This document is a Statement of Work (SOW) for the replacement of the Automatic Transfer Switch (ATS) at the Troy Lock facility operated by the U.S. Army Corps of Engineers Albany Field Office in Troy, New York.
The key requirements of the SOW include: removing and replacing the existing 208V, 400A, 3-phase, 4-wire, 35,000A AIC ASCO 300 Series ATS with a new ATS of the same type, rating, and size; conducting a load test of the existing generator and preparing a report; functionally testing the new ATS per specifications; and maintaining continuous temporary power to the facility during the ATS replacement. The work is to be performed within a 30-day period starting after April 15, 2025. All work must comply with federal, state, and local codes and standards. The contractor will be granted access to the site, but must comply with security and safety requirements. The government will not provide any resources to the contractor.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
381333–067 LFlorham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com
ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3
Operator’s Manual
Series 300 Automatic Transfer Switches E–design, 260 and 400 A
DANGER is used in this manual to warn of a hazardous situation which, if not avoided, will result in death or serious injury.
WARNING is used in this manual to warn of a hazardous situation which, if not avoided, could result in death or serious injury.
CAUTION is used in this manual to warn of a hazardous situation which, if not avoided, could result in minor or moderate injury.
Refer to the outline and wiring drawings provided with your ASCO Series 300 ATS for all installation details.
Rating Label Each automatic transfer switch contains a rating label to define the loads and fault circuit withstand / closing ratings.
Refer to the label on the transfer switch for specific values.
Do not exceed the values on the rating label.
Exceeding the rating can cause personal injury or serious equipment damage.
An experienced licensed electrician must install the Automatic Transfer Switch (ATS).
TABLE OF CONTENTS
section-page
INSTALLATION 1-1
Mounting and Line Connections 1-1 Engine Starting Contacts 1-2 Input / Output Label 1-2 Functional Test 1-3, 1-4, 1-5
SEQUENCE OF OPERATION 2-1
TESTING & SERVICE 3-1
Preventive Maintenance 3-1 Transfer Test 3-1 Disconnecting the Controller 3-1 Manual Load Transfer 3-2 Trouble-Shooting 3-2
ADJUSTMENTS 4-1
Time Delay and Sensor Adjustments 4-1 How to Change a Setting 4-2
CONTROL FEATURES 5-1
Engine Exercisers 5-1, 5-2, 5-3 Motor Load Transfer 5-4 Load Disconnect & Remote Control 5-4
INDEX back of manual
Nameplate and Catalog Number Identification The Transfer Switch nameplate includes data for each specific ASCO Series 300 ATS. Use the ATS only within the limits shown on this nameplate. A typical Catalog Number is shown below with its elements explained.
The example is for a Series 300 ATS with switched neutral, 3 pole, 400 ampere, 480 V, in a Type 1 enclosure:
E 300 C 3 400 N 1 C
Phase PolesNeutral Amperes Voltage Controller Enclosure
C – overlapping 1 – standard
G – type 4
C – type 1
F – type 3R
L – type 12
3 – three Ø
2 – single Ø
D 220
C 208
E 230
K 415
M 460
J 400
L 440
N 480
F 240
H 380
Q 575
R 600 blank – solid blank – open type
1X – if accessories ordered transfer switch prefix letter
B 120
A 115 terminals for engine start contacts
Transfer Switch
Controller normal power connections emergency power connections membrane controls
400 ampere size in typical enclosure with location of customer connections terminals for switch position contacts load power connections
SECTION 1 INSTALLATION
1---1
Series 300 Automatic Transfer Switches are factory wired and tested. Installation requires skid removal then secur-ing the enclosure to the supporting foundation.
Supporting Foundation
The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the Series 300 for all mounting details including door opening space.
If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly.
Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.
Mounting
Refer to the applicable enclosure outline drawing furnished with this switch and mount the Series 300 according to details and instructions shown on diagram.
NOTICE
Protect the automatic transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the ATS.
Mount the ATS vertically to a rigid supporting structure.
Level all mounting points by using flat washers behind the holes to avoid distortion of the switch.
Transfer switches rated 260 and 400 amperes are mounted on an insulator backing piece (installed behind the transfer switch). If the transfer switch is removed from the cabinet and then reinstalled, this insulator piece must be placed behind the transfer switch. See Figure 1–1.
Line Connections
Refer to the Wiring Diagram provided with your Series 300 ATS. All wiring must be made in accordance with the National Electrical Code and local codes.
De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine generator starting control in the OFF position. Make sure engine generator is not in operation.
It is not necessary to remove the barriers from the transfer switches to install cables.
Be sure that the insulator piece is behind 260 and 400 ampere transfer switches.
insulator backing piece
Figure 1-1. Insulator backing piece for 260 and 400 ampere transfer switches.
The controller is mounted on the cabinet door. An add-on DIN rail is provided for some optional accesso-ries and is mounted below the controller on the door.
Testing Power Conductors
Do not connect the power conductors to the ASCO Series 300 transfer switch until they are tested.
Installing power cables in conduit, cable troughs and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.
Connecting Power Conductors
After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with this Series
300. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the Series 300 ATS.
Be careful when stripping insulation from the cables;
avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.
Do not run cables behind the switch. Cables can be bundled on the right side of the switch. Maintain proper electrical clearance between the live metal parts and grounded metal: ½ inch minimum.
INSTALLATION (continued)
1---2
Engine Starting Contacts
The engine control contact connections are located on the transfer switch. Connect signal wires to appropriate term– inals as specified in Table A, shown in Figure 1–2.
Table A. Engine start connections.
When normal source fails
Terminals on transfer switch contact closes TB14 and TB15 contact opens TB14 and TB16
Transfer Switch
Figure 1-2. Engine starting contact label and location for 260 and 400 ampere transfer switches.
Controller Ground
A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.
Harnesses
The transfer switch is connected to the left side of the controller by a plug–in harness (two plugs).
Auxiliary Circuits
Connect auxiliary circuit wires to appropriate terminals on transfer switch. Note the control features that are furnished on this switch. Make the necessary auxiliary connections by referring to Section 5, Control Features.
Connections to Controller for other Control Features (located on bottom of Controller):
for factory use only
Remote Control Features Connections (refer to the Wiring Diagram & page 5–5 for DIP switch settings) Each control contact must be suitable for a 5 V DC low energy circuit.
Programmable Engine Exerciser connection, if provided (refer to page 5–2)
Load Disconnect Feature
Connections (see Wiring Diagram & refer to page 5–5 for DIP switch settings)
Figure 1-3. Input / output label on the Controller showing possible connections to the lower terminal block.
1---3
Functional Test
The Functional Test consists of three checks: manual operation, voltage checks, and electrical operation.
NOTICE
Do these checks in the order presented to avoid damaging the automatic transfer switch.
Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.
1 – Manual Operation Test
A detachable manual operator handle is provided on the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).
Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.
1. Insert the maintenance handle into the hole in the shaft, left side of the operator.
2. Move the maintenance handle as shown to manually operate the transfer switch. The switch should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.
3. Return the transfer switch to the N (normal) position.
4. Remove the maintenance handle and store it on the transfer switch in the place provided.
NOTICE
Verify that the maintenance handle has been removed before proceeding!
Now continue to 2 – Voltage Checks on next page.
maintenance handle shaft hole
Figure 1-4. Removable maintenance handle on 260 and 400 ampere transfer switches.
1---4 observe these lights
Figure 1–5. Standard controls and indicators.
2 – Voltage Checks First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.
Use extreme caution when using a meter to measure voltages in the following steps.
Do not touch power terminals; shock, burns, or death could result !
Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–5.
Black circle means light is on.
White circle means light is off.
* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.
Also see page 4–1 for the HI–LOW voltage adjust setting in the controller. The LOW setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V.
Close the normal source circuit breaker. The Normal Transfer Switch Position and the Normal Source Accepted lights should come on.
Source Accepted
Normal Emergency
Use an accurate voltmeter to check phase to phase and phase to neutral voltages pres-ent at the transfer switch normal source terminals.
Close the emergency source circuit breaker. (Start generator, if necessary.) The Emergency Source Accepted light should come on.
Source Accepted
Normal Emergency
Use an accurate voltmeter to check phase to phase and phase to neutral voltages pres-ent at the transfer switch emer-gency source terminals.*
Use a phase rotation meter to check phase rotation of emer-gency source; it must be the same as the normal source.
A B C
Shut down the engine–genera-tor, if applicable. The Emergen-cy Source Accepted light should go off. Then put the starting control selector switch (on the generator set) in the automatic position. Close enclosure door.
Source Accepted
Normal Emergency
Now continue to 3 – Electrical Operation on next page.
1---5 press this button observe these lights
Figure 1–6. Standard controls and indicators.
3 – Electrical Operation This procedure will check the electrical operation of the Automatic Transfer Switch.
Close the transfer switch enclosure door and tighten the screws before you test electrical operation.
Transfer Test Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.
Perform steps 1 through 8 at the right. Observe the status lights. See Figure 1–6.
Black circle means light is on.
White circle means light is off.
NOTE: If Motor Load Transfer feature is activated, then transfer may not occur immediately after the respective time delays. Transfer will only occur when the phase relationship between sources is correct.
This completes the Functional Test of the ASCO Series 300 Automatic Transfer Switch. Leave the engine–generator starting control in the automatic position.
The normal source must be available and the generator must be ready to start.
Check that the Normal Source Accepted light is on.
Source Accepted
Normal Emergency
Press and hold the Transfer Test button until the engine starts and runs. This should happen within 15 sec.
Transfer Test
3 The Emergency Source Accepted light should come on.
Source Accepted
Normal Emergency
The transfer switch should transfer to the Emergency position. The Emergency Transfer Switch Position light should come on and the Normal light should go off.
Transfer Switch Position
Normal Emergency
If the transfer to emergency delay is used the transfer should occurs after a time delay (up to 5 minutes).
For immediate transfer press the Bypass Time Delay button.
Bypass Time Delay
The transfer switch should transfer back to the Normal position. The Normal Transfer Switch Position light should come on and the Emergency light should go off.
Transfer Switch Position
Normal Emergency
If the retransfer to normal delay is used the retransfer should occur after a time delay (up to 30 minutes).
For immediate retransfer press the Bypass Time Delay button.
Bypass Time Delay
The unloaded running delay keeps the generator running for 5 minutes (cool–down period).
Then the generator should stop and the Emergency Source Accepted light should go off.
Source Accepted
Normal Emergency
Hold 15 sec. to start the engine generator and to transfer the load to emergency.
Press to cancel the active exercise period (stops engine now or after cooldown) See page 5–1.
Hold 5 sec. to set 20 min. engine exercise period immediately (engine starts) and weekly thereafter.
blinks slowly when button is released (set) and during 20 min.
exercise period.
blinks rapidly when button is held 5 sec.
while being set
Lights show position of transfer switch. Lights show the sources accepted.
Light for built–in engine exercise timer:
See page 5–1 for complete instructions
Figure 2–1. Membrane controls and indicator lights.
stays on after engine stops (exerciser is enabled for weekly operation)
SECTION 2 SEQUENCE OF OPERATION
2---1
Transfer To Emergency The sequence for load transfer to emergency source begins automatical-ly when normal source voltage falls below the preset dropout point or when Transfer Test button is pressed.
An under voltage condition on any phase of the normal source is de-tected by the sensor.
When the normal source voltage fails or the Transfer Test button is pressed, the SE relay de-energizes and relay NR begins its timing cycle (1 or 3 seconds, momentary normal source outage delay). The NR relay is provided with a time delay on dropout to override momentary outages and prevent nuisance starting of the engine-driven generator. If the normal source voltage returns above the sensor dropout setting before the time delay expires, the NR relay timing cycle is reset to zero and relay SE energizes.
If the normal source voltage does not return above the sensor dropout setting before the time delay expires, the NR relay de-energizes and signals the engine-driven gen-erator to start. At the same time, a voltage and frequen-cy sensor begins monitoring the emergency source. The sensor will accept the emergency source only when both voltage and frequency reach preset pickup points. Usual-ly about ten seconds elapse from dropout of the NR relay to acceptance by the sensor. This time span occurs be-cause the engine-driven generator must crank, start, and run up to nominal pickup points. For this reason, if the Transfer Test button is pressed it must be held for 15 sec-onds. If the emergency source is available immediately, the sensor may accept it as soon as NR relay drops out.
When the emergency source is accepted by the sensor, relay ER begins its timing cycle (transfer to emergency delay). ER relay is provided with an adjustable (0 to 5 minutes) time delay on pickup to delay transfer of the load to the emergency source. For immediate transfer press Bypass Time Delay button.
ER relay energizes, the TS coil is energized, the transfer switch operates, and all switch contacts (mains, controls, auxiliaries) reverse position. The transfer switch is now supplying the load from the emergency source.
The transfer switch will remain in the Emergency position until the normal source is restored. If the Transfer Test button is used, the transfer switch will remain on emergency until the retransfer to normal delay times out.
Retransfer to Normal The sequence for load retransfer to the normal source automatically begins when the voltage sensor detects restoration of the normal source. The voltage level must rise above the preset pickup point on all phases before the sensor will accept the normal source.
When the normal source is accepted by the sensor, relay SE begins its timing cycle (adjustable 1 sec. to 30 min., retransfer to normal delay). For immediate retransfer press Bypass Time Delay button. SE relay is provided with a time delay on pickup to prevent immediate load retransfer to the normal source. The delay insures that the normal source has stabilized before reconnection of vital loads. If the normal source voltage falls below the present dropout point before the time delay expires, the timing cycle is reset to zero. If the emergency source fails for more than 4 seconds during the timing cycle, ER relay drops out and the load is immediately retransferred to the normal source, if that source is acceptable.
SE relay energizes and ER relay is dropped out. The TS coil is energized, the transfer switch operates, and all switch contacts (mains, controls, auxiliaries) reverse position. The transfer switch is now supplying the load from the normal source again.
Upon retransfer to the normal source, NR relay begins its timing cycle (unloaded running delay, engine cooldown).
NR relay is provided with a 5 min. time delay on pickup to keep the engine running for a cool-down period.
NR relay energizes after the time delay and signals the engine-driven generator to shut down. All circuits are reset for any future normal source failure.
Activationof standardcontrol features shown inSection 5will alter the sequenceof operation and introduce additional time delays during transfer operations.
SECTION 3 TESTING & SERVICE
3---1
PREVENTIVE MAINTENANCE
For high reliability and long life for the ATS:
Operate the switch at least once a month. Perform this 4–step Electrical Operation Test (test with load transfer).
Transfer Switch Test
1. Press and hold the door-mounted Transfer Test button until the engine starts and runs. This should happen within 15 seconds.
2. The transfer switch will operate to the Emergency position. If the Transfer To Emergency Delay is used, the transfer will occur after a time delay (up to 5 minutes). For immediate transfer press Bypass Time Delay button.
3. The Transfer Switch will operate back to the Normal position after the Retransfer To Normal Delay (up to 30 minutes). For immediate retransfer press Bypass Time Delay button.
4. Unloaded Running (Engine Cooldown) Delay allows engine to run unloaded for 5 minutes.
Checklist for Yearly Inspection
Hazardous voltage capable of causing shock, burns, or death is used in this switch.
Deenergize both Normal & Emergency power sources before performing inspections!
Clean the enclosure. De–energize all sources, then brush and vacuum away any excessive dust accumulation. Remove moisture with a clean cloth.
Check the transfer switch contacts. De-energize all sources, then remove the transfer switch barriers and check contact condition. Replace the contacts if they become pitted or worn excessively. Reinstall the barriers carefully.
Maintain transfer switch lubrication. Under normal operating conditions no further lubricating is required. Renew factory lubrication if the switch is subjected to severe dust or abnormal operating conditions or if TS coil is replaced. Order lubricant 625550–001 (Castrol EndurexR 4000 lubricant).
Check all cable connections & retighten them.
Torque to values shown on transfer switch label.
Replacement parts.When ordering parts provide the Serial and Catalog Nos. from the transfer switch nameplate. Contact ASI. In the US call
1–800–800–ASCO (2726)).
DISCONNECTING THE CONTROLLER
The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged.
If the controller must be isolated, follow these steps carefully.
Disconnecting the Plugs
1. Observe the position of the transfer switch.
a. If the transfer switch is in the Normal position, place standby engine starting control in the off position. Then open the emergency source circuit breaker.
b. If the transfer switch is in the Emergency position, open the normal source circuit breaker. Place the engine starting control in the test or run position.
2. Separate the quick disconnect plugs by squeezing the latches. Do not pull on the harness wires.
3. Label, remove, and tape the signal wires connected to the engine start terminals on the transfer switch:
TB14 and TB15, or TB14 and TB16.
Reconnecting the Plugs
1. Observe the position of the transfer switch.
a. If the transfer switch is in the Normal position, be sure that the standby engine starting control is still in the off position. The emergency source circuit breaker still should be open.
b. If the transfer switch is in the Emergency position, normal source circuit breaker still should be open.
2. Reconnect the signal wires connected to the appropriate engine start terminals on the transfer switch. See Section 1, Engine Starting Contacts.
3. The harness plugs and sockets are keyed.
Carefully align the plugs with the sockets and press straight in until both latches click.
4. Restore the opposite source as follows:
a. If the transfer switch is in the Normal position, place the standby engine starting control in the automatic position. Then close the emergency source circuit breaker.
b. If the transfer switch is in the Emergency position, close the normal source circuit breaker. The load will be automatically retransferred to the normal source after the Retransfer to Normal Delay. For immediate retransfer, press Bypass Time Delay button. Place the engine starting control in the automatic position.
TESTING & SERVICE (continued)
3---2
MANUAL LOAD TRANSFER
This procedure will manually transfer the load if the controller is disconnected.
Do not manually operate the transfer switch until both power sources are disconnected:
open both circuit breakers.
1. Open normal and emergency source circuit breakers.
2. Use the maintenance handle to manually operate transfer switch to the opposite source. See page 1–3, Manual Operation Test.
3. If the transfer switch is in the Emergency position manually start the engine generator and then close the emergency source circuit breaker.
TROUBLE-SHOOTING
Note the control features that are activated or furnished on the switch and review their operation.
Refer to Section 5, Control Features.
Proceed with care! The automatic transfer switch is energized.
Table 3-1. Trouble-Shooting Checks.
PROBLEM
CHECK IN NUMERICAL SEQUENCE
1 OPERATION 2 GEN-SET 3 VOLTAGE
Gen-Set does not start when the Transfer Test button is pressed and held for 15 seconds or when the normal source fails.
Hold the Transfer Test button 15 sec. or the outage must be long enough to allow for the 1 or 3 sec. Momentary Normal Source Outage Delay plus engine cranking and starting time.
Starting control must be in automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts.
Transfer switch does not transfer the load to emergency source after the gen-set starts.
Wait for Transfer to Emergen-cy Delay (0 to 5 min.) to time out. For immediate transfer, press the Bypass Time Delay button. If Motor Load Transfer is active, wait for inphase con-dition (see below).
Generator output circuit breaker must be closed.
Generator frequency must be at least 57 Hz.
Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals EA and EC (or EL1 and EL2 for 2 pole switches). *
* These are factory settings.
Transfer switch does not transfer the load to normal source when normal returns or when Transfer Test button is released.
Wait for Retransfer to Normal Delay (1 sec. to 30 min.) to time out. For immediate re– transfer, press Bypass Time Delay button. If Motor Load Transfer is active, wait for in-phase condition (see below).
Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals NB and NC, NC and NA, and NA and NB (or NL1 and NL2 for 2 pole switches).
Gen-Set does not stop after load retransfer to the normal source.
Wait for the 5 minute Unloaded Running Delay to time out.
Starting control must be in automatic position. —
Trouble-Shooting the Motor Load Transfer Feature (refer to page 5–4)
Use extreme caution when using a meter to measure voltages in the following steps. Do not touch power terminals; shock, burns, or death could result !
1. Connect a voltmeter (set for twice system phase–to–phase voltage) between Transfer Switch terminals NA and EA.
2. Manually start generator. Voltmeter needle should sweep back and forth at a regular rate between 0 and about twice system voltage.
3. Press and hold Transfer Test button. The load should transfer to emergency source when meter needle is near 0 volts. If transfer does not occur, Motor Load Transfer feature is not operating.
4. Release the Transfer Test button. The load should retransfer back to the normal source after the Retransfer to Normal Delay, if used. The retransfer should occur when the needle is near 0 volts. If retransfer does not occur after the time delay, the Motor Load Transfer feature is not operating.
5. For immediate retransfer, press the Bypass Time Delay button. Then disconnect the voltmeter.
If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office, representative, or ASI. In the United States, call 1–800–800–2726. Furnish the Serial No., Bill of Material (BOM) No., and Catalog No. from transfer switch nameplate.
SECTION 4 ADJUSTMENTS
4---1
Time Delay Adjustment Standard time delays are set to customer specifications (if none specified, standard factory settings are used).
To change a setting, follow procedure on page 4-2. Use Table 4-1 as a guide to time delay values and their cor-responding adjustment DIP switch or potentiometer.
Table 4-1. Time Delay Settings
DESCRIPTION LABELS FACTORY
SETTING
ADJUSTMENT
RANGE
S3 DIP
SWITCH
ADJUSTMENT
POTENTIOMETER
Override Momentary Normal Source Outages TD ES 3 seconds
1 second Actuator 1 on 1
3 seconds Actuator 1 off 1
Transfer to Emergency TIMER N/E
0 minutes (full ccw)
0 to 5 minutes — — P2
Override Momentary Emergency S. Outages — 4 seconds non-adjustable — — —
Retransfer to Normal TIMER E/N
30 minutes (full cw)
1 second to 30 minutes — — P1
Unloaded Running (Engine Cooldown) — 5 minutes non-adjustable — — —
Sensor Adjustments Voltage and frequency sensor pickup and dropout points are set to customer specifications (if none specified, standard factory settings are used). To change a setting, follow procedure on page 4–2. Use Tables 4-2 and 4–3 for settings and corresponding DIP switch actuators.
NOTICE
Any change in these settings may affect the normal operation of the automatic transfer switch. This change could allow the load circuits to remain connected to a low voltage source.
Table 4-2. Voltage and Frequency Settings. ( Shaded DIP switches are standard factory settings).
DESCRIPTION LABELS SETTING
% of nominal S1 DIP
SWITCHFACT. SET ADJ RANGE
Normal Source Voltage
PU / N Pickup 90 % 95 % * Actuator 3 off 3
90 % Actuator 3 on 3
DO / N Dropout 85 %
90 % * Actuator 1 off Actuator 2 off
85 % Actuator 1 on Actuator 2 off
80 % Actuator 1 off Actuator 2 on
70 % Actuator 1 on Actuator 2 on
Emergency Source Voltage
– – Pickup 90 % non-adjustable
– – Dropout 75 % non-adjustable
Emergency Source Frequency
– – Pickup 95 % non-adjustable
– – Dropout 85 % non-adjustable
60 / 50 Hz 60 / 50 Hz 60 Hz
60 Hz Actuator 4 off 4
50 Hz Actuator 4 on 4
Voltage Phases 3, 1 3 / 1 3 3 phase Actuator 6 off 6
1 phase Actuator 6 on 6
* If dropout voltage is set to 90%, the pickup voltage must be set to 95%.
Table 4-3. Transformer Voltage Adjust.
(Low setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V, or 480 V to 460 V)
DESCRIPTION LABELS FACTORY SETTING ADJUSTMENT S3 DIP SWITCH
Voltage Adjust (4.2%) LOW /
HI HI
LOW Actuator 2 off 2
HI Actuator 2 on 2
ADJUSTMENTS (continued)
4---2
NOTICE
Do not make any setting changes while the controller is energized.
How to Change a Setting
1. Prevent the transfer switch from operating by discon-necting one source first, then the other, as follows:
a. If the transfer switch is in the Normal position, open the emergency source circuit breaker.
Turn the engine starting control to off. Then open the normal source circuit breaker.
b. If the transfer switch is in the Emergency position, open the normal source circuit breaker.
Turn engine starting control to test or run. Then open the emergency source circuit breaker.
2. Disconnect both harness plugs from controller by squeezing the latches. Do not pull on the wires.
3. Remove cover from the controller by releasing latch on right side with your thumb. See Figure 4-1.
4. Locate the appropriate adjustment potentiometer or DIP switch for the setting that you want to change.
Refer to Table 4-1 and Table 4–2 on page 4-1 and Figure 4-2, Figure 4–3, Figure 4–4 on page 4–2.
5. Use a small screwdriver to turn the potentiometer clockwise to increase the time delay or counter-clockwise to decrease it. See Figure 4-3.
6. Use a ball-point pen (or similar pointed tool) to slide the switch actuators left or right so they match the illustration next to the setting (left = off, right = on). Recheck the setting. See Figure 4-4.
7. Install the cover on the controller by hooking it on the left side and latching the right side.
8. Reconnect both harness plugs to the controller by aligning and pressing straight in until latches click.
Close the transfer switch enclosure door.
9. Close the enclosure door, then restore both sources:
a. If the transfer switch is in the Normal position first close the normal source circuit breaker, then close the emergency source circuit breaker.
b. If the transfer switch is in the Emergency position, close the normal source circuit breaker. The load will be automatically retransferred to the normal source. Then close the emergency source circuit breaker.
10. Turn the engine starting control to automatic.
thumb latch cover hook on left side
Figure 4-1. Controller cover latch.
9 volt alkaline battery battery on/off jumper retransfer to normal time delay transfer to emergency time delay harness plugs
S3 DIP
switch
S1 DIP
switch
S2 DIP
switch
P1
P2
J5
Figure 4-2. Location of potentiometers.
P1 or P2 potentiometer clockwise to increase counterclockwise to decrease
Figure 4-3. Changing time delay potentiometers.
DIP
switches
SW1
SW2
SW3
actuator onoff
(8 on each DIP switch)
Figure 4-4. Setting DIP switch actuators.
SECTION 5 CONTROL FEATURES – ENGINE EXERCISERS
5---1
These timers periodically exercise the emergency engine-generator plant. They can be set to exercise with or without load transfer, or they can be completely disabled. The engine-generator should be exercised under load once a week for a minimum time period of 20 minutes, or follow the recommendations of the engine-generator set manufacturer. Refer to page 4–2 for location of DIP switches, battery (provided), and jumper block in the controller.
BUILT–IN ENGINE EXERCISER
The engine exerciser included in ASCO Series 300 Automatic Transfer Switches provides a once a week 20–minute exercise period. It occurs immediately when the Set Engine Exerciser push button is pressed (and held for at least 5 seconds), and then at the same time weekly thereafter. A 9 volt alkaline battery (Duracell MN1604, Everready 522, or Panasonic 6AM6) is furnished and installed in the controller to maintain the setting. The battery jumper block must be shifted to the ON position. See Figure 4–2 on page 4–2.
Fill in day and time set. Week Day ______ Time _______.
DIP Switch Settings
FUNCTION S1 DIP
SWITCH
S2 DIP
SWITCH
Std. Timer Enabled
Actuator 7 on
7 Actuator 5 on
Std. Timer Disabled
Actuator 7 off
7 Actuator 5 on
Exercise without Load
Actuator 8 off
Exercise with Load
Actuator 8 on
Shaded DIP switches are standard factory settings.
status light
If Exerciser with Load is set, transfers load to Emergency.
If Exercise with Load is set, retransfers load to Normal, then stops generator after min. cooldown.
Press to cancel an active exercise period (stops generator). Press and hold for 5 sec. or until status light blinks rapidly to set exercise period immediately and every week hereafter (generator starts).
Figure 5-1. Operator panel pushbuttons and light.
Select below either Exercise without Load or Exercise with Load according to the setting of DIP switch S1, actuator 8. The load transfers from the Normal source to Emergency source (generator) and back again if Exercise with Load is selected.
Exercise without Load, DIP Switch S1, Actuator 8 off
How to Set Built–In Timer
Step Function Explanation
Push Button Status Light
Set Engine Exerciser hold 5 sec.
blinks rapidly set exercise period Exercise the generator now and every week at this time hereafter.
2 release blinks slowly exercise period now active Generator starts and runs.
3 press Bypass Time Delay stays on cancel active exercise period Generator stops.
4 — stays on generator off Exerciser enabled; repeats every 7 days.
Exercise with Load, DIP Switch S1, Actuator 8 on
How to Set Built–In Timer
Step Function Explanation
Push Button Status Light
Set Engine Exerciser hold 5 sec.
blinks rapidly set exercise period Exercise the generator now and every week at this time hereafter.
2 release blinks slowly exercise period now active Generator starts and runs;
the load transfers to Emergency.
3 press Bypass Time Delay blinks slowly cancel active exercise period The load retransfers to Normal; then generator runs for 5 minute cooldown ( light blinks slowly during cooldown ).
4 — stays on generator off Exerciser enabled; repeats every 7 days.
NOTE: Every time SET ENGINE EXERCISER push button is pressed (held 5 seconds) the exercise period is changed.
CONTROL FEATURES (continued)
5---2
Optional Accessory 11BG – SOURCE AVAILABILITY SIGNAL
& PROGRAMMABLE ENGINE EXERCISER MODULE
2–line display
3 buttons connections for source availability signal contacts
Figure 5–2. Accessory 11BG module (mounted behind operator interface and connected to the controller) includes source availability signal contacts and a programmable engine exerciser.
Source Availability Signal Contacts The module provides one Form C contact each for the normal and emergency sources signal the acceptability of the source as sensed by the controller. The signal contacts operate in conjunction with the Source Accepted lights on the operator interface. Field wiring terminals are provided as shown in Figure 5–3 and the wiring diagram.
Contact ratings:
2 amps @ 30 Vdc, 0.5 amp. @ 125 Vac resistive
SOURCE
AVAILABILITY SIGNALS
2 AMPS @ 30 VDC, resistive
0.5 AMP @ 125 VAC, resistive
contacts shown de–energized
Figure 5–3. Source availability signal contacts.
Programmable Engine Exerciser The module includes a programmable engine exerciser that provides for weekly or biweekly operation. This optional exercise timer may have to be turned on (enabled) by setting the S1 DIP switch actuator 7 to off, and S2 DIP switch actuator 5 to off. A backup battery in the controller (see page 4–2 and page 5–3) must be turned on to maintain the settings and to allow programming with the normal and emergency power turned off (page 5–1).
The programmable engine exerciser incorporates a 7 day or 14 day time base. Proper controller settings must be made to determine whether or not the test will be done with or without load transfer (S1 DIP switch actuator 8).
See next page for instructions on setting the timer.
DIP Switch Settings in the Controller (see page 4–2)
FUNCTION S1 DIP
SWITCH
S2 DIP
SWITCH
Opt. Timer Enabled
Actuator 7 off
7 Actuator 5 off
Opt. Timer Disabled
Actuator 7 off
7 Actuator 5 on
Exercise without Load
Actuator 8 off
Exercise with Load
Actuator 8 on
Shaded DIP switches are standard factory settings.
Fast/Slow Adjust
Daylight Saving Time Adjust
Date
Time
Start TIme
Engine Exerciser
Run TIme
CONTROL FEATURES (continued)
5---3
How to Set Optional Programmable Engine Exerciser (part of Acc. 11BG module)
Hazardous voltage capable of causing shock, burns, or death is used in this transfer switch.
Deenergize both Normal and Emergency power sources before programming the exerciser.
Navigating the Menu Use the UP and DOWN arrow keys to move through the displays.
Changing the Parameters Use the UP and DOWN arrow keys to move though the displays to the parameter to be changed.
Push the ENTER key to start the editing process. The first parameter will flash. Use the UP and DOWN arrow keys to adjust the parameter to the desired value and press the ENTER key to save the value. The next parameter will now flash. Repeat the process until each parameter is properly configured.
Engine Exerciser Display The Engine Exerciser Display shows the status of the engine exerciser. When the unit is shipped from the factory the programmable engine exerciser is “Disabled” and must be set to “Enabled” by the customer. When the engine exerciser is running, this display will count down the remaining time until the end of the exercise period.
Start Time Display The Start Time Display shows the engine exerciser start time. There are four parameters that determine the start time:
weekly (”Every”) or bi–weekly (”Alt”) operation day of week (”Sun” through “Sat”) start hour (0 through 23) start minutes (0 through 59)
For example, if the user wants the exerciser to run every other Saturday at 3 PM, the proper configuration would be: “Alt Sat @ 15:00”
NOTE: When choosing bi–weekly operation, the exerciser will always run on the week designated “(1)” on the date display.
Run Time Display The Run Time Display shows the run time for the engine exerciser. The default setting from the factory is 30 min.
Time Display The Time Display shows the present system time. The format is “hours:minutes:seconds”.
NOTE: During total power outages, power to the accessory is maintained by a battery in the Controller (see page 4–2). Be sure that the 9–volt alkaline battery is fresh and enabled (jumper in ON position) so that the time and date settings are not lost.
Date Display The Date Display shows the present system date. The format is “day of week (week) month/day of month/year”.
NOTE: Week is either week 1 or week 2. This is used in conjunction with the bi–weekly timer.
Daylight Savings Time Adjust Display This display shows whether the automatic daylight saving time adjustment is active. The factory default is “NO”. If enabled, the unit will automatically adjust for daylight saving time at 2 AM on Sunday as follows:
Part No. 629857–001* 629857–002* Start first Sunday in April 2nd Sunday in March Stop last Sunday in Oct first Sunday in Nov
* Part no. on back of circuit board. New DST starts in 2007.
Fast / Slow Adjust Display This display shows the automatic fast/slow adjustment value. The factory default is 0. This feature can be used to trim a clock that runs fast or slow. For example, if your clock runs 10 seconds slow per week, change the fast/slow adjust value to “+10” and the unit will automatically add 10 seconds to the clock every week.
NOTE: Adjustments are made Sunday morning at 2 AM. If you want your exerciser period to start at 2 AM on Sunday, you cannot use this feature and the adjustment must be set to 0.
Date exerciser was set ___________________________
Fill in your settings for future reference Weekly or Bi–weekly Day of Week Start Time Run Time
Every = weekly Alt = bi–weekly Sun through Sat 0 – 23 hour
0 – 59 minute
0 – 23 hour 0 – 59 minute
30 min. is default setting
5---4
INPHASE MONITOR
FOR MOTOR LOAD TRANSFER
Inphase monitoring logic controls transfer and retransfer of motor loads, so that inrush currents do not exceed normal starting currents. It avoids nuisance tripping of circuit breakers and mechanical damage to motor couplings.
The Motor Load Transfer feature is built into the controller. DIP switch S1 (actuator 5) activates this feature: right = ON, left = OFF.
FUNCTION S1 DIP SWITCH
enable Actuator 5 on 5 disable Actuator 5 off 5
Shaded DIP switches are standard factory settings.
If the Motor Load Transfer feature is enabled, it will be activated following the Load Disconnect Feature Delay Before Transfer delay.
Note
LOAD DISCONNECT FEATURE
Connect external circuits to the terminals indicated on the Wiring Diagram provided with the ATS.
The double throw (Form C) contact is rated for 28 VDC or 120 VAC (5 amperes resistive). The contact operates prior to a selectable 0, 3, 10, or 20 second delay before transfer of the Automatic Transfer Switch.
The contact resets either immediately following transfer or after the same delay as set for pre–signal before transfer.
Time delay between the load disconnect control signal and initiation of transfer is set on the controller with DIP switch S2 (actuators 6, 7, 8) as shown below:
Delay Before Transfer
LD TDBT S2 DIP SWITCH
0 (disable) Actuator 7 on Actuator 8 on 8
3 seconds Actuator 7 on Actuator 8 off
10 seconds Actuator 7 off Actuator 8 on
20 seconds Actuator 7 off Actuator 8 off
Shaded DIP switches are standard factory settings.
Delay After Transfer*
LD TDAT S2 DIP SWITCH
enable Actuator 6 on 6 disable Actuator 6 off 6
*Enabling the Delay After Transfer will cause the control signal to reset after the same delay as set for the Delay Before Transfer.
REMOTE CONTROL FEATURES
These remote control features require a customer–supplied normally closed contact suitable for a 5 V dc low energy circuit. Refer to the Wiring Diagram provided with the ATS. Activate appropriate DIP switch S2 actuators below.
Remote Test (terminals CP6–7)
RTSW S2 DIP SWITCH
disable Actuator 3 on 3 enable Actuator 3 off 3
Bypass Transfer Time Delay (CP12–13)
TD E/N BYP. S2 DIP SWITCH
disable Actuator 1 on 1 enable Actuator 1 off 1
Remote Transfer to Emergency (CP8–9)
RT /E S2 DIP SWITCH
disable Actuator 2 on 2 enable Actuator 2 off 2
Inhibit Transfer to Emergency (CP10–11)
N/E INHIB. S2 DIP SWITCH
disable Actuator 4 on 4 enable Actuator 4 off 4
5---5
OPTIONAL STRIP HEATER (Accessory 44)
Accessory 44 Strip Heater is designed to keep ambient temperatures within the Automatic Transfer Switch enclosure at acceptable levels. This accessory consists of a mounting bracket with strip heater, thermostat, and terminal block. A transformer with fuses is included when the power for the assembly is derived from voltages above 120 V ac. The 120 V ac customer powered assembly does not include a transformer. This optional accessory is available factory installed or in kit form.
Turn the thermostat’s dial to required setting as shown.
dial turn counterclockwise to lower temperature turn clockwise to raise temperature thermostat
Figure 5–4. Thermostat.
AVAILABLE KITS
Controls
Description Accessory Kit
Programmable Engine Exerciser & Source Availability Contacts
11BG K629830
Serial Communication Module 72A K601110
Strip Heater – Accessory 44
Description Accessory Kit
120 volt customer supplied voltage
(without transformer) 44A K613127–001
208 – 480 volt ATS derived voltage (with transformer)
44G K613127–002
380 volt ATS derived voltage (with transformer)
44G K613127
550 – 600 volt ATS derived voltage (with transformer)
44G K613127–003
INDEX
Printed in U.S.A. Copyright --- ASCO Power Technologies, L.P. 2014
A accessories, 5–2, 5–5 auxiliary circuits, 1–2
B battery, 4–2, 5–1 buttons, push, 3–1 bypass time delay, 1–5, 2–1, 3–1
C cable lugs, preparation, 1–1 catalog number, cover cleaning, 3–1 connections engine control contact, 1–2 line, 1–1 contacts auxiliary, 1–2 engine control, 1–2 main, 1–3, 3–1 source availability signal, 5–2 control features, 5–1 load disconnect, 5–4 motor load transfer, 5–4 plant exerciser, 5–1, 5–2, 5–3 controller, 4–1, 4–2 codes, cover cover removal, 4–2 disconnecting, 3–1 time delay potentiometers, 4–2
D DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4
E electrical operation, 1–5 engine exerciser, 5–1, 5–2, 5–3 engine starting contacts, 1–2
F features, see control features frequency, pickup and dropout settings, 4–1 functional test, 1–3, 1–4, 1–5
G ground, controller, 1–1
H handle, maintenance, 1–3 warning, 1–3 harness, 1–2 disconnect plugs, 3–1
HELP
800–800–2726 (ASCO)
customercare@asco.com
I inphase monitor, 5–4 inspection, 3–1 installation, 1–1
L labels, engine starting contacts, 1–2 inputs / outputs, 1–2 rating, cover lights, 1–4, 5–1 load disconnect feature, 5–4 lubrication, 3–1
M maintenance, preventive, 3–1 manual load transfer, 3–2 warning, 3–2 manual operation, 1–3 illustration of, warning, 1–3 motor load transfer feature, 5–4
N nameplate, cover
O operation electrical, 1–5 manual, 1–3 illustration of, 1–3 warning, 1–3 sequence of, 2–1 optional accessories programmable engine exerciser
& source availability signal contacts, 5–2, 5–3 serial communication module, 5–5 strip heater, 5–5
P parts, 3–1 problem, 3–2 programmable engine exerciser, 5–2, 5–3
R rating label, cover remote control features, 5–4 bypass transfer time delay, 5–4 inhibit transfer to emergency, 5–4 remote test, 5–4 remote transfer to emergency, 5–4 replacement parts, 3–1
S service, call 800–800–2726 (ASCO) set engine exerciser, 5–1, 5–2, 5–3 settings changing, 4–1 factory, 4–1 frequency, 4–1 phase, 4–1 time delay, 4–1 voltage, 4–1 source accepted lights, 1–4, 1–5
T terminal block, 1–2 test, functional, 1–3, 1–4, 1–5 time delay adjustment, 4–1 gen–set cooldown, 4–1 how to change, 4–2 override momentary outages, 4–1 settings, 4–1 transfer to emergency, 4–1 transfer to normal, 4–1 timer (plant exerciser), how to set, 5–1, 5–2, 5–3 transfer switch position lights, 1–4, 1–5 transfer test, 1–5, 3–1 trouble–shooting, 3–2
V voltage, phase, 4–1 voltage, pickup and dropout settings, 4–1
| 067l0 |
| 067kp |
| 067k1 |
| 228h2 |
| 067l3 |
| 228h4 |
| 228h5 |
| 067li |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .