This file contains two attachments - Attachment 2 (Company Specialized Experience) and Attachment 3 (Past Performance Questionnaire) that are forms to be completed by offerors and their clients for the renovation project at Pituffik Space Base, Greenland.
Attachment 2 requires offerors to provide detailed information about up to 5 construction and 5 design projects, including contract numbers, award/completion dates, project scope, contract types, and pricing. Attachment 3 is a comprehensive past performance evaluation form where clients rate contractors across multiple performance categories including quality, schedule, customer satisfaction, management, cost control, and safety using a 5-point scale from Unsatisfactory to Exceptional. The questionnaire must be completed by the client and either returned to the offeror for inclusion in their proposal or submitted directly to USACE. These forms will be used to evaluate offerors' experience and past performance for the Building 99 renovation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 5.docx | DOCX document | |
| Amendment 0001.pdf | ||
| W912DS25R0002.pdf | ||
| Package 1-Pituffik SB_B99 Reno DB RFP - RTA.pdf | ||
| Package 3-Pituffik SB B99 Reno CID-FFE-RTA.pdf | ||
| Package 2-Pituffik SB B99 Reno Appendices RTA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2. COMPANY SPECIALIZED EXPERIENCE
Provide the following information to show examples of recent and relevant projects your company constructed in accordance with the solicitation requirements. Indicate whether the example is to demonstrate design or construction experience
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : CON #1 CON #2 CON #3
| DESIGN #1 | DESIGN #2 | DESIGN #3 |
| CON #4 |
DESIGN #4
CON #5
DESIGN #5
| 1. Experience for: | Offeror | Joint-Venture |
| Other (Explain) |
Firm Name:
Address:
Phone Number:
UEI Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor
Percent of project work performed:
Type and extent of work you subcontracted out: If subcontractor, who was prime (Name/Phone #):
| Joint Venture |
| Other (Explain) |
3. Contract Number: Delivery/Task Order Number:
Type of Facility:
Title:
Location:
Owner:
Owner’s Point of Contact (POC) for Reference (Name and Company):
Current Telephone Number of Reference POC:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
| Award Amount: | Final Price: |
| Date Construction Began: | Date Construction Completed: Percent Complete: |
Type of Contract/Task Order: (Check ALL that apply) Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (Explain): If Design-Build, identify the Lead Design Firm:
8. Design Project:
| A/E Design Fee: | Total Construction Value: |
| Date Design Began: | Date Design Completed: Percent Complete: |
Type of Contract/Task Order: (Check ALL that apply) Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Designer of Record Engineering Services Full Plans & Specs Other (Explain):
9. Provide a general scope of the project:
10. Describe the project in accordance with the submittal requirements as defined under Factor 2 – Specialized Experience/Past Performance, paragraph 3.C.i:
11. Were you terminated or assessed Liquidated Damages? (If either is “Yes,” attach an explanation.)
12. Other Information:
ATTACHMENT 3. PAST PERFORMANCE QUESTIONNAIRE
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name:
CAGE Code:
Address:
UEI Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: ☐Prime Contractor ☐Sub Contractor ☐Joint Venture ☐Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: ☐Firm Fixed Price ☐Cost Reimbursement ☐Other (Please specify): Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work ☐High ☐Med ☐Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name: Title: Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMIT DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
| (E) Exceptional |
| Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO |
significant weaknesses identified.
| (VG) Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor |
were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
| (S) Satisfactory |
| Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. |
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
| (M) Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions |
appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
| (U) Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective. |
| An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. |
| (N) Not Applicable |
| No information or did not apply to your contract |
| Rating will be neither positive nor negative. |
| Contractor Information (Firm Name): | Client Information (Name): | TO BE COMPLETED BY CLIENT |
| PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE. |
1. QUALITY:
| a) Quality of technical data/report preparation efforts |
| E |
| VG |
| S |
| M |
| U |
| N |
| b) Ability to meet quality standards specified for technical performance |
| E |
| VG |
| S |
| M |
| U |
| N |
| c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance |
| E |
| VG |
| S |
| M |
| U |
| N |
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E
VG
S
M
U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E
VG
S
M
U
N
| b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract |
| E |
| VG |
| S |
| M |
| U |
| N |
3. CUSTOMER SATISFACTION:
| a) To what extent were the end users satisfied with the project? |
| E |
| VG |
| S |
| M |
| U |
| N |
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E
VG
S
M
U
N
| c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? |
| E |
| VG |
| S |
| M |
| U |
| N |
| d) Overall customer satisfaction |
| E |
| VG |
| S |
| M |
| U |
| N |
4. MANAGEMENT/ PERSONNEL/LABOR
| a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? |
| E |
| VG |
| S |
| M |
| U |
| N |
| b) Ability to hire, apply, and retain a qualified workforce to this effort |
| E |
| VG |
| S |
| M |
| U |
| N |
| c) Government Property Control |
| E |
| VG |
| S |
| M |
| U |
| N |
| d) Knowledge/expertise demonstrated by contractor personnel |
| E |
| VG |
| S |
| M |
| U |
| N |
| e) Utilization of Small Business concerns |
| E |
| VG |
| S |
| M |
| U |
| N |
| f) Ability to simultaneously manage multiple projects with multiple disciplines |
| E |
| VG |
| S |
| M |
| U |
| N |
| g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes |
| E |
| VG |
| S |
| M |
| U |
| N |
| h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) |
| E |
| VG |
| S |
| M |
| U |
| N |
5. COST/FINANCIAL MANAGEMENT
| a) Ability to meet the terms and conditions within the contractually agreed price(s)? |
| E |
VG
S
| M |
| U |
| N |
| b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client |
| E |
VG
S
| M |
| U |
| N |
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns) E
VG
S
| M |
| U |
| N |
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes
No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes
No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes:
following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
VG
S
M
U
b) Contractor complied with all security requirements for the project and personnel security requirements.
| E |
| VG |
| S |
| M |
| U |
| N |
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
VG
S
M
U
b) Compliance with contractual terms/provisions (explain if specific issues)
| E |
| VG |
| S |
| M |
| U |
| N |
c) Would you hire or work with this firm again? (If no, please explain below)
Yes
No
d) In summary, provide an overall rating for the work performed by this contractor.
| E |
| VG |
| S |
| M |
| U |
| N |
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):