Package 1-Pituffik SB_B99 Reno DB RFP - RTA.pdf

PDF 3 MB Posted

Attached to
Renovation of Building 99 at Pituffik Space Base, Greenland
Solicitation number
W912DS25R0002
Issued by

About this file

This document is a Design-Build Request for Proposal (RFP) for the renovation of Building 99, a three-story dormitory facility, at Pituffik Space Base in Greenland. The RFP requires the design-build contractor to prepare construction documents and provide construction services for the facility recapitalization, including site work, utilities, roof and exterior envelope repair, and a complete interior renovation. The objective is to modernize the aging dormitory to provide quality living quarters for U.S. military personnel in grades E5-E6. Key requirements include updating mechanical, electrical, and control systems, installing fire suppression and keyless entry, and achieving energy efficiency standards. The government estimates the work to cost between $25,000,000 and $100,000,000 and plans to award the contract in the 1st or 2nd Quarter of Fiscal Year 2025. The project is restricted to Danish and Greenlandic firms only, and the work is anticipated to take place over approximately 3 years.

View the file

Other files

File Type Posted
ATTACHMENT 5.docx DOCX document
Amendment 0001.pdf PDF
ATTACHMENT 2.docx DOCX document
W912DS25R0002.pdf PDF
Package 3-Pituffik SB B99 Reno CID-FFE-RTA.pdf PDF
Package 2-Pituffik SB B99 Reno Appendices RTA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build Request for Proposal

Package 1 - Division 1 & Scope of Work

Repair Dormitory Building 99 Pituffik Space Base, Greenland

19 September 2024

FINAL SUBMISSION

BAUTISA

Snapshot

BAUTISA

Rectangle

BAUTISA

Snapshot

Building 99 Renovation 19 September 2024 Pituffik Space Base, Greenland Design-Build Request For Proposal

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS

01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 08/23 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 16.00 10 05/16 DESIGN DATA (DESIGN AFTER AWARD)

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 02/14 METRIC MEASUREMENTS

01 45 00 08/23 QUALITY CONTROL

01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 20.00 18 NY Dist. July 2018 TESTING FOR MECHANICAL AND ELECTRICAL

SYSTEMS

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 05/23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS

01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 2

SECTION 01 11 00

SUMMARY OF WORK

08/15, CHG 2: 08/21

PART 1 GENERAL

As set forth in UFC 1-300-02, Change 3, 18 May 2021, 2-3.1, in project specifications directed to the Construction Contractor, the term "must" will replace the term "shall".

1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor must be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use, not later than 1500 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion must include final cleanup of the premises. (FAR 52.212-3)

b. With the exception of Government furnished items, the Contractor must furnish all labor, materials, equipment, and services for the construction for infrastructure upgrades as described in the solicitation package.

c. All work must be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.

d. In addition, all work on base shall take place in accordance with the Final Government Standards, GL 2020 (FGS, GL 2020) defining any environmental requirement and regulations.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals Salvage Plan; G , RO

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

See project description in PART 3 Execution at the end of this section.

1.3.2 Location

The site of work is located at Pituffik Space Base, Greenland. The site of the work is on a military installation and all rules and regulations issued by the Commanding Officer covering general safety, security, and

SECTION 01 11 00 Page 1 sanitary requirements, etc., shall be observed by the contractor.

1.3.3 Hazardous Materials

Prior to demolition or renovation of a facility that involves removing or disturbing friable asbestos containing material, a written assessment of the action will be prepared and furnished to the installation commander. A copy of the assessment will also be kept on file.

1.3.4 Exposed Structural Elements

A structural engineer shall evaluate the conditions of the exposed concrete foundations and steel structure. If the foundations/steel are exposed over the winter season, a follow-up inspection shall be held to ensure no further damages are observed.

Contractor is responsible for all necessary coordination with the Base Management Contractor for services/inspections.

1.4 OCCUPANCY OF PREMISES

Building 99 will not be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area. The Contractor is responsible for keeping access, stairs and stairways free of snow at Building 99 during the length of the project.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. Contractor is responsible for moving/disposal of any furniture remaining in building upon commencement of work.

1.5 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS

This project is estimated between $10,000,000.00 and $25,000,000.00.

1.6 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. At the completion of the Contractor's Work, all work performed under this contract as well as systems, sub-systems, and equipment must be in a condition that is equal to or better than the condition before the work was performed.

1.7 LOCATION OF UNDERGROUND UTILITIES

Obtain a properly executed AF Form 103, Base Civil Engineering Work Clearance Request coordinated through the Contracting Officer and signed by the Base Civil Engineer prior to excavating to mark utilities, and

SECTION 01 11 00 Page 2 within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.7.1 Notification Prior to Excavation

Notify the Contracting Officer at least 7 days prior to starting excavation work.

Excavation must not be performed until site utilities have been field located. The Contractor must take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations must be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located must not be disturbed without written approval from the CCI.

1.7.2 Maintenance Of Utilities

In the event of accidental disruption of an utility service caused by the Contractor's operation, the Contractor must immediately notify the Contracting Officer's Representative and the Installation Commander and must continue on a round-the-clock basis utilizing overtime labor on extra shifts as required until the service is restored. If restoration of service was effected by temporary or makeshift repairs, the necessary permanent repairs must subsequently be made by the Contractor and must be done at no cost to the Government. The Contractor will need to enter into a service agreement with the BMC for planned utility outages.

1.8 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

a. The Government will furnish to the Contractor the property identified below. When the property is provided, the Contractor must verify its quantity and condition and acknowledge receipt in writing to the Contracting Officer. The Contractor must also report in writing to the Contracting officer within 72 hours of delivery damage to or shortage of the property as received. This property must be installed or incorporated into the work at the expense of the Contractor, unless otherwise indicated in this contract.

b. Each item of property to be furnished under this clause must be identified in the Schedule by Quantity, item and description.

(FAR-52.245-3)

SECTION 01 11 00 Page 3

Item No.

Description Quantity

1. POL Products Arctic Diesel Fuel (for Contractor to purchase).

2. Arctic Parkas Provided by Contractor. See ARCTIC PARKAS paragraph

3. Arctic Gear, other than parkas Provided by Contractor. See ARCTIC PARKAS paragraph

4. Aggregate for concrete work Provided by Contractor

Non Frost Susceptible (NFS) material

See NON FROST SUSCEPTIBLE (NFS) MATERIAL paragraph.

1.8.1 Arctic Parkas

The U.S. Government will provide no articles of arctic clothing.

1.8.2 Non Frost Susceptible (NFS) Material

Non Frost Susceptible (NFS) material is available at Pituffik Space Base.

The material is free; however, the Contractor must process the material to achieve the proper gradation as required by the specifications.

Contractor must coordinate NFS material requirements with BMC for locations of materials.

1.9 MARKINGS ON GOVERNMENT AND CONTRACTOR EQUIPMENT AND PROPERTY

The Contractor shall comply with the following equipment marking requirements:

a. Government-Owned: All items of Government-furnished construction plant, including but not limited to mobile vehicles, tractors, cranes;

secondary equipment such as trailers, trailer-mounted heavy stationary equipment, such as batch plants, crusher plants, etc., shall have the following marking conspicuously placed and maintained on both sides of each such vehicle or equipment:

GOVERNMENT OWNED (VEHICLE) (EQUIPMENT)

OPERATED BY

(NAME OF CONTRACTOR)

The marking shall be in legible and easily visible letters at least two inches high. The markings may be accomplished by stencils, using durable outdoor type paint or by firmly secured plaques or decals.

SECTION 01 11 00 Page 4

Uniformity of markings is required.

b. Contractor-Owned: All Contractor-owned or Contractor-furnished construction plant including but not limited to the same categories of such items as listed in sub-paragraph (a) above, shall have the same marking as prescribed in subparagraph (a) above for Government-owned construction-plant except that the word "Contractor" shall be substituted in place of the word "Government" in said prescribed marking.

c. Prior to the return by the Contractor of Government-furnished construction plant equipment, the Contractor shall neatly remove the name of the Contractor.

1.10 GOVERNMENT FURNISHED SERVICES

The Government will make available to the Contractor for the duration of the contract the following services, free of charge, or at the rates noted below, subject to the regulations set forth by the Pituffik Space Base Installation Commander

a. Billeting/Quarters

(1) Work Force. Contractor personnel will be billeted in available facilities, usually transient quarters furnished with beds, closets and lights, Individual maid service is not available. Once per week the Contractor shall arrange to bring soiled linen to the Linen Exchange and receive clean replacement linen. Contractor's own personnel shall clean assigned billets. Personnel paying short visits (14 days or less) will be billeted in transient quarters at prevailing rates.

(2) Contract Managerial Personnel, such as the Project Manager, who may be billeted in VOQ (Visiting Officers, Quarters), when available, will be charged $185.00 per night inclusive of maid service and weekly linen exchange. Actual rate may differ based on when projects are awarded.

b. Food Service: The Contractor employees are able to buy meals at Dundas Base Restaurant where the current daily rate for three meals is US dollars. The Contractor shall arrange the work schedule so that employees can eat during existing dining hall schedules. The dining hall is located at the Main Base.

Meal Daily

Breakfast 0500 - 0800

Lunch 1100 - 1300

Dinner 1700 - 1900

Messing for transient personnel (14 days or less) will be on a cash basis at prevailing rates. Present FY24 rates are $4.00 for breakfast and $6.46 for lunch or dinner with subject to 3.4% increase for subsequent years. The Contractor's personnel will not be issued free

SECTION 01 11 00 Page 5 meal cards.

The Contractor is responsible for damage to messing facilities as caused by personnel tracking asphalt, tar, oil, grease, mud, etc., and will be charged any costs incurred for the repair or replacement of Government property.

c. Transportation: Contractor personnel may use the regularly scheduled Base bus system to go from one place to another on the Base.

d. Laundry and Dry Cleaning Services are available at prevailing rates, on a weekly basis. Rates and service times are posted in Building #100 (North Star Inn) and at the pick up point, Building #252.

e. Recreation Facilities including gymnasium, Motion Picture Theater, access to the Top of the World Club, and Base Exchange are subject to the regulations as set forth by the Pituffik Space Base Installation Commander. Approval for establishing Contractor's Clubs and rules for their operations must be obtained from the Installation Commander.

Individual users must pay the prevailing rates.

f. Vehicle and Equipment Maintenance: Maintenance and repair of Contractor-owned vehicles and equipment used in the performance of this contract will be the responsibility of the Contractor. Base maintenance shops may be made available to the Contractor for emergency repairs on an as available basis.

g. POL: Fuel products, oil and lubricants as required for Government -furnished equipment and Contractor- owned vehicles and equipment used in the performance of this Contractor will be sold by the U.S.

Government at cost to the Contractor. Fuel products, oil and lubricants provided for Contractor-owned vehicles and equipment will be limited to such types as are readily available at the base and shall be purchased through base supply. Special products, not available at the base, shall be furnished by the Contractor at his own expense. The following POL products can be made available to the Contractor for purchase: DFA and Mogas. These will be issued to the Contractor using an approved Serv-O-Plate (AF Form 1252A) issued by Vehicle Maintenance. Information regarding this contract, including contract number, expiration date, as well as identification of vehicles and equipment must be provided to the Base O&M contractors.

If MOGAS is used the contractor will be required to provide estimated usage prior to the shipping season to ensure correct quantities for contractor use and base use.

h. Utilities: Water and electricity will be provided within allotted building work-spaces from existing sources and outlets. No electrical power or outlets will be made available for work to be performed away from buildings. The Contractor shall furnish a generator, as necessary, to power any equipment or machines utilized to produce the aggregate stockpiles. The U.S. Government will not furnish electrical power for use in connection with production of aggregate. Contractor must Carefully conserve any utilities furnished without charge. POL will be available on a cost reimbursable basis per subparagraph g above.

1.11 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the

SECTION 01 11 00 Page 6 property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 10 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

1.12 SALVAGE AREA

Salvaged, non-hazardous materials or equipment must be identified to the Contracting Officer and must be returned to the Government as requested.

All salvaged items must be properly documented and signed by the Contracting Officer in compliance with Base regulations. Returned materials must be delivered to the landfill shown on the drawings or the DRMO yard at the Contractor's expense. No materials must be placed within the landfills without prior approval.

All recyclable materials must be cut into manageable pieces, one meter by three meters and neatly stacked in a pile at the DRMO yard. The contractor must be responsible for coordination of all demolition activities with the Contracting Officer and Pituffik Space Base BCE Office.

The contractor must adhere to the regulations as outlined in the respective management plans included in the Appendix. (Solid Waste Management Plan, Spill Prevention and Response Plan, Asbestos Management Plan, Slug (Wastewater) Management Plan, Hazardous Waste Management Plan, Pollution Prevention Management Plan)

1.13 CRITERIA AND REGULATIONS APPLICABLE TO THIS WORK AT PITUFFIK SPACE

BASE

Refer to Appendices, work shall be executed in strict accordance with the following:

" Conservation Mgmt Plan Final - 2022

" Oversees Hazardous Waste Management Plan - 2022

" Installation HAZMAT Management Plan (IHMP) - 2022

" Spill Prevention-Response Plan - 2023

" Pollution Prevention Management Plan - 2015

" Solid Waste Management Plan - 2015

" Storm Water Mgmt Plan - 2023

" Asbestos Management Plan - 2023

" Affirmative Proc Plan - 2021

" Wastewater Slug Prevention Plan - 2022

" Final Governing Standards for Environmental Protection by United States Forces in Greenland (FGS-GL) - dated 2020

SECTION 01 11 00 Page 7

" Consolidated Act of Working Environment No. 268 of 18 March 2005 as subsequently amended issued by "The Greenland Working Environment Authority". Document may be obtained from the Danish Working Environment Authority, available on website

" The Greenland Executive Order on design of construction sites and similar workplaces in Greenland, no 1348 of 15th December 2005.

Document may be obtained from the Greenland Working Environment Act, available on website

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

SECTION 01 11 00 Page 8

SECTION 01 11 00 Page 9

ARTICLE 1 – DESIGN OBJECTIVES

1.1 SCOPE OF WORK

Building 99 was originally constructed in 1959 and needs updating.

The Space Force goal is to provide eighteen (18) remodeled living units on each of the three (3) floors for a total of fifty-four (54) apartment modules for E5/E6 NCO’s.

The base bid includes the preparation of design/build construction documents and construction for the renovation of an approximately

27,120 square foot (existing), three (3) story dormitory facility to accommodate mechanical rooms, electrical rooms, multi-purpose and kitchen/dining areas, laundry rooms, two (2) renovated egress stairwells, and a renovated central stair. The structural frame and building envelope walls are to remain, but demolition is required for all existing non-structural interior elements, MEP equipment and associated piping and conduits, the interior face of the building envelope walls, and the roof panels and attic insulation. See Appendix

C for the Base Bid concept drawings.

An Optional Bid Item (No. 1) will include replacing the existing building envelope walls and windows with new thermally efficient products. See Appendix C for Optional Bid Item No. 1 concept drawings.

Each living unit will be paired with another living unit, both sharing a common bathroom to be located between them. The facility must be provided with all necessary utility upgrades, communications, and site improvements to accommodate vehicles (number of block heaters and vehicles to be maximized per available space on south face of Building

99).

The D/B RFP includes a conceptual Comprehensive Interior Design (CID) document that has been taken to a 90% level of completion. Refer to the CID Package for Concept Comprehensive Interior Design. The CID includes concept Structural Interior Design (SID) and concept

Furniture, Fixtures, & Equipment (FF&E) information. The work under this contract will include completing documentation of the CID document to a 100% level. The concept CID documents are provided to assist the Contractor with the final design. Plumbing fixtures, faucets, sinks; etc. and lighting fixtures, (not lamps) if shown in the CID or Product Data Sheets, indicate the type, style, finish, and level of quality that the Government expects to be provided under this project. The Contractor will provide all items defined in the SID

(e.g., painted surfaces, counter tops, carpet, floor tiles, ceiling tiles, ceramic tiles, etc.) in accordance with the SID guidelines. For coordinating the SID with the CID, the Contractor must provide all

SECTION 01 11 00 Page 10 necessary drawing files and finish samples, as may be necessary or required, to the government or it's AE for the preparation of a complete CID brochure.

Furniture, pictures, and appliances are not part of the scope of work.

In general terms these are items that are not built in, i.e., hard wired, bolted into place or piped/plumbed with water supply and/or sanitary sewer connection. Exceptions to this rule are for example stove top ranges mounted in counter tops and kitchen range/stove top exhaust hoods, if so indicated on the drawings or elsewhere herein.

As part of the Base Bid, the Design-Build Contractor must provide a detailed Autodesk Revit 2022 3D Building Information Model (BIM), AutoCAD 2020 CAD exports for each drawing sheet, a USACE BIM Execution

Plan, and a combined PDF file of all drawings at each Design

Submission. The BIM file must show all rough-in framing of walls, doors and windows, ductwork, plumbing, electrical lighting/power, electrical face plate locations and heating, etc. A major Space Force objective is to provide unaccompanied military personnel with housing conducive to their proper rest, relaxation, and personal well-being.

Properly designed and furnished quarters providing individual privacy are essential to the successful accomplishment of the increasingly complicated and essential jobs these people perform at this remote arctic location, e.g., compliant with current UFC/Air Force criteria for dormitory buildings and Federal/DOD energy standards as specified in this RFP. This project is in accordance with Air Staff guidance for quality-of-life improvement and meets the Air Force Unaccompanied

Housing Design Guide criteria unless specified otherwise in this RFP.

ATFP, UFAS, ADA-ABA/ADAAG do not apply nor are there any LEED objectives or certification requirements. Federal/DOD Energy standards and goals that are lifecycle justifiable apply.

1.2 BID OPTIONS

Please see Bid Schedule (Section 00 00 10) for complete details.

1.3 DESIGN CRITERIA

The conceptual building design shown in this RFP is based on:

• DD Form 1391 (DD) - Appendix I

• UFC 1-200-01 DOD Building Code, General Building Requirements

• Thule Excellence Plan (Sept. 2012) Base Standards and Design

Guidelines – Refer to Appendices for details.

Design development, construction drawings, technical specifications and construction must at minimum comply with the requirements and quality standards outlined herein and in the Unified Facilities Guide

SECTION 01 11 00 Page 11

Specifications (UFGS). The Architect-Engineer (AE) must employ safety and health standards promulgated under the Occupational Safety and

Health Act (OSHA) of 1970 as published in the Federal Register, October 18, 1972, Volume 37, Number 202, Part II (Title 29, Chapter

17, Part 1910) and subsequently issued OSHA standards or standards consistent therewith in the design of this facility. In addition, the

AE must follow the National Institute of Occupational Safety and

Health (NIOSH) Standards.

Air Force Criteria is available from the National Institute of

Building Sciences Whole Building Design Guide Construction Criteria

Base (CCB), from their website for CCB subscribers

(http://www.wbdg.org/ccb), or via the USACE website

(http://www.usace.army.mil). The resources found on the CCB include US

Army Corps of Engineers requirements and Air Force Base Design Guides

(AFDG), Engineering Technical Letters (AFETL), Pamphlets (AFP), and

Regulations (AFR).

Applicable design and construction criteria are specifically indicated, but not limited to that mentioned in the following sections of this document. Criteria must be taken from the most current references as of the date of issue of the RFP, unless noted otherwise.

Referenced codes and standards are minimum acceptable criteria.

Administrative, contractual, and procedural features of the contract must be as described in other sections of this RFP.

1.4 SPECIFICATIONS

The technical specifications must be developed from those provided with this RFP and the Unified Facilities Guide Specifications (UFGS) by the Designers of Record. Danish Architect-Engineers may deliver

Specification in the Danish BIPS system. BIPS must be modified for requirements for standard forms, submittals, and Contracting Officer

(CO) approval. If not available in UFGS, the Designer of Record must develop specific sections using a SpecIntact template. The Design-

Build Contractor may use specifications other than from UFGS as long as the specifications meet Master Format 2020 and meet the technical requirements for the RFP.

1.5 DESIGN QUALITY

The main objectives of this solicitation are to obtain a design for the Building 99 renovation, including associated site development within funds and gross square footage available while maximizing design and material quality. Utility systems must be integrated within the building and on the site. Building systems must be selected for low-cost maintenance and operation. Therefore, there must be an

SECTION 01 11 00 Page 12 overall balance of aesthetics and functionality within the parameters provided in this RFP.

1.6 DESIGN FREEDOM

Requirements stated and illustrated in this RFP are minimums.

Innovative, creative, or cost saving proposals which meet or exceed these requirements are encouraged and must be considered during design submittal reviews. The drawings provided establish project floor area requirements and spatial relationships that have been reviewed for user function and preliminary code compliance. Floor plans may change with government approval to enhance design, comply with codes, incorporate options, include betterments, or support constructability.

1.7 ENERGY STANDARD COMPLIANCE

Per UFC 1-200-02 (High Performance and Sustainable Building

Requirements), the building must exceed the provisions of ASHRAE

Standard 90.1 – Energy Standard for Buildings by the percentage as required in other parts of this RFP. As a separate part or section of the Design Analysis demonstrate exceeding ASHRAE 90.1 with calculations, vendor literature, equipment catalog sheets, compliance forms, worksheets, and narrative descriptions of the building envelope, HVAC systems, service water heating, electrical power, lighting, and other equipment and systems.

1.8 PERMITS

Not applicable.

ARTICLE 2 – FUNCTION DESIGN REQUIREMENTS

2.1 GENERAL DEFINITIONS AND REQUIREMENTS

2.1.1 GROSS AREA DEFINITION

Gross building area is measured to the outside face of exterior enclosure walls. The Design-Build Contractor's proposal must meet all requirements including Minimum or Maximum net areas indicated in this

RFP.

2.1.2 NET AREA DEFINITION

Net area is measured to the inside face of the room or partition walls.

SECTION 01 11 00 Page 13

2.1.3 NET AREA REQUIREMENTS

A programmed space is included on the floor plans under the room names. Net areas indicated for building circulation and utility rooms are for guidance only. These spaces must be sized to accommodate the required function and equipment, comply with code requirements, enhance constructability, and comply with other requirements of the

RFP.

2.1.4 FINISH REQUIREMENTS

Room finishes stated in the following sections are the minimum requirements and must be coordinated with the furniture specified in the concept Comprehensive Interior Design (CID) which accompanies this

RFP.

2.1.5 FUNCTIONAL AREA REQUIREMENTS

During work sessions conducted with the users, discussions resulted in some variations from the original functional requirements matrix.

Complete adjacencies can be found in the concept drawings (Appendix

C).

ARTICLE 3 – DESIGN NARRATIVES

A - SUBSTRUCTURE

A10 FOUNDATIONS

Although a project specific geotechnical report for the dormitory building has not been completed at the time of preparing the RFP, for footing design, assumptions have been made based on available geotechnical information in as-built drawings from adjacent dormitory renovation projects. According to the foundation notes of the existing drawings and previous geotechnical reports, any new isolated foundations required can be sized based on an allowable bearing capacity of 4000 psf. Based on a 2013 dormitory design and related geotechnical report, footing bearing elevation must be at a minimum of

8’-0” below the finished grade.

A1010 STANDARD FOUNDATIONS

A1010.1 COLUMN FOUNDATIONS

The existing building is supported on shallow cast-in-place concrete spread footings and mats bearing on non-frost susceptible material.

The Design-Build contractor must evaluate the condition of the existing exposed concrete foundations and remediate all areas showing deterioration.

SECTION 01 11 00 Page 14

Although not anticipated, if during the design-build phase, new or replacement foundations are required, it is recommended to use precast concrete footing elements to support any required steel support structure to avoid difficulties in pouring concrete for new foundations on the permafrost building site. Any new steel posts or stringer bases must be attached to supporting footings, either new or existing after verification of capacity, using galvanized steel anchor bolts and components.

A1030 THERMAL PROTECTION

Insulate all existing building foundation elements and any new foundations required to a minimum depth of 8” below finished grade with the same rigid insulation system described for the building piers in section B2010.1.

B - SHELL

B10 SUPERSTRUCTURE

All building structural systems and components must comply with the requirements of the current UFCs and codes, standards and criteria adopted by them as well as industry standards and commonly accepted methods of practice. The interior stairs will be code compliant steel framed with concrete filled metal pan treads connected to the existing building structure at each floor level. Covered entries will consist of exterior steel grating stairs and landings connecting the building’s 1st floor level to the grade and covered by a framed steel canopy.

Refer to Appendix D for preliminary structural calculations for the rehabilitation of the existing building. Any structural calculations and/or reports that are part of the structural design during the design/build phases of construction must be submitted as part of design documents.

B1001 LATERAL SYSTEM EVALUATION AND REHABILITATION OF EXISTING

BUILDING

B1001.1 SEISMIC DESIGN DATA AND PERFORMANCE OBJECTIVES

UFC 3-301-01 and the Structural Load Data Tool on WBDG.org website provides guidance on applicable seismic data for Thule Airbase (the previous name for Pituffik Space Base). Applicable spectral accelerations as follows:

• Short-period (0.2-sec) spectral response acceleration (2% probability of being exceeded in 50 years) (Site Class B)

Ss = 0.39 g

SECTION 01 11 00 Page 15

• Long-period (1.0-sec) spectral response acceleration (2% probability of being exceeded in 50 years) (Site Class B)

S1 = 0.18 g

• Short-period (0.2-sec) spectral response acceleration (10% probability of being exceeded in 50 years) (Site Class B)

Ss-10/50 = 0.20 g

• Long-period (1.0-sec) spectral response acceleration (10% probability of being exceeded in 50 years) (Site Class B)

S1-10/50 = 0.09 g

The Design-Build Contractor is responsible for identifying the site classification to be used to modify the UFC provided seismic data to match site soil characteristics. In lieu of additional site-specific seismic/geotechnical information, analyses can be perform using a seismic site class of “C”.

UFC 3-310-04 provides minimum seismic response parameters for the lateral resisting system consisting of steel ordinary moment resisting frames in the dormitory building as follows:

Response Modification Coefficient R = 3-1/2

System Overstrength Factor o = 3

Deflection Amplification Factor Cd = 3

The Design-Build Contractor is permitted to utilize alternate parameters from what is listed above to reduce demand on lateral resisting elements or connections if they provide documentation through detailing and calculation that the lateral resisting system complies with all requirements in applicable UFC and building code provisions.

UFC 3-310-04 and ASCE/SEI 41-17 provides information about the required evaluation and rehabilitation performance objectives for various risk categories. The dormitory building must be classified as having a risk category II and therefore must require the satisfaction of the following performance objectives:

SECTION 01 11 00 Page 16

RISK

Category

SCOPE ITEM EVALUATION

PERFORMANCE OBJECTIVE

RETROFIT

PERFORMANCE OBJECTIVE

II STRUCTURAL LIFE SAFETY IN BSE-1E LIFE SAFETY IN BSE-1N

Collapse Prevention in BSE-2N

NON-

STRUCTURAL

LIFE SAFETY IN BSE-1E LIFE SAFETY IN BSE-1N

B1001.2 WIND DESIGN DATA

UFC 3-301-01 and the Structural Load Data Tool on WBDG.org website provides guidance on applicable wind design parameters for Thule

Airbase (the previous name for Pituffik Space Base).

Risk Category II

Basic Design Wind Speed (for Risk Category II) VII=148 mph

Allowable Stress Design Wind Speed Vasd=115 mph

Wind Exposure C

B1001.3 EVALUATION / REHABILITATION REQUIREMENTS

Evaluation of the existing building structure is required to comply with all applicable UFCs and building code provisions adopted therein.

The following is a list of some relevant criteria which must be considered in the design.

• ICSSC Recommended Practice 10 (RP 10-22) as modified by UFC 3-

301-01 Section 4-2 gives direction for renovations which require seismic evaluation of existing structures.

• IEBC Sections 805.3, 906.2, and 1103.2 include conditions where the full existing building lateral force resisting system must be evaluated.

• IEBC Section 503.12 as modified by UFC 3-301-01 Section 4-4.2 provide conditions which, to allow for reroofing of an existing building, it is necessary to perform an evaluation of the existing building’s roof diaphragm and diaphragm connections to roof framing and walls.

The thresholds listed in these documents for evaluation and possible retrofit of specific components or the complete lateral force resisting system of the existing building are not being triggered at the time of writing this RFP. Relevant threshold criteria include:

SECTION 01 11 00 Page 17

• The preliminary estimated project cost is below 50%of the plant replacement value based on DD 1391 budgets and facility replacement costs.

• The seismic design category based on the seismic design data listed in B1001.2 is SDC “C”.

• The renovation scope in the project is not anticipated to meet the requirements of a “Substantial Structural Alteration” per chapter 2 of the IEBC.

• The exterior stair canopies and walls are not anticipated to increase the demand-capacity ratio in any element of the lateral force resisting system by more than 10%.

During design, if the parameters of the project scope change to trigger any of these thresholds, the Design-Build Contractor must perform necessary technical analyses to complete the structural evaluation of the existing building and documents and execute necessary upgrades to meet UFC and building code performance requirements.

B1002 STRUCTURAL SYSTEMS

B1002.1 GRAVITY SYSTEM

The existing dormitory building utilizes steel framing as the primary load-carrying system to support the building’s gravity loads (i.e.

dead, live, snow). Typical floors are constructed of concrete filled metal deck supported by steel beams that span between steel columns.

All beam-to-girder connections are of the shear-type while all beam/girder-to-column connections are of the moment-resisting type.

The contractor is responsible for the detailed design of the roof and wall support framing including connections back to the primary steel building framing. Design must also include any supplemental framing necessary to support walls, roofs, ceilings, and floors around proposed openings. The contractor is responsible for providing sufficient documentation to verify that all performance requirements have been met, the design configuration matched and may have to provide added substrate support to adequately resist imposed loads.

B1002.2 LATERAL SYSTEM

The existing dormitory building utilizes ordinary moment resisting steel frames in both orthogonal directions to provide resistance to lateral loads. Floor slabs and roof deck serve as rigid diaphragms transferring lateral loads due to wind or earthquake effects to supporting frames at various levels along the building height.

SECTION 01 11 00 Page 18

B1010 FLOOR CONSTRUCTION

B1010.1 FLOOR SYSTEM

The existing floor construction consists of a 2” normal weight concrete slab reinforced with weld wire fabric over 4 ½” deep metal floor deck. The metal deck is supported by steel beams framing to wide flange columns.

The revised usage of some of the former dormitory spaces as Mechanical and Electrical Rooms requires the evaluation of the existing floor framing in those areas for additional live and dead loads. UFC recommendations indicate these MEP spaces should be designed for a minimum of 100 psf live load; however, it is anticipated that actual equipment loads in the spaces, particularly at the upper floors will not be that heavy. Preliminary evaluation of these members indicate they have some reserve capacity for the additional gravity loads.

However, evaluation and reinforcing as required of beams/columns and their connections for all actual loads including wind and seismic forces in members acting as part of the lateral force resisting system is the responsibility of the Design-Build Contractor.

Slab in-fills required to close existing MEP openings not used in the proposed space layout, and revised slab edges at existing stairwell where stairs geometry is being changed, the floor system will match the existing floor construction. Refer to B1010.2 for additional requirements at exterior stairs.

B1010.2 EXTERIOR STAIRS

Building 99 has three (3) existing entry stairs with canopied landings on the south of the building and one (1) existing mechanical room stair on the north of the building that is not canopied. Preliminary visual observations of the exterior stairs, guardrails, and canopy assemblies indicate the existing support members and railings can be maintained. Areas of minor deterioration must be cleaned, and a corrosion resistant coating must be applied. It can be assumed for cost estimating that 100% of the stair structure will require some remediation of corrosion. An evaluation of the capacity of all existing exterior stairs, guardrails, and canopy structures must be completed by the Design-Build Contractor including site investigation of any deteriorated members or connections. Pending the results of this evaluation, components in the stair assemblies are to be repaired or replaced.

If replacement is required, exterior stair treads and landings must be fabricated and constructed of hot-dipped galvanized structural steel rolled sections and plates. The stairs framing must be supported by an

SECTION 01 11 00 Page 19 independent foundation system as described in section A1010. All stair treads, risers, and landings must be constructed from serrated galvanized welded steel bar grating of sufficient size to support all

UFC and building code requirements.

If replacement is required, guardrail components including handrails, stiles, posts, and other railing structure must be constructed from hot-dipped galvanized steel. The contractor is required to design all railing elements and their connections to new or existing framing/walls to support and comply with all UFC and building code requirements.

B1020 ROOF CONSTRUCTION

B1020.1 ROOF STRUCTURAL FRAME

The gabled roof structural system for the existing building consists of steel purlins spanning between roof steel beams and columns. Roof purlin-to-beam connections are of the shear-type while purlin and/or beam-to-column connections are of the moment-resisting type to ensure lateral stability in addition to improved gravity load carrying capacity.

The existing primary steel structure at the roof will remain and be used to support any required replacement or new purlins determined to be necessary for support of the new roofing assembly; refer to section

B1020.2. These primary steel rakers are supported at each column location, 76 locations total, with an existing stack of plywood shims at the third-floor ceiling level. The integrity of this wood material must be evaluated by the Design-Build Contractor. If it has deteriorated, it must be replaced by steel or another suitable non-combustible shim material of adequate compressive capacity. This replacement, if necessary, will require the existing roof framing to be temporarily shored while the repairs are completed.

B1020.2 ROOF ASSEMBLY

The existing roofing assembly consists of corrugated metal roof panels fastened to the existing steel structure, sheet metal flashing at the roof eaves, rake edges, and ridge, and backup wood blocking. The entire roof assembly must be demolished down to the existing structural steel purlins. Preliminary analysis of original design documents indicates that the existing purlins are sufficient to support the proposed reroofing based on assumed assembly weights and requirements. However, an evaluation of the capacity of the existing purlins must be completed once a final roof assembly has been selected and design loads are determined by the Design-Build Contractor, including site investigation of any deteriorated members or connections which could reduce their capacity.

SECTION 01 11 00 Page 20

It can be assumed for cost estimating that approximately 10% of the roof framing may have some signs of deterioration that will at least require cleaning and recoating if repair or replacement is not determined to be necessary.

B1020.3 EXTERIOR STAIR CANOPIES

B1020.3.1 EXTERIOR STAIR CANOPIES BASE BID

The three (3) existing exterior entry stairs on the south of the building have canopied landings with wind walls. Existing canopy and wind wall metal panels including existing “Z” clips attached to the existing steel beams/tubes will be maintained unless damaged. Complete an evaluation of the existing structure at these entries and remediate, repair, or replace members as indicated in B1010.2.

Replace canopy and wind wall panels in kind only where damaged and anchor back to the existing structure. Canopies must be constructed of galvanized metal roof deck supported by existing steel beams that are bearing on existing steel posts. Any connections to the main building structure must be provided with thermal breaks. Metal roof deck will be covered with uninsulated standing seam metal panel roofing to match the main building roof.

B1020.3.2 EXTERIOR STAIR CANOPIES OPTION (OPTIONAL BID ITEM NO. 1)

Demolish existing canopy and wind wall metal panels at the three (3) existing exterior entry stairs on the south of the building including existing “Z” clips down to the existing steel beams/tubes. Complete an evaluation of the existing structure at these entries and remediate, repair, or replace members as indicated in B1010.2. Evaluation and all remediation, repairs, and replacements must be coordinated with the new building envelope design.

Install new canopy and wind wall panels over the existing structure and coordinate with the new building envelope. Canopies must be constructed of galvanized metal roof deck supported by existing steel beams that are bearing on existing steel posts. Any connections to the main building structure must be provided with thermal breaks. Metal roof deck will be covered with uninsulated standing seam metal panel roofing to match the main building roof.

Wind wall framing must be enclosed on all sides by uninsulated metal panels that match the new exterior wall panel profiles. Provide supplemental backup girt framing as necessary to support the metal panels and all associated flashing and trim required back to the existing steel posts and beams.

SECTION 01 11 00 Page 21

B20 EXTERIOR ENCLOSURE

B2010 EXTERIOR WALLS

B2010.1 EXTERIOR WALL SKIN

B2010.1.1 EXTERIOR WALL SKIN (BASE BID)

The existing metal panel building skin including any existing structural studs or girt framing between existing structural steel members or slabs will remain where it is not damaged or required to be removed to perform other work.

B2010.1.2 EXTERIOR WALL SKIN (OPTIONAL BID ITEM NO. 1)

The existing building skin will be removed including any existing studs or girts framing between existing structural steel members or slabs. The exterior building face must be comprised of a minimum 4-inch insulated metal panel system supported on minimum 14-gauge horizontal blocking between 3 5/8-inch 14-gauge cold formed metal framing (CFMF) studs spanning from existing slab to underside of existing spandrel members. The overall R-Value for the exterior wall assembly, exclusive of the insulated interior furring, must be at least R-28.

Provide exterior finish topcoat of 70 percent polyvinylidene fluoride resin with not less than 0.8 mil dry film thickness. Provide exterior primer standard with panel manufacturer with not less than 0.8 mil dry film thickness. Interior finish must consist of 0.5 mil dry film thick backer coat if permanently concealed from view by construction or the same coating and dry film thickness as the exterior coating if the panel interior side will be exposed. Provide factory-applied clear 70 percent polyvinylidene fluoride (PVF), 0.8 mil topcoat and edge coating on all factory-cut or unfinished panel edges and field apply

70 percent PVDF clear coat to field cut panels.

B2010.2 EXTERIOR WALL VAPOR RETARDERS AIR BARRIERS AND INSULATION

A 4-inch insulated metal panel with a minimum R-Value of R-23 will be installed below the existing first floor structure. All existing exterior building insulation at the piers will be removed and replaced with 3-inches of insulation.

B2010.3 INTERIOR FURRING AT EXTERIOR WALL

B2010.3.1 INTERIOR FURRING AT EXTERIOR WALL (BASE BID)

All existing interior furring (non-structural) and insulation at the existing exterior wall must be demolished down to interior face of the existing exterior metal ‘sandwich’ panel. Install 6” metal stud framing, held off of the exterior panel by 1-inch. Provide a minimum

R-28 closed cell, two-component, medium density Spray Polyurethane

SECTION 01 11 00 Page 22

Foam (SPF) insulation in new furring cavity. SPF must have a Class A/1 flame spread and smoke development rating and meet NFPA 285 and 286 requirements. The interior face of the metal stud furring must have two layers of fire-rated 5/8-inch gypsum board.

B2010.3.2 INTERIOR FURRING AT EXTERIOR WALL (OPTIONAL BID ITEM NO. 1)

Provide a minimum R-14 closed cell, two-component, medium density

Spray Polyurethane Foam (SPF) insulation in the CFMF stud assembly.

SPF must have a Class A/1 flame spread and smoke development rating and meet NFPA 285 and 286 requirements. The interior face of the exterior 14-gauge CFMF stud assembly must have two layers of 5/8-inch gypsum board.

B2010.4 EXTERIOR LOUVERS, GRILLES AND SCREENS

Pre-finished storm resistant louvers and grilles with bird screens.

AMCA 500-D and AMCAS 511 rated for air performance and water penetration; three coat fluorocarbon coating not less than 1.4 mil thick full strength 70% resin 3 coat Fluoropolymar finish. Color to match adjoining exterior wall color.

B2010.5 EXTERIOR SOFFITS

Exterior soffits must be fabricated from sheet metal and pre-finished with baked on fluorocarbon coating, color to match surrounding wall/roof.

B2020 EXTERIOR WINDOWS

B2020.1 EXTERIOR STANDARD WINDOWS

B2020.1.1 EXTERIOR STANDARD WINDOWS (BASE BID)

Existing windows to remain unless assessed as damaged beyond repair.

If window replacement is required, follow guidelines in B2020.1.2.

B2020.1.2 EXTERIOR STANDARD WINDOWS (OPTIONAL BID ITEM NO. 1)

Windows must be triple glazed high-performance units. Frames must be fabricated from vinyl. The single sash is operable with a tilt/turn ventilator style operation. Provide PVC, reinforcing members, fasteners, hardware, weather-stripping, and anchors conforming to

AAMA/WDMA/CSA 101/I.S.2/A440. Windows must have a typical assembly U value of 0.2 (Imperial). Windows must be Energy Star qualified products as appropriate to Northern climate zone. Window frames must be white.

SECTION 01 11 00 Page 23

B2030 EXTERIOR DOORS

B2030.1 EXTERIOR ENTRANCE DOORS

Insulated steel doors and frames must be provided in lieu of Grade I standard steel…

This is the start of the file's text. The full file is on GovTribe.