miles from the main post office

Zone 2: Over 45 radius miles from the main post office

PLUM0044-001 06/01/2017

Rates Fringes

Plumbers and Pipefitters.........$ 40.41 17.74

ROOF0189-013 07/01/2018

Rates Fringes

ROOFER (Including Tearoff).......$ 27.48 12.73

SHEE0066-007 06/01/2013

Rates Fringes

Sheet metal worker (Includes HVAC DUCT and Metal Roof Installation)....................$ 28.25 17.22

TEAM0690-008 06/01/2017

Rates Fringes

Truck drivers: (ANYONE

WORKING ON HAZMAT JOBS SEE

FOOTNOTE A BELOW)

ZONE 1: LEWISTON ZONE

CENTER

GROUP 3....................$ 26.07 17.30

GROUP 4....................$ 26.40 17.30

GROUP 5....................$ 26.51 17.30

GROUP 6....................$ 26.67 17.30

GROUP 7....................$ 27.21 17.30

GROUP 8....................$ 27.53 17.30

ZONE 1: PASCO ZONE CENTER

GROUP 3....................$ 26.07 17.30

GROUP 4....................$ 26.40 17.30

GROUP 5....................$ 26.51 17.20

GROUP 6....................$ 26.67 17.30

GROUP 7....................$ 27.21 17.30

GROUP 8....................$ 27.53 17.30

ZONE 1: SPOKANE ZONE CENTER

GROUP 3....................$ 26.07 17.30

GROUP 4....................$ 26.40 17.30

GROUP 5....................$ 26.51 17.30

GROUP 6....................$ 26.67 17.30

GROUP 7....................$ 27.21 17.30

GROUP 8....................$ 27.53 17.30

Zone Differential For ZONE 2: ( Zone 1 +$2.00)

BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office

Zone 2: Outside a 45 mile radius from the main post office

TRUCK DRIVERS CLASSIFICATIONS

GROUP 3: Trucks, side, end, bottom and articulated end dump (3 yards to and including 6 yds.)

GROUP 4: Trucks, side, end, bottom and articulated end dump (over 6 yds. to & including 12 yds.)

GROUP 5: Trucks, side, end, bottom and articulated end dump (over 12 yds. to & including 20 yds.)

GROUP 6: Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.)

GROUP 7: Truck, side, end, bottom and articulated end dump (over 40 yds. to & including 100 yds.)

GROUP 8: Trucks, side, end, bottom and articulated end dump (over 100 yds.)

FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.

LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.

Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.

SUWA2009-030 05/22/2009

Rates Fringes

CARPENTER (Acoustical Ceiling Installation Only)...............$ 18.00 1.43

CARPENTER (Drywall Hanging Only)............................$ 20.62 0.00

CARPENTER (Form Work Only).......$ 18.63 2.65

LABORER: Handheld Drill.........$ 17.17 5.36

LABORER: Irrigation.............$ 11.58 0.00

LABORER: Landscape..............$ 11.48 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 9.00 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.31 0.00

OPERATOR: Concrete Pumper.......$ 22.30 5.27

OPERATOR: Mechanic..............$ 24.33 4.33

PAINTER: Brush Only.............$ 13.00 0.50

PAINTER: Roller.................$ 22.62 0.25

PAINTER: Spray..................$ 22.47 0.00

TILE SETTER......................$ 14.83 0.00

TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

FAFB SERE Pipeline Dormitory (150 rm) 17015 Fairchild AFB, WA W912DW18R0019

00 73 00-A R0003

ATTACHMENT 00 73 00-A

INDEX OF DRAWINGS

DRAWING NO. 236s/721-14-01, DATED 13 July 2018

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

GENERAL

1 G-001 TITLE, LOCATION, & VICINITY MAPS

2 G-002 DRAWING INDEX 1

3 G-003 DRAWING INDEX 2

GEOTECHNICAL

4 B-101 BORING LOCATIONS

5 B-201 SOIL DESCRIPTION & LOG KEYS

6 B-301 BORING LOGS - TEST PITS - TP-16-TP-01 & TP-16-TP-02

& BORING LOGS B-16-MRRC-01

7 B-302 BORING LOGS - B-16-MR-02

8 B-303 BORING LOGS - B-16-MR-03

9 B-304 BORING LOGS - B-16-MRRC-04

CIVIL

10 C-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES R0001 8/22/18

11 C-002 HAUL ROUTES R0001 8/22/18

12 CX101 EXISTING CONDITIONS

13 CX102 DEMOLITION PLAN R0001 8/22/18

14 CS101 GENERAL SITE PLAN R0001 8/22/18

15 CS101x GENERAL SITE PLAN - BID OPTION R0001 8/22/18

16 CS102 SITE PLAN

17 CS102x SITE PLAN - BID OPTION

18 CP101 JOINT LAYOUT OVERALL PLAN R0001 8/22/18

19 CP101x JOINT LAYOUT OVERALL PLAN - BID OPTION R0001 8/22/18

20 CP102 JOINT LAYOUT PLAN

21 CP103 PAVEMENT JOINT DETAILS

22 CP104 DRILL PAD OPTION JOINT DETAILS

23 CP105 PAVEMENT & DRILL PAD OPTION REINFORCEMENT

DETAILS

24 CG101 GRADING PLAN R0003 9/21/18

25 CG101x GRADING PLAN - BID OPTION R0003 9/21/18

26 CU101 UTILITIES PLAN R0001 8/22/18

27 CU101x UTILITIES PLAN - BID OPTION R0001 8/22/18

28 CU102 STORMWATER PLAN

29 CU102x STORMWATER PLAN - BID OPTION

30 C-301 SECTIONS 1

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

31 C-302 SECTIONS 2

32 C-302x SECTIONS 2 - BID OPTION

33 C-303 SANITARY SEWER PLAN AND PROFILE

34 C-304 STORMWATER PLAN AND PROFILE

35 C-304x STORMWATER PLAN AND PROFILE - BID OPTION

36 C-501 WATER DETAILS

37 C-502 SANITARY SEWER DETAILS

38 C-503 STORMWATER DETAILS

39 C-504 MISCELLANEOUS DETAILS 1

40 C-505 MISCELLANEOUS DETAILS 2

41 C-506 PAVEMENT DETAILS

42 C-507 SECTIONS & SIDEWALK

LANDSCAPE

43 L-101 LANDSCAPE SITE PLAN

44 L-101x LANDSCAPE SITE PLAN - BID OPTION

STRUCTURAL

45 S-001 GENERAL STRUCTURAL NOTES

46 S-002 GENERAL STRUCTURAL NOTES

47 S-101 OVERALL FOUNDATION PLAN

48 S-101x OVERALL FOUNDATION PLAN - BID OPTION

49 S-102 FOUNDATION PLAN - ZONES A & B R0003 9/21/18

50 S-103 FOUNDATION PLAN - ZONE C R0003 9/21/18

51 S-103x FOUNDATION PLAN - ZONE C - BID OPTION R0003 9/21/18

52 S-104 OVERALL SLAB ON GRADE PLAN

53 S-104x OVERALL SLAB ON GRADE PLAN - BID OPTION

54 S-105 OVERALL SECOND FLOOR FRAMING PLAN

55 S-105x OVERALL SECOND FLOOR FRAMING PLAN - BID

OPTION

56 S-106 SECOND FLOOR FRAMING PLAN - ZONES A & B

57 S-107 SECOND FLOOR FRAMING PLAN - ZONE C

58 S-107x SECOND FLOOR FRAMING PLAN - ZONE C - BID

59 S-108 OVERALL THIRD FLOOR FRAMING PLAN

60 S-108x OVERALL THIRD FLOOR FRAMING PLAN - BID OPTION

61 S-109 THIRD FLOOR FRAMING PLAN - ZONES A & B

62 S-110 THIRD FLOOR FRAMING PLAN - ZONE C

63 S-110x THIRD FLOOR FRAMING PLAN - ZONE C - BID OPTION

64 S-111 GEAR STORAGE BUILDING ROOF FRAMING PLAN

65 S-112 OVERALL ATTIC FLOOR FRAMING PLAN

66 S-112x OVERALL ATTIC FLOOR FRAMING PLAN - BID OPTION

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

67 S-113 ATTIC FLOOR FRAMING PLAN - ZONES A & B

68 S-114 ATTIC FLOOR FRAMING PLAN - ZONE C

69 S-114x ATTIC FLOOR FRAMING PLAN - ZONE C - BID OPTION

70 S-115 OVERALL HIGH ROOF FRAMING PLAN

71 S-115x OVERALL HIGH ROOF FRAMING PLAN - BID OPTION

72 S-116 OVERALL SECOND AND THIRD FLOOR PLAN -

PROGRESSIVE COLLAPSE PREVENTION

73 S-116x OVERALL SECOND AND THIRD FLOOR PLAN -

PROGRESSIVE COLLAPSE PREVENTION - BID OPTION

74 S-117 OVERALL ATTIC FLOOR PLAN - PROGRESSIVE COLLAPSE

PREVENTION

75 S-117x OVERALL ATTIC FLOOR PLAN - PROGRESSIVE COLLAPSE

PREVENTION - BID OPTION

76 S-161 DUMPSTER ENCLOSURE - FOUNDATION PLAN

77 S-201 DORMITORY FRAMING ELEVATIONS

78 S-202 DORMITORY FRAMING ELEVATIONS

79 S-203 DORMITORY FRAMING ELEVATIONS

80 S-204 DORMITORY FRAMING ELEVATIONS

81 S-205 GEAR STORAGE FRAMING ELEVATIONS

82 S-206 GEAR STORAGE FRAMING ELEVATIONS

83 S-301 FOUNDATION SECTIONS

84 S-302 COMBINED FOUNDATIONS SECTIONS

85 S-303 COMBINED FOUNDATIONS SECTIONS

86 S-304 ROOF FRAMING SECTIONS

87 S-305 WALL SECTIONS & DETAILS

88 S-401 ENLARGED PLANS - MECHANICAL PLATFORM

89 S-402 ENLARGED PLANS - DORMITORY ENTRANCE

90 S-403 ENLARGED PLANS - DORMITORY ENTRANCE

91 S-501 TYPICAL FOUNDATION DETAILS

92 S-502 TYPICAL FOUNDATION DETAILS

93 S-503 TYPICAL STEEL DETAILS

94 S-504 DORMITORY DETAILS

95 S-505 DORMITORY DETAILS

96 S-506 DORMITORY DETAILS

97 S-507 DORMITORY DETAILS

98 S-508 DORMITORY DETAILS

99 S-509 DORMITORY DETAILS

100 S-510 DORMITORY DETAILS

101 S-511 DORMITORY DETAILS

102 S-512 DORMITORY DETAILS

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

103 S-513 GEAR STORAGE BUILDING DETAILS

104 S-514 GEAR STORAGE BUILDING DETAILS

105 S-515 GEAR STORAGE BUILDING DETAILS

106 S-516 GEAR STORAGE BUILDING DETAILS

107 S-517 GEAR STORAGE BUILDING DETAILS

108 S-518 FLOOR FRAMING DETAILS

109 S-519 ROOF FRAMING DETAILS

110 S-520 AT/FP ELEVATIONS & DETAILS

111 S-521 PROGRESSIVE COLLAPSE DETAILS

112 S-601 FRAMING SCHEDULES

113 S-701 WIND DIAGRAMS

114 S-702 WIND DIAGRAMS

115 S-703 SNOW DIAGRAMS

116 S-704 SNOW DIAGRAMS

ARCHITECTURAL

117 A-001 ABBREVIATIONS, SYMBOLS, & GENERAL NOTES

118 A-002 CODE SUMMARY

119 A-003 FIRST FLOOR LIFE SAFETY PLAN

120 A-004 SECOND FLOOR LIFE SAFETY PLAN

121 A-005 AIR BARRIER PLANS & SECTIONS

122 A-006 AIR BARRIER CONSTRUCTION METHODS

123 A-007 AIR BARRIER EXTENTS - DETAILS

124 A-008 FIRE STOPPING DETAILS

125 A-009 FIRE STOPPING DETAILS

126 A-010 FIRE STOPPING DETAILS

127 A-101 OVERALL FIRST FLOOR PLAN

128 A-101x OVERALL FIRST FLOOR PLAN – BID OPTION

129 A-102 FIRST FLOOR PLAN - ZONES A & B R0003 9/21/18

130 A-103 FIRST FLOOR PLAN - ZONE C

131 A-103x FIRST FLOOR PLAN - ZONE C – BID OPTION

132 A-104 OVERALL SECOND FLOOR PLAN

133 A-104x OVERALL SECOND FLOOR PLAN – BID OPTION

134 A-105 SECOND FLOOR PLAN - ZONE A & B

135 A-106 SECOND FLOOR PLAN - ZONE C

136 A-106x SECOND FLOOR PLAN - ZONE C – BID OPTION

137 A-107 OVERALL THIRD FLOOR PLAN

138 A-107x OVERALL THIRD FLOOR PLAN – BID OPTION

139 A-108 THIRD FLOOR PLAN - ZONE A & B

140 A-109 THIRD FLOOR PLAN - ZONE C

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

141 A-109x THIRD FLOOR PLAN - ZONE C – BID OPTION

142 A-110 ATTIC FLOOR PLAN

143 A-110x ATTIC FLOOR PLAN – BID OPTION

144 A-111 FIRST FLOOR REFLECTED CEILING PLAN

145 A-111x FIRST FLOOR REFLECTED CEILING PLAN – BID OPTION

146 A-112 FIRST FLOOR REFLECTED CEILING PLAN - ZONE A & B

147 A-113 FIRST FLOOR REFLECTED CEILING PLAN - ZONE C

148 A-113x FIRST FLOOR REFLECTED CEILING PLAN - ZONE C – BID

149 A-114 SECOND FLOOR REFLECTED CEILING PLAN

150 A-114x SECOND FLOOR REFLECTED CEILING PLAN – BID

151 A-115 SECOND FLOOR REFLECTED CEILING PLAN - ZONE A &

B

152 A-116 SECOND FLOOR REFLECTED CEILING PLAN - ZONE C

153 A-116x SECOND FLOOR REFLECTED CEILING PLAN - ZONE C –

BID OPTION

154 A-117 THIRD FLOOR REFLECTED CEILING PLAN

155 A-117x THIRD FLOOR REFLECTED CEILING PLAN – BID OPTION

156 A-118 THIRD FLOOR REFLECTED CEILING PLAN - ZONE A & B R0003 9/21/18

157 A-119 THIRD FLOOR REFLECTED CEILING PLAN - ZONE C R0003 9/21/18

158 A-119x THIRD FLOOR REFLECTED CEILING PLAN - ZONE C – BID

OPTION

R0003 9/21/18

159 A-121 ROOF PLAN

160 A-121x ROOF PLAN – BID OPTION

161 A-122 DUMPSTER ENCLOSURE - PLANS, ELEVATIONS, &

SECTIONS

162 A-201 OVERALL BUILDING ELEVATIONS - NORTH & SOUTH

163 A-202 OVERALL BUILDING ELEVATIONS - EAST & WEST

164 A-203 PARTIAL BUILDING ELEVATIONS

165 A-203x PARTIAL ELEVATIONS - ZONE C - BID OPTION

166 A-301 OVERALL BUILDING SECTIONS

167 A-310 WALL SECTIONS

168 A-311 WALL SECTIONS

169 A-312 WALL SECTIONS

170 A-401 ENLARGED PLANS R0003 9/21/18

171 A-402 ENLARGED PLANS

172 A-403 ENLARGED PLANS - STAIRS

173 A-404 ENLARGED PLANS - STAIRS

174 A-501 BUILDING DETAILS R0003 9/21/18

175 A-502 BUILDING DETAILS - PLAN

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

176 A-503 BUILDING DETAILS - CEILINGS

177 A-504 BUILDING DETAILS - CEILINGS

178 A-505 BUILDING DETAILS - ROOF R0003 9/21/18

179 A-506 BUILDING DETAILS - ROOF

180 A-507 BUILDING DETAILS - STAIRS

181 A-601 EXTERIOR WALL, ROOF, FLOOR, & CEILING TYPES R0003 9/21/18

182 A-602 INTERIOR WALL TYPES R0003 9/21/18

183 A-603 INTERIOR STUD DETAILS & EXTERIOR FINISH PROFILES

184 A-604 OPENING SCHEDULE & DETAILS

185 A-604x OPENING SCHEDULE - OPTION

186 A-605 TYPICAL OPENING DETAILS

187 A-606 TYPICAL OPENING DETAILS

188 A-607 TYPICAL OPENING DETAILS

189 A-608 TYPICAL OPENING DETAILS

190 A-609 LOUVER DETAILS

191 A-901 PERSPECTIVE VIEWS

GENERAL – VOLUME 2 OF 2

192 G-XX1 TITLE, LOCATION AND VICINITY MAPS

193 G-XX2 DRAWING INDEX 1

194 G-XX3 DRAWING INDEX 2

INTERIORS

195 IF-101 OVERALL FIRST FLOOR FURNITURE & EQUIPMENT

PLAN

196 IF-101x OVERALL FIRST FLOOR FURNITURE & EQUIPMENT

PLAN – BID OPTION

197 IF-102 FIRST FLOOR FURNITURE PLAN - ZONE A & B

198 IF-103 FIRST FLOOR FURNITURE PLAN - ZONE C

199 IF-103x FIRST FLOOR FURNITURE PLAN - ZONE C – BID OPTION

200 IF-104 OVERALL SECOND FLOOR FURNITURE & EQUIPMENT

201 IF-104x OVERALL SECOND FLOOR FURNITURE & EQUIPMENT

202 IF-105 SECOND FLOOR FURNITURE PLAN - ZONE A & B

203 IF-106 SECOND FLOOR FURNITURE PLAN - ZONE C

204 IF-106x SECOND FLOOR FURNITURE PLAN - ZONE C – BID

205 IF-107 OVERALL THIRD FLOOR FURNITURE & EQUIPMENT

206 IF-107x OVERALL THIRD FLOOR FURNITURE & EQUIPMENT

207 IF-108 THIRD FLOOR FURNITURE PLAN - ZONE A & B

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

208 IF-109 THIRD FLOOR FURNITURE PLAN - ZONE C

209 IF-109x THIRD FLOOR FURNITURE PLAN - ZONE C – BID

210 IF-110 ENLARGED FURNITURE PLANS

211 IN-101 FIRST FLOOR ELEMENTS PLAN - ZONE A & B R0001 8/22/18

212 IN-102 FIRST FLOOR ELEMENTS PLAN - ZONE C R0001 8/22/18

213 IN-102x FIRST FLOOR ELEMENTS PLAN - ZONE C – BID OPTION R0001 8/22/18

214 IN-103 SECOND FLOOR ELEMENTS PLAN - ZONE A & B R0001 8/22/18

215 IN-104 SECOND FLOOR ELEMENTS PLAN - ZONE C R0001 8/22/18

216 IN-104x SECOND FLOOR ELEMENTS PLAN - ZONE C – BID

OPTION

R0001 8/22/18

217 IN-105 THIRD FLOOR ELEMENTS PLAN - ZONE A & B R0001 8/22/18

218 IN-106 THIRD FLOOR ELEMENTS PLAN - ZONE C R0001 8/22/18

219 IN-106x THIRD FLOOR ELEMENTS PLAN - ZONE C – BID OPTION R0001 8/22/18

220 IN-201 INTERIOR ELEVATIONS

221 IN-202 INTERIOR ELEVATIONS

222 IN-203 INTERIOR ELEVATIONS

223 IN-401 ENLARGED PLANS

224 IN-402 ENLARGED PLANS

225 IN-501 RESTROOM DETAILS

226 IN-502 INTERIOR DETAILS

227 IN-503 CASEWORK DETAILS

228 IN-504 CASEWORK DETAILS

229 IN-505 CASEWORK DETAILS

230 IN-506 LAUNDRY TABLE DETAILS

231 IN-601 FINISH LEGEND

232 IN-701 FIRST FLOOR FINISH PLAN ZONE A & B

233 IN-702 FIRST FLOOR FINISH PLAN ZONE C

234 IN-702x FIRST FLOOR FINISH PLAN ZONE C – BID OPTION

235 IN-703 SECOND FLOOR FINISH PLAN ZONE A & B

236 IN-704 SECOND FLOOR FINISH PLAN ZONE C

237 IN-704x SECOND FLOOR FINISH PLAN ZONE C – BID OPTION

238 IN-705 THIRD FLOOR FINISH PLAN ZONE A & B

239 IN-706 THIRD FLOOR FINISH PLAN ZONE C

240 IN-706x THIRD FLOOR FINISH PLAN ZONE C – BID OPTION

241 IN-707 INTERIOR FLOOR FINISH DETAILS

242 IN-708 INTERIOR FLOOR FINISH DETAILS

243 IN-801 INTERIOR SIGNAGE DETAILS

244 IN-802 INTERIOR SIGNAGE SCHEDULE

245 IN-802x INTERIOR SIGNAGE SCHEDULE – BID OPTION

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

FIRE PROTECTION

246 FX101 FIRST FLOOR HAZARD CATEGORY PLAN

247 FX101x FIRST FLOOR HAZARD CATEGORY PLAN – BID OPTION

248 FX102 SECOND FLOOR HAZARD CATEGORY PLAN

249 FX102x SECOND FLOOR HAZARD CATEGORY PLAN – BID

250 FX103 THIRD FLOOR HAZARD CATEGORY PLAN

251 FX103x THIRD FLOOR HAZARD CATEGORY PLAN – BID OPTION

252 FX111 FIRST FLOOR SPRINKLER PAN

253 FX111x FIRST FLOOR SPRINKLER PAN – BID OPTION

254 FX112 SECOND FLOOR SPRINKLER PLAN

255 FX112x SECOND FLOOR SPRINKLER PLAN – BID OPTION

256 FX113 THIRD FLOOR SPRINKLER PLAN

257 FX113x THIRD FLOOR SPRINKLER PLAN – BID OPTION

258 FX201 STAIRWELL RISER

259 FX202 RISER ROOM ELEVATION VIEW

260 FX203 RISER ROOM PLAN VIEW

261 FX204 1ST, 2ND, & 3RD FLOOR FEED MAIN ROUTING

262 FX205 GEAR STORAGE SOUTH

PLUMBING

263 P-001 PLUMBING LEGEND

264 P-101 OVERALL FIRST FLOOR SANITARY PLAN

265 P-102 FIRST FLOOR SANITARY PLAN - ZONE A & B

266 P-103 FIRST FLOOR SANITARY PLAN - ZONE C

267 P-103x FIRST FLOOR SANITARY PLAN - ZONE C – BID OPTION

268 P-104 OVERALL SECOND FLOOR SANITARY PLAN

269 P-105 SECOND FLOOR SANITARY PLAN - ZONE A & B

270 P-106 SECOND FLOOR SANITARY PLAN - ZONE C

271 P-106x SECOND FLOOR SANITARY PLAN - ZONE C – BID

272 P-107 OVERALL THIRD FLOOR SANITARY PLAN

273 P-108 THIRD FLOOR SANITARY PLAN - ZONE A & B

274 P-109 THIRD FLOOR SANITARY PLAN - ZONE C

275 P-109x THIRD FLOOR SANITARY PLAN - ZONE C – BID OPTION

276 P-110 OVERALL FIRST FLOOR DOMESTIC PLAN

277 P-111 FIRST FLOOR DOMESTIC PLAN - ZONE A & B

278 P-112 FIRST FLOOR DOMESTIC PLAN - ZONE C

279 P-112x FIRST FLOOR DOMESTIC PLAN - ZONE C – BID OPTION

280 P-113 OVERALL SECOND FLOOR DOMESTIC PLAN

281 P-114 SECOND FLOOR DOMESTIC PLAN - ZONE A & B

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

282 P-115 SECOND FLOOR DOMESTIC PLAN - ZONE C

283 P-115x SECOND FLOOR DOMESTIC PLAN - ZONE C – BID

284 P-116 OVERALL THIRD FLOOR DOMESTIC PLAN

285 P-117 THIRD FLOOR DOMESTIC PLAN - ZONE A & B

286 P-118 THIRD FLOOR DOMESTIC PLAN - ZONE C

287 P-118x THIRD FLOOR DOMESTIC PLAN - ZONE C – BID OPTION

288 P-119 OVERALL FIRST FLOOR NATURAL GAS PLAN

289 P-120 FIRST FLOOR NATURAL GAS PLAN - ZONE A & B

290 P-121 FIRST FLOOR NATURAL GAS PLAN - ZONE C

291 P-122 OVERALL SECOND FLOOR NATURAL GAS PLAN

292 P-123 SECOND FLOOR NATURAL GAS PLAN - ZONE A & B

293 P-124 SECOND FLOOR NATURAL GAS PLAN - ZONE C

294 P-125 OVERALL THIRD FLOOR NATURAL GAS PLAN

295 P-126 THIRD FLOOR NATURAL GAS PLAN - ZONE A & B

296 P-127 THIRD FLOOR NATURAL GAS PLAN - ZONE C

297 P-301 PLUMBING SECTION - I

298 P-302 PLUMBING SECTION - II

299 P-303 PLUMBING SECTION - III

300 P-401 DORM ROOM SANITARY VIEWS

301 P-402 DORM ROOM DOMESTIC VIEWS

302 P-403 PUBLIC BATHROOMS SANITARY VIEWS

303 P-404 FIRST FLOOR LAUNDRY ROOM VIEWS

304 P-405 SECOND FLOOR LAUNDRY ROOM VIEWS

305 P-406 THIRD FLOOR LAUNDRY ROOM VIEWS

306 P-407 MECH ROOM VIEWS

307 P-501 PLUMBING DETAIL - I

308 P-502 PLUMBING DETAIL - II

309 P-601 PLUMBING SCHEDULES

310 P-601x PLUMBING SCHEDULES – BID OPTION

311 P-901 NATURAL GAS ISOMETRIC VIEW

MECHANICAL

312 M-001 HVAC LEGEND

313 M-101 OVERALL FIRST FLOOR HVAC PLAN

314 M-102 FIRST FLOOR HVAC PLAN - ZONE A & B

315 M-103 FIRST FLOOR HVAC PLAN - ZONE C

316 M-103x FIRST FLOOR HVAC PLAN - ZONE C – BID OPTION

317 M-104 OVERALL SECOND FLOOR HVAC PLAN

318 M-105 SECOND FLOOR HVAC PLAN - ZONE A & B

319 M-106 SECOND FLOOR HVAC PLAN - ZONE C

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

320 M-106x SECOND FLOOR HVAC PLAN - ZONE C – BID OPTION

321 M-107 OVERALL THIRD FLOOR HVAC PLAN

322 M-108 THIRD FLOOR HVAC PLAN - ZONE A & B

323 M-109 THIRD FLOOR HVAC PLAN - ZONE C

324 M-109x THIRD FLOOR HVAC PLAN - ZONE C – BID OPTION

325 M-301 HVAC BUILDING SECTION

326 M-401 HVAC ENLARGED PLANS

327 M-402 ENLARGED DORM ROOM MECHANICAL PLANS

328 M-501 HVAC DETAILS - I

329 M-502 HVAC DETAILS - II

330 M-601 HVAC SCHEDULES

331 M-601x HVAC SCHEDULES – BID OPTION

332 M-700 CONTROLS LEGEND

333 M-701 CONTROLS POINTS SCHEDULE INSTRUCTIONS

334 M-702 HVAC CONTROLS - I

335 M-703 HVAC CONTROLS - II

336 M-704 HVAC POINTS SCHEDULE

ELECTRICAL

337 E-001 ELECTRICAL NOTES, LEGEND, & ABBREVIATIONS

338 ED100 ELECTRICAL OVERALL DEMOLITION PLAN

339 ES100 ELECTRICAL OVERALL SITE PLAN

340 ES100x ELECTRICAL OVERALL SITE PLAN – BID OPTION

341 ES101 ELECTRICAL SITE PLAN 1

342 ES101x ELECTRICAL SITE PLAN 1 – BID OPTION

343 ES102 ELECTRICAL SITE PLAN 2

344 EG101 GROUNDING SITE PLAN

345 EG101x GROUNDING SITE PLAN – BID OPTION

346 E-101 OVERALL FIRST FLOOR LIGHTING PLAN

347 E-102 FIRST FLOOR LIGHTING PLAN - ZONE A1

348 E-103 FIRST FLOOR LIGHTING PLAN - ZONE A2

349 E-104 FIRST FLOOR LIGHTING PLAN - ZONE B1

350 E-105 FIRST FLOOR LIGHTING PLAN - ZONE B2

351 E-106 FIRST FLOOR LIGHTING PLAN - ZONE C1

352 E-106x FIRST FLOOR LIGHTING PLAN - ZONE C1 – BID OPTION

353 E-107 FIRST FLOOR LIGHTING PLAN - ZONE C2

354 E-107x FIRST FLOOR LIGHTING PLAN - ZONE C2 – BID OPTION

355 E-108 OVERALL SECOND FLOOR LIGHTING PLAN

356 E-109 SECOND FLOOR LIGHTING PLAN - ZONE A1

357 E-110 SECOND FLOOR LIGHTING PLAN - ZONE A2

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

358 E-111 SECOND FLOOR LIGHTING PLAN - ZONE B2

359 E-112 SECOND FLOOR LIGHTING PLAN - ZONE C1

360 E-112x SECOND FLOOR LIGHTING PLAN - ZONE C1 – BID

361 E-113 SECOND FLOOR LIGHTING PLAN - ZONE C2

362 E-113x SECOND FLOOR LIGHTING PLAN - ZONE C2 – BID

363 E-114 OVERALL THIRD FLOOR LIGHTING PLAN

364 E-115 THIRD FLOOR LIGHTING PLAN - ZONE A1

365 E-116 THIRD FLOOR LIGHTING PLAN - ZONE A2

366 E-117 THIRD FLOOR LIGHTING PLAN - ZONE B2

367 E-118 THIRD FLOOR LIGHTING PLAN - ZONE C1

368 E-118x THIRD FLOOR LIGHTING PLAN - ZONE C1 – BID OPTION

369 E-119 THIRD FLOOR LIGHTING PLAN - ZONE C2

370 E-119x THIRD FLOOR LIGHTING PLAN - ZONE C2 – BID OPTION

371 E-121 OVERALL FIRST FLOOR POWER PLAN

372 E-122 FIRST FLOOR POWER PLAN - ZONE A1

373 E-123 FIRST FLOOR POWER PLAN - ZONE A2

374 E-124 FIRST FLOOR POWER PLAN - ZONE B1

375 E-125 FIRST FLOOR POWER PLAN - ZONE B2

376 E-126 FIRST FLOOR POWER PLAN - ZONE C1

377 E-126x FIRST FLOOR POWER PLAN - ZONE C1 – BID OPTION

378 E-127 FIRST FLOOR POWER PLAN - ZONE C2

379 E-127x FIRST FLOOR POWER PLAN - ZONE C2 – BID OPTION

380 E-128 OVERALL SECOND FLOOR POWER PLAN

381 E-129 SECOND FLOOR POWER PLAN - ZONE A1

382 E-130 SECOND FLOOR POWER PLAN - ZONE A2

383 E-131 SECOND FLOOR POWER PLAN - ZONE B2

384 E-132 SECOND FLOOR POWER PLAN - ZONE C1

385 E-132x SECOND FLOOR POWER PLAN - ZONE C1 – BID OPTION

386 E-133 SECOND FLOOR POWER PLAN - ZONE C2

387 E-133x SECOND FLOOR POWER PLAN - ZONE C2 – BID OPTION

388 E-134 OVERALL THIRD FLOOR POWER PLAN

389 E-135 THIRD FLOOR POWER PLAN - ZONE A1

390 E-136 THIRD FLOOR POWER PLAN - ZONE A2

391 E-137 THIRD FLOOR POWER PLAN - ZONE B2

392 E-138 THIRD FLOOR POWER PLAN - ZONE C1

393 E-138x THIRD FLOOR POWER PLAN - ZONE C1 – BID OPTION

394 E-139 THIRD FLOOR POWER PLAN - ZONE C2

395 E-139x THIRD FLOOR POWER PLAN - ZONE C2 – BID OPTION

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

396 E-141 OVERALL FIRST FLOOR MECHANICAL POWER PLAN

397 E-142 FIRST FLOOR MECHANICAL POWER PLAN - ZONE A1

398 E-143 FIRST FLOOR MECHANICAL POWER PLAN - ZONE A2

399 E-144 FIRST FLOOR MECHANICAL POWER PLAN - ZONE B1

400 E-145 FIRST FLOOR MECHANICAL POWER PLAN - ZONE B2

401 E-146 FIRST FLOOR MECHANICAL POWER PLAN - ZONE C1

402 E-146x FIRST FLOOR MECHANICAL POWER PLAN - ZONE C1 –

403 E-147 FIRST FLOOR MECHANICAL POWER PLAN - ZONE C2

404 E-147x FIRST FLOOR MECHANICAL POWER PLAN - ZONE C2 –

405 E-148 OVERALL SECOND FLOOR MECHANICAL POWER PLAN

406 E-149 SECOND FLOOR MECHANICAL POWER PLAN - ZONE A1

407 E-150 SECOND FLOOR MECHANICAL POWER PLAN - ZONE A2

408 E-151 SECOND FLOOR MECHANICAL POWER PLAN - ZONE B2

409 E-152 SECOND FLOOR MECHANICAL POWER PLAN - ZONE C1

410 E-152x SECOND FLOOR MECHANICAL POWER PLAN - ZONE C1

– BID OPTION

411 E-153 SECOND FLOOR MECHANICAL POWER PLAN - ZONE C2

412 E-153x SECOND FLOOR MECHANICAL POWER PLAN - ZONE C2

413 E-154 OVERALL THIRD FLOOR MECHANICAL POWER PLAN

414 E-155 THIRD FLOOR MECHANICAL POWER PLAN - ZONE A1

415 E-156 THIRD FLOOR MECHANICAL FLOOR PLAN - ZONE A2

416 E-157 THIRD FLOOR MECHANICAL POWER PLAN - ZONE B2

417 E-158 THIRD FLOOR MECHANICAL POWER PLAN - ZONE C1

418 E-158x THIRD FLOOR MECHANICAL POWER PLAN - ZONE C1 –

419 E-159 THIRD FLOOR MECHANICAL POWER PLAN - ZONE C2

420 E-159x THIRD FLOOR MECHANICAL POWER PLAN - ZONE C2 –

421 E-401 STAIR PLANS & SECTIONS

422 E-402 STAIR PLANS & SECTIONS

423 E-501 LIGHTING DETAILS 1 R0003 9/21/18

424 E-502 LIGHTING DETAILS 2

425 E-503 GROUNDING DETAILS

426 E-504 LIGHT POLE DETAILS

427 E-505 VAULT & TRANSFORMER DETAILS

428 E-506 ELECTRICAL DETAILS 1

429 E-507 CONTROL DIAGRAMS

430 E-601 ONE-LINE DIAGRAM (480)

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

431 E-602 ONE-LINE DIAGRAM (208)

432 E-603 PANEL SCHEDULES 1

433 E-604 PANEL SCHEDULES 2

434 E-605 PANEL SCHEDULES 3

435 E-606 PANEL SCHEDULES 4

436 E-607 PANEL SCHEDULES 5

437 E-608 PANEL SCHEDULES 6

438 E-609 PANEL SCHEDULES 7

439 E-610 PANEL SCHEDULES 8

440 E-611 PANEL SCHEDULES 9

441 E-612 PANEL SCHEDULES 10

442 E-613 PANEL SCHEDULES 11

443 E-614 PANEL SCHEDULES 12

444 E-615 PANEL SCHEDULES 13

445 E-616 PANEL SCHEDULES 14

446 E-617 PANEL SCHEDULES 15

447 E-618 PANEL SCHEDULES 16

448 E-619 PANEL SCHEDULES 17

449 E-620 PANEL SCHEDULES 18

450 E-621 PANEL SCHEDULES 19

451 E-622 PANEL SCHEDULES 20

452 E-623 PANEL SCHEDULES 21

453 E-624 PANEL SCHEDULES 22

454 E-625 PANEL SCHEDULES 23

455 E-626 PANEL SCHEDULES 24

456 E-627 PANEL SCHEDULES 25

457 E-628 PANEL SCHEDULES 26

458 E-629 PANEL SCHEDULES 27

459 E-630 PANEL SCHEDULES 28

460 E-631 PANEL SCHEDULES 29

461 EF001 FIRE ALARM LEGEND & ABBREVIATIONS R0003 9/21/18

462 EF101 OVERALL FIRST FLOOR FIRE ALARM PLAN

463 EF101x OVERALL FIRST FLOOR FIRE ALARM PLAN – BID

464 EF102 FIRST FLOOR FIRE ALARM PLAN - ZONE A1

465 EF103 FIRST FLOOR FIRE ALARM PLAN - ZONE A2

466 EF104 FIRST FLOOR FIRE ALARM PLAN - ZONE B1

467 EF105 FIRST FLOOR FIRE ALARM PLAN - ZONE B2

468 EF106 FIRST FLOOR FIRE ALARM PLAN - ZONE C1

469 EF106x FIRST FLOOR FIRE ALARM PLAN - ZONE C1 – BID

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

OPTION

470 EF107 FIRST FLOOR FIRE ALARM PLAN - ZONE C2

471 EF107x FIRST FLOOR FIRE ALARM PLAN - ZONE C2 – BID

472 EF108 OVERALL SECOND FLOOR FIRE ALARM PLAN

473 EF108x OVERALL SECOND FLOOR FIRE ALARM PLAN – BID

474 EF109 SECOND FLOOR FIRE ALARM PLAN - ZONE A1

475 EF110 SECOND FLOOR FIRE ALARM PLAN - ZONE A2

476 EF111 SECOND FLOOR FIRE ALARM PLAN - ZONE B2

477 EF112 SECOND FLOOR FIRE ALARM PLAN - ZONE C1

478 EF112x SECOND FLOOR FIRE ALARM PLAN - ZONE C1 – BID

479 EF113 SECOND FLOOR FIRE ALARM PLAN - ZONE C2

480 EF113x SECOND FLOOR FIRE ALARM PLAN - ZONE C2 – BID

481 EF114 OVERALL THIRD FLOOR FIRE ALARM PLAN

482 EF114x OVERALL THIRD FLOOR FIRE ALARM PLAN – BID

483 EF115 THIRD FLOOR FIRE ALARM PLAN - ZONE A1

484 EF116 THIRD FLOOR FIRE ALARM PLAN - ZONE A2

485 EF117 THIRD FLOOR FIRE ALARM PLAN - ZONE B2

486 EF118 THIRD FLOOR FIRE ALARM PLAN - ZONE C1

487 EF118x THIRD FLOOR FIRE ALARM PLAN - ZONE C1 – BID

488 EF119 THIRD FLOOR FIRE ALARM PLAN - ZONE C2

489 EF119x THIRD FLOOR FIRE ALARM PLAN - ZONE C2 – BID

490 EF501 FIRE ALARM DETAILS

491 EF601 FIRE ALARM RISER DIAGRAM

492 EF602 FIRE ALARM MATRIX

TELECOMMUNICATIONS

493 T-001 TELECOMMUNICATIONS NOTES, LEGEND, &

ABBREVIATIONS

494 TD100 TELECOM OVERALL DEMOLITION PLAN

495 TS100 TELECOM OVERALL SITE PLAN

496 TS100x TELECOM OVERALL SITE PLAN – BID OPTION

497 TS101 TELECOM SITE PLAN 1

498 TS101x TELECOM SITE PLAN 1 – BID OPTION

499 TS102 TELECOM SITE PLAN 2

500 T-101 OVERALL FIRST FLOOR TELECOMMUNICATIONS PLAN

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

501 T-102 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE A1

502 T-103 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE A2

503 T-104 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE B1

504 T-105 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE B2

505 T-106 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C1

506 T-106x FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C1

507 T-107 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C2

508 T-107x FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C2

509 T-108 OVERALL SECOND FLOOR TELECOMMUNICATIONS

510 T-109 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

A1

511 T-110 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

A2

512 T-111 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

B2

513 T-112 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

C1

514 T-112x SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

C1 – BID OPTION

515 T-113 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

C2

516 T-113x SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE

C2 – BID OPTION

517 T-114 OVERALL THIRD FLOOR TELECOMMUNICATIONS PLAN

518 T-115 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

A1

519 T-116 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

A2

520 T-117 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

B2

521 T-118 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

C1

522 T-118x THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

C1 – BID OPTION

523 T-119 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

C2

524 T-119x THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE

C2 – BID OPTION

525 T-121 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE A1

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

526 T-122 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE A2

527 T-123 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE B1

528 T-124 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE B2

529 T-125 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE C1

530 T-125x TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE C1 – BID OPTION

531 T-126 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE C2

532 T-126x TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR

PLAN - ZONE C2 – BID OPTION

533 T-127 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

534 T-128 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

535 T-129 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

536 T-130 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

537 T-130x TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

538 T-131 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

539 T-131x TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR

540 T-132 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

541 T-133 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

542 T-134 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

543 T-135 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

544 T-135x TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

545 T-136 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

546 T-136x TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR

547 T-401 TELECOMMUNICATIONS ENLARGED PLANS-1

548 T-402 TELECOMMUNICATIONS ENLARGED PLANS-2

00 73 00-A R0003

SHEET

NUMBER

PLATE

NUMBER TITLE

REVISION

NUMBER

DATE

549 T-403 TELECOMMUNICATIONS ENLARGED PLANS-3

550 T-404 TELECOMMUNICATIONS ENLARGED PLANS-4

551 T-501 TELECOMMUNICATIONS - DETAILS 1

552 T-502 TELECOMMUNICATIONS - DETAILS 2

553 T-503 TELECOMMUNICATIONS - DETAILS 3

554 T-504 TELECOMMUNICATIONS - DETAILS 4

555 T-601 TELECOMMUNICATIONS DIAGRAM-1

556 T-602 TELECOMMUNICATIONS DIAGRAM-2

557 T-603 TELECOMMUNICATIONS GROUNDING DETAIL

558 T-604 CCTV & ACCESS RISER CONTROL DIAGRAM

559 T-605 EXISTING BUTTERFLY DIAGRAM

End of Attachment 00 73 00-A

FY17 SERE Pi pel i ne Dor mi t or y ( 150 r m) 17015 Fai r chi l d AFB, WA W912DW18R0019

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 45 00. 00 10

QUALI TY CONTROL

11/16

PART 1 GENERAL

1. 1 REFERENCES

1. 2 PAYMENT

1. 3 SUBMI TTALS

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

3. 2 CONTRACTOR…