W912DW-17-B-0007,_Amendment_R0005_(1_of_2).pdf
PDF 157 KB Posted
- Attached to
- Lake Washington Ship Canal Emergency Closure System (ECS) Crane Replacement, Seattle, WA
- Solicitation number
- W912DW-17-B-0007
About this file
Solicitation Amendment 0005 (1of 2)
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD971307837
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Lake Washington Ship Canal Emergency Closure System (ECS) Crane Replacement
The purpose of Amendment 0005 is as follow s:
Please see continuation page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-B-0007
X 9B. DATED (SEE ITEM 11)
06-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2017
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-17-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
NOTES
The purpose of Amendment Five (R0005) is as follows:
Incorporate below items as indicated.
1. Specifications/Drawings – revised specifications/drawings are as follows:
00 73 00-A, Index of Drawings C-2-3-179 34 Hoist Equipment Elevation and Section
The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
2. Bid Opening Bid opening date/time remains the same: 28 August 2017 at 1:00:00 p.m. LOCAL TIME.
NOTICE TO BIDDERS: Bidders must acknowledge receipt of this amendment by number and date on bid.
Encl:
Specification as identified above Drawing as identified above
(End of Notes)
SUMMARY OF CHANGES
(End of Summary of Changes)
ECS Crane Replacement 16002 Lake Washington Ship Canal, WA
00 73 00-A
W912DW-17-B-0007 R0005
INDEX OF DRAWINGS
FILE NO. E-2-3-244 DATED 14 JUNE 2017
SHEET
NUMBER
SHEET ID
TITLE
REVISION
DATE
1 G-001 TITLE, LOCATION AND VICINITY MAPS
2 G-002 DRAWING INDEX AND GENERAL
PROJECT DESCRIPTION
R0002 08/02/2017
3 C-101 GENERAL SITE AND ACCESS PLAN
4 C-102 CIVIL SITE PLAN
5 S-001 GENERAL NOTES R0002 08/02/2017
6 S-101 STRUCTURAL PLAN AND DETAILS
7 A-001 LEGEND, ABBREVIATIONS AND
GENERAL NOTES
8 AD101 DEMO 1 - OPERATING HOUSE DOOR
9 A-101 FLOOR PLANS AND SECTION
10 A-501 ARCHITECTURAL DETAILS
11 A-502 ARCHITECTURAL DETAILS R0005 08/22/2017
12 MD101 DEMO 1 - DERRICK CRANE AND DECK
13 MD401 DEMO 2 - OPERATING HOUSE
EQUIPMENT AND DECK
14 M-101 LUFFING CRANE LIFTING
REQUIREMENTS
15 M-201 LUFFING CRANE ELEVATION
16 M-501 DIESEL POWER GENERATOR
INSTALLATION
R0003 08/11/2017
17 E-001 ELECTRICAL LEGEND
18 ED101 ELECTRICAL DEMOLITION PLAN R0004 08/14/2017
19 ED401 EMERGENCY DAM HOIST HOUSE
DEMOLITION PLAN AND SECTIONS
R0003 08/09/2017
20 ED402 CONTROL HOUSE DEMOLITION PLAN
AND SECTION
21 ED601 EXISTING ELECTRICAL ONE-LINE
DEMOLITION
22 E-101 EMERGENCY DAM HOIST HOUSE PLAN
AND SECTIONS
R0002 08/02/2017
23 E-401 CONTROL HOUSE ENLARGED PLANS
SHEET
SHEET ID
TITLE
24 E-601 ONE-LINE DIAGRAM R0002 08/02/2017
REFERENCE DRAWINGS
Reference drawings provided show conditions at time of construction. These drawings are furnished for information only and the Government does not warrant that conditions will be exactly as shown. Minor deviations can be anticipated and shall not be the basis for a claim for extra compensation.
Drawing File number_______________
REFERENCE
DRAWING
TITLE
1 14038 STIFF LEG DERRICK DESIGN -
OVERALL PLAN & SECTION
2 14051 GENERAL ARRANGEMENT OF
DERRICK CRANE
3 12424 DERRICK FOUNDATION
4 14040 MAST DESIGN
5 14122 BULL WHEEL DETAILS
6 14032 STEP BEARING (BASE OF MAST)
7 14117 STIFF LEGS DETAILS
8 14034 BOOM DETAILS
9 14118 BOOM DETAILS
10 14119 BOOM DETAILS
11 12458 MAIN HOIST BLOCK
12 12459 MAIN HOIST HANGER
13 12422 BLOCK & RIGGING (AUX HOIST)
14 14050 SWINGER (ROTATES CRANE)
15 12416 HOIST (SERVES BOOM, MAIN,
AND AUX HOISTS)
16 14044.1 CRANE OPERATING HOUSE
ELECTRICAL & GENERAL LAYOUT
17 14044.2 CRANE OPERATING HOUSE
ELECTRICAL & GENERAL LAYOUT
18 C-2-4-213_60 ELEVATION 125 TO 130
19 C-2-4-213_59 ELEVATION 120 TO 125
20 C-2-4-213_58 ELEVATION 115 TO 120
21 C-2-4-213_57 ELEVATION 110 TO 115
22 C-2-4-213_56 ELEVATION 105 TO 110
23 C-2-4-213_55 ELEVATION 100 TO 105
24 C-2-4-213_54 ELEVATION 95 TO 100
25 C-2-4-213_53 ELEVATION 90 TO 95
26 C-2-4-213_52 ELEVATION 85 TO 90
27 C-2-4-213_51.1 ELEVATION 80 TO 85
28 C-2-3-179_12 LOCK BULKHEADS TYPE
“A” PLAN AND SECTIONS
29 C-2-3-179_13 LOCK BULKHEADS TYPE
“B” PLAN AND SECTIONS
30 C-2-3-179_14 LOCK BULKHEADS TYPE
“C” PLAN AND SECTIONS
31 C-2-3-179_15 LOCK BULKHEADS
ROLLER END FRAMING
32 C-2-3-179_16 LOCK BULKHEADS PICK-
UP TRUSS GENERAL ARRANGEMENT
33 C-2-3-179_17 LOCK BULKHEADS PICK-
UP TRUSS PLAN AND ELEVATIONS
34 C-2-3-179_18 PICK-UP TRUSS SECTIONS
AND DETAILS I
35 C-2-3-179_19 PICK-UP TRUSS SECTIONS
AND DETAILS II
36 C-2-3-179_20 PICK-UP TRUSS HOOK
MECHANISM ASSEMBLY
37 C-2-3-179_21 PICK-UP TRUSS HOOK
MECHANISM DETAILS
38 C-2-3-179_22 PICK-UP TRUSS HOOK-UP
BEAM DETAILS
39 C-2-3-179_23 PICK-UP TRUSS
MISCELLANEOUS DETAILS
40 C-2-3-179_31A BULKHEAD STORAGE
PLAN SECTION AND DETAILS
41 C-2-3-179_31 STORAGE WHARF
REPLACEMENT, PLANS, SECTIONS AND
DETAILS
42 151 LAND WALL AT UPPER GUARD
GATE
R0003 08/10/2017
43 14036 75 TON STIFF LEG DERRICK
GRIILLAGE & SHEAVE HANGER
R0003 08/10/2017
44 C-2-3-179_34 HOIST EQUIPMENT
ELEVATION AND SECTION
R0005 08/22/2017
| 17B0007 R0005 Plan Revisions.pdf |
| Plan Revisions - R0005 |
| PN444974_LWCR-A-502-SHEET-000 |
| Reference Drawing Revisions - R0005 |
| c-2-3-179 sht 34 |
File details come from the government source that posted it. Updated .