W912DW18R0019_Amendment_0003_SERE_Dorm.pdf
PDF 4 MB Posted
- Attached to
- FY17 SERE Pipeline Dormitory Federal contract opportunity
- Solicitation number
- W912DW18R0019
About this file
W912DW18R0019 Amendment 0003 SERE Dorm
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW18R0019_Amendment_0004_SERE_Dorm.pdf | ||
| W912DW18R0019_-_Amendment_0002.pdf | ||
| SERE_Dorm_Site_Visit_PowerPoint_Slides.pdf | ||
| SERE_Dorm_Site_Visit_Attendees.pdf | ||
| W912DW18R0019_-_Amendment_0001.pdf | ||
| FAFB_SERE_Pipeline_Dorm_SPECS_-_09_Aug_2018.pdf | ||
| RFP__W912DW18R0019_-_SERE_Dorm.pdf | ||
| FY17_PNGJKZ040009_SEREPD-00-COMPILATION-VOL1-CFRTA.pdf | ||
| FY17_PNGJKZ040009_SEREPD-00-COMPILATION-VOL2-CFRTA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW18R0019, Survival, Evasion, Resistance, Escape (SERE) Pipeline Dormitory, Fairchild Air Force Base, Spokane, Washington
(See Continuation Page)
1. CONTRACT ID CODE PAGE OF PAGES
1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW-18-R-0019
X 9B. DATED (SEE ITEM 11)
10-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Sep-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-18-R-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE - 0003
1. This amendment three (0003) provides for the following changes:
a. Revision to General Wage Determination. WA180042, with 9 modifications, dated 21 September 2018 replaces in its entirety, WA180042, with 6 modifications.
b. Revise and replace in its entirety Section 00 11 00 Price Schedule.
c. Revise and reissue two (2) Sepcifications sections.
d. Revise and replace in its entirety twelve (12) modified drawings.
e. Revise and replace in its entirety Section 00 73 00-A Index of Drawings.
2. The proposal submittal time and date of 28 September 2018 at 2:00:00 p.m. LOCAL TIME remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
SECTION 00 10 00 - SOLICITATION
The following have been modified:
PRICE SCHEDULE
PRICE SCHEDULE
CLIN
Item # Description of Item Quantity Unit Unit Price Amount
BASE ITEMS
0001 All work for construction of SERE Pipeline Dormitory including all associated site work within 5-feet of the building.
1 JOB N/A $____________________
0002 All work for site preparation including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.
0003 All work for O&M manuals as specified in
Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.
1 JOB N/A $75,000
0004 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $30,000
All work for DD 1354 as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $15,000
TOTAL ALL BASE ITEMS 0001 - 0005 $________________________
OPTIONAL ITEMS
0006 All work for construction of Optional Wing. See note #6.
0007 All work for construction of the drill pad.
See note #7.
CLIN
Item # Description of Item Quantity Unit Unit Price Amount 0008 All work for Furnishings, Fixtures, and
Equipment (FF&E) for Base Item #0001.
See note #8.
0009 All work for Furnishings, Fixtures, and
Equipment (FF&E) for Optional Item #0006. See note #8.
TOTAL ALL OPTION ITEMS 0006 - 0009 $________________________
TOTAL ALL ITEMS 0001 - 0009 $________________________
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all amendments to proposals shall be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
3) Offerors must insert a price on all entry amount lines of numbered items of the Price Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amounts established in Item #0003, #0004, and #0005 shall not be revised by Offerors.
5) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph OPTION FOR INCREASED QUANTITY.
6) See Section 01 23 00 ALTERNATES for more information and detailed descriptions of the work for Optional Item #0006.
7) Please refer to drawing CS101 for additional information.
8) Please refer to Interiors Drawings for additional information.
END PRICE SCHEDULE
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION WA42
General Decision Number: WA180042 09/21/2018 WA42
Superseded General Decision Number: WA20170042
State: Washington
Construction Type: Building
County: Spokane County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/23/2018 3 03/16/2018 4 04/27/2018 5 06/29/2018 6 08/10/2018 7 08/24/2018 8 09/14/2018 9 09/21/2018
ASBE0082-001 08/01/2018
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 36.67 19.75
BRWA0001-002 06/01/2017
Rates Fringes
BRICKLAYER.......................$ 39.46 16.15
CARP0004-011 06/01/2017
Rates Fringes
CARPENTER (Excluding Acoustical ceiling, Drywall Hanging and Form Work)...........$ 27.76 16.14
ZONE PAY:
ZONE 1 0-45 MILES FREE
ZONE 2 46-65 MILES $2.00/PER HOUR
ZONE 3 66-100 MILES $3.00/PER HOUR
ZONE 4 OVER 100 MILES $4.50/PER HOUR
DISPATCH POINTS:
CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
HAZMAT PROJECTS:
Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:
LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.
LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.
ELEC0073-003 01/01/2018
Rates Fringes
ELECTRICIAN......................$ 33.25 18.40
ELEC0073-010 08/01/2018
Rates Fringes
ELECTRICIAN (Sound Equipment Installation Only)...............$ 26.74 15.89
ENGI0370-017 06/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 27.51 15.95
GROUP 2.....................$ 27.83 15.95
GROUP 3.....................$ 28.44 15.95
GROUP 4.....................$ 28.60 15.95
GROUP 5.....................$ 28.76 15.95
GROUP 6.....................$ 29.04 15.95
GROUP 7.....................$ 29.31 15.95
GROUP 8.....................$ 30.41 15.95
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Compactor; Drill Oiler; Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Drills (churn, core, calyx or diamond); Oiler;
Loaders (overhead & front-end, under 4 yds. R/T); Vacuum
Drill (reverse circulation drill under 8 inch bit)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.
incl. 8 yds.); Scrapers, all, rubber-tired; Screed Operator
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers); Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2018
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 33.18 27.82
* LABO0238-014 06/01/2018
Rates Fringes
LABORER: Mason Tender - Brick...$ 27.75 12.25
* LABO0238-024 06/01/2018
Rates Fringes
LABORER
GROUP 1.....................$ 24.74 12.45
GROUP 2.....................$ 26.84 12.45
GROUP 3.....................$ 27.11 12.45
GROUP 4.....................$ 27.38 12.45
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagman
GROUP 2: Common or General Laborer; Form-Stripping
GROUP 3: Chipping Guns; Concrete Saw; Pipelayer
GROUP 4: Asphalt Raker; Grade Checker; Gunite; Vibrating Plate
PAIN0054-001 06/01/2008
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 22.78 8.88
PAIN0054-002 07/01/2018
Rates Fringes
GLAZIER..........................$ 21.68 8.81
PAIN0054-004 10/01/2005
Rates Fringes
FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22
PLAS0072-006 06/01/2018
Rates Fringes
PLASTERER........................$ 29.07 14.13
Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0-45 radius miles from the main post office
Zone 2: Over 45 radius miles from the main post office
PLUM0044-001 06/01/2017
Rates Fringes
Plumbers and Pipefitters.........$ 40.41 17.74
ROOF0189-013 07/01/2018
Rates Fringes
ROOFER (Including Tearoff).......$ 27.48 12.73
SHEE0066-007 06/01/2013
Rates Fringes
Sheet metal worker (Includes HVAC DUCT and Metal Roof Installation)....................$ 28.25 17.22
TEAM0690-008 06/01/2017
Rates Fringes
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1: LEWISTON ZONE
CENTER
GROUP 3....................$ 26.07 17.30
GROUP 4....................$ 26.40 17.30
GROUP 5....................$ 26.51 17.30
GROUP 6....................$ 26.67 17.30
GROUP 7....................$ 27.21 17.30
GROUP 8....................$ 27.53 17.30
ZONE 1: PASCO ZONE CENTER
GROUP 3....................$ 26.07 17.30
GROUP 4....................$ 26.40 17.30
GROUP 5....................$ 26.51 17.20
GROUP 6....................$ 26.67 17.30
GROUP 7....................$ 27.21 17.30
GROUP 8....................$ 27.53 17.30
ZONE 1: SPOKANE ZONE CENTER
GROUP 3....................$ 26.07 17.30
GROUP 4....................$ 26.40 17.30
GROUP 5....................$ 26.51 17.30
GROUP 6....................$ 26.67 17.30
GROUP 7....................$ 27.21 17.30
GROUP 8....................$ 27.53 17.30
Zone Differential For ZONE 2: ( Zone 1 +$2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office
Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 3: Trucks, side, end, bottom and articulated end dump (3 yards to and including 6 yds.)
GROUP 4: Trucks, side, end, bottom and articulated end dump (over 6 yds. to & including 12 yds.)
GROUP 5: Trucks, side, end, bottom and articulated end dump (over 12 yds. to & including 20 yds.)
GROUP 6: Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.)
GROUP 7: Truck, side, end, bottom and articulated end dump (over 40 yds. to & including 100 yds.)
GROUP 8: Trucks, side, end, bottom and articulated end dump (over 100 yds.)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-030 05/22/2009
Rates Fringes
CARPENTER (Acoustical Ceiling Installation Only)...............$ 18.00 1.43
CARPENTER (Drywall Hanging Only)............................$ 20.62 0.00
CARPENTER (Form Work Only).......$ 18.63 2.65
LABORER: Handheld Drill.........$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 11.48 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 9.00 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.31 0.00
OPERATOR: Concrete Pumper.......$ 22.30 5.27
OPERATOR: Mechanic..............$ 24.33 4.33
PAINTER: Brush Only.............$ 13.00 0.50
PAINTER: Roller.................$ 22.62 0.25
PAINTER: Spray..................$ 22.47 0.00
TILE SETTER......................$ 14.83 0.00
TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
FAFB SERE Pipeline Dormitory (150 rm) 17015 Fairchild AFB, WA W912DW18R0019
00 73 00-A R0003
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING NO. 236s/721-14-01, DATED 13 July 2018
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
GENERAL
1 G-001 TITLE, LOCATION, & VICINITY MAPS
2 G-002 DRAWING INDEX 1
3 G-003 DRAWING INDEX 2
GEOTECHNICAL
4 B-101 BORING LOCATIONS
5 B-201 SOIL DESCRIPTION & LOG KEYS
6 B-301 BORING LOGS - TEST PITS - TP-16-TP-01 & TP-16-TP-02
& BORING LOGS B-16-MRRC-01
7 B-302 BORING LOGS - B-16-MR-02
8 B-303 BORING LOGS - B-16-MR-03
9 B-304 BORING LOGS - B-16-MRRC-04
CIVIL
10 C-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES R0001 8/22/18
11 C-002 HAUL ROUTES R0001 8/22/18
12 CX101 EXISTING CONDITIONS
13 CX102 DEMOLITION PLAN R0001 8/22/18
14 CS101 GENERAL SITE PLAN R0001 8/22/18
15 CS101x GENERAL SITE PLAN - BID OPTION R0001 8/22/18
16 CS102 SITE PLAN
17 CS102x SITE PLAN - BID OPTION
18 CP101 JOINT LAYOUT OVERALL PLAN R0001 8/22/18
19 CP101x JOINT LAYOUT OVERALL PLAN - BID OPTION R0001 8/22/18
20 CP102 JOINT LAYOUT PLAN
21 CP103 PAVEMENT JOINT DETAILS
22 CP104 DRILL PAD OPTION JOINT DETAILS
23 CP105 PAVEMENT & DRILL PAD OPTION REINFORCEMENT
DETAILS
24 CG101 GRADING PLAN R0003 9/21/18
25 CG101x GRADING PLAN - BID OPTION R0003 9/21/18
26 CU101 UTILITIES PLAN R0001 8/22/18
27 CU101x UTILITIES PLAN - BID OPTION R0001 8/22/18
28 CU102 STORMWATER PLAN
29 CU102x STORMWATER PLAN - BID OPTION
30 C-301 SECTIONS 1
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
31 C-302 SECTIONS 2
32 C-302x SECTIONS 2 - BID OPTION
33 C-303 SANITARY SEWER PLAN AND PROFILE
34 C-304 STORMWATER PLAN AND PROFILE
35 C-304x STORMWATER PLAN AND PROFILE - BID OPTION
36 C-501 WATER DETAILS
37 C-502 SANITARY SEWER DETAILS
38 C-503 STORMWATER DETAILS
39 C-504 MISCELLANEOUS DETAILS 1
40 C-505 MISCELLANEOUS DETAILS 2
41 C-506 PAVEMENT DETAILS
42 C-507 SECTIONS & SIDEWALK
LANDSCAPE
43 L-101 LANDSCAPE SITE PLAN
44 L-101x LANDSCAPE SITE PLAN - BID OPTION
STRUCTURAL
45 S-001 GENERAL STRUCTURAL NOTES
46 S-002 GENERAL STRUCTURAL NOTES
47 S-101 OVERALL FOUNDATION PLAN
48 S-101x OVERALL FOUNDATION PLAN - BID OPTION
49 S-102 FOUNDATION PLAN - ZONES A & B R0003 9/21/18
50 S-103 FOUNDATION PLAN - ZONE C R0003 9/21/18
51 S-103x FOUNDATION PLAN - ZONE C - BID OPTION R0003 9/21/18
52 S-104 OVERALL SLAB ON GRADE PLAN
53 S-104x OVERALL SLAB ON GRADE PLAN - BID OPTION
54 S-105 OVERALL SECOND FLOOR FRAMING PLAN
55 S-105x OVERALL SECOND FLOOR FRAMING PLAN - BID
OPTION
56 S-106 SECOND FLOOR FRAMING PLAN - ZONES A & B
57 S-107 SECOND FLOOR FRAMING PLAN - ZONE C
58 S-107x SECOND FLOOR FRAMING PLAN - ZONE C - BID
59 S-108 OVERALL THIRD FLOOR FRAMING PLAN
60 S-108x OVERALL THIRD FLOOR FRAMING PLAN - BID OPTION
61 S-109 THIRD FLOOR FRAMING PLAN - ZONES A & B
62 S-110 THIRD FLOOR FRAMING PLAN - ZONE C
63 S-110x THIRD FLOOR FRAMING PLAN - ZONE C - BID OPTION
64 S-111 GEAR STORAGE BUILDING ROOF FRAMING PLAN
65 S-112 OVERALL ATTIC FLOOR FRAMING PLAN
66 S-112x OVERALL ATTIC FLOOR FRAMING PLAN - BID OPTION
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
67 S-113 ATTIC FLOOR FRAMING PLAN - ZONES A & B
68 S-114 ATTIC FLOOR FRAMING PLAN - ZONE C
69 S-114x ATTIC FLOOR FRAMING PLAN - ZONE C - BID OPTION
70 S-115 OVERALL HIGH ROOF FRAMING PLAN
71 S-115x OVERALL HIGH ROOF FRAMING PLAN - BID OPTION
72 S-116 OVERALL SECOND AND THIRD FLOOR PLAN -
PROGRESSIVE COLLAPSE PREVENTION
73 S-116x OVERALL SECOND AND THIRD FLOOR PLAN -
PROGRESSIVE COLLAPSE PREVENTION - BID OPTION
74 S-117 OVERALL ATTIC FLOOR PLAN - PROGRESSIVE COLLAPSE
PREVENTION
75 S-117x OVERALL ATTIC FLOOR PLAN - PROGRESSIVE COLLAPSE
PREVENTION - BID OPTION
76 S-161 DUMPSTER ENCLOSURE - FOUNDATION PLAN
77 S-201 DORMITORY FRAMING ELEVATIONS
78 S-202 DORMITORY FRAMING ELEVATIONS
79 S-203 DORMITORY FRAMING ELEVATIONS
80 S-204 DORMITORY FRAMING ELEVATIONS
81 S-205 GEAR STORAGE FRAMING ELEVATIONS
82 S-206 GEAR STORAGE FRAMING ELEVATIONS
83 S-301 FOUNDATION SECTIONS
84 S-302 COMBINED FOUNDATIONS SECTIONS
85 S-303 COMBINED FOUNDATIONS SECTIONS
86 S-304 ROOF FRAMING SECTIONS
87 S-305 WALL SECTIONS & DETAILS
88 S-401 ENLARGED PLANS - MECHANICAL PLATFORM
89 S-402 ENLARGED PLANS - DORMITORY ENTRANCE
90 S-403 ENLARGED PLANS - DORMITORY ENTRANCE
91 S-501 TYPICAL FOUNDATION DETAILS
92 S-502 TYPICAL FOUNDATION DETAILS
93 S-503 TYPICAL STEEL DETAILS
94 S-504 DORMITORY DETAILS
95 S-505 DORMITORY DETAILS
96 S-506 DORMITORY DETAILS
97 S-507 DORMITORY DETAILS
98 S-508 DORMITORY DETAILS
99 S-509 DORMITORY DETAILS
100 S-510 DORMITORY DETAILS
101 S-511 DORMITORY DETAILS
102 S-512 DORMITORY DETAILS
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
103 S-513 GEAR STORAGE BUILDING DETAILS
104 S-514 GEAR STORAGE BUILDING DETAILS
105 S-515 GEAR STORAGE BUILDING DETAILS
106 S-516 GEAR STORAGE BUILDING DETAILS
107 S-517 GEAR STORAGE BUILDING DETAILS
108 S-518 FLOOR FRAMING DETAILS
109 S-519 ROOF FRAMING DETAILS
110 S-520 AT/FP ELEVATIONS & DETAILS
111 S-521 PROGRESSIVE COLLAPSE DETAILS
112 S-601 FRAMING SCHEDULES
113 S-701 WIND DIAGRAMS
114 S-702 WIND DIAGRAMS
115 S-703 SNOW DIAGRAMS
116 S-704 SNOW DIAGRAMS
ARCHITECTURAL
117 A-001 ABBREVIATIONS, SYMBOLS, & GENERAL NOTES
118 A-002 CODE SUMMARY
119 A-003 FIRST FLOOR LIFE SAFETY PLAN
120 A-004 SECOND FLOOR LIFE SAFETY PLAN
121 A-005 AIR BARRIER PLANS & SECTIONS
122 A-006 AIR BARRIER CONSTRUCTION METHODS
123 A-007 AIR BARRIER EXTENTS - DETAILS
124 A-008 FIRE STOPPING DETAILS
125 A-009 FIRE STOPPING DETAILS
126 A-010 FIRE STOPPING DETAILS
127 A-101 OVERALL FIRST FLOOR PLAN
128 A-101x OVERALL FIRST FLOOR PLAN – BID OPTION
129 A-102 FIRST FLOOR PLAN - ZONES A & B R0003 9/21/18
130 A-103 FIRST FLOOR PLAN - ZONE C
131 A-103x FIRST FLOOR PLAN - ZONE C – BID OPTION
132 A-104 OVERALL SECOND FLOOR PLAN
133 A-104x OVERALL SECOND FLOOR PLAN – BID OPTION
134 A-105 SECOND FLOOR PLAN - ZONE A & B
135 A-106 SECOND FLOOR PLAN - ZONE C
136 A-106x SECOND FLOOR PLAN - ZONE C – BID OPTION
137 A-107 OVERALL THIRD FLOOR PLAN
138 A-107x OVERALL THIRD FLOOR PLAN – BID OPTION
139 A-108 THIRD FLOOR PLAN - ZONE A & B
140 A-109 THIRD FLOOR PLAN - ZONE C
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
141 A-109x THIRD FLOOR PLAN - ZONE C – BID OPTION
142 A-110 ATTIC FLOOR PLAN
143 A-110x ATTIC FLOOR PLAN – BID OPTION
144 A-111 FIRST FLOOR REFLECTED CEILING PLAN
145 A-111x FIRST FLOOR REFLECTED CEILING PLAN – BID OPTION
146 A-112 FIRST FLOOR REFLECTED CEILING PLAN - ZONE A & B
147 A-113 FIRST FLOOR REFLECTED CEILING PLAN - ZONE C
148 A-113x FIRST FLOOR REFLECTED CEILING PLAN - ZONE C – BID
149 A-114 SECOND FLOOR REFLECTED CEILING PLAN
150 A-114x SECOND FLOOR REFLECTED CEILING PLAN – BID
151 A-115 SECOND FLOOR REFLECTED CEILING PLAN - ZONE A &
B
152 A-116 SECOND FLOOR REFLECTED CEILING PLAN - ZONE C
153 A-116x SECOND FLOOR REFLECTED CEILING PLAN - ZONE C –
BID OPTION
154 A-117 THIRD FLOOR REFLECTED CEILING PLAN
155 A-117x THIRD FLOOR REFLECTED CEILING PLAN – BID OPTION
156 A-118 THIRD FLOOR REFLECTED CEILING PLAN - ZONE A & B R0003 9/21/18
157 A-119 THIRD FLOOR REFLECTED CEILING PLAN - ZONE C R0003 9/21/18
158 A-119x THIRD FLOOR REFLECTED CEILING PLAN - ZONE C – BID
OPTION
R0003 9/21/18
159 A-121 ROOF PLAN
160 A-121x ROOF PLAN – BID OPTION
161 A-122 DUMPSTER ENCLOSURE - PLANS, ELEVATIONS, &
SECTIONS
162 A-201 OVERALL BUILDING ELEVATIONS - NORTH & SOUTH
163 A-202 OVERALL BUILDING ELEVATIONS - EAST & WEST
164 A-203 PARTIAL BUILDING ELEVATIONS
165 A-203x PARTIAL ELEVATIONS - ZONE C - BID OPTION
166 A-301 OVERALL BUILDING SECTIONS
167 A-310 WALL SECTIONS
168 A-311 WALL SECTIONS
169 A-312 WALL SECTIONS
170 A-401 ENLARGED PLANS R0003 9/21/18
171 A-402 ENLARGED PLANS
172 A-403 ENLARGED PLANS - STAIRS
173 A-404 ENLARGED PLANS - STAIRS
174 A-501 BUILDING DETAILS R0003 9/21/18
175 A-502 BUILDING DETAILS - PLAN
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
176 A-503 BUILDING DETAILS - CEILINGS
177 A-504 BUILDING DETAILS - CEILINGS
178 A-505 BUILDING DETAILS - ROOF R0003 9/21/18
179 A-506 BUILDING DETAILS - ROOF
180 A-507 BUILDING DETAILS - STAIRS
181 A-601 EXTERIOR WALL, ROOF, FLOOR, & CEILING TYPES R0003 9/21/18
182 A-602 INTERIOR WALL TYPES R0003 9/21/18
183 A-603 INTERIOR STUD DETAILS & EXTERIOR FINISH PROFILES
184 A-604 OPENING SCHEDULE & DETAILS
185 A-604x OPENING SCHEDULE - OPTION
186 A-605 TYPICAL OPENING DETAILS
187 A-606 TYPICAL OPENING DETAILS
188 A-607 TYPICAL OPENING DETAILS
189 A-608 TYPICAL OPENING DETAILS
190 A-609 LOUVER DETAILS
191 A-901 PERSPECTIVE VIEWS
GENERAL – VOLUME 2 OF 2
192 G-XX1 TITLE, LOCATION AND VICINITY MAPS
193 G-XX2 DRAWING INDEX 1
194 G-XX3 DRAWING INDEX 2
INTERIORS
195 IF-101 OVERALL FIRST FLOOR FURNITURE & EQUIPMENT
PLAN
196 IF-101x OVERALL FIRST FLOOR FURNITURE & EQUIPMENT
PLAN – BID OPTION
197 IF-102 FIRST FLOOR FURNITURE PLAN - ZONE A & B
198 IF-103 FIRST FLOOR FURNITURE PLAN - ZONE C
199 IF-103x FIRST FLOOR FURNITURE PLAN - ZONE C – BID OPTION
200 IF-104 OVERALL SECOND FLOOR FURNITURE & EQUIPMENT
201 IF-104x OVERALL SECOND FLOOR FURNITURE & EQUIPMENT
202 IF-105 SECOND FLOOR FURNITURE PLAN - ZONE A & B
203 IF-106 SECOND FLOOR FURNITURE PLAN - ZONE C
204 IF-106x SECOND FLOOR FURNITURE PLAN - ZONE C – BID
205 IF-107 OVERALL THIRD FLOOR FURNITURE & EQUIPMENT
206 IF-107x OVERALL THIRD FLOOR FURNITURE & EQUIPMENT
207 IF-108 THIRD FLOOR FURNITURE PLAN - ZONE A & B
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
208 IF-109 THIRD FLOOR FURNITURE PLAN - ZONE C
209 IF-109x THIRD FLOOR FURNITURE PLAN - ZONE C – BID
210 IF-110 ENLARGED FURNITURE PLANS
211 IN-101 FIRST FLOOR ELEMENTS PLAN - ZONE A & B R0001 8/22/18
212 IN-102 FIRST FLOOR ELEMENTS PLAN - ZONE C R0001 8/22/18
213 IN-102x FIRST FLOOR ELEMENTS PLAN - ZONE C – BID OPTION R0001 8/22/18
214 IN-103 SECOND FLOOR ELEMENTS PLAN - ZONE A & B R0001 8/22/18
215 IN-104 SECOND FLOOR ELEMENTS PLAN - ZONE C R0001 8/22/18
216 IN-104x SECOND FLOOR ELEMENTS PLAN - ZONE C – BID
OPTION
R0001 8/22/18
217 IN-105 THIRD FLOOR ELEMENTS PLAN - ZONE A & B R0001 8/22/18
218 IN-106 THIRD FLOOR ELEMENTS PLAN - ZONE C R0001 8/22/18
219 IN-106x THIRD FLOOR ELEMENTS PLAN - ZONE C – BID OPTION R0001 8/22/18
220 IN-201 INTERIOR ELEVATIONS
221 IN-202 INTERIOR ELEVATIONS
222 IN-203 INTERIOR ELEVATIONS
223 IN-401 ENLARGED PLANS
224 IN-402 ENLARGED PLANS
225 IN-501 RESTROOM DETAILS
226 IN-502 INTERIOR DETAILS
227 IN-503 CASEWORK DETAILS
228 IN-504 CASEWORK DETAILS
229 IN-505 CASEWORK DETAILS
230 IN-506 LAUNDRY TABLE DETAILS
231 IN-601 FINISH LEGEND
232 IN-701 FIRST FLOOR FINISH PLAN ZONE A & B
233 IN-702 FIRST FLOOR FINISH PLAN ZONE C
234 IN-702x FIRST FLOOR FINISH PLAN ZONE C – BID OPTION
235 IN-703 SECOND FLOOR FINISH PLAN ZONE A & B
236 IN-704 SECOND FLOOR FINISH PLAN ZONE C
237 IN-704x SECOND FLOOR FINISH PLAN ZONE C – BID OPTION
238 IN-705 THIRD FLOOR FINISH PLAN ZONE A & B
239 IN-706 THIRD FLOOR FINISH PLAN ZONE C
240 IN-706x THIRD FLOOR FINISH PLAN ZONE C – BID OPTION
241 IN-707 INTERIOR FLOOR FINISH DETAILS
242 IN-708 INTERIOR FLOOR FINISH DETAILS
243 IN-801 INTERIOR SIGNAGE DETAILS
244 IN-802 INTERIOR SIGNAGE SCHEDULE
245 IN-802x INTERIOR SIGNAGE SCHEDULE – BID OPTION
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
FIRE PROTECTION
246 FX101 FIRST FLOOR HAZARD CATEGORY PLAN
247 FX101x FIRST FLOOR HAZARD CATEGORY PLAN – BID OPTION
248 FX102 SECOND FLOOR HAZARD CATEGORY PLAN
249 FX102x SECOND FLOOR HAZARD CATEGORY PLAN – BID
250 FX103 THIRD FLOOR HAZARD CATEGORY PLAN
251 FX103x THIRD FLOOR HAZARD CATEGORY PLAN – BID OPTION
252 FX111 FIRST FLOOR SPRINKLER PAN
253 FX111x FIRST FLOOR SPRINKLER PAN – BID OPTION
254 FX112 SECOND FLOOR SPRINKLER PLAN
255 FX112x SECOND FLOOR SPRINKLER PLAN – BID OPTION
256 FX113 THIRD FLOOR SPRINKLER PLAN
257 FX113x THIRD FLOOR SPRINKLER PLAN – BID OPTION
258 FX201 STAIRWELL RISER
259 FX202 RISER ROOM ELEVATION VIEW
260 FX203 RISER ROOM PLAN VIEW
261 FX204 1ST, 2ND, & 3RD FLOOR FEED MAIN ROUTING
262 FX205 GEAR STORAGE SOUTH
PLUMBING
263 P-001 PLUMBING LEGEND
264 P-101 OVERALL FIRST FLOOR SANITARY PLAN
265 P-102 FIRST FLOOR SANITARY PLAN - ZONE A & B
266 P-103 FIRST FLOOR SANITARY PLAN - ZONE C
267 P-103x FIRST FLOOR SANITARY PLAN - ZONE C – BID OPTION
268 P-104 OVERALL SECOND FLOOR SANITARY PLAN
269 P-105 SECOND FLOOR SANITARY PLAN - ZONE A & B
270 P-106 SECOND FLOOR SANITARY PLAN - ZONE C
271 P-106x SECOND FLOOR SANITARY PLAN - ZONE C – BID
272 P-107 OVERALL THIRD FLOOR SANITARY PLAN
273 P-108 THIRD FLOOR SANITARY PLAN - ZONE A & B
274 P-109 THIRD FLOOR SANITARY PLAN - ZONE C
275 P-109x THIRD FLOOR SANITARY PLAN - ZONE C – BID OPTION
276 P-110 OVERALL FIRST FLOOR DOMESTIC PLAN
277 P-111 FIRST FLOOR DOMESTIC PLAN - ZONE A & B
278 P-112 FIRST FLOOR DOMESTIC PLAN - ZONE C
279 P-112x FIRST FLOOR DOMESTIC PLAN - ZONE C – BID OPTION
280 P-113 OVERALL SECOND FLOOR DOMESTIC PLAN
281 P-114 SECOND FLOOR DOMESTIC PLAN - ZONE A & B
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
282 P-115 SECOND FLOOR DOMESTIC PLAN - ZONE C
283 P-115x SECOND FLOOR DOMESTIC PLAN - ZONE C – BID
284 P-116 OVERALL THIRD FLOOR DOMESTIC PLAN
285 P-117 THIRD FLOOR DOMESTIC PLAN - ZONE A & B
286 P-118 THIRD FLOOR DOMESTIC PLAN - ZONE C
287 P-118x THIRD FLOOR DOMESTIC PLAN - ZONE C – BID OPTION
288 P-119 OVERALL FIRST FLOOR NATURAL GAS PLAN
289 P-120 FIRST FLOOR NATURAL GAS PLAN - ZONE A & B
290 P-121 FIRST FLOOR NATURAL GAS PLAN - ZONE C
291 P-122 OVERALL SECOND FLOOR NATURAL GAS PLAN
292 P-123 SECOND FLOOR NATURAL GAS PLAN - ZONE A & B
293 P-124 SECOND FLOOR NATURAL GAS PLAN - ZONE C
294 P-125 OVERALL THIRD FLOOR NATURAL GAS PLAN
295 P-126 THIRD FLOOR NATURAL GAS PLAN - ZONE A & B
296 P-127 THIRD FLOOR NATURAL GAS PLAN - ZONE C
297 P-301 PLUMBING SECTION - I
298 P-302 PLUMBING SECTION - II
299 P-303 PLUMBING SECTION - III
300 P-401 DORM ROOM SANITARY VIEWS
301 P-402 DORM ROOM DOMESTIC VIEWS
302 P-403 PUBLIC BATHROOMS SANITARY VIEWS
303 P-404 FIRST FLOOR LAUNDRY ROOM VIEWS
304 P-405 SECOND FLOOR LAUNDRY ROOM VIEWS
305 P-406 THIRD FLOOR LAUNDRY ROOM VIEWS
306 P-407 MECH ROOM VIEWS
307 P-501 PLUMBING DETAIL - I
308 P-502 PLUMBING DETAIL - II
309 P-601 PLUMBING SCHEDULES
310 P-601x PLUMBING SCHEDULES – BID OPTION
311 P-901 NATURAL GAS ISOMETRIC VIEW
MECHANICAL
312 M-001 HVAC LEGEND
313 M-101 OVERALL FIRST FLOOR HVAC PLAN
314 M-102 FIRST FLOOR HVAC PLAN - ZONE A & B
315 M-103 FIRST FLOOR HVAC PLAN - ZONE C
316 M-103x FIRST FLOOR HVAC PLAN - ZONE C – BID OPTION
317 M-104 OVERALL SECOND FLOOR HVAC PLAN
318 M-105 SECOND FLOOR HVAC PLAN - ZONE A & B
319 M-106 SECOND FLOOR HVAC PLAN - ZONE C
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
320 M-106x SECOND FLOOR HVAC PLAN - ZONE C – BID OPTION
321 M-107 OVERALL THIRD FLOOR HVAC PLAN
322 M-108 THIRD FLOOR HVAC PLAN - ZONE A & B
323 M-109 THIRD FLOOR HVAC PLAN - ZONE C
324 M-109x THIRD FLOOR HVAC PLAN - ZONE C – BID OPTION
325 M-301 HVAC BUILDING SECTION
326 M-401 HVAC ENLARGED PLANS
327 M-402 ENLARGED DORM ROOM MECHANICAL PLANS
328 M-501 HVAC DETAILS - I
329 M-502 HVAC DETAILS - II
330 M-601 HVAC SCHEDULES
331 M-601x HVAC SCHEDULES – BID OPTION
332 M-700 CONTROLS LEGEND
333 M-701 CONTROLS POINTS SCHEDULE INSTRUCTIONS
334 M-702 HVAC CONTROLS - I
335 M-703 HVAC CONTROLS - II
336 M-704 HVAC POINTS SCHEDULE
ELECTRICAL
337 E-001 ELECTRICAL NOTES, LEGEND, & ABBREVIATIONS
338 ED100 ELECTRICAL OVERALL DEMOLITION PLAN
339 ES100 ELECTRICAL OVERALL SITE PLAN
340 ES100x ELECTRICAL OVERALL SITE PLAN – BID OPTION
341 ES101 ELECTRICAL SITE PLAN 1
342 ES101x ELECTRICAL SITE PLAN 1 – BID OPTION
343 ES102 ELECTRICAL SITE PLAN 2
344 EG101 GROUNDING SITE PLAN
345 EG101x GROUNDING SITE PLAN – BID OPTION
346 E-101 OVERALL FIRST FLOOR LIGHTING PLAN
347 E-102 FIRST FLOOR LIGHTING PLAN - ZONE A1
348 E-103 FIRST FLOOR LIGHTING PLAN - ZONE A2
349 E-104 FIRST FLOOR LIGHTING PLAN - ZONE B1
350 E-105 FIRST FLOOR LIGHTING PLAN - ZONE B2
351 E-106 FIRST FLOOR LIGHTING PLAN - ZONE C1
352 E-106x FIRST FLOOR LIGHTING PLAN - ZONE C1 – BID OPTION
353 E-107 FIRST FLOOR LIGHTING PLAN - ZONE C2
354 E-107x FIRST FLOOR LIGHTING PLAN - ZONE C2 – BID OPTION
355 E-108 OVERALL SECOND FLOOR LIGHTING PLAN
356 E-109 SECOND FLOOR LIGHTING PLAN - ZONE A1
357 E-110 SECOND FLOOR LIGHTING PLAN - ZONE A2
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
358 E-111 SECOND FLOOR LIGHTING PLAN - ZONE B2
359 E-112 SECOND FLOOR LIGHTING PLAN - ZONE C1
360 E-112x SECOND FLOOR LIGHTING PLAN - ZONE C1 – BID
361 E-113 SECOND FLOOR LIGHTING PLAN - ZONE C2
362 E-113x SECOND FLOOR LIGHTING PLAN - ZONE C2 – BID
363 E-114 OVERALL THIRD FLOOR LIGHTING PLAN
364 E-115 THIRD FLOOR LIGHTING PLAN - ZONE A1
365 E-116 THIRD FLOOR LIGHTING PLAN - ZONE A2
366 E-117 THIRD FLOOR LIGHTING PLAN - ZONE B2
367 E-118 THIRD FLOOR LIGHTING PLAN - ZONE C1
368 E-118x THIRD FLOOR LIGHTING PLAN - ZONE C1 – BID OPTION
369 E-119 THIRD FLOOR LIGHTING PLAN - ZONE C2
370 E-119x THIRD FLOOR LIGHTING PLAN - ZONE C2 – BID OPTION
371 E-121 OVERALL FIRST FLOOR POWER PLAN
372 E-122 FIRST FLOOR POWER PLAN - ZONE A1
373 E-123 FIRST FLOOR POWER PLAN - ZONE A2
374 E-124 FIRST FLOOR POWER PLAN - ZONE B1
375 E-125 FIRST FLOOR POWER PLAN - ZONE B2
376 E-126 FIRST FLOOR POWER PLAN - ZONE C1
377 E-126x FIRST FLOOR POWER PLAN - ZONE C1 – BID OPTION
378 E-127 FIRST FLOOR POWER PLAN - ZONE C2
379 E-127x FIRST FLOOR POWER PLAN - ZONE C2 – BID OPTION
380 E-128 OVERALL SECOND FLOOR POWER PLAN
381 E-129 SECOND FLOOR POWER PLAN - ZONE A1
382 E-130 SECOND FLOOR POWER PLAN - ZONE A2
383 E-131 SECOND FLOOR POWER PLAN - ZONE B2
384 E-132 SECOND FLOOR POWER PLAN - ZONE C1
385 E-132x SECOND FLOOR POWER PLAN - ZONE C1 – BID OPTION
386 E-133 SECOND FLOOR POWER PLAN - ZONE C2
387 E-133x SECOND FLOOR POWER PLAN - ZONE C2 – BID OPTION
388 E-134 OVERALL THIRD FLOOR POWER PLAN
389 E-135 THIRD FLOOR POWER PLAN - ZONE A1
390 E-136 THIRD FLOOR POWER PLAN - ZONE A2
391 E-137 THIRD FLOOR POWER PLAN - ZONE B2
392 E-138 THIRD FLOOR POWER PLAN - ZONE C1
393 E-138x THIRD FLOOR POWER PLAN - ZONE C1 – BID OPTION
394 E-139 THIRD FLOOR POWER PLAN - ZONE C2
395 E-139x THIRD FLOOR POWER PLAN - ZONE C2 – BID OPTION
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
396 E-141 OVERALL FIRST FLOOR MECHANICAL POWER PLAN
397 E-142 FIRST FLOOR MECHANICAL POWER PLAN - ZONE A1
398 E-143 FIRST FLOOR MECHANICAL POWER PLAN - ZONE A2
399 E-144 FIRST FLOOR MECHANICAL POWER PLAN - ZONE B1
400 E-145 FIRST FLOOR MECHANICAL POWER PLAN - ZONE B2
401 E-146 FIRST FLOOR MECHANICAL POWER PLAN - ZONE C1
402 E-146x FIRST FLOOR MECHANICAL POWER PLAN - ZONE C1 –
403 E-147 FIRST FLOOR MECHANICAL POWER PLAN - ZONE C2
404 E-147x FIRST FLOOR MECHANICAL POWER PLAN - ZONE C2 –
405 E-148 OVERALL SECOND FLOOR MECHANICAL POWER PLAN
406 E-149 SECOND FLOOR MECHANICAL POWER PLAN - ZONE A1
407 E-150 SECOND FLOOR MECHANICAL POWER PLAN - ZONE A2
408 E-151 SECOND FLOOR MECHANICAL POWER PLAN - ZONE B2
409 E-152 SECOND FLOOR MECHANICAL POWER PLAN - ZONE C1
410 E-152x SECOND FLOOR MECHANICAL POWER PLAN - ZONE C1
– BID OPTION
411 E-153 SECOND FLOOR MECHANICAL POWER PLAN - ZONE C2
412 E-153x SECOND FLOOR MECHANICAL POWER PLAN - ZONE C2
413 E-154 OVERALL THIRD FLOOR MECHANICAL POWER PLAN
414 E-155 THIRD FLOOR MECHANICAL POWER PLAN - ZONE A1
415 E-156 THIRD FLOOR MECHANICAL FLOOR PLAN - ZONE A2
416 E-157 THIRD FLOOR MECHANICAL POWER PLAN - ZONE B2
417 E-158 THIRD FLOOR MECHANICAL POWER PLAN - ZONE C1
418 E-158x THIRD FLOOR MECHANICAL POWER PLAN - ZONE C1 –
419 E-159 THIRD FLOOR MECHANICAL POWER PLAN - ZONE C2
420 E-159x THIRD FLOOR MECHANICAL POWER PLAN - ZONE C2 –
421 E-401 STAIR PLANS & SECTIONS
422 E-402 STAIR PLANS & SECTIONS
423 E-501 LIGHTING DETAILS 1 R0003 9/21/18
424 E-502 LIGHTING DETAILS 2
425 E-503 GROUNDING DETAILS
426 E-504 LIGHT POLE DETAILS
427 E-505 VAULT & TRANSFORMER DETAILS
428 E-506 ELECTRICAL DETAILS 1
429 E-507 CONTROL DIAGRAMS
430 E-601 ONE-LINE DIAGRAM (480)
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
431 E-602 ONE-LINE DIAGRAM (208)
432 E-603 PANEL SCHEDULES 1
433 E-604 PANEL SCHEDULES 2
434 E-605 PANEL SCHEDULES 3
435 E-606 PANEL SCHEDULES 4
436 E-607 PANEL SCHEDULES 5
437 E-608 PANEL SCHEDULES 6
438 E-609 PANEL SCHEDULES 7
439 E-610 PANEL SCHEDULES 8
440 E-611 PANEL SCHEDULES 9
441 E-612 PANEL SCHEDULES 10
442 E-613 PANEL SCHEDULES 11
443 E-614 PANEL SCHEDULES 12
444 E-615 PANEL SCHEDULES 13
445 E-616 PANEL SCHEDULES 14
446 E-617 PANEL SCHEDULES 15
447 E-618 PANEL SCHEDULES 16
448 E-619 PANEL SCHEDULES 17
449 E-620 PANEL SCHEDULES 18
450 E-621 PANEL SCHEDULES 19
451 E-622 PANEL SCHEDULES 20
452 E-623 PANEL SCHEDULES 21
453 E-624 PANEL SCHEDULES 22
454 E-625 PANEL SCHEDULES 23
455 E-626 PANEL SCHEDULES 24
456 E-627 PANEL SCHEDULES 25
457 E-628 PANEL SCHEDULES 26
458 E-629 PANEL SCHEDULES 27
459 E-630 PANEL SCHEDULES 28
460 E-631 PANEL SCHEDULES 29
461 EF001 FIRE ALARM LEGEND & ABBREVIATIONS R0003 9/21/18
462 EF101 OVERALL FIRST FLOOR FIRE ALARM PLAN
463 EF101x OVERALL FIRST FLOOR FIRE ALARM PLAN – BID
464 EF102 FIRST FLOOR FIRE ALARM PLAN - ZONE A1
465 EF103 FIRST FLOOR FIRE ALARM PLAN - ZONE A2
466 EF104 FIRST FLOOR FIRE ALARM PLAN - ZONE B1
467 EF105 FIRST FLOOR FIRE ALARM PLAN - ZONE B2
468 EF106 FIRST FLOOR FIRE ALARM PLAN - ZONE C1
469 EF106x FIRST FLOOR FIRE ALARM PLAN - ZONE C1 – BID
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
OPTION
470 EF107 FIRST FLOOR FIRE ALARM PLAN - ZONE C2
471 EF107x FIRST FLOOR FIRE ALARM PLAN - ZONE C2 – BID
472 EF108 OVERALL SECOND FLOOR FIRE ALARM PLAN
473 EF108x OVERALL SECOND FLOOR FIRE ALARM PLAN – BID
474 EF109 SECOND FLOOR FIRE ALARM PLAN - ZONE A1
475 EF110 SECOND FLOOR FIRE ALARM PLAN - ZONE A2
476 EF111 SECOND FLOOR FIRE ALARM PLAN - ZONE B2
477 EF112 SECOND FLOOR FIRE ALARM PLAN - ZONE C1
478 EF112x SECOND FLOOR FIRE ALARM PLAN - ZONE C1 – BID
479 EF113 SECOND FLOOR FIRE ALARM PLAN - ZONE C2
480 EF113x SECOND FLOOR FIRE ALARM PLAN - ZONE C2 – BID
481 EF114 OVERALL THIRD FLOOR FIRE ALARM PLAN
482 EF114x OVERALL THIRD FLOOR FIRE ALARM PLAN – BID
483 EF115 THIRD FLOOR FIRE ALARM PLAN - ZONE A1
484 EF116 THIRD FLOOR FIRE ALARM PLAN - ZONE A2
485 EF117 THIRD FLOOR FIRE ALARM PLAN - ZONE B2
486 EF118 THIRD FLOOR FIRE ALARM PLAN - ZONE C1
487 EF118x THIRD FLOOR FIRE ALARM PLAN - ZONE C1 – BID
488 EF119 THIRD FLOOR FIRE ALARM PLAN - ZONE C2
489 EF119x THIRD FLOOR FIRE ALARM PLAN - ZONE C2 – BID
490 EF501 FIRE ALARM DETAILS
491 EF601 FIRE ALARM RISER DIAGRAM
492 EF602 FIRE ALARM MATRIX
TELECOMMUNICATIONS
493 T-001 TELECOMMUNICATIONS NOTES, LEGEND, &
ABBREVIATIONS
494 TD100 TELECOM OVERALL DEMOLITION PLAN
495 TS100 TELECOM OVERALL SITE PLAN
496 TS100x TELECOM OVERALL SITE PLAN – BID OPTION
497 TS101 TELECOM SITE PLAN 1
498 TS101x TELECOM SITE PLAN 1 – BID OPTION
499 TS102 TELECOM SITE PLAN 2
500 T-101 OVERALL FIRST FLOOR TELECOMMUNICATIONS PLAN
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
501 T-102 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE A1
502 T-103 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE A2
503 T-104 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE B1
504 T-105 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE B2
505 T-106 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C1
506 T-106x FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C1
507 T-107 FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C2
508 T-107x FIRST FLOOR TELECOMMUNICATIONS PLAN - ZONE C2
509 T-108 OVERALL SECOND FLOOR TELECOMMUNICATIONS
510 T-109 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
A1
511 T-110 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
A2
512 T-111 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
B2
513 T-112 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
C1
514 T-112x SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
C1 – BID OPTION
515 T-113 SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
C2
516 T-113x SECOND FLOOR TELECOMMUNICATIONS PLAN - ZONE
C2 – BID OPTION
517 T-114 OVERALL THIRD FLOOR TELECOMMUNICATIONS PLAN
518 T-115 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
A1
519 T-116 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
A2
520 T-117 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
B2
521 T-118 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
C1
522 T-118x THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
C1 – BID OPTION
523 T-119 THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
C2
524 T-119x THIRD FLOOR TELECOMMUNICATIONS PLAN - ZONE
C2 – BID OPTION
525 T-121 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE A1
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
526 T-122 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE A2
527 T-123 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE B1
528 T-124 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE B2
529 T-125 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE C1
530 T-125x TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE C1 – BID OPTION
531 T-126 TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE C2
532 T-126x TELECOMMUNICATIONS CABLE TRAY - FIRST FLOOR
PLAN - ZONE C2 – BID OPTION
533 T-127 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
534 T-128 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
535 T-129 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
536 T-130 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
537 T-130x TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
538 T-131 TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
539 T-131x TELECOMMUNICATIONS CABLE TRAY - SECOND FLOOR
540 T-132 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
541 T-133 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
542 T-134 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
543 T-135 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
544 T-135x TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
545 T-136 TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
546 T-136x TELECOMMUNICATIONS CABLE TRAY - THIRD FLOOR
547 T-401 TELECOMMUNICATIONS ENLARGED PLANS-1
548 T-402 TELECOMMUNICATIONS ENLARGED PLANS-2
00 73 00-A R0003
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
549 T-403 TELECOMMUNICATIONS ENLARGED PLANS-3
550 T-404 TELECOMMUNICATIONS ENLARGED PLANS-4
551 T-501 TELECOMMUNICATIONS - DETAILS 1
552 T-502 TELECOMMUNICATIONS - DETAILS 2
553 T-503 TELECOMMUNICATIONS - DETAILS 3
554 T-504 TELECOMMUNICATIONS - DETAILS 4
555 T-601 TELECOMMUNICATIONS DIAGRAM-1
556 T-602 TELECOMMUNICATIONS DIAGRAM-2
557 T-603 TELECOMMUNICATIONS GROUNDING DETAIL
558 T-604 CCTV & ACCESS RISER CONTROL DIAGRAM
559 T-605 EXISTING BUTTERFLY DIAGRAM
End of Attachment 00 73 00-A
FY17 SERE Pi pel i ne Dor mi t or y ( 150 r m) 17015 Fai r chi l d AFB, WA W912DW18R0019
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 45 00. 00 10
QUALI TY CONTROL
11/16
PART 1 GENERAL
1. 1 REFERENCES
1. 2 PAYMENT
1. 3 SUBMI TTALS
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 2 CONTRACTOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.