Amendment 0001 SF 30, Revised SF 1442 and associated changes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW18R0019_Amendment_0004_SERE_Dorm.pdf | ||
| W912DW18R0019_Amendment_0003_SERE_Dorm.pdf | ||
| W912DW18R0019_-_Amendment_0002.pdf | ||
| SERE_Dorm_Site_Visit_PowerPoint_Slides.pdf | ||
| SERE_Dorm_Site_Visit_Attendees.pdf | ||
| FAFB_SERE_Pipeline_Dorm_SPECS_-_09_Aug_2018.pdf | ||
| RFP__W912DW18R0019_-_SERE_Dorm.pdf | ||
| FY17_PNGJKZ040009_SEREPD-00-COMPILATION-VOL1-CFRTA.pdf | ||
| FY17_PNGJKZ040009_SEREPD-00-COMPILATION-VOL2-CFRTA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW18R0019, Survival, Evasion, Resistance, Escape (SERE) Pipeline Dormitory, Fairchild Air Force Base, Spokane, WA
(See Continuation Page)
1. CONTRACT ID CODE PAGE OF PAGES
1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW-18-R-0019
X 9B. DATED (SEE ITEM 11)
10-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-18-R-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE
1. This amendment one (0001) provides for the following changes:
a. Revision to General Wage Determination. WA180042, with 6 modifications, dated 10 August 2018 replaces in its entirety, WA180042, with 5 modifications.
b. Change the date of the site visit from 30 August 2018 to 06 September 2018.
c. Change the cutoff for the site visit registration from 17 August 2018 to 27 August 2018 at
1500 hours.
d. Change the proposal due date from 10 September 2018 to 14 September 2018.
e. Correct the number of proposal copies to be submitted on the SF 1442.
f. Revise and replace in its entirety Section 00 11 00 Price Schedule.
g. Reissue the Specifications PDF volume with bookmarks as a separate attachment.
h. Revise and replace in its entirety twenty (20) modified drawings.
i. Revise and replace in its entirety Section 00 73 00-A Index of Drawings.
2. The proposal submittal time and date of 10 September 2018 at 2:00:00 p.m. LOCAL TIME has been extended to 14 September 2018 at 2:00:00 p.m. LOCAL TIME.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl.
SF 1442
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 10-Sep-2018 02:00 PM to 14-Sep-2018 02:00 PM.
The number of offeror copies required has decreased by 3 from 5 to 2.
The following have been modified:
PRICE SCHEDULE
PRICE SCHEDULE
CLIN
Item # Description of Item Quantity Unit Unit Price Amount
BASE ITEMS
0001 All work for construction of SERE Pipeline
Dormitory including all associated site work within 5-feet of the building.
1 JOB N/A $____________________
0002 All work for site preparation including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.
1 JOB N/A $____________________
0003 All work for O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.
1 JOB N/A $75,000
0004 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $30,000
0005 All work for DD 1354 as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $15,000
TOTAL ALL BASE ITEMS 0001 - 0005 $________________________
OPTIONAL ITEMS
CLIN
Item # Description of Item Quantity Unit Unit Price Amount 0006 All work for construction of Optional
Wing. See note #6.
1 JOB N/A $____________________
0007 All work for construction of the drill pad.
See note #7.
1 JOB N/A $____________________
0008 All work for Furnishings, Fixtures, and Equipment (FF&E) for Base Item #0001.
See note #8.
1 JOB N/A $____________________
0009 All work for Furnishings, Fixtures, and Equipment (FF&E) for Optional Item #0006. See note #8.
1 JOB N/A $____________________
TOTAL ALL OPTION ITEMS 0006 - 0009 $________________________
TOTAL ALL ITEMS 0001 - 0009 $________________________
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all amendments to proposals shall be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
3) Offerors must insert a price on all entry amount lines of numbered items of the Price Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amounts established in Item #0003, #0004, and #0005 shall not be revised by Offerors.
5) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph OPTION FOR INCREASED QUANTITY.
6) See Section 01 23 00 ALTERNATES for more information and detailed descriptions of the work for items #0006, #0008, AND #0009.
7) Please refer to drawing CS101 for additional information.
8) Please refer to Interiors Drawings for additional information.
END PRICE SCHEDULE
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
INSTRUCTIONS TO PROPOSERS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for the construction of a three-story, dormitory for the SERE Pipeline school at Fairchild AFB in Spokane, WA. The building will house 150 double occupancy dorm style rooms, each with private bathroom, with associated core spaces. The base CLINs include 117 student rooms and core spaces for a total of approximately 65,660 square feet. The option CLINs include another 33 student rooms and approximately 13,780 square feet, totaling 150 student rooms and approximately 79,440 square feet. Core spaces include mechanical and electrical rooms, a laundry room, computer labs, lounges and a residential kitchen. Site features include landscaping, area lighting, fencing, construction of a parking lot, and an entry drop off point.
Included are underground utilities and connections to sanitary sewers, storm sewers, water main, electrical lines, communication duct banks and gas lines to the building, along with sidewalks, access areas and pathways, curbs and gutters, storm drainage, and signage.
1.2. DISCLOSURE OF MAGNITUDE
Proposed project will be a Firm Fixed-Price construction project. In accordance with DFARS
236.204 Disclosure of the magnitude of construction projects, the order of magnitude for this project is estimated to be in the range of $25,000,000.00 to $100,000,000.00. 100 percent payment and performance bonds will be required.
1.3. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Seattle District (NWS) District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at US Army Corps of Engineers, P.O. Box 3755, Seattle WA 98124-3755 if it does not contain a return mailing address. There will be no exceptions.
1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at:
www.fbo.gov W912DW18R0019.
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) with the solicitation announcement.
1.5. OFFEROR'S QUESTIONS AND COMMENTS
Administrative questions and/or comments relative to these documents should be submitted via e-mail or mailed to:
Contract Specialist U.S. Army Corps of Engineers, Seattle District ATTN: Lorraine Laurente Mailing Address:
PO Box 3755 Seattle, WA 98124-3755 Phone: 206-764-6662 Email: Lorraine.Q.Laurente@usace.army.mil
Contracting Officer U.S. Army Corps of Engineers, Seattle District ATTN: Susan Newby Phone: 206-764-6754 Email: Susan.F.Newby@usace.army.mil
Note: All questions and/or comments must should reach the above referenced Contracting Office no later than three (3) business days before proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.
1.5.1. Bidder Inquiry
1.5.1.1.Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet
1.5.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.5.1.1.2. From this page you may view all bidder inquiries or add inquiry.
1.5.1.1.3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.5.1.1.4. The Solicitation Number is : W912DW-18-R-0019
1.5.1.1.5. The Bidder Inquiry Key is: Y2D489-CPBC76
1.5.1.2. The Bidder Inquiry System will be unavailable for new inquiries three (3) business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.5.1.3. Offerors are requested to review the solicitation in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.5.1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.5.1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. SITE VISIT
Bidders wishing to visit the site shall contact Mr. Evan Lauterbach at 509-244-5571 extension 1240 no later than 1500 hours (3:00 PM) PDT on 27 August 2018 to register by providing their full names, social security numbers, and date of birth so that a background check can be completed prior to the site visit. Bidders who have registered by the deadline above shall assemble at the Visitor Center parking lot at the Main Gate entrance of Fairchild Air Force Base at 8:00 am on Thursday, 06 September 2018 to obtain 1 day access pass to the base. Bidders who fail to register by the deadline will not be permitted attend the site visit.
Individuals will need to have current, valid identification as specified in specification section 01 14 00, Work Restrictions, of this solicitation. Anyone wishing to drive on base must have a current vehicle registration and proof of insurance with them. Background checks will be conducted and anyone with an open warrant, foreign nationals without adequate documentation, and anyone in possession of Federally controlled substances (esp. marijuana) are likely to be detained. Procedures are available at: http://www.fairchild.af.mil/Home/VVCC.aspx. Tour at the construction site will depart the main gate promptly at 10:00 am on 06 September 2018.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.
1001.
1.9. PROPOSAL SUBMITTALS
Due to heightened security at Government installations, those offerors who have their proposals hand-delivered shall contact Procurement Technician, Sonia Frees at 206-764-3516 or Contract Specialist, Lorraine Laurente at 206-764-6662 prior to delivering to the address shown below. At the time specified below, it will be announced that receipt of proposals is closed.
Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.
See Box 13 of the Standard Form 1442 for the time and date your proposal is due.
EMAIL: Emailed Proposal will NOT be accepted.
FAX: Faxed Proposal will NOT be accepted.
FED-EX/UPS: Lorraine Laurente, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CENWS-CTA
4735 E. Marginal Way S., Bldg # 1202 Seattle, WA 98134-2385 Note: Commercial Carriers will not deliver to PO Boxes
MAIL: Lorraine Laurente, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CENWS-CTA
PO Box 3755 Seattle, WA 98124-3755
HAND DELIVERY: Lorraine Laurente, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CENWS-CTA
4735 E. Marginal Way S., Bldg # 1202 Seattle, WA 98134-2385
The method of Hand Deliver has changed and takes longer than the previous method of arriving at the Federal Center South building lobby to deliver your Offer. Please allow sufficient time to allow for heightened security at Government installations and to get to our new location in Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the new USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Sonia Frees, Procurement Technician at 206-764-3516, or Lorraine Laurente, Contract Specialist at 206-764- 6662. A Contracting representative will come down and accept your Proposal.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Proposal is delivered on time.
The Packaging that contains the Proposals shall be marked:
”Proposals for Solicitation Number: W912DW-18-R-0019, DO NOT OPEN”
1.10. PROPOSAL FORMAT
(a) Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders (except that Pro Forma material and price proposal shall be submitted in a closed manila envelope. Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein.
(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.
(ii) Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
(c) Electronic Format: Provide two (2) CDs in read-only format, preferably using .pdf files of the technical proposal.
(d) Number of copies: Submit one original and 2 CDs that contain copies of the technical proposal (Volume I as defined in Section 00 22 16). Submit one original of the price proposal (Volume II as defined in Section 00 22 16).
(e) Volume I
The Offeror’s Technical Proposal shall include the following sections, in the general format specified below:
Table of Contents for Volume I – (Listing of all sections of the technical proposal) Tab A/Factor A – Relevant Experience, Attachment 1.
Tab B/Factor B –Past Performance, Attachment 2.
(f) Volume II
The Offeror’s Price Proposal shall include the following, in the general format specified below:
SF 1442 and Bid Schedule, Section 00 11 00 (filled out in its entirety) Bid Guarantee Pre-Award Information found at back of Section 00 45 00 (filled out in its entirety) Section 00 45 00 Representations and Certifications
Subcontracting Plan
NOTE: Offeror’s Price Proposal is due AT THE SAME TIME as Technical Proposal.
1.11 BID GUARANTEE
In accordance with FAR 52.228-1 in Section 00 21 16 Instructions to Proposers, the Offeror is required to submit a bid guarantee along with its proposal. The bid guarantee shall be included in Volume II of the proposal. Any proposal received without a bid guarantee will be rejected and is ineligible for review by the Government. The amount of the Bid Guarantee shall be twenty (20) percent of the Offeror’s proposed price or $3,000,000.00, whichever is less.
1.12. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.13. SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE
UTILIZATION OF SMALL BUSINESS CONCERNS
(a) Application. This clause applies to all offerors submitting proposals.
(b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation:
52.219-8, Utilization of Small Business Concerns (Alternate I)
52.219-9, Small Business Sub Contracting Plan (Alternate I) (applies only to Large Business)
52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to Large Business)
252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
(c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:
Small Business – 33% HUBZone Small Business – 3% Service-Disabled Veteran-Owned Small Business – 3% Veteran-Owned Small Business – 2%
Small Disadvantaged Business – 5% Women-Owned Small Business – 5%
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION WA42
General Decision Number: WA180042 08/10/2018 WA42
Superseded General Decision Number: WA20170042
State: Washington
Construction Type: Building
County: Spokane County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/23/2018 3 03/16/2018 4 04/27/2018 5 06/29/2018 6 08/10/2018
ASBE0082-001 09/01/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 34.17 19.35
BRWA0001-002 06/01/2017
Rates Fringes
BRICKLAYER.......................$ 39.46 16.15
CARP0004-011 06/01/2017
Rates Fringes
CARPENTER (Excluding Acoustical ceiling, Drywall Hanging and Form Work)...........$ 27.76 16.14
ZONE PAY:
ZONE 1 0-45 MILES FREE
ZONE 2 46-65 MILES $2.00/PER HOUR
ZONE 3 66-100 MILES $3.00/PER HOUR
ZONE 4 OVER 100 MILES $4.50/PER HOUR
DISPATCH POINTS:
CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
HAZMAT PROJECTS:
Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:
LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.
LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B+ $.75 per hour - Uses same respirator protection as
Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.
ELEC0073-003 01/01/2018
Rates Fringes
ELECTRICIAN......................$ 33.25 18.40
ELEC0073-010 09/01/2017
Rates Fringes
ELECTRICIAN (Sound Equipment Installation Only)...............$ 25.77 15.36
* ENGI0370-017 06/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 27.51 15.95
GROUP 2.....................$ 27.83 15.95
GROUP 3.....................$ 28.44 15.95
GROUP 4.....................$ 28.60 15.95
GROUP 5.....................$ 28.76 15.95
GROUP 6.....................$ 29.04 15.95
GROUP 7.....................$ 29.31 15.95
GROUP 8.....................$ 30.41 15.95
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Compactor; Drill Oiler; Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Drills (churn, core, calyx or diamond); Oiler;
Loaders (overhead & front-end, under 4 yds. R/T); Vacuum Drill (reverse circulation drill under 8 inch bit)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.
incl. 8 yds.); Scrapers, all, rubber-tired; Screed Operator
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers); Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2017
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.64 25.06
LABO0238-014 06/01/2018
Rates Fringes
LABORER: Mason Tender - Brick...$ 26.94 12.35
LABO0238-024 06/01/2018
Rates Fringes
LABORER
GROUP 1.....................$ 24.84 12.35
GROUP 2.....................$ 26.94 12.35
GROUP 3.....................$ 27.21 12.35
GROUP 4.....................$ 27.48 12.35
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagman
GROUP 2: Common or General Laborer; Form-Stripping
GROUP 3: Chipping Guns; Concrete Saw; Pipelayer
GROUP 4: Asphalt Raker; Grade Checker; Gunite; Vibrating Plate
PAIN0054-001 06/01/2008
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 22.78 8.88
* PAIN0054-002 07/01/2018
Rates Fringes
GLAZIER..........................$ 21.68 8.81
PAIN0054-004 10/01/2005
Rates Fringes
FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22
PLAS0072-006 06/01/2018
Rates Fringes
PLASTERER........................$ 29.07 14.13
Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0-45 radius miles from the main post office
Zone 2: Over 45 radius miles from the main post office
PLUM0044-001 06/01/2017
Rates Fringes
Plumbers and Pipefitters.........$ 40.41 17.74
* ROOF0189-013 07/01/2018
Rates Fringes
ROOFER (Including Tearoff).......$ 27.48 12.73
SHEE0066-007 06/01/2013
Rates Fringes
Sheet metal worker (Includes HVAC DUCT and Metal Roof Installation)....................$ 28.25 17.22
TEAM0690-008 06/01/2017
Rates Fringes
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1: LEWISTON ZONE
CENTER
GROUP 3....................$ 26.07 17.30
GROUP 4....................$ 26.40 17.30
GROUP 5....................$ 26.51 17.30
GROUP 6....................$ 26.67 17.30
GROUP 7....................$ 27.21 17.30
GROUP 8....................$ 27.53 17.30
ZONE 1: PASCO ZONE CENTER
GROUP 3....................$ 26.07 17.30
GROUP 4....................$ 26.40 17.30
GROUP 5....................$ 26.51 17.20
GROUP 6....................$ 26.67 17.30
GROUP 7....................$ 27.21 17.30
GROUP 8....................$ 27.53 17.30
ZONE 1: SPOKANE ZONE CENTER
GROUP 3....................$ 26.07 17.30
GROUP 4....................$ 26.40 17.30
GROUP 5....................$ 26.51 17.30
GROUP 6....................$ 26.67 17.30
GROUP 7....................$ 27.21 17.30
GROUP 8....................$ 27.53 17.30
Zone Differential For ZONE 2: ( Zone 1 +$2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 3: Trucks, side, end, bottom and articulated end dump (3 yards to and including 6 yds.)
GROUP 4: Trucks, side, end, bottom and articulated end dump (over 6 yds. to & including 12 yds.)
GROUP 5: Trucks, side, end, bottom and articulated end dump (over 12 yds. to & including 20 yds.)
GROUP 6: Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.)
GROUP 7: Truck, side, end, bottom and articulated end dump (over 40 yds. to & including 100 yds.)
GROUP 8: Trucks, side, end, bottom and articulated end dump (over 100 yds.)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-030 05/22/2009
Rates Fringes
CARPENTER (Acoustical Ceiling Installation Only)...............$ 18.00 1.43
CARPENTER (Drywall Hanging Only)............................$ 20.62 0.00
CARPENTER (Form Work Only).......$ 18.63 2.65
LABORER: Handheld Drill.........$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 11.48 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 9.00 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.31 0.00
OPERATOR: Concrete Pumper.......$ 22.30 5.27
OPERATOR: Mechanic..............$ 24.33 4.33
PAINTER: Brush Only.............$ 13.00 0.50
PAINTER: Roller.................$ 22.62 0.25
PAINTER: Spray..................$ 22.47 0.00
TILE SETTER......................$ 14.83 0.00
TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
"Survival, Evasion, Resistance, Escape (SERE) Pipeline Dormitory at Fairchild Air Force Base, Spokane, Washington"
This is a Full and Open (Unrestricted) Procurement.
Funds are not currently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available from w hich payment for contract purposes can be made.
In accordance w ith DFARS 236.204, Disclosure of the magnitude of construction projects, this procurement is estimated to be betw een $25,000,000 and $100,000,000.
LORRAINE WAREHIME 206-764-6662
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
10-Aug-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________700 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Sec 00 73 00
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________14 Sep 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912DW-18-R-0019 66
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FAFB SERE Pipeline Dormitory (150 rm) 17015 Fairchild AFB, WA W912DW18R0019
00 73 00-A R0001
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING NO. 236s/721-14-01, DATED 13 July 2018
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
GENERAL
1 G-001 TITLE, LOCATION, & VICINITY MAPS
2 G-002 DRAWING INDEX 1
3 G-003 DRAWING INDEX 2
GEOTECHNICAL
4 B-101 BORING LOCATIONS
5 B-201 SOIL DESCRIPTION & LOG KEYS
6 B-301 BORING LOGS - TEST PITS - TP-16-TP-01 & TP-16-TP-02
& BORING LOGS B-16-MRRC-01
7 B-302 BORING LOGS - B-16-MR-02
8 B-303 BORING LOGS - B-16-MR-03
9 B-304 BORING LOGS - B-16-MRRC-04
CIVIL
10 C-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES R0001 8/22/18
11 C-002 HAUL ROUTES R0001 8/22/18
12 CX101 EXISTING CONDITIONS
13 CX102 DEMOLITION PLAN R0001 8/22/18
14 CS101 GENERAL SITE PLAN R0001 8/22/18
15 CS101x GENERAL SITE PLAN - BID OPTION R0001 8/22/18
16 CS102 SITE PLAN
17 CS102x SITE PLAN - BID OPTION
18 CP101 JOINT LAYOUT OVERALL PLAN R0001 8/22/18
19 CP101x JOINT LAYOUT OVERALL PLAN - BID OPTION R0001 8/22/18
20 CP102 JOINT LAYOUT PLAN
21 CP103 PAVEMENT JOINT DETAILS
22 CP104 DRILL PAD OPTION JOINT DETAILS
23 CP105 PAVEMENT & DRILL PAD OPTION REINFORCEMENT
DETAILS
24 CG101 GRADING PLAN R0001 8/22/18
25 CG101x GRADING PLAN - BID OPTION R0001 8/22/18
26 CU101 UTILITIES PLAN R0001 8/22/18
27 CU101x UTILITIES PLAN - BID OPTION R0001 8/22/18
28 CU102 STORMWATER PLAN
29 CU102x STORMWATER PLAN - BID OPTION
30 C-301 SECTIONS 1
00 73 00-A R0001
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
31 C-302 SECTIONS 2
32 C-302x SECTIONS 2 - BID OPTION
33 C-303 SANITARY SEWER PLAN AND PROFILE
34 C-304 STORMWATER PLAN AND PROFILE
35 C-304x STORMWATER PLAN AND PROFILE - BID OPTION
36 C-501 WATER DETAILS
37 C-502 SANITARY SEWER DETAILS
38 C-503 STORMWATER DETAILS
39 C-504 MISCELLANEOUS DETAILS 1
40 C-505 MISCELLANEOUS DETAILS 2
41 C-506 PAVEMENT DETAILS
42 C-507 SECTIONS & SIDEWALK
LANDSCAPE
43 L-101 LANDSCAPE SITE PLAN
44 L-101x LANDSCAPE SITE PLAN - BID OPTION
STRUCTURAL
45 S-001 GENERAL STRUCTURAL NOTES
46 S-002 GENERAL STRUCTURAL NOTES
47 S-101 OVERALL FOUNDATION PLAN
48 S-101x OVERALL FOUNDATION PLAN - BID OPTION
49 S-102 FOUNDATION PLAN - ZONES A & B
50 S-103 FOUNDATION PLAN - ZONE C
51 S-103x FOUNDATION PLAN - ZONE C - BID OPTION
52 S-104 OVERALL SLAB ON GRADE PLAN
53 S-104x OVERALL SLAB ON GRADE PLAN - BID OPTION
54 S-105 OVERALL SECOND FLOOR FRAMING PLAN
55 S-105x OVERALL SECOND FLOOR FRAMING PLAN - BID
OPTION
56 S-106 SECOND FLOOR FRAMING PLAN - ZONES A & B
57 S-107 SECOND FLOOR FRAMING PLAN - ZONE C
58 S-107x SECOND FLOOR FRAMING PLAN - ZONE C - BID
59 S-108 OVERALL THIRD FLOOR FRAMING PLAN
60 S-108x OVERALL THIRD FLOOR FRAMING PLAN - BID OPTION
61 S-109 THIRD FLOOR FRAMING PLAN - ZONES A & B
62 S-110 THIRD FLOOR FRAMING PLAN - ZONE C
63 S-110x THIRD FLOOR FRAMING PLAN - ZONE C - BID OPTION
64 S-111 GEAR STORAGE BUILDING ROOF FRAMING PLAN
65 S-112 OVERALL ATTIC FLOOR FRAMING PLAN
66 S-112x OVERALL ATTIC FLOOR FRAMING PLAN - BID OPTION
00 73 00-A R0001
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
67 S-113 ATTIC FLOOR FRAMING PLAN - ZONES A & B
68 S-114 ATTIC FLOOR FRAMING PLAN - ZONE C
69 S-114x ATTIC FLOOR FRAMING PLAN - ZONE C - BID OPTION
70 S-115 OVERALL HIGH ROOF FRAMING PLAN
71 S-115x OVERALL HIGH ROOF FRAMING PLAN - BID OPTION
72 S-116 OVERALL SECOND AND THIRD FLOOR PLAN -
PROGRESSIVE COLLAPSE PREVENTION
73 S-116x OVERALL SECOND AND THIRD FLOOR PLAN -
PROGRESSIVE COLLAPSE PREVENTION - BID OPTION
74 S-117 OVERALL ATTIC FLOOR PLAN - PROGRESSIVE COLLAPSE
PREVENTION
75 S-117x OVERALL ATTIC FLOOR PLAN - PROGRESSIVE COLLAPSE
PREVENTION - BID OPTION
76 S-161 DUMPSTER ENCLOSURE - FOUNDATION PLAN
77 S-201 DORMITORY FRAMING ELEVATIONS
78 S-202 DORMITORY FRAMING ELEVATIONS
79 S-203 DORMITORY FRAMING ELEVATIONS
80 S-204 DORMITORY FRAMING ELEVATIONS
81 S-205 GEAR STORAGE FRAMING ELEVATIONS
82 S-206 GEAR STORAGE FRAMING ELEVATIONS
83 S-301 FOUNDATION SECTIONS
84 S-302 COMBINED FOUNDATIONS SECTIONS
85 S-303 COMBINED FOUNDATIONS SECTIONS
86 S-304 ROOF FRAMING SECTIONS
87 S-305 WALL SECTIONS & DETAILS
88 S-401 ENLARGED PLANS - MECHANICAL PLATFORM
89 S-402 ENLARGED PLANS - DORMITORY ENTRANCE
90 S-403 ENLARGED PLANS - DORMITORY ENTRANCE
91 S-501 TYPICAL FOUNDATION DETAILS
92 S-502 TYPICAL FOUNDATION DETAILS
93 S-503 TYPICAL STEEL DETAILS
94 S-504 DORMITORY DETAILS
95 S-505 DORMITORY DETAILS
96 S-506 DORMITORY DETAILS
97 S-507 DORMITORY DETAILS
98 S-508 DORMITORY DETAILS
99 S-509 DORMITORY DETAILS
100 S-510 DORMITORY DETAILS
101 S-511 DORMITORY DETAILS
102 S-512 DORMITORY DETAILS
00 73 00-A R0001
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
103 S-513 GEAR STORAGE BUILDING DETAILS
104 S-514 GEAR STORAGE BUILDING DETAILS
105 S-515 GEAR STORAGE BUILDING DETAILS
106 S-516 GEAR STORAGE BUILDING DETAILS
107 S-517 GEAR STORAGE BUILDING DETAILS
108 S-518 FLOOR FRAMING DETAILS
109 S-519 ROOF FRAMING DETAILS
110 S-520 AT/FP ELEVATIONS & DETAILS
111 S-521 PROGRESSIVE COLLAPSE DETAILS
112 S-601 FRAMING SCHEDULES
113 S-701 WIND DIAGRAMS
114 S-702 WIND DIAGRAMS
115 S-703 SNOW DIAGRAMS
116 S-704 SNOW DIAGRAMS
ARCHITECTURAL
117 A-001 ABBREVIATIONS, SYMBOLS, & GENERAL NOTES
118 A-002 CODE SUMMARY
119 A-003 FIRST FLOOR LIFE SAFETY PLAN
120 A-004 SECOND FLOOR LIFE SAFETY PLAN
121 A-005 AIR BARRIER PLANS & SECTIONS
122 A-006 AIR BARRIER CONSTRUCTION METHODS
123 A-007 AIR BARRIER EXTENTS - DETAILS
124 A-008 FIRE STOPPING DETAILS
125 A-009 FIRE STOPPING DETAILS
126 A-010 FIRE STOPPING DETAILS
127 A-101 OVERALL FIRST FLOOR PLAN
128 A-101x OVERALL FIRST FLOOR PLAN – BID OPTION
129 A-102 FIRST FLOOR PLAN - ZONES A & B
130 A-103 FIRST FLOOR PLAN - ZONE C
131 A-103x FIRST FLOOR PLAN - ZONE C – BID OPTION
132 A-104 OVERALL SECOND FLOOR PLAN
133 A-104x OVERALL SECOND FLOOR PLAN – BID OPTION
134 A-105 SECOND FLOOR PLAN - ZONE A & B
135 A-106 SECOND FLOOR PLAN - ZONE C
136 A-106x SECOND FLOOR PLAN - ZONE C – BID OPTION
137 A-107 OVERALL THIRD FLOOR PLAN
138 A-107x OVERALL THIRD FLOOR PLAN – BID OPTION
139 A-108 THIRD FLOOR PLAN - ZONE A & B
140 A-109 THIRD FLOOR PLAN - ZONE C
00 73 00-A R0001
SHEET
NUMBER
PLATE
NUMBER TITLE
REVISION
NUMBER
DATE
141 A-109x THIRD FLOOR PLAN - ZONE C – BID OPTION
142 A-110 ATTIC FLOOR PLAN
143 A-110x ATTIC FLOOR PLAN – BID OPTION
144 A-111 FIRST FLOOR REFLECTED CEILING PLAN
145 A-111x FIRST FLOOR REFLECTED CEILING PLAN – BID OPTION
146 A-112 FIRST FLOOR REFLECTED CEILING PLAN - ZONE A & B
147 A-113 FIRST FLOOR REFLECTED…