Drawing_PN444974_LWCR-ED101_(R0004).pdf

PDF 771 KB Posted

Attached to
Lake Washington Ship Canal Emergency Closure System (ECS) Crane Replacement, Seattle, WA
Solicitation number
W912DW-17-B-0007
Issued by

About this file

Solicitation Amendment 0004 (2 of 2)

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4' 2' 4'0

''= 1'-0"4

1SCALE:

ED101

P N

L

W C

R -E

D .d g n

LOCATION

EXISTING CRANE

S U

S

IN

S U

S

IN

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N

LEAD COVERED CABLE IN STEEL CONDUIT

3 #2/0 CONDUCTOR-RUBBER INSULATED

LEAD COVERED CABLE IN STEEL CONDUIT

3 #2/0 CONDUCTOR-RUBBER INSULATED

EDH-LTG

EXISTING PANEL

STORAGE TANKS

EXISTING AIR

(STIFFLEG CRANE SWITCHBOARD)

REMOVE 3-#250 MCM ONLY

UTILIZE EXISTING DUCT.

POINT IS UNKNOW. CONTRACTOR MAY

EXISTING 4 - 3" CONDUIT. TERMINATION

M A

S T

E N

GO THRU CRANE OPERATING HOUSE.

1. REROUTE LANDSIDE HYDRAULIC PUMP POWER SO IT DOES NOT

NOTES:

CONSTRUCTION.

4. HYDRAULIC PUMPS SHALL HAVE CONTINUOUS POWER DURING

ACCORDINGLY.

3. LEAD IN THE ELECTRICAL INSULATING MATERIAL. REMOVE

FROM MDP PANEL IN CONTROL HOUSE #1.

2. PROTECT FEEDS TO PANEL EDH-LTG IN CRANE OPERATING HOUSE

1. REMOVE STIFFLEG CRANE CONDUCTORS ONLY. CONDUIT TO REMAIN.

GENERAL NOTES:

A N

E W T

E X

T /1

/2

D R

C

A

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

A N

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:4

P

M

OF

P L

O T D

A T

E

P L

O T T

IM

E

/1

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY16_PN444974_LWCR\Current_Phase\Con_Docs\CAD_Sheets\Electrical\ED101 - ELECTRICAL DEMOLITION PLAN

E -2 -3 -2

E C

S C

R A

N E R

E P

L A

C E

M E

N T

F Y P

N L

W C

R

L A

K E W

A S

H

IN

G T

O N S

H

IP

C

A N

A L

W A

S H

IN

G T

O N

24SHEET

J

U N

E

B R

IA

N C

N E

L S

O N

EDGE OF WALL N-90

EDGE OF WALL N-40

CHANNEL FLOW

" = 1'-0"4

1SCALE:

E E

E

E

E

HYDRAULIC PUMP

RIVERSIDE

DEMO PLAN OF CONTROL HOUSE #1

SEE SHEET ED402 FOR ENLARGED

ELECTRICAL DEMOLITION PLAN

HOUSE

DEMO PLAN OF CRANE OPERATING

SEE SHEET ED401 FOR ENLARGED

2 - 4

" DIA

. CABLE T

RAYS(E

XISTING)

SEE NOTE 1

HYDRAULIC PUMP

LANDSIDE

R0004

File details come from the government source that posted it. Updated .