W68MD952881561
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW-16-R-0001 FY15 NICoE Satellite Site at JBLM, WA
(See continuation page)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-R-0001
X 9B. DATED (SEE ITEM 11)
30-Oct-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Nov-2015
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
1. This amendment four (0004) provides for the following:
a. Revision to Caution to Offerors page.
b. Revision to Section 00 73 00-A, Index of Drawings.
c. Revisions to Drawing C-003, Existing Conditions.
2. The proposal submittal time and date of December 1, 2015 at 1:00:00 p.m. LOCAL TIME remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl:
Caution to Offerors page (revised) 00 73 00-A (revised) Drawing C-003 (revised)
(End of Summary of Changes)
W912DW-16-R-0001 R0004
! ! ! C A U T I O N TO O F F E R O R S ! ! !
1. TELEPHONES: There are no public telephones at the Seattle District Corps of Engineers.
2. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M., Monday through Friday.
3. AVAILABILITY OF FUNDS: Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available from which payment for contract purposes can be made.
BEFORE SIGNING AND MAILING THIS OFFER, PLEASE TAKE NOTE OF THE FOLLOWING, AS
FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR OFFER TO BE REJECTED
4. AMENDMENTS: Have you acknowledged receipt of ALL amendments? If in doubt as to the number of amendments issued, please contact the representative listed on the Information Page.
5. AMENDED SECTIONS: If any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.
6. MISTAKE IN OFFER: Have you reviewed your offer price for possible errors in calculation or work left out?
7. OFFER ACCEPTANCE PERIOD: The minimum offer acceptance period is specified in block 13D of SF1442, page 00 11 00 -1, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.
8. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/
9. Far 52.204-4 - Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) (b) The Contractor is asked to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.
10. ATTENTION: Due to heightened security, hand-delivering proposals to Federal Center South may be more time-consuming than in years past.
A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government.
A Contracting representative will be in the Federal Center South lobby (building 1201) at the security guard desk to accept proposals fifteen (15) minutes prior to the specified time on the proposal due date.
If you arrive before a Contracting representative is present, the desk guard will direct you to building 1202, the Oxbow Building, where you will contact the Contract Specialist, or a procurement technician. Note that official receipt of a proposal shall be in accordance with FAR 52.215-1.
10. ATTENTION: Due to heightened security, the method of Hand Delivery has changed and takes longer than the previous method of arriving at the Federal Center South building lobby to deliver your Offer, Bid or Proposal.
Please allow sufficient time to allow for heightened security at Government installations and to get to Building #1202.
Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.
https://www.sam.gov/portal/public/SAM/
W912DW-16-R-0001 R0004
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Bobbie Weitzel, Procurement Technician, at 206-764-6692 or Sonia Frees, Procurement Technician, at 206-764-3516. A Contracting representative will come down and accept your Offer, Bid or Proposal.
A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government. Note that official receipt of a proposal shall be in accordance with FAR 52.215-1.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.
PN 81627 - FY15 NICoE Sattelite Site - Site Work 15018 Joint Base Lewis-McChord, WA W912DW-16-R-0001
00 73 00-A - 1 R0004
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING RECORD FILE NO. 20s/550-10-01, DATED: 11 SEP 2015
PAGE SHEET# SHEET TITLE REVISION DATE
GENERAL
1 G-001 COVER SHEET & INDEX OF DRAWINGS
GEOTECHNICAL
2 B-101 BORING LOGS
CIVIL
3 C-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES
4 C-002 HAUL ROUTE
5 C-003 EXISTING CONDITIONS R0004 16 NOV 2015
6 C-101 DEMOLITION PLAN
7 C-102 SITE PLAN
8 C-103 GRADING & STORM DRAIN PLAN
9 C-104 UTILITY PLAN
ELECTRICAL
10 E-001 ELECTRICAL LEGEND, ABBREVIATIONS, & GENERAL NOTES
11 E-101 ELECTRICAL DEMOLITION PLAN
12 E-102 ELECTRICAL SITE PLAN
13 E-501 ELECTRICAL DETAILS 1
14 E-502 ELECTRICAL DETAILS 2
15 E-503 ELECTRICAL DETAILS 3
16 E-504 ELECTRICAL LIGHTING DETAILS
TELECOMMUNICATIONS
17 T-001 TELECOMMUNICATIONS LEGEND, ABBREVIATIONS, &
GENERAL NOTES
18 T-101 TELECOMMUNICATIONS GENERAL SITE PLAN
19 T-101 TELECOMMUNICATIONS SITE PLAN 1
20 T-501 TELECOMMUNICATIONS DETAILS 1
A
N
C-003
GARDNER LOOP ROAD
T
H S
T R
E E
T
DEARBORN AVENUE
EXISTING CONDITIONS
C-003 1" = 30' 0 30' 60'
E X
IS
T
IN
G C
O N
D
IT
IO
N S
EL = 275.65'
E 1,129,433.7362 N 655,563.5279
NAIL AND WASHER
AHBL #3
EL = 273.82
E 1,128,859.3767 N 655,579.2894
NAIL AND WASHER
AHBL #107
EL = 274.99'
E 1,128,946.4206 N 655,408.2079
SUMAG
AHBL #105
EL = 275.25'
E 1,129,143.6501 N 655,541.1274
NAIL AND WASHER
AHBL #104
EL = 274.73'
E 1,129,158.7224 N 655,834.9030
NAIL AND WASHER
AHBL #103
SURVEY CONTROL DATUM
AHBL #107
AHBL #104
AHBL #103
AHBL #105
AHBL #3
T
H S
T R
E E
T
E N
G
L E J
O N
S K
R
IN
D E
JBLM REQUIREMENTS.
3. RELOCATE SIGNAGE IN ACCORDANCE WITH
VERIFIED PRIOR TO ANY EXCAVATION.
SHALL HAVE ALL EXISTING SITE UTILITIES
UNDERGROUND UTILITIES. THE CONTRACTOR
DEPTH, MATERIAL, OR LOCATION OF ANY
EXISTENCE OR NON-EXISTENCE, SIZE, TYPE,
2. THIS SURVEY DOES NOT GUARANTEE THE
GENERAL NOTES, SEE SHEET C-001.
1. FOR LEGEND, ABBREVIATIONS, AND
NOTES:
A
R0004
M O
D
IF
IE
D T
O S
H O
W S
S M
H
I
N F
O R
M A
T
IO
N /1
/1
M
R E
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
®of Engineers
US Army Corps of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:2
A
M
OF
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
D A
T E A
N D T
IM
E P
L O
T T
E D
/1
/2
W
D W -1
-R -0
D E
S
IG
N F
IL
E I:
\A
E C
D e s ig n s \F
Y P
N
N
IC
O E \C o n
D o c s \C
A D
S h e e ts \C iv il \P
N
N
IC
o E
C -0
E .d g n
P N
N
IC
o E
C -0
E .d g n
S
U P
P O
R T
IN
G F
A C
IL
IT
IE
S
J O
IN
T B
A S
E L
E W
IS
-M c C
H O
R D
W A
S H
IN
G T
O N s /5
-1
-0
M c
W
IL
S O
N
20SHEET
IDENTIFICATION
SHEET
F Y P
N N
IC
o E S
A T
E L L
IT
E I
N F
R A
S T
R U
C T
U R
E S
E P
T E
M B
E R
S O
L
IC
IT
A T
IO
N N o
C O
N T
R A
C T N o
F
IL
E N o
T
T
JBLM
PHYS ED
M E D
TR
A
IN
IN
GN
O
P
A R
K
IN
G
M E D
TR
A
IN
IN
G
N O
TR
A
IN
IN
G
P E D
X
IN
G
MADIGAN
SIGN
M U S T
TU
R
N
N O
P
A R
K
M P
H
N O
P
A R
K
S
TO
P
P E R
M
IT
P A R
K
N O
P
A R
K
TU
R N
HOSPITAL
SIGNN
O
P
A R
K
N O
P
A R
K S
TO
P
S
TO
P
N O
P
A R
K
P E R
M
IT
P A R
K
C H
IN
L
IN
K
B A
R B
E D
W
IR
E
N O
P
A R
K
15" CMP
IE=271.18
18" CMP
IE=271.21
18" CMP
IE=271.44
12" CONC
IE=271.08
"O
"O
"O
"O
"O
"F
12" CONC
IE=271.84
F
"M
"M
"M
"F
"F
SSMH 500 RIM=275.81
8" CONC SW IE=266.96
8" CONC NW IE=265.91
LADDER NW
STCB 2367 RIM=274.72
15" CMP SE IE=271.82
STCB 2214 RIM=274.90
15" CMP NE IE=272.32
15" CMP NW IE=272.30
HB
FF=
.6
ELECTRICAL
OUTLET
ELECTRICAL
OUTLET
ELECTRICAL
OUTLET
ELECTRICAL
METER/BREAKER
ELECTRICAL
OUTLET
36" CMP
IE=275.81
36" CMP
IE=276.11
G R
A V E L
TOWER
ROOF=293.13
TOWER
ROOF=291.92
ROOF=
290.73
FF=
.6
2FF=
.6
STCB 733 RIM=275.03
15" CMP SE IE=273.23
4" PVC SW IE=273.88
8" PVC NW IE=273.33
STCB 734 RIM=276.00
8" PVC SE IE=273.70
4" PVC SW IE=274.80
8" PVC NW IE=273.65
STCB 735 RIM=275.02
8" PVC SE IE=273.62
4" PVC SW IE=274.82
8" PVC NW IE=273.62
STCB 736 RIM=275.99
8" PVC SE IE=273.59
4" PVC SW IE=274.79
HB
HB
HB
15" CMP
IE=271.81
12" CMPIE=271.64
STCB 1038 RIM=275.59
15" CMP SW IE=273.19STCB 1066 RIM=275.65
15" CMP NE IE=273.00
15" CMP SW IE=272.95
15" CMP NW IE=273.00
STCB 1067 RIM=275.53
15" CMP NE IE=272.43
15" CMP SW IE=272.43
"F
"F
"F
"F
"F
"F
"F
"F
"F
"F
"F
"F
"F
"O
"F
"F
"F
"F
"F
"F
"A
"M
A D
"F
"F
"F
"F 10
"F "F
"F
TR
A
IN
IN
G
C E N
TE
R
M E D
IC
A L
S
IM
U
LA
TIO
B
LD
G
12" CMP
IE=271.41
"U
"F
"F
"F
"F x8
"P "P
"F x8
"P x10
"U "F
"F
"F
"F
7' CHAIN LINK/BARBED WIRE
SEWER LINE PER
LOCATE PAINT
FF=
.6
FF=
.5
SHED
FF=276.22
SHED
FF=276.22
"F
"F
"F
"F
"F
"F
"F
"F
"F12
"F4 "F
"F
"F
"F
"F
"F
275275
6 276
G3ENDRDN
Text Box
16 NOV 15
| AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT |
| CAUTION TO OFFERORS! |
| 00 73 00-A, INDEX OF DRAWINGS |
| SHEET C-003 |