Drawing_PN444974_LWCR-ED101_(R0004).pdf
PDF 771 KB Posted
- Attached to
- Lake Washington Ship Canal Emergency Closure System (ECS) Crane Replacement, Seattle, WA
- Solicitation number
- W912DW-17-B-0007
About this file
Solicitation Amendment 0004 (2 of 2)
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4' 2' 4'0
''= 1'-0"4
1SCALE:
ED101
P N
L
W C
R -E
D .d g n
LOCATION
EXISTING CRANE
S U
S
IN
S U
S
IN
E L E
C T
R
IC
A L D
E M
O L
IT
IO
N P
L A
N
LEAD COVERED CABLE IN STEEL CONDUIT
3 #2/0 CONDUCTOR-RUBBER INSULATED
LEAD COVERED CABLE IN STEEL CONDUIT
3 #2/0 CONDUCTOR-RUBBER INSULATED
EDH-LTG
EXISTING PANEL
STORAGE TANKS
EXISTING AIR
(STIFFLEG CRANE SWITCHBOARD)
REMOVE 3-#250 MCM ONLY
UTILIZE EXISTING DUCT.
POINT IS UNKNOW. CONTRACTOR MAY
EXISTING 4 - 3" CONDUIT. TERMINATION
M A
S T
E N
GO THRU CRANE OPERATING HOUSE.
1. REROUTE LANDSIDE HYDRAULIC PUMP POWER SO IT DOES NOT
NOTES:
CONSTRUCTION.
4. HYDRAULIC PUMPS SHALL HAVE CONTINUOUS POWER DURING
ACCORDINGLY.
3. LEAD IN THE ELECTRICAL INSULATING MATERIAL. REMOVE
FROM MDP PANEL IN CONTROL HOUSE #1.
2. PROTECT FEEDS TO PANEL EDH-LTG IN CRANE OPERATING HOUSE
1. REMOVE STIFFLEG CRANE CONDUCTORS ONLY. CONDUIT TO REMAIN.
GENERAL NOTES:
A N
E W T
E X
T /1
/2
D R
C
A
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
A N
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:4
P
M
OF
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY16_PN444974_LWCR\Current_Phase\Con_Docs\CAD_Sheets\Electrical\ED101 - ELECTRICAL DEMOLITION PLAN
E -2 -3 -2
E C
S C
R A
N E R
E P
L A
C E
M E
N T
F Y P
N L
W C
R
L A
K E W
A S
H
IN
G T
O N S
H
IP
C
A N
A L
W A
S H
IN
G T
O N
24SHEET
J
U N
E
B R
IA
N C
N E
L S
O N
EDGE OF WALL N-90
EDGE OF WALL N-40
CHANNEL FLOW
" = 1'-0"4
1SCALE:
E E
E
E
E
HYDRAULIC PUMP
RIVERSIDE
DEMO PLAN OF CONTROL HOUSE #1
SEE SHEET ED402 FOR ENLARGED
ELECTRICAL DEMOLITION PLAN
HOUSE
DEMO PLAN OF CRANE OPERATING
SEE SHEET ED401 FOR ENLARGED
2 - 4
" DIA
. CABLE T
RAYS(E
XISTING)
SEE NOTE 1
HYDRAULIC PUMP
LANDSIDE
R0004
File details come from the government source that posted it. Updated .