R0005.pdf
PDF 527 KB Posted
- Attached to
- PN81627 FY15 NICOE Satellite Site and Infrastructure Support, Joint Base Lewis-McChord (JBLM), WA
- Solicitation number
- W912DW-16-R-0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD952881561
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW-16-R-0001 FY15 NICoE Satellite Site at JBLM, WA
(See continuation page)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-R-0001
X 9B. DATED (SEE ITEM 11)
30-Oct-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Nov-2015
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
1. This amendment five (0005) provides for the following:
a. Revision to Section 00 73 00-A, Index of Drawings.
b. Revisions to Drawing C-102, Site Plan.
2. The proposal submittal time and date of December 1, 2015 at 1:00:00 p.m. LOCAL TIME remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl:
00 73 00-A (revised) Drawing C-102 (revised)
(End of Summary of Changes)
PN 81627 - FY15 NICoE Sattelite Site - Site Work 15018 Joint Base Lewis-McChord, WA W912DW-16-R-0001
00 73 00-A - 1 R0005
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING RECORD FILE NO. 20s/550-10-01, DATED: 11 SEP 2015
PAGE SHEET# SHEET TITLE REVISION DATE
GENERAL
1 G-001 COVER SHEET & INDEX OF DRAWINGS
GEOTECHNICAL
2 B-101 BORING LOGS
CIVIL
3 C-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES
4 C-002 HAUL ROUTE
5 C-003 EXISTING CONDITIONS R0004 16 NOV 2015
6 C-101 DEMOLITION PLAN
7 C-102 SITE PLAN R0005 19 NOV 2015
8 C-103 GRADING & STORM DRAIN PLAN
9 C-104 UTILITY PLAN
ELECTRICAL
10 E-001 ELECTRICAL LEGEND, ABBREVIATIONS, & GENERAL NOTES
11 E-101 ELECTRICAL DEMOLITION PLAN
12 E-102 ELECTRICAL SITE PLAN
13 E-501 ELECTRICAL DETAILS 1
14 E-502 ELECTRICAL DETAILS 2
15 E-503 ELECTRICAL DETAILS 3
16 E-504 ELECTRICAL LIGHTING DETAILS
TELECOMMUNICATIONS
17 T-001 TELECOMMUNICATIONS LEGEND, ABBREVIATIONS, &
GENERAL NOTES
18 T-101 TELECOMMUNICATIONS GENERAL SITE PLAN
19 T-101 TELECOMMUNICATIONS SITE PLAN 1
20 T-501 TELECOMMUNICATIONS DETAILS 1
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
®of Engineers
US Army Corps of Engineers
US Army Corps
A N
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:1
:3
P
M
OF
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
D A
T E A
N D T
IM
E P
L O
T T
E D
/1
/2
W
D W -1
-R -0
D E
S
IG
N F
IL
E I:
\A
E C
D e s ig n s \F
Y P
N
N
IC
O E \C o n
D o c s \C
A D
S h e e ts \C iv il \P
N
N
IC
o E
C -1
S .d g n
P N
N
IC
o E
C -1
S .d g n
S
U P
P O
R T
IN
G F
A C
IL
IT
IE
S
J O
IN
T B
A S
E L
E W
IS
-M c C
H O
R D
W A
S H
IN
G T
O N s /5
-1
-0
M c
W
IL
S O
N
20SHEET
IDENTIFICATION
SHEET
F Y P
N N
IC
o E S
A T
E L L
IT
E I
N F
R A
S T
R U
C T
U R
E S
E P
T E
M B
E R
S O
L
IC
IT
A T
IO
N N o
C O
N T
R A
C T N o
F
IL
E N o
T
7' CHAIN LINK/BARBED WIRE
A
C-102
N
SITE PLAN
C-102
S
IT
E P
L A
N
GARDNER LOOP ROAD
T
H S
T R
E E
T
DEARBORN AVENUE
1" = 30' 0 30' 60'
(2 ADA STALLS)
43 PARKING STALLS
(4 A
D A S
T A
L L S
P
A R
K
IN
G S
T A
L L S
9 PARKING STALLS
(TYP)
MARKING
PAVEMENT
LANDSCAPE
(2 TYP)
ADA RAMP
(TYP)
GUTTER
CURB AND
LANDSCAPE
E N
G
L E J
O N
AREA
DROP OFF
FFE = 277 FT
BUILDING
SATELLITE
NICoE
(4 EA)
BOLLARD
REMOVABLE
SEE NOTE 2
PAVEMENT (TYP)
(6 EA)
BOLLARD
REMOVABLE
S K
R
IN
D E
PROJECT LIMITS
PROJECT LIMITS
RIBBON CURB
REMAINING SIDES
BUILDING, 30' AT
58' AT FRONT OF
ATFP SETBACK,
LANDSCAPE
CELL
BIORETENTION
CELL
BIORETENTION
LANDSCAPE
LANDSCAPE
(SEE NOTE 4)
LAYDOWN AREA
CONTRACTOR
DUMPSTER (N.I.C.)
(N.I.C.)
UTILITY YARD
(N.I.C.)
NICoE BUILDING
(2 TYP)
ADA RAMP
PROJECT COMPLETION.
HYDROSEED CONTRACTOR LAYDOWN AREA AT
4. CONTRACTOR TO GRADE FLAT AND
STREETSIDE.
THE FURNISHING AND EDGE ZONES OF THE
STEEPER DRIVEWAY SLOPES ARE PERMITTED IN
SLOPES ARE LIMITED TO A MAXIMUM OF 2 PERCENT;
CLEAR PEDESTRIAN TRAVEL ZONE, WHERE CROSS
DRIVEWAY APRONS SHOULD NOT EXTEND INTO THE
SHALL MAINTAIN THE ELEVATION OF THE SIDEWALK.
3. DRIVEWAY CROSSINGS AND DROP OFF AREA
REQUIREMENTS OF ASHRAE 189.1.
2. SITE HARDSCAPE MUST MEET THE
NOTES, SEE SHEET C-101.
1. FOR LEGEND, ABBREVIATIONS, AND GENERAL
NOTES:
FOR NICoE FACILITY.
PREPARATION
LIMITS OF INITIAL SITE
A
R0005
A D
D E
D L
IM
IT
S O
F S
IT
E P
R E
P A
R A
T
IO
N /1
/1
M
R E
G3ENDRDN
Rectangle
| AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT |
| 00 73 00-A, INDEX OF DRAWINGS |
| SHEET C-102 |
File details come from the government source that posted it. Updated .