W912DS25R0005 Amendment 1.pdf
PDF 144 KB Posted
- Attached to
- Troy Lock Automatic Transfer Switch Replacement Federal contract opportunity
- Solicitation number
- W912DS25R0005
About this file
This is Amendment 1 to solicitation W912DS25R0005 issued by the US Army Corps of Engineers New York District for the Troy Lock Automatic Transfer Switch (ATS) replacement project in Troy, NY. The amendment changes the response date from December 5, 2024 to January 24, 2025 at 5:00 PM and modifies the acquisition set-aside from Small Business to Women-Owned Small Business (WOSB).
The scope of work requires removing and replacing an existing ASCO 300 Series ATS with a new 208V 600A (increased from 400A) three-phase service-rated ATS with maintenance bypass and manual actuation capabilities at the Albany Field Office. Key requirements include providing continuous temporary power during replacement with no more than 30 minutes of power interruption, conducting a three-hour load test of the existing generator at 80% capacity, and completing all work within 30 days after April 15, 2025. The contractor must coordinate with National Grid utility company and comply with all federal, state and local codes. Site access requires security screening and escort arrangements must be made in advance through the Albany Field Office.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 1 updates Section SW3 of the SOW.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS25R0005
X 9B. DATED (SEE ITEM 11)
22-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jan-2025
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS25R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 05-Dec-2024 02:00 PM to 24-Jan-2025 05:00 PM.
The Acquisition Set Aside has changed from Small Business to WOSB ELIGIBLE UNDER WOSB
PROG.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
TROY LOCK Automatic Transfer Switch Replacement
ALBANY FIELD OFFICE (AFO), TROY, NY
SW-1 LOCATION: Albany Field Office, Troy, NY. Arrangements for entrance onto AFO must be made by contacting AFO at (518) 273-0870 between the hours of 7:00 a.m. and 3:00 p.m., Monday through Friday. Access is restricted, escorts shall be provided by Albany Field Office personnel.
SW-2 SCOPE OF WORK: The work covered in this contract consists of furnishing all labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the work described in paragraph SW-3. It is the intent of the government for the contractor to provide a complete and useable system. Any relevant details required for a complete system that are omitted in the contract plans and specifications will be provided by the Contractor at no cost to the government.
SW-3 SUMMARY OF WORK: Work shall consist of but is not limited to the following:
Remove and replace the existing Automatic Transfer Switch (ATS) and furnish and install a with new ATS of the same an appropriate type, rating, and size for the system (see characteristics below). Contractor will dispose of the removed ATS. Functionally test the ATS after installation per the Troy Lock ATS Specifications. See attached drawing and specifications for more details. Continuous temporary power to the Lockhouse will be required during the ATS replacement. The Lock and Lockhouse shall not be without power for more than 30 minutes. The ATS and connected switchgear are all outside.
ATS Requirements– 208V 400A 600A, 3 phase, 4 wire, 35,000 A.I.C., NEMA 3R with Maintenance Bypass. The new ATS will have a manual actuation handle in addition to the automatic function. The new ATS must be service rated.
Current ATS (for information only): ASCO 300 Series. See attached O+M Manual
The contractor shall conduct a load test of the existing generator up to 80% of its maximum load for three hours and prepare a report documenting the load test and its results.
As part of functional testing of the ATS, the contractor shall troubleshoot and document issues encountered in a report.
SW-4 TIMING OF WORK: Workdays for which the Lock shall be without power for any length of time shall be scheduled no less than two weeks in advance to allow for posting of Notice to Mariners. The period of performance is 30 days after 15 April, 2025. The contractor shall notify the Government of any material delays they encounter.
SW-5 CODES & STANDARDS: All work performed under this contract shall be in accordance with federal, state and local codes & standards, as well as widely accepted industry standards, including but not limited to: American
Institute of Architects, American Institute of Electrical Engineers, American National Standards Institute, American
Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National
Electric Code, National Fire Protection Association, National Electric Code, Occupational Safety & Health
Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the New York DOT standard specification. Additionally, all requirements of the New York Department of Health must be satisfied in their entirety for any work performed or materials bought under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply to contract specifications.
SW-6 UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction. The local power utility company is National Grid.
SW-7 MATERIALS: The materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, whichever is more stringent. Certificates of compliance and Technical Data
Sheets are required for all materials supplied.
SW-8 SITE INSPECTION: The contractor shall have the opportunity to visit the site before the Bid Opening. The contractor is required to acknowledge at time of Bid Opening that said contractor has inspected and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition which existed at the time of the site visit.
SW-9 SECURITY AND FACILITY ACCESS: The contractor shall be granted access to the AFO site. Contractor personnel must sign in at the administration building when they arrive on site and sign out before they leave the site.
The Government reserves the right to deny access to any person, with no consequence to the contract.
1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative
(e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
2. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime
Information Center-Interstate Identification Index (commonly referred to as "NCIC-111") and Terrorist Screening
Database (commonly referred to as "TSDB"). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
SW-10 SAFETY: Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the commercial contractor. Government and contractor employees must comply with the Corps of Engineers Safety Manual EM 385-1-1. All contractors and employees will attend a pre-construction meeting prior to project work beginning.
SW-11 CLEAN-UP: Clean-up and remove debris generated by this contract to an approved off-site location. Two
(2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken.
SW-12 GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate
Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the Contractors actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel, and facilities.
SW-13 SUPPLEMENTAL ATTACHMENTS:
1. Troy Lock Electrical One Line Riser Diagram
2. Troy Lock ATS Specifications
3. ASCO 300 Series Operation and Maintenance Manual
4. Generator Data plate
5. Power System Analysis
(End of Summary of Changes)
File details come from the government source that posted it. Updated .