Solicitation_4_of_4_PN444974_LWCR-18-REFERENCE_DRAWINGS-RTA.pdf

PDF 36 MB Posted

Attached to
Lake Washington Ship Canal Emergency Closure System (ECS) Crane Replacement, Seattle, WA
Solicitation number
W912DW-17-B-0007
Issued by

About this file

Solicitation 4 of 4_PN444974_LWCR-18-REFERENCE DRAWINGS-RTA

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFERENCE DRAWING 1

REFERENCE DRAWING 2

REFERENCE DRAWING 3

REFERENCE DRAWING 4

REFERENCE DRAWING 5

REFERENCE DRAWING 6

REFERENCE DRAWING 7

REFERENCE DRAWING 8

REFERENCE DRAWING 9

REFERENCE DRAWING 10

REFERENCE DRAWING 11

REFERENCE DRAWING 12

REFERENCE DRAWING 13

REFERENCE DRAWING 14

REFERENCE DRAWING 15

REFERENCE DRAWING 16

REFERENCE DRAWING 17

REFERENCE DRAWING 18

REFERENCE DRAWING 19

REFERENCE DRAWING 20

REFERENCE DRAWING 21

REFERENCE DRAWING 22

REFERENCE DRAWING 23

REFERENCE DRAWING 24

REFERENCE DRAWING 25

REFERENCE DRAWING 26

REFERENCE DRAWING 27

REFERENCE DRAWING 28

REFERENCE DRAWING 29

REFERENCE DRAWING 30

REFERENCE DRAWING 31

REFERENCE DRAWING 32

REFERENCE DRAWING 33

REFERENCE DRAWING 34

REFERENCE DRAWING 35

REFERENCE DRAWING 36

REFERENCE DRAWING 37

REFERENCE DRAWING 38

REFERENCE DRAWING 39

REFERENCE DRAWING 40

REFERENCE DRAWING 41

1 - 14038 - OVERALL PLAN & SECTION
2 - 14051 - GENERAL ARRANGEMENT OF DERRICK CRANE
3 - 12424 - DERRICK FOUNDATION

4 - 14040 - MAST DESIGN

5 - 14122 - BULL WHEEL DETAILS

6 - 14032 - STEP BEARING (BASE OF MAST)

7 - 14117 - STIFFLEGS DETAILS

8 - 14034 - BOOM DETAILS

9 - 14118 - BOOM DETAILS

10 - 14119 - BOOM DETAILS

11 - 12458 - BOOM HANGER

12 - 12459 - MAIN HOIST HANGER

13 - 12422 - BLOCK & RIGGING (AUX HOIST)

14 - 14050 - SWINGER (ROTATES CRANE)

15 - 12416 - HOIST (SERVES BOOM, MAIN, AND AUX HOISTS)

16 - 14044.1 - CRANE OPERATING HOUSE ELECTRICAL & GENERAL LAYOUT

17 - 14044.2 - CRANE OPERATING HOUSE ELECTRICAL & GENERAL LAYOUT

18 - C-2-4-213_60 - ELEVATION 125 TO 130
19 - C-2-4-213_59 - ELEVATION 120 TO 125

20 - C-2-4-213_58 - ELEVATION 115 TO 120

21 - C-2-4-213_57 - ELEVATION 110 TO 115

22 - C-2-4-213_56 - ELEVATION 105 TO 110

23 - C-2-4-213_55 - ELEVATION 100 TO 105

24 - C-2-4-213_54 - ELEVATION 95 TO 100

25 - C-2-4-213_53 - ELEVATION 90 TO 95

26 - C-2-4-213_52 - ELEVATION 85 TO 90

27 - C-2-4-213_51 - ELEVATION 80 TO 85

28 - LOCK BULKHEADS TYPE 'A' PLAN AND SECTIONS

29 - LOCK BULKHEADS TYPE 'B' PLAN AND SECTIONS

30 - LOCK BULKHEADS TYPE 'C' PLAN AND SECTIONS

31 - LOCK BULKHEADS ROLLER END FRAMING

32 - LOCK BULKHEAD PICK-UP TRUSS GENERAL ARANGEMENT

33 - LOCK BULKHEAD PICK-UP TRUSS PLAN AND ELEVATIONS

34 - PICK-UP TRUSS SECTIONS AND DETAILS I

35 - PICK-UP TRUSS SECTIONS AND DETAILS II
36 - PICK-UP TRUSS HOOK MECHANISM ASSEMBLY

37 - PICK-UP TRUSS HOOK MECHANISM DETAILS

38 - PICK-UP TRUSS HOOK BEAM DETAILS

39 - PICK-UP TRUSS MISCELLANEOUS DETAILS

40 - BULKHEAD STORAGE PLAN, SECTION & DETAILS
41 - STORAGE WHARF REPLACEMENT PLAN, SECTIONS & DETAILS

File details come from the government source that posted it. Updated .