Amendment 0006_PFAS Addendum.pdf
PDF 2 MB Posted
- Solicitation number
- W912DS26BA006
About this file
This is a management policy document issued by Fort Drum's Directorate of Public Works Environmental Division governing the handling of PFAS-contaminated soils originating on the installation, effective January 30, 2026.
The policy establishes a case-by-case protocol for soil management during construction projects at Fort Drum where PFAS contamination is known or suspected. During project planning, the Directorate of Public Works must avoid construction in known contamination areas when feasible, per Installation Management Command policy. For projects where avoidance is impossible, contract Statements of Work must require contractors to maintain excavated soil within the construction footprint and proximal to the original source, using soil first as backfill and then spreading/feathering excess material on-site. If contractors cannot manage excess soils on-site and historical analytical results show no exceedances compared to Office of the Secretary of Defense (OSD) 2023 Risk Screening Levels for Soil (PFOS: 0.013 mg/kg; PFOA: 0.019 mg/kg), excess soil may be directly hauled to the designated Fort Drum Land Clearing Debris (LCD) Landfill without temporary stockpiling or composite sampling. If analytical results show exceedances, contractors must either temporarily stockpile soils on-site (if project footprint permits) or at a designated off-site hardstand location surrounded by silt fence. Fort Drum completes required PFAS sampling at contractor expense with seven business days' notice; if results exceed OSD standards, the contractor disposes of contaminated soils at their expense in compliance with applicable legal guidelines and OSD policies; if results are below standards, soils are hauled to the LCD Landfill at contractor expense. All soil relocations must be documented with marked maps and detailed logs reporting dates, volumes, and excavation locations.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Directorate of Public Works – Environmental Division
Management Policy for PFAS Contaminated Soils Originating on Fort Drum
EXTERNAL DISTRIBUTION ONLY
Current as of 30-Jan-2026
Fort Drum PFAS Contaminated Soils Management Policy A. Background Information
1. A PFAS Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Investigation (RI) is currently underway at Fort Drum to determine the extent of PFAS contamination in soil, groundwater, and surface water at a minimum of 27 locations (“Areas of Interest or “AOIs”) across the installation.
2. The RI is a multi-year effort through 2027 at minimum.
3. The intent of this policy is to avoid creating additional PFAS hazardous waste sites on Fort Drum when relocating contaminated soils from a construction site to an alternative Fort Drum location, including the Land Clearing Debris (LCD) Landfill.
B. Protocol:
Until contamination has been thoroughly delineated, Environmental Division will utilize all existing analytical results, groundwater flow models, and project characteristics to make soil management determinations on a case-by-case basis according to the following and associated decision tree (Appendix A):
1. During the project citing and planning process, Directorate of Public Works
(DPW) EP&S staff should avoid construction in areas of known PFAS contamination to the greatest extent possible in accordance with Installation Management Command (IMCOM) Policy Memorandum – Timely Identification and Mitigation of Contaminated Soil at Proposed Construction Sites on Installation Management Command Installations (Appendix B).
2. For projects that are known or suspected of having PFAS contamination and avoiding construction in the area is not possible, contract Statements of Work shall specify that contractors are required to maintain all soil within the construction footprint and proximal to the original source of the material.
Excavated soil should first be used as backfill and then spread/feathered when no additional backfill material is required near the source of the material.
Contractors are not authorized to haul excess soil off the project site. Given the variability of contamination across the installation, consult with Fort Drum DPW Environmental Division to ensure proper placement of excess soil.
3. If the contractor is unable to use excess soils within the construction footprint but review of historic analytical sampling results performed by the Environmental Division shows favorable results (i.e., no exceedances compared to Office of the Secretary of Defense (OSD) 2023 Risk Screening Levels for Soil (RSLs)1) then excess soil can be directly hauled to the designated location at the Fort Drum Land Clearing Debris (LCD) Landfill (Appendix C). No temporary stockpiling on site or composite sampling required. Access to the LCD Landfill will be coordinated through DPW. DPW staff will control access to the LCD Landfill and will ensure that no soil relocated to the designated area (surrounded by silt fence and posted with off-limits signage) is used for future projects.
Contract Statements of Work shall require/direct:
a) The placement of excess spoils at the LCD Landfill after the Contractor has exhausted all means to manage excess soils on site. Every effort should be made to keep as much soil on site as possible to minimize the amount of soil that is hauled to the LCD Landfill.
b) The Contractor to report the total cubic yards to the Project COR after soils have been relocated to the LCD Landfill. The report will include marked up maps showing excavation location(s) and a log detailing dates hauled, and volumes moved (Appendix D) to accurately and thoroughly document how much soil has been relocated from a given project area to the LCD Landfill.
4. If the contractor is unable to use excess soils within the construction footprint and review of historic analytical sampling results performed by the Environmental Division show exceedances compared to OSD 2023 Risk Screening Levels1 then:
a) If the project footprint accommodates the temporary stockpiling of excess soils, the contractor will temporarily stockpile excess soils onsite. All excess soils from a given project area will be consolidated and stockpiled in one location as proximal to the original source of the material as possible. A Construction Representative (CON REP) from Fort Drum DPW EP&S will provide oversight when temporary stockpiles are developed to ensure proper placement within the project footprint/area. Fort Drum will complete all required PFAS sampling2/testing to determine management strategy for all soils that will require removal from the site. A minimum of seven business days of advanced notification will be required to complete soil sampling.
Analytical analysis costs will be at the contractor’s expense.
i. If results indicate that PFAS contamination exceeds OSD 2023 Risk
Screening Levels1 the contractor will be required to dispose of excess soils IAW all applicable legal guidelines and OSD policies. Fort Drum will review all disposal documentation prior to removal. Disposal of contaminated soils will be at the contractor’s expense.
ii. If results indicate that PFAS contamination is below OSD 2023 Risk
Screening Levels1, excavated soils will be hauled to a designated location at the Fort Drum LCD Landfill. Hauling of excess soils will be at the contractor’s expense and will be reported per the guidance in Section 3(b) above.
b) If the project footprint cannot accommodate the temporary stockpiling of excess soils, the contractor will haul and temporarily stockpile excess soils at a designated location outside of the project footprint, on hardstand and surrounded by silt fence, identified by EP&S Division in coordination with Environmental Division. All excess soils from a given project area will be consolidated and stockpiled in one location. Fort Drum will complete all required PFAS sampling2/testing to determine management strategy for all soils that will require removal from the site. A minimum of seven business days of advanced notification will be required to complete soil sampling.
Analytical analysis costs will be at the contractor’s expense.
i. If results indicate that PFAS contamination exceeds OSD 2023 Risk
Screening Levels1, the contractor will be required to dispose of excess soils IAW all applicable legal guidelines and OSD policies. Fort Drum will review all disposal documentation prior to removal. Disposal of contaminated soils will be at the contractor’s expense.
ii. If results indicate that PFAS contamination is below OSD 2023 Risk
Screening Levels1, excavated soils will be hauled to a designated location at the Fort Drum LCD Landfill. Hauling of excess soils will be at the contractor’s expense and will be reported per the guidance in Section 3(b) above.
Kurt W. Hauk, P.E.
Director Public Works
Footnotes
1. OSD 2023 Residential Risk Screening Levels (RSL) for Soil*
Chemical RSL (mg/kg)
PFOS 0.013
PFOA 0.019
*Detections of target PFAS constituents greater than OSD 2023 RSLs would trigger a CERCLA investigation.
2. Soil Sampling Methodology
a. PFAS are considered Semi-Volatile Organic Compounds (SVOCs) therefore the number of samples will be based on cubic yards of “spoils”.
b. Table for determination of the number of composite samples to pull from the stockpile
Cubic Yards (yd3) of “Spoils” Number of Composite Samples 0-300 1
300-1,000 2
>1,000 1 additional composite for each additional 1,000 yd3 of “spoils”
c. Each composite sample for analysis is created from 3-5 discrete samples from representative locations of the “spoils”.
When siting project footprint, can areas of known or suspected PFAS contamination be avoided?
Yes No
Given the project scope, can all excavated soils be maintained within the construction footprint and proximal to the original source of the material?
Based on Environmental Division review of historic analytical sampling results, can excess spoils be directly hauled to the
LCD without stockpiling/sampling?
Can the project footprint accommodate temporary stockpiling of excess spoils to complete necessary sampling to determine way forward for all soils requiring removal from the site?Yes No
Project will proceed with no management requirements for
PFAS contaminated soils.
Project will proceed with requirement that all excess soils must remain within the construction footprint and as close to the point(s) of excavation to the greatest extent practicable. Excess soils may be used as backfill and/or spread on site to match existing grades and feathered along the edges to blend into existing grades. Contractor(s) are not authorized to haul excess soils off-site.
Project will proceed with the condition that any excess soils that cannot be used as backfill or spread within the construction limits may be directly removed to a designated location at the Fort Drum Land
Clearing Debris (LCD) Landfill and documented accordingly. No temporary stockpiling on site or sampling required.
Historic analytical soil results below OSD
2023 Risk Screening Levels for PFOS (0.013 mg/kg) and PFOA (0.019 mg/kg).
Historic analytical soil results above OSD 2023 Risk Screening Levels for PFOS (0.013 mg/kg) and
PFOA (0.019 mg/kg) or no sampling results available.
Project will proceed with the condition that any excess soils from a given project area that cannot be used as backfill or spread/feathered will be temporarily stockpiled in one location near the original source material. Given a minimum of 1-week advance notice, the Environmental Division will complete all sampling2, testing and analysis to determine if the excess excavated soil exceeds the OSD 2023 Risk Screening
Levels for PFOS and PFOA.
Does composite sampling of the excess excavated soils exceed OSD 2023 Risk Screening Levels for PFOS
(0.013 mg/kg) and/or PFOA (0.019 mg/kg)?Yes No
Project will proceed with the condition that any excess soils from a given project area that cannot be used as backfill or spread/feathered will be temporarily stockpiled at a designated location outside of the project footprint. Given a minimum of 1-week advance notice, the Environmental Division will complete all sampling2, testing and analysis to determine if the excess excavated soil exceeds the
OSD 2023 Risk Screening Levels for PFOS and PFOA.
Excess excavated soil must be disposed of off government property at a licensed facility in accordance with all applicable federal, state, and local criteria at no additional cost to the government. Provide weight tickets from the approved license facility for all contaminated material disposed of off government property.
Excess excavated soil will be hauled to a designated location at the Fort Drum Land
Clearing Debris (LCD) Landfill at no additional cost to the government and documented accordingly.
Management Policy for PFAS Contaminated Soils Originating on Fort Drum Decision Tree
EXTERNAL DISTRIBUTION
Current as of 30-January-2026
Notes/Background Information The PFAS CERCLA Remedial Investigation (RI) currently underway at Fort Drum is to determine the extent of PFAS contamination in soil, groundwater, and surface water at a minimum of 27 locations (“Areas of Interest or “AOIs”) across the installation and will continue through 2027 at minimum.
Until contamination has been thoroughly delineated, Environmental Division will utilize all existing analytical results, groundwater flow models, and project characteristics to make soil management determinations on a case-by-case basis per this decision tree.
^Policy Memorandum – Timely Identification and Mitigation of Contaminated Soil at Proposed Construction Sites on Installation Management Command Installations.
OSD 2023 Risk Screening Levels (RSLs) for PFOS and PFOA are being used as the decision point because exceedances trigger a CERCLA investigation.1 1
In accordance with IMCOM Contaminated Soil Policy (NOV 25)^.
May require ETP per IMCOM
Contaminated Soil Policy (NOV 25)^.
Given the variability of contamination across the installation, coordinate with Environmental
Division to ensure proper placement of excess soils. A temporary stockpile site, on hardstand and surrounded by silt fence, will be identified by EP&S in coordination with Environmental Division.
EP&S CON REPs will provide oversight when siting temporary stockpile locations.
1. PFAS Contaminated Soil Guidance Values
Organization Guidance/Screening Value PFOA (ppm or mg/kg)
PFOS
(ppm or mg/kg)
NYSDEC Unrestricted Site Use 0.00066 0.00088
NYSDEC Protection of Groundwater 0.00080 0.00100
NYSDEC Ecological Screening Value -- 0.00870
NYSDEC Residential Use 0.00660 0.00880
OSD Residential RSL 0.01900 0.01300
NYSDEC Restricted Residential 0.03300 0.04400
NYSDEC Commercial 0.50000 0.44000
NYSDEC Ecological Screening Value 0.57000 --
NYSDEC Industrial 0.60000 0.44000
− NYSDEC Guidance and Screening Values from CP-51, Soil Cleanup Guidance (June 2024 Proposed Revisions).
− OSD Residential Risk Screening Levels (RSLs) from OSD Memorandum: Investigating Per- and Polyfluoroalkyl Substances within the Department of Defense Cleanup Program, August 2023. Detections of target PFAS constituents greater than the 2023 RSLs have and would currently trigger a CERCLA investigation.
2. Soil Sampling Methodology
a) PFAS are considered SVOCs therefore the number of samples will be based on cubic yards (yd3) of “spoils”.
b) Table for determination of number of composite samples to pull from the stockpile:
c) Each composite sample for analysis is created from 3-5 discrete samples from representative locations of the “spoils”.
Cubic Yards (yd3) of “Spoils” Number of Composite Samples
0-300 1
300-1,000 2
>1,000 1 additional composite sample for each additional 1,000 yd3 of “spoils”
Management Policy for PFAS Contaminated Soils Originating on Fort Drum Decision Tree
EXTERNAL DISTRIBUTION
Current as of 30-January-2026
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
2405 GUN SHED ROAD
JOINT BASE SAN ANTONIO FORT SAM HOUSTON, TX 78234-1223
AMIM-PWE (200)
MEMORANDUM FOR SEE DISTRIBUTION
SUBJECT: Policy Memorandum – Timely Identification and Mitigation of Contaminated Soil at Proposed Construction Sites on Installation Management Command Installations
1. References.
a. Department of Defense Instruction (DoDI) 4715.08; Remediation of Environmental Contamination Outside the United States; 1 Nov 13 (Change 2, 31 Aug 18).
b. Department of Defense Manual (DoDM) 4715.20; Defense Environmental
Restoration Program (DERP) Management; 9 Mar 12 (Change 1, 31 Aug 18).
c. Army Regulation (AR) 200-1; Environmental Protection and Enhancement; 13 Dec 07.
d. AR 210-20; Real Property Master Planning for Army Installations; 16 May 05.
e. AR 420-1; Army Facilities Management; 12 Feb 08 (Admin Revision, 1 Aug 24).
f. Department of the Army (DA) Pamphlet (PAM) 420-1-2; Army Military Construction and Nonappropriated-Funded Construction Program Development and Execution; 2 Apr 09.
g. U.S. Army Environmental Funding Guidance FY2025-30; 1 Jul 25.
h. Handling of Environmental Contaminants on Military Construction (MILCON) Sites;
Office of the Deputy Chief of Staff, 9 Jan 23.
2. Purpose. Establish a standardized process for investigating, documenting, and managing environmental contaminants at proposed construction sites. This approach aims to prevent cost exceedance, ensure the timely completion of mission-critical infrastructure, and protect the health of personnel. In addition, provide a standard procedure for developing exception to policy (ETP) requests to support informed decision-making regarding site conditions.
3. Applicability. This policy applies to Headquarters, Installation Management
Command (HQ IMCOM), Installation Directorates, Installations, and the United States Army Environmental Command (USAEC) and supersedes IMCOM Policy Memorandum 200-1f (same title), August 29, 2023. Further, the policy scope encompasses all on-post construction sites (both MILCON and non-MILCON) where the proponent includes but is not limited to, Department of Defense (DoD) tenants, non-DoD tenants, retail activities, and partners. This policy does not cover renovations of existing facilities or related Operations and Maintenance (O&M) activities. MILCON projects with a site approval validated by HQ IMCOM, as of the policy’s effective date, are not subject to these requirements.
4. Authority. The HQ IMCOM Commanding General retains approval authority for exceptions to this policy.
5. Policy. Installations should avoid, to the extent feasible, construction on sites with established land use controls or known contamination. In some instances, the preferred course of action is to choose an alternative construction site. If contamination on a construction site cannot be avoided, and would subsequently lead to project delays, cost increases, or unacceptable risk to human health, the installation shall submit a request for an ETP (paragraph 6.e.) to the HQ IMCOM Commanding General. For all projects, the installation shall not commit funds for design or construction until in possession of an approved ETP. Specific to MILCON projects, an approved ETP is required prior to site approval validation by HQ IMCOM.
6. Procedures. As early as possible, the installation shall initiate investigation(s) on all proposed construction sites. When assessing a site for suitability, fully comply with the requirements of references 1.a. through 1.h.
a. Installations shall conduct a comprehensive record review and physical inspection of the proposed project site(s). Examining historical records, land use (e.g., fuel or chemical usage), and documented spills can offer valuable insights into potential soil contamination. Physical site inspections allow for visual assessments to identify locations and evidence of environmental impacts. Furthermore, data from prior restoration studies should be reviewed for applicability to the construction footprint.
Contact USAEC for technical assistance.
b. Soil sampling shall be conducted at project sites where contamination is expected during construction, but the concentration levels are uncertain due to the absence of previous environmental investigation data. This information will support potential design modifications to avoid or minimize excavation of contaminated soil. The sampling should be representative of the proposed project footprint and target specific contaminants of concern identified by the record review and/or physical inspection.
c. If contamination is identified, some degree of remediation and/or mitigation may be required. USAEC can evaluate the site’s eligibility for cleanup under the Defense Environmental Restoration Program (DERP). If determined as DERP eligible, the time needed to complete cleanup actions may be significant and impact construction timelines.
d. For all projects, installations shall include cost estimates associated with environmental requirements in requisite project documents. Specific to MILCON projects and the DD Form 1391, installation personnel shall specify environmental-related requirements in Tab J and the Tab A cost estimates.
e. At a minimum, the ETP request shall include the following components.
(1) Details of the construction project, including the project proponent, proposed schedule, and all associated costs. Describe any anticipated delays in the project timeline due to contamination. Provide general cost estimates for remediation, soil removal and disposal, and other mitigation measures. If required, include costs to complete additional sampling and site characterization.
(2) Information on the nature and extent of the contamination. The request should also indicate whether contamination poses a potential risk to human health, considering future land use. This assessment should account for possible changes in land use (e.g., from industrial to residential) and potential impact on future receptors.
(3) Analysis of an alternative site. This should include an evaluation and discussion of the assessment conducted and consideration given to use of alternative construction site(s).
(4) If applicable, include site-specific regulatory requirements and necessary actions to maintain compliance, informed by engagement and communication with the appropriate regulatory authority.
7. Proponent. HQ IMCOM, G4, Environmental Division is the proponent of this policy.
The Environmental Division email is usarmy.jbsa.imcom.list.hq-g4-env@army.mil.
JAMES M. SMITH
Lieutenant General, U.S. Army mailto:usarmy.jbsa.imcom.list.hq-g4-env@army.mil
Commanding General
Distribution:
IMCOM Directorates (E,P,R,S,T) Commander, U.S. Army Environmental Command Commanders/Managers, U.S. Army Garrisons
HQ IMCOM G4
THIS MAP IS FOR PLANNING PURPOSES ONLY. IT SHOULD NOT BE USED FOR DESIGN, CONSTRUCTION, OR TARGETING. QUESTIONS OR UPDATES TO THE DATA REPRESENTED HERE SHOULD BE DIRECTED TO THE FORT DRUM DIRECTORATE OF PUBLIC WORKS (DPW), ENVIRONMENTAL DIVISION-GIS/MAPPING OFFICE.
UPON COMPLETION OF SERVICE OR INTENDED MISSION SUPPORT OF THIS DOCUMENT IT MUST BE PROPERLY DISPOSED OF AS PER THE CLASSIFICATION LEVEL.o
0 30 60 90 120 METERS
0 150 300 450 600 FEET
UNITED STATES ARMY GARRISON - FORT DRUM
DIRECTORATE OF PUBLIC WORKS
ENVIRONMENTAL DIVISION - GIS/MAPPING OFFICE
COMM: 315-772-1502/DSN: 772-1502/CELL: 315-408-5089
REPRODUCE IN COLOR ONLY
UNCLASSIFIEDUNCLASSIFIED
UNCLASSIFIEDUNCLASSIFIED
Basemap: Esri, NASA, NGA, USGS, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community
CURRENT AS OF 1/9/2026 9:35 AM COORDINATE SYSTEM: NAD 1983 STATEPLANE NEW YORK CENTRAL FIPS 3102 FEET
DATA SOURCES
Vector: ISDB Raster: 2022 Ortho
(3-inch Res.)
FORT DRUM MILITARY INSTALLATION, FORT DRUM, NEW YORK
R E L O C A T I O N O F P F A S C O N T A M I N A T E D S O I L S I N V I C I N I T Y O F L C D L A N D F I L L
4E 5B 1A
3D
3B 3C 4D
5D 3A
4B
4A
6A
SCALE: 1:240,000
Location Map:
Area for Relocation of
PFAS Contaminated Soils
05D
05E
20571
SOUTH TANK TRAIL
MUNNS CORNER RD
20617
20621 20619
BRK08BRK01
21544
Wellhead Protection Area
Wellhead Protection Area
Land Clearing Debris
Landfill
Land Clearing Debris
Landfill
Notional Location for Relocation of PFAS Contaminated Soils (0.98 acres)
Notional Location for Relocation of PFAS Contaminated Soils (0.98 acres)
LEGEND
[ Access Control
Fence
Building
Designated Area for Relocation of PFAS Contaminated Soils*
Land Clearing Debris (LCD) Landfill
Wellhead Protection Area (WPA)
Training Area and ID
*The designated area for the relocation of PFAS contaminated soils will be surrounded on all sides with silt fence except to allow movement of vehicles in/ out of the area, posted with signage identifying the area and soil contents as off-limits and prohibited for any future uses, and maintained by DPW-O&M- Roads & Grounds as needed to ensure proper drainage of surface water runoff (i.e., grading, feathering,etc.).
Log_Instructions
Hauling information to be completed by Contractor
No. Starting with 1, sequential count of records populated for project.
Project Name/ID Name/ID of construction project
Contractor Name Name of Contractor of record for the project
Haul Date Date material was hauled to the designated area at the LCD Landfill.
Format: DD/MM/YYYY.
Excavation Location Detailed description of location of excavation within the project footprint.
Use in conjunction with marked up maps showing specific location(s) of excavation.
Total Cubic Yards (yd3) Total cubic yards associated with specific hauling record.
There may be multiple hauling records on a given date and/or for a given project.
See "Log_Example_Relocatd_PFAS_Soils" tab for example of contractor populated information
Log_Example_Relocatd_PFAS_Soils
Hauling information to be completed by Contractor Associated analytical sampling results to be completed by Environmental Division (IRP)
No. Project Name/ID Contractor Name Haul Date Excavation Location Total Cubic Yards (yd3) Sample ID Area of Interest (AOI) PFOS (mg/kg) Compared to NYSDEC GVs for PFOS PFOA (mg/kg) Compared to NYSDEC GVs for PFOA Highest Sampled NYSDEC Designation
1 WSAAF Lighting Upgrade Construction Inc. 1/8/2026 Marked on map titled "WSAAF Lighting Upgrade Soil Relocation - Map 1", trench drawn in RED and labeled as AREA 1. 10-feet off of southern shoulder to Taxiway K. Depth of excavation 0-5 feet. Grid point for trench: 44.068538N, 75.712626W. 10
2 WSAAF Lighting Upgrade Construction Inc. 1/8/2026 Marked on map titled "WSAAF Lighting Upgrade Soil Relocation - Map 1", trench drawn in BLUE and labeled as AREA 2. 10-feet off of eastern shoulder to Taxiway J. Depth of excavation 0-5 feet. Grid point for trench: 44.069999N, 75.712981W. 20
3 WSAAF Lighting Upgrade Construction Inc. 1/9/2026 Marked on map titled "WSAAF Lighting Upgrade Soil Relocation - Map 2", trench drawn in RED and labeled as AREA 3. 10-feet off of FOB Shank Road. Depth of excavation 0-8 feet. Grid point for trench: 44.059733N, 75.709189W. 5
&"-,Bold"Report of PFAS Contaminated Soils Relcoated to the Fort Drum LCD Landfill
Page &P of &N
Log_Relocated_PFAS_Soils
Hauling information to be completed by Contractor Associated analytical sampling results to be completed by Environmental Division (IRP)
No. Project Name/ID Contractor Name Haul Date Excavation Location Total Cubic Yards (yd3) Sample ID Area of Interest (AOI) PFOS (mg/kg) Compared to NYSDEC GVs for PFOS PFOA (mg/kg) Compared to NYSDEC GVs for PFOA Highest Sampled NYSDEC Designation
&"-,Bold"Report of PFAS Contaminated Soils Relcoated to the Fort Drum LCD Landfill
Page &P of &N
| 2026-02-06T14:08:34-0500 | |
| HAUK.KURT.W.1038568007 |
File details come from the government source that posted it. Updated .