Attachment 4 - Generator Data plate.jpg
JPG image 3 MB Posted
- Attached to
- Troy Lock Automatic Transfer Switch Replacement Federal contract opportunity
- Solicitation number
- W912DS25R0005
About this file
This document is a Statement of Work for a contract to remove and replace the Automatic Transfer Switch (ATS) at the Troy Lock in Albany, New York. The work includes removing the existing ASCO 300 Series ATS, disposing of it, and installing a new 208V 400A, 3 phase, 4 wire, 35,000 A.I.C., NEMA 3R ATS with a manual actuation handle and maintenance bypass. The contractor will also conduct a load test on the existing generator and troubleshoot any issues encountered during functional testing of the new ATS. The contract period of performance is 30 days after April 15, 2025, and the work must be scheduled at least two weeks in advance to allow for posting of a Notice to Mariners. The contractor is responsible for providing all necessary labor, equipment, materials, and transportation, and must comply with all applicable federal, state, and local codes, standards, and safety requirements.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .