This is Amendment 0002 to a federal dredging solicitation (W912DS26BA011) issued by the U.S. Army Corps of Engineers (USACE), New York District, for work at the U.S. Merchant Marine Academy in Kings Point, New York. The amendment, effective April 6, 2026, revises bid schedules, updates specification sections, adds survey data, and establishes an RFI cutoff date of April 7, 2026.
The solicitation requires dredging and placement of dredged material from Hague Basin with four basic and optional contract line items (CLINs). CLIN 0002 covers removal of 6,110 cubic yards to -17.5 feet mean lower low water (MLLW) with no overdepth; CLIN 0003 covers 5,175 cubic yards to -15 feet MLLW plus 2-foot overdepth; CLIN 0005 (Option 1) covers 18,010 cubic yards to -12 feet MLLW plus 2-foot overdepth; and CLIN 0006 (Option 2) covers 22,680 cubic yards to -12 feet MLLW plus 2-foot overdepth. The contractor must transport, process, and place dredged material at a contractor-furnished, state-permitted, government-approved upland placement site. The base contract requires completion within 43 calendar days of Notice to Proceed at a minimum production rate of 1,500 cubic yards per day. Options 3 and 4 establish fixed completion dates of July 1, 2026, and June 19, 2026, respectively, with adjusted pricing reflecting cost differences from the 43-day baseline. Award is based on lowest total price for all CLINs 0001-0008 from the responsible, responsive bidder. Apparent low bidders must submit required site compliance documentation within 20 calendar days of notification. The government notes that quantities are estimated based on September 2025 survey data and that an additional Before Dredge survey will be performed prior to Notice to Proceed. Offerors must acknowledge receipt of this amendment prior to bid submission.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this Amendment is to:Block 14 (Description of Amendment/Modification):
1. Revise bid schedule
2. Revise specification Section 01 11 00 and Section 01 30 00
3. Add -XYZ data for the Plans & Specifications survey
4. establish RFI cut off date of 07 April 2026. Any RFI submitted after 07 April 2026 will not be responded to.
5. Answer bidder inquiries. Responses to bidder inquiries are provided "for informational purposes only" and do not revise solicitation, plans and specifications.
NOTE: Offerors must acknowledge receipt of this amendment by date specified in the bid (or as amended) by one of the following methods: In space provided on the SF 1442, by separate letter, or by signing block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE
SPECIFIED MY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE
BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATI
ON
FROM TO AMOUNT
Description Basic Work 1 - Dredging and Placement of Dredged Material Dredging (to -17.5 feet MLLW) and Placement.
Removal of all material (6,100 CY) lying above the plane of
17.5 feet below mean lower low water (MLLW) from Hague Basin, U.S. Merchant Marine Academy, as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state
Basic Work 1 - Dredging and Placement of Dredged Material Dredging (to -17.5 feet MLLW) and Placement.
Removal of all material (6,110 CY) lying above the plane of
17.5 feet below mean lower low water (MLLW) from Hague Basin, U.S. Merchant Marine Academy, as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state
W912DS26BA0110002
permitted, Government approved upland placement site(s). All material above the plane of 17.5 feet below MLLW must be removed and no material below the plane of
17.5 feet below MLLW shall be removed. These are estimated quantities.
permitted, Government approved upland placement site(s). All material above the plane of 17.5 feet below MLLW must be removed and no material below the plane of
17.5 feet below MLLW shall be removed. These are estimated quantities.
Quantity 6,100 6,110 +10
INFORMATI
ON
FROM TO AMOUNT
Description Basic Work 2 - Dredging and Placement of Dredged Material Dredging (to -15 feet MLLW + 2 foot allowable overdepth) and Placement.
Removal of material (5,300 CY) lying above the plane of 15 feet below mean lower low water (MLLW), plus 2 foot allowable overdepth from Hague Basin, U.S. Merchant Marine Academy as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). These are estimated quantities.
Basic Work 2 - Dredging and Placement of Dredged Material Dredging (to -15 feet MLLW + 2 foot allowable overdepth) and Placement.
Removal of material (5,175 CY) lying above the plane of 15 feet below mean lower low water (MLLW), plus 2 foot allowable overdepth from Hague Basin, U.S. Merchant Marine Academy as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). These are estimated quantities
Quantity 5,300 5,175 -125
Option Line Item 0005
INFORMATI
ON
FROM TO AMOUNT
Description Option Work 1 - Dredging and Placement of Dredged Material Dredging (to -12 feet MLLW + 2 foot allowable overdepth) and Placement.
Removal of material (18,090 CY) lying above the plane of 12 feet below mean lower low water (MLLW), plus 2 foot allowable overdepth from Hague Basin, U.S. Merchant Marine Academy, as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). These are estimated quantities. This option may be exercised within 5 days from
NTP.
Option Work 1 - Dredging and Placement of Dredged Material Dredging (to -12 feet MLLW + 2 foot allowable overdepth) and Placement.
Removal of material (18,010 CY) lying above the plane of 12 feet below mean lower low water (MLLW), plus 2 foot allowable overdepth from Hague Basin, U.S. Merchant Marine Academy, as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). These are estimated quantities. This option may be exercised within 5 days from NTP. Twelve (12) days will be added to the period of performance unless Option 3 or Options 3 and 4 are exercised.
Quantity 18,090 18,010 -80
Option Line Item 0006
INFORMATI
ON
FROM TO AMOUNT
Description Option Work 2 - Dredging and Placement of Dredged Material Dredging (to -12 feet MLLW + 2 foot allowable overdepth) and Placement.
Removal of material (22,685 CY) lying above the plane of 12 feet below mean lower low
Option Work 2 - Dredging and Placement of Dredged Material Dredging (to -12 feet MLLW + 2 foot allowable overdepth) and Placement.
Removal of material (22,680 CY) lying above the plane of 12 feet below mean lower low water (MLLW), plus 2 foot allowable overdepth from Hague Basin, U.S. Merchant Marine Academy, as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). These are estimated quantities. This option may be exercised within 5 days from
NTP.
water (MLLW), plus 2 foot allowable overdepth from Hague Basin, U.S. Merchant Marine Academy, as shown on contract drawing sheet C- 101, with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). These are estimated quantities. This option may be exercised within 5 days from NTP. Sixteen (16) days will be added to the period of performance unless Option 3 or Options 3 and 4 are exercised.
Quantity 22,685 22,680 -5
Section 00 20 00 - Instructions for Procurements
Miscellaneous text in this section has been modified to:
TOTAL BASE BID (CLINs 0001 THRU 0004) $ ________________________________
TOTAL OPTION BID (CLINs 0005 THRU 0008) $ ________________________________
TOTAL BID (CLINs 0001 THRU 0008) $ ________________________________
NOTES TO BIDDERS:
NOTE 1: Bidders must bid on all items. Failure to bid on all work will be cause for rejection of the bid as nonresponsive.
NOTE 2: Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001 through 0008.
NOTE 3: The unit prices for CLINs 0002, 0003, 0005, and 0006 represent the cost per cubic yard for the removal of the estimated quantities of dredged material (all material except ledge rock lying above the planes of -15 feet and -12 feet mean lower low water (MLLW) respectively, plus 2 foot allowable overdepth and the plane of -17.5 feet MLLW), in the Basic Work (Dredging Areas of CLIN 0002 and 0003) and Option Work (Dredging Area of CLINs 0005 and 0006) contract areas of Hague Basin. The dredged material from CLINs 0002, 0003, 0005, and 0006 must subsequently be transported, processed, and placed at a contractor furnished, state permitted, Government approved upland placement site(s).
NOTE 4: All bidders are hereby advised that the execution of the Options is subject to the availability of funds.
NOTE 5: Exercise of Options are at the discretion of the Government and may be exercised within five (5) calendar days of receipt by the Contractor of the Notice to Proceed (Basic Work) for Option 1, Option 2, Options 3 and/or 4. If Options 1 and/or 2 are exercised, their performance periods will be consecutive to that of the Basic Work. If Option 3, or Options 3 and 4 are exercised, please see Notes 12 thru 15.
NOTE 6: All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on 14-17 September 2025.
USACE Before Dredge (BD) survey will be performed prior to Notice to Proceed (NTP).
NOTE 7: The Government may reject a bid as non-responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.
NOTE 8: Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself may render the proposal non-responsive and may be cause for its rejection.
NOTE 9: The apparent low bidder shall submit the documents specified in Section 01 30 00, Administrative Requirements, paragraph 1.4, Contractor-Identified Offloading, Processing and Disposal Site Compliance. If the apparent low bidder does not submit the required information within 20 calendar days from the date the apparent low bidder is notified of being the low bidder, the bidder may be considered non-responsible and his bid will no longer be considered.
Information provided by the apparent low bidder regarding the 20-day submittal will be the final version. If the apparent low bidder requests to make changes to the 20-day submittal, they can only be made with approval from the Government.
NOTE 10: It is the contractor's responsibility to comply with all conditions and requirements of the Contractor furnished placement site(s).
NOTE 11: The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire work (Basic and Options 1 and 2) ready for use, not later than 43 calendar days after the date the Contractor receives the Notice to Proceed. Should any option(s) be exercised, all work is still required to be completed by the required completion date as included in the exercised option. The time stated for completion shall include final cleanup of the premises. (FAR 52.236-12)
NOTE 12: The Contractor shall meet a production rate to complete all work based upon the adjusted required completion date set forth in Option 3 and Option 4, subject to availability of funding. If Option 3 is exercised, the required contract completion date will be July 1, 2026. If Option 4 is exercised, the required contract completion date will be June 19, 2026. Hence, the additional 12 and 16 days stated in option 1 and 2 will not be applicable.
NOTE 13: Option 3 represents the difference in net price (positive or negative) for CLINs 0001 thru 0006, between completing the contract within 43 calendar days of NTP issuance, and the adjusted required completion date of July 1, 2026. For example, if completing the contract for CLINs 0001 thru 0006 by July 1, 2026 is a lower cost than completing the contract within 43 calendar days of NTP issuance, then the firm fixed price for Option 3 would be negative to reflect the reduced cost.
If completing the contract for CLINs 0001 thru 0006 by July 1, 2026 is a higher cost than completing the contract within 43 calendar days of NTP issuance, then the firm fixed price for Option 3 would be positive to reflect the increased cost.
NOTE 14: Option 4 represents the difference in net price (positive or negative) for CLINs 0001 thru 0006, between completing the contract by the required completion date of July 1, 2026 in Option 3 and completing the contract by the required completion date of June 19, 2026 in Option 4. For example, if completing the contract for CLINs 0001 thru 0006 by June 19, 2026 is a lower cost than completing the contract by July 1, 2026, then the firm fixed price for Option 4 would be negative to reflect the reduced cost. If completing the contract for CLINs 0001 thru 0006 by June 19, 2026 is a higher cost than completing the contract by July 1, 2026, then the firm fixed price for Option 4 would be positive to reflect the increased cost.
NOTE 15: If Option 3, or Options 3 and 4 are exercised, FAR 52.211-18 Variation in Estimated Quantity clause would not be authorized nor will there be any increases or decreases in quantities.
Section 01 00 00 - General Requirements
Miscellaneous text in this section has been modified to:
Amendment 0002
TO BIDDERS:
The following changes shall be made to this solicitation.
DRAWINGS:
1. The following DRAWINGS have been REVISED and REISSUED:
None
2. The following DRAWINGS have been REVISED but NOT REISSUED:
None
3. The following DRAWINGS have been ADDED:
None
4. The following DRAWINGS have been DELETED:
None
SPECIFICATIONS:
1. The following SPECIFICATIONS have been REVISED and REISSUED:
None
2. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 01 11 00 Page 1 Paragraph 1.2a.: "The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire base work ready for use, not later than 15 calendar days after the date the Contractor receives the notice to proceed.
- Section 01 11 00 Page 1 Paragraph 1.2 b.: "Should Option 1 and/or Option 2 be exercised, an additional one (1) calendar day for each 1,500 cubic yards to be removed under the option(s) will be allowed. This will not applicable if option 3 or 4 are exercised, since both options require a fixed completion date."
- Section 01 11 00 Page 2 Paragraph 1.3.1: "The maintenance for this project consists of dredging a total of approximately 51,975 CY of material based on the plans and specifications survey performed in September 2025."
- Section 01 11 00 Page 2 Paragraph 1.3.1 Table: "BASIC WORK 1 - Dredging Area: (-17.5' MLLW + 0' OD)". Quantity (CY): 6,110
- Section 01 11 00 Page 2 Paragraph 1.3.1 Table: "BASIC WORK 2 - Dredging Area: (-15' MLLW + 2' OD)". Quantity (CY): 5,175
- Section 01 11 00 Page 2 Paragraph 1.3.1 Table: "OPTION 1 - Dredging Area: (-12' MLLW + 2' OD)". Quantity (CY): 18,010
- Section 01 11 00 Page 2 Paragraph 1.3.1 Table: "OPTION 2 - Dredging Area: (-12' MLLW + 2' OD)". Quantity (CY): 22,680
- Section 01 11 00 Page 2 Paragraph 1.3.1: "Contract time for completion of the basic work and/or Option 1 and Option 2 is based on a minimum average production rate of 1,500 cubic yards (CY) per day for dredging, transportation, processing and placement at a contractor furnished, state permitted, Government approved upland placement site(s). Should the total quantity of material exceed the estimated quantities within the Solicitation Contract Form, additional time will be allowed at the rate of one (1) calendar day for each 1,500 cubic yards in excess of the established limit. The time stated for completion shall include final clean up. See 1.2.c for contract time for completion should Option 3 or Option 4 be exercised."
- Section 01 11 00 Page 2 Paragraph 1.3.1: "Based on the plans and specifications survey performed in September 2025, the maximum quantity available to be dredged is 51,975 CY from the contract areas in the Hague Basin, U.S. Merchant Marine Academy."
- Section 01 30 00 Page 11 Paragraph 1.9 Table: "BASIC WORK 1 - Dredging Area: (-17.5' MLLW + 0' OD)". Required Dredging Depth (FT) MLLW: -17.5. Quantity (CY): 6,110
- Section 01 30 00 Page 11 Paragraph 1.9 Table: "BASIC WORK 2 - Dredging Area: (-15' MLLW + 2' OD)". Required Dredging Depth (FT) MLLW: -15. Quantity (CY): 5,175
- Section 01 30 00 Page 11 Paragraph 1.9 Table: "OPTION 1 - Dredging Area: (-12' MLLW + 2' OD)". Required Dredging Depth (FT) MLLW: -12. Quantity (CY): 18,010
- Section 01 30 00 Page 11 Paragraph 1.9 Table: "OPTION 2 - Dredging Area: (-12' MLLW + 2' OD)". Required Dredging Depth (FT) MLLW: -12. Quantity (CY): 22,680
- Section 01 30 00 Page 11 Paragraph 1.9: "Total Estimated Quantity Available: 51,975 CY"
3. The following SPECIFICATIONS have been ADDED:
- Section 01 11 00 Page 1 Paragraph 1.2 c.: "The work is anticipated to be performed within the approximate time period of September 2026 - November 2026. Should Option 3, or Options 3 and
4 be exercised, work shall be performed as early as practical to achieve the CLIN-based adjusted required completion date. Should Option 3 or Options 3 and 4 be exercised, the contractor shall meet a production rate to complete the work based upon the required completion date set forth in
<font style="font-size: 1rem;">the Option. Hence, the additional 12 and 16 days stated in option 1 and 2 will not be applicable. "
4. The following SPECIFICATIONS have been DELETED:
None
BID SCHEDULE:
2. The following BID SCHEDULE have been REVISED and REISSUED:
- CLIN 0002: Basic Work 1 - Dredging and Placement of Dredged Material to -17.5 feet MLLW with no overdepth. Quantity (CY): 6,110
- CLIN 0003: Basic Work 2 - Dredging and Placement of Dredged Material to -15 feet MLLW + 2 foot allowable overdepth. Quantity (CY): 5,175
- CLIN 0005: Option Work 1 - Dredging and Placement of Dredged Material to -12 feet MLLW + 2 foot allowable overdepth. Quantity (CY): 18,010
- CLIN 0006: Option Work 2 - Dredging and Placement of Dredged Material to -12 feet MLLW + 2 foot allowable overdepth. Quantity (CY): 22,680
- Note 11: "The Contractor shall be required to (i) commence work under this contract within five
(5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire work (Basic and Options 1 and 2) ready for use, not later than 43 calendar days after the date the Contractor receives the Notice to Proceed. Should any option(s) be exercised, all work is still required to be completed by the required completion date as included in the exercised option. The time stated for completion shall include final cleanup of the premises. (FAR 52.236-12)"
- Note 13: "Option 3 represents the difference in net price (positive or negative) for CLINs 0001 thru 0006, between completing the contract within 43 calendar days of NTP issuance, and the adjusted required completion date of July 1, 2026. For example, if completing the contract for CLINs 0001 thru 0006 by July 1, 2026 is a lower cost than completing the contract within 43 calendar days of NTP issuance, then the firm fixed price for Option 3 would be negative to reflect the reduced cost. If completing the contract for CLINs 0001 thru 0006 by July 1, 2026 is a higher cost than completing the contract within 43 calendar days of NTP issuance, then the firm fixed price for Option 3 would be positive to reflect the increased cost."
2. The following BID SCHEDULE have been REVISED but NOT REISSUED:
None
3. The following BID SCHEDULE have been ADDED:
- CLIN 0005 Option 1 Work: "Twelve (12) days will be added to the period of performance unless Option 3 or Options 3 and 4 are exercised."
- CLIN 0006 Option 2 Work: "Sixteen (16) days will be added to the period of performance unless Option 3 or Options 3 and 4 are exercised."
4. The following BID SCHEDULE have been DELETED:
None
ATTACHMENTS:
1. The following ATTACHMENTS have been REVISED and REISSUED:
- Please refer to "02 - Bid Schedule USMMA26 03APR2026".
2. The following ATTACHMENTS have been REVISED but NOT REISSUED:
- Please refer to attachments "SPECS_CHG-01 11 00_USMMA26_03APR_v2" and
"SPECS_CHG-01 30 00_USMMA26_03APR".
3. The following ATTACHMENTS have been ADDED:
- XYZ data for the Plans & Specifications survey "5615_3med_mllw_ELEVATION" and "5615_10sort_mllw_ELEVATION".
4. The following ATTACHMENTS have been DELETED:
None
BIDDERS'S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "For Information Only" and do not revise the solicitation, plans or specifications.)
1) Note 15 in the amendment states "If Option 3, or Options 3 and 4 are exercised, FAR 52.211-18 Variation in Estimated Quantity clause would not be authorized nor will there be any increases or decreases in quantities." What does this mean? Does it mean that, if the options are exercised, the pay quantities for volume dredged will be fixed to what's in the solicitation, and surveys quantities will be irrelevant? Please clarify, as this has the potential to significantly impact bid prices.
Response: If the Options 3, or Options 3 and 4 are exercised, the pay quantities for the volume will remain fixed to the solicitation amount. This means that the pay volume would not be adjusted as a result of the Before Dredge (BD) Survey.
2) The amended solicitation also states "All material above the plane of 17.5 feet below MLLW must be removed and no material below the plane of 17.5 feet below MLLW shall be removed.
Dredging to a flat plane of 17.5 with zero tolerance is not feasible. Please clarify what happens in the event that grades less than 17.5 are left, and in the event that grades deeper than 17.5 are left.
Would the govt entertain adding a 6" tolerance to this work?
Response: It is recommended that dredging is accomplished as close to grade as practical using best management practices.
3) A thorough analysis of companies capable of processing/unloading/disposing of dredged material revealed that a consistent production rate of 2,500 CY is near-impossible. Barge availability is another key factor that would make this production rate unachievable. Would the govt entertain reducing the daily production requirement to 1,500 CY per day?
Response: The minimum average production rate has been updated to 1,500 CY per day for dredging, transportation, processing and placement at a contractor furnished, state permitted, Government approved upland placement site(s) unless Option 3 or Options 3 and 4 are exercised.
Should Option 3 or Options 3 and 4 be exercised, the contractor shall meet a production rate to complete the work based upon the required completion date set forth in the Option.
4) Can the govt provide any XYZ data available for the existing grades?
Response: The XYZ data for the Plans & Specifications survey is added with amendment 0002.
No RFIs will be responded to after 7 April 2026
| IDCode: J |
| Page: 1 |
| Pages: 12 |
| AmendNo: 0002 |
| EffDate: 06 APR 2026 |
| ReqNo: |
| ProjNo: 573377 |
| IssCode: W912DS |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW YORK |
KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300
NEW YORK, NY 10278-0004
UNITED STATES
MOHENDA SURAGE, EMAIL: MOHENDA.R.SURAGE@USACE.ARMY.MIL TELEPHONE: 917-940-8013
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912DS26BA011 |
| SolDate: 13 MAR 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: NICHOLAS EMANUEL |
| ContDate: |
| CODate: 07 APR 2026 |