This document is a Department of the Army Permit authorizing the New York City Department of Parks and Recreation to perform construction activities related to an existing dock structure in the Bronx River. The key details are:

The permit authorizes the removal of an existing 102 square foot section of a fixed pier, ramp, and float, and the installation of a new 4-foot by 30-foot ramp and 8-foot by 50-foot float. The work must be completed within 3 years. The permit includes standard conditions as well as special conditions related to coordination with the U.S. Coast Guard, NOAA, and requirements for minimizing turbidity and environmental impacts. The permittee has the right to appeal the permit decision if they object to any of the terms and conditions.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT

JACOB K. JAVITS FEDERAL BUILDING

26 FEDERAL PLAZA

NEW YORK NEW YORK 10278-0090

REGULATORY BRANCH

SUBJECT: Department of the Army Permit Number NAN-2024-00634 Issued to New York City Department of Parks and Recreation

New York City Department of Parks and Recreation Attn: Terence McCormick 117-02 Roosevelt Avenue Flushing Meadows Corona Park Flushing, New York 11368 Terrence.McCormick@parks.nyc.gov

Dear Mr. McCormick:

We have completed our review of Application Number NAN-2024-00634-EMI.

Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403), you are hereby authorized by the Secretary of the Army:

ACTIVITY: Remove an approximately 102 square foot irregularly shaped section of the existing fixed pier, the existing ramp and existing eight-foot-wide by 50-foot-long float and four (4) associated landside steel piles.

Install a new four-foot-wide by 30-foot-long ramp from the existing pier to a new eight-foot-wide by 50-foot-long float located approximately eight (8) feet seaward of the previous. The new 50-foot-long float will be secured using four existing piles.

All work shall be done in accordance with the attached plans, subject to Special Conditions A through E, which are hereby made part of this permit.

WATERWAY: Bronx River

LOCATION: Hunts Point Riverside Park, Borough of The Bronx, Bronx County, City of New York, New York

The activity authorized herein by Letter of Permission must be completed within three years of the date of this permit. This authorization is subject to the enclosed conditions. Please find enclosed two forms to be used to submit to this office, as required, the dates of commencement and completion for the authorized activity.

This letter contains an initial proffered permit for your activity. If you object to this permit decision because of certain terms and conditions therein, you may request that the permit be modified accordingly under Corps regulations at 33 CFR 331. Enclosed you will mailto:Terrence.McCormick@parks.nyc.gov

REGULATORY BRANCH

SUBJECT: Department of the Army Permit Number NAN-2024-00634

Issued to New York City Department of Parks and Recreation for Installation of Dock Structures

- 2 -find a combined Notification of Appeal Process (NAP) and Request for Appeal (RFA) form. If you object to this permit decision you must submit a completed RFA form to the New York District Office at:

Stephan A. Ryba Chief, Regulatory Branch

New York District Corps of Engineers 26 Federal Plaza, Room 16-406

New York, New York 10278-0090

In order for a RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR Part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit a RFA form, it must be received at the above address by _________________________. Additionally, send an electronic copy of the RFA form to Christopher.W.Minck@usace.army.mil. It is not necessary to submit a RFA form to the District Office if you do not object to the permit decision in this letter.

The authorized activity must be performed in accordance with the enclosed plans.

If any material changes in the location or plans of the subject work are found necessary, revised plans should be submitted to the District Engineer. These plans must receive the approval required by law before work begins.

Notice is hereby given that the permittee should recognize that a possibility exists that the structures permitted herein may be subject to wavewash from passing vessels.

The issuance of this permit does not relieve the permittee from taking all proper steps to insure the integrity of the structures permitted herein and the safety of boats moored thereto from damage by wavewash and the permittee shall not hold the United States liable for any such damage.

In order for us to better serve you, please complete our Customer Service Survey located at: http://www.nan.usace.army.mil/Missions/Regulatory/CustomerSurvey.aspx.

If any questions should arise concerning this matter, please contact Christopher Minck, of my staff, at Christopher.W.Minck@usace.army.mil.

Sincerely, FOR AND IN BEHALF OF

Alexander L. Young Colonel, U.S. Army

Enclosures Commander and District Engineer mailto:Christopher.W.Minck@usace.army.mil http://www.nan.usace.army.mil/Missions/Regulatory/CustomerSurvey.aspx mailto:Christopher.W.Minck@usace.army.mil

PERMITTEE: New York City Department of Parks and Recreation

PERMIT NO.: NAN-2024-00634

- 3 -

PERMIT CONDITIONS:

NOTE: The term "you" and its derivatives, as used in this permit means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or appropriate official of that office acting under the authority of the commanding officer.

GENERAL CONDITIONS:

1. The time limit for completing the work authorized ends within three years of the date of this permit. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least four months before the date is reached.

2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party upon written notification to this office. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.

4. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

Special Conditions:

A. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

- 4 -

B. The permittee shall utilize best management practices to minimize turbidity during all in-water work activities as well as prevent construction materials, including debris, from entering any waterway to become drift or pollution hazards.

C. The permit shall submit the following information for any in-water work, at a minimum, to the First Coast Guard District and Sector New York at D01-SMB- LNM@uscg.mil and D01-SMB-SecNY-Waterways@uscg.mil, a minimum of 14 days before starting operations for publication in the Local Notice to Mariners:

Date of submission Name, phone number, and email address of project point of contact Company Name Type of Work Waterway and location where work will be done Latitude & Longitude of work area (Degrees, Minutes, Thousandths of seconds) Work Start & Stop dates and Hours of Operation Equipment on scene Passing Arrangements / Time to move vessels to not impede navigation VHF Radio Channel monitored Disposal Site (if used) NOAA Chart Number for the area

D. The permittee shall email a copy of the USACE Permit; as-built drawings; and NOAA Permit/Public Notice Status Report from https://www.nauticalcharts.noaa.gov/charts/docs/charts-updates/USACE+Permit+Status+Report.pdf to ocs.ndb@noaa.gov so they may initiate the appropriate chart and Coast Pilot corrections.

E. The permittee shall ensure any current, or future, outdoor lighting is located or shielded so that it is not confused with any aids to navigation and does not interfere with navigation on the adjacent waterway. If installed, the lights must be white and non-flashing.

Further Information:

1. Limits of authorization.

a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law.

b. This permit does not grant any property rights or exclusive privileges.

c. This permit does not authorize any injury to the property or rights of others.

d. This permit does not authorize interference with any existing or proposed Federal project.

mailto:D01-SMB-LNM@uscg.mil mailto:D01-SMB-LNM@uscg.mil mailto:D01-SMB-SecNY-Waterways@uscg.mil https://www.nauticalcharts.noaa.gov/charts/docs/charts-updates/USACE+Permit+Status+Report.pdf https://www.nauticalcharts.noaa.gov/charts/docs/charts-updates/USACE+Permit+Status+Report.pdf mailto:ocs.ndb@noaa.gov

- 5 -

2. Limits to Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:

a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.

b. Damages to the permitted project or uses thereof as result of current or future activities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.

d. Design or construction deficiencies associated with the permitted work.

e. Damage claims associated with any future modification, suspension, or revocation of this permit.

3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.

4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:

a. You fail to comply with the terms and conditions of the permit.

b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (See 3 above).

c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5.

The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

5. Extensions. General Condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a

- 6 -prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit.

TC 10TC 10 . 4444

9 .71

TCTC9

C 6 7

TC

7.3.3

TCTC

TC 8 .6 6

TC 9 .1 6

T CC 9 .3 8

TC 9.

TC

89 7

2 3

C 7 .5

T C 7 .0 1

W OO D D O CK

FL OA T IN G D OC K

.94

HUNTS POINT RIVERSIDE - DOCK

OLMSTED CENTER

FLUSHING MEADOWS CORONA PARK

FLUSHING, NEW YORK, NY 11368

X3

-1

M

X336-119M

CITY OF NEW YORK PARKS & RECREATION

COMMISSIONER

DEPUTY COMMISSIONER, CAPITAL PROJECTS

LANDSCAPE ARCHITECTURE

VINCENT CIRRITO, PLA

NANCY PRINCE, PLA, ASLA

MEREDITH GRIFFIN

ANDREW PENZI, PLA

, PLA

TEAM LEADER, BROOKLYN

CHRISTOPHER SYRETT, PLA

DESIGN DIRECTOR, BROOKLYN

TEAM LEADER, MANHATTAN

DESMOND SPILLANE, PLA

DESIGN DIRECTOR, MANHATTAN

ERIC MATTES, PLA

DESIGN DIRECTOR, QUEENS

TEAM LEADER, STATEN ISLAND

ADRIAN SMITH, PLA

ARCHITECTURE AND ENGINEERING

ASSISTANT COMMISSIONER FOR ARCHITECTURE AND

ENGINEERING PROGRAM MANAGEMENT

TERENCE MCCORMICK, PE

ALLAIRE O'CONNOR, PE

CONSTRUCTION

PHILIP GRANITTO

Hunts Point Riverside Dock 6 21 24

USACE FILE: NAN-2024-00634-EMI

-2.58

WWWWWWW

BOULDER

"RIP-RAP"

1.26

1.41

6.0

RASS

6.23

4.42

3.72

3.98

4.36

4.42

3.37

3.54

4.34

5.78

5.39

5.60

5.74

5.05

4.26

5.09

6.47

6.15

6.21

6.17

3.66

3.45

2.81

2.87 3.62

-5.33

-6.08

-5.93 -5.86

-5.62

-7.55

-7.56

-3.72

-4.19

-4.48

-4.62

-4.11-3.50

-1.50

-1.37

-1.48

-0.98

-0.89

1.52

1.10

2.75

3.87

4.23

3.76

5.39

5.47

5.71

5.70

-1.04

-1.03

-1.07

3.82

3.04

2.24

2.62

5.79

5.46

5.41

-2.0

-1.0

3.0

4.0

0.0

2.0

1.0

3.5

6.35

0.68

S

-1.0

0.0

1.0

-5.0

-5.0

-6.0

-4.0

2.0

2.0 1.0

0.0

3.0

-2.0

DISCIPLINE LEAD:

DESIGNER:

DRAFTED BY:

CHECKED BY:

CONTRACT NO.: DATE:

PROJECT TITLE:

ADDRESS:

NO. DATE REVISION

LOT:BLOCK:

DRAWING TITLE:

DRAWING NO.:

SHEETS IN

CONTRACT SET:

SHEET OF

RESERVED FOR PLAN EXAMINER'S STAMPS

PROJECT MANAGER

X336-199M

Hunts Point Dock

N/A N/A 1409 Lafayette Ave Bronx, NY 10474

CONSULTANTS:

BLUESHORE ENGINEERING LLC

NYC PARKS PROJECT MANAGER:

COMMISSIONER

DEPUTY COMMISSIONER, CAPITAL PROJECTS

LANDSCAPE ARCHITECTURE

VINCENT CIRRITO, PLA

ASSISTANT COMMISSIONER

NANCY PRINCE, PLA, FASLA

CHIEF OF LANDSCAPE ARCHITECTURE

MEREDITH GRIFFIN

CHIEF OF LANDSCAPE PROGRAM MANAGEMENT

ARCHITECTURE AND ENGINEERING

TERENCE MCCORMICK, PE

ASSISTANT COMMISSIONER FOR ARCHITECTURE

AND ENGINEERING PROGRAM MANAGEMENT

REBECCA BYRNES, RA

CHIEF OF ARCHITECTURE AND ENGINEERING

MARLISA WISE, RA

TEAM LEADER OF ARCHITECTURE

ALLAIRE O'CONNOR, PE

TEAM LEADER OF ENGINEERING

RICHARD GILBERT

JOSEPH ANGELI, MIGUEL SANCHEZ

JOSEPH ANGELI, MIGUEL SANCHEZ

RICHARD GILBERT

04/23/2024

REMOVALS PLAN

S-201.00

NORTH

00 8' 16'4'

BRONX RIVER

CUT AND REMOVE AT MUDLINE,

LANDSIDE STEEL PILES

TYP. FOR (4)

REMOVE

FLOATING

DOCK

PROPERTY LINE

REMOVE

ALUMINUM

GANGWAY

PROPERTYLINE

MLW EL.

-3.26'

S-501

REMOVE TIMBER

JOISTS, TYP. OF (4)

REMOVE TIMBER

PILE

REMOVE PILE

CAP

CUT AND REMOVE COMPOSITE

DECK APPROX. 102 SF

CUT & REMOVE PIER

EDGE BEAM

TIMBER PILE

CAP TO

REMAIN

CUT TIMBER

JOISTS, TYP. OF (4)

INSTALL SHORING AS

REQUIRED

MHW EL. +2.98'

SHW EL. +3.66'

PROPERTY LINE

PROPERTY LINE

REMOVALS WORK

AREAS, SEE 1/S-201

LEGEND

CONTOUR LINE

Hunts Point Riverside Dock 6 21 24

S

S

BOULDER

"RIP-RAP"

1.26

1.47

1.41

6.23

4.42

3.72

3.98

4.364

4.42

3.37

3.54

4.34

5.78

5.39339

5.60

5.74

5.055 5

4.26644

6.47

6.15

6.21

6.177

TB

6 65

3.66

3.45 2.87 3.62

2 70

-5.33

-6.08

-5.93 -5.86

-5.62

-7.55

-7.56

-3.72

-4.19

-4.48

-4.62

-4.11-3.50

-1.50

-1.37

-1.48

-0.98

-0.89

1.52

1.10

0.68

2.75

3.87

4.234

3.76

5.47

5.71

5.70

-1.04

-1.03

-1.07

3.82

3.04

2.24

2.62

5.7975

5.46

5.41

3.50

2 7

-1.0

0.0

1.0

2.0

2.0

2.0

1.0

0.0

-1.0

3.0

3.0

4.0

-4.0

-5.0

-5.0

-6.06 0-6 0-66

-7.00-7.0-7

3.0

0.0

2.0

1.0 -1.0

-5.0

3.5

3.5

-55 00

-55 0

-55 0

-0.

-1 00

-00.9 -1 0

-1 00

00 0

00.0

0.00

1.00

1.1 1 00

1 00

22.00

22 0

33.0

A

22.00

2 0

3 04

3 00

22 662

1.41

-2.58585888

6.35

-44 00

3.03.3 003 0-3 0-333 00

DISCIPLINE LEAD:

DESIGNER:

DRAFTED BY:

CHECKED BY:

CONTRACT NO.: DATE:

PROJECT TITLE:

ADDRESS:

NO. DATE REVISION

LOT:BLOCK:

DRAWING TITLE:

DRAWING NO.:

SHEETS IN

CONTRACT SET:

SHEET OF

RESERVED FOR PLAN EXAMINER'S STAMPS

PROJECT MANAGER

X336-199M

Hunts Point Dock

N/A N/A 1409 Lafayette Ave Bronx, NY 10474

CONSULTANTS:

BLUESHORE ENGINEERING LLC

NYC PARKS PROJECT MANAGER:

COMMISSIONER

DEPUTY COMMISSIONER, CAPITAL PROJECTS

LANDSCAPE ARCHITECTURE

VINCENT CIRRITO, PLA

ASSISTANT COMMISSIONER

NANCY PRINCE, PLA, FASLA

CHIEF OF LANDSCAPE ARCHITECTURE

MEREDITH GRIFFIN

CHIEF OF LANDSCAPE PROGRAM MANAGEMENT

ARCHITECTURE AND ENGINEERING

TERENCE MCCORMICK, PE

ASSISTANT COMMISSIONER FOR ARCHITECTURE

AND ENGINEERING PROGRAM MANAGEMENT

REBECCA BYRNES, RA

CHIEF OF ARCHITECTURE AND ENGINEERING

MARLISA WISE, RA

TEAM LEADER OF ARCHITECTURE

ALLAIRE O'CONNOR, PE

TEAM LEADER OF ENGINEERING

RICHARD GILBERT

JOSEPH ANGELI, MIGUEL SANCHEZ

JOSEPH ANGELI, MIGUEL SANCHEZ

RICHARD GILBERT

04/23/2024

PROPOSED SITE PLAN

S-202.00

NORTH

LEGEND

BLOCK 2770

LOT 316

PROPOSED 30'X4' ALUMINUM

GANGWAY TO BE INSTALLED AT

MODIFIED PIER CORNER

BRONX RIVER

EXISTING OUTBOARD PILES TO REMAIN

AS INBOARD PILES, TYP. OF (4).

REINFORCE PER 1/S-501

50'X8' PROPOSED FLOATING DOCK

W/ STEEL FRAME AND COMPOSITE

TIMBER DECKING, 400 SQFT

4'-0"

1"

S-301

PROPERTY LINE

TYP.

MLW EL. -3.26'

60" MIN

CLEAR SPACE

AT LANDING

FLOATING DOCK EXTENSION AREA

TO SUPPORT GANGWAY. APPROX

7.65 SF.

3'-0"

PROPERTY LINE

S-301

3' TRANSITION PLATE

MHW EL. +2.98'

SHW EL. +3.66'

7"

12"X12" GANGWAY SUPPORT

BEAM TO BE

ATTACHED TO EXISTING PIER

FRAME

2'-4"

6'-9" 12'-0"

INSTALL IN-KIND RAILING TO MATCH

EXISTING APPROX. 25' LF.

REPAIR DECKING AT

NEW GANGWAY

CONNECTION

S-501

S-301

PROPOSED PIER

AREA 465 SQFT

S-301

PROPERTY LINE

EXISTING SIGNAGE

00 8' 16'4'

6"

1'-10"

Hunts Point Riverside Dock 6 21 24

DISCIPLINE LEAD:

DESIGNER:

DRAFTED BY:

CHECKED BY:

CONTRACT NO.: DATE:

PROJECT TITLE:

ADDRESS:

NO. DATE REVISION

LOT:BLOCK:

DRAWING TITLE:

DRAWING NO.:

SHEETS IN

CONTRACT SET:

SHEET OF

RESERVED FOR PLAN EXAMINER'S STAMPS

PROJECT MANAGER

X336-199M

Hunts Point Dock

N/A N/A 1409 Lafayette Ave Bronx, NY 10474

CONSULTANTS:

BLUESHORE ENGINEERING LLC

NYC PARKS PROJECT MANAGER:

COMMISSIONER

DEPUTY COMMISSIONER, CAPITAL PROJECTS

LANDSCAPE ARCHITECTURE

VINCENT CIRRITO, PLA

ASSISTANT COMMISSIONER

NANCY PRINCE, PLA, FASLA

CHIEF OF LANDSCAPE ARCHITECTURE

MEREDITH GRIFFIN

CHIEF OF LANDSCAPE PROGRAM MANAGEMENT

ARCHITECTURE AND ENGINEERING

TERENCE MCCORMICK, PE

ASSISTANT COMMISSIONER FOR ARCHITECTURE

AND ENGINEERING PROGRAM MANAGEMENT

REBECCA BYRNES, RA

CHIEF OF ARCHITECTURE AND ENGINEERING

MARLISA WISE, RA

TEAM LEADER OF ARCHITECTURE

ALLAIRE O'CONNOR, PE

TEAM LEADER OF ENGINEERING

RICHARD GILBERT

JOSEPH ANGELI, MIGUEL SANCHEZ

JOSEPH ANGELI, MIGUEL SANCHEZ

RICHARD GILBERT

04/23/2024

SECTIONS & ELEVATIONS

S-301.00

FLOATING DOCK

PER PLAN

ALUMINUM

GANGWAY PER

PLAN

DECK EL.

+6.80'

STEEL PILES PER

STEEL 4-PILE

CLUSTER PER

PLAN, TYP.

TYP.

50'-0"

SHW EL. +3.69'

4.25"X12.5"

TIMBER BRACING, TYP.

MHW EL. +2.98'

MLW EL. -3.26'

MUDLINE EL.

ALUMINUM GANGWAY

PER PLAN

DECK EL. +6.8'

REINFORCED STEEL PILES PER PLAN.

SEE 1/S-501

TYP.

TIMBER FRAME

SEE 7/S-501

MAX. DESIGN WATER EL. +15'

DOCK PER PLAN

50'-0"

MUDLINE EL.

MHW EL. +2.98'

MLW EL. -3.26'

SHW EL. +3.69'

NOTE: 4-PILE CLUSTERS NOT SHOWN FOR CLARITY

NEW CAP EL. +20.5'

6'-9" PILE

EXTENSION

FLOATING DOCK

PER PLAN

3.55

MHW EL. +2.98'

MLW EL. -3.26'

SHW EL. +3.69'

FREEBOARD

FLOATING DOCK

EXTENSION AREA

PER PLAN

ALUMINUM

GANGWAY

PER PLAN

STEEL PILES

PER PLAN

GANGWAY SUPPORT

BEAM PER PLAN

MUDLINE

EL. +6.8'

60" MIN. CLEAR

SPACE AT LANDING

TUBE PICKETS @ 4"

O.C. ALONG FULL

LENGTH OF

GANGWAY

NOTES:

1. CONTRACTOR AND GANGWAY MANUFACTURER SHALL DETERMINE FINAL GANGWAY MEMBER SIZES AND

SUBMIT TO ENGINEER FOR REVIEW AND APPROVAL.

2. ALUMINUM GRATING SHALL MEET ADA REQUIREMENTS.

NOTE:

1. CONTRACTOR AND DOCK MANUFACTURER SHALL DETERMINE FINAL DOCK MEMBER

SIZES, FLOAT SIZES, FLOAT MATERIAL, AND CONSTRUCTION, AND SUBMIT TO ENGINEER

FOR REVIEW AND APPROVAL.

STEEL CROSS

BRACE

DOCK FLOAT,

TYP.

8"-12"

COMPOSITE

TIMBER DOCK

DECKING

2X8 TIMBER

(2) 2X6 TIMBER

TYP.

LAG BOLT,

TYP.

2" HEX THROUGH

BOLT TO FASTEN FLOAT

TO DOCK FRAME

EXISTING PIER

FRAME PER PLAN

STEEL INFILL TO

MATCH EXISTING,

TYP.

TIMBER TOP

RAIL

DECKING PER

PLAN

42"

6'-6" TYP.

STEEL POSTS

TO MATCH

EXISTING

2"

16"

9" FREEBOARD

MLW EL. -3.26'

2" CLEARANCE AT MLW

NOTE: SPECIAL CARE SHOULD BE TAKEN IN THE FIELD WHEN POSITIONING THE

GANGWAY SUPPORT BEAM SUCH THAT THE GANGWAY WILL NOT INTERSECT WITH

THE EXISTING STRUCTURE.

EXST PIER (PILES NOT

SHOWN FOR CLARITY)

8'-11"

4"

S-301

S-501

00 4' 6'2'

00 8' 16'4'

00 2' 3'1' 00 2' 3'1'

00 8' 16'4' 00 10' 20'5'

00 8' 16'4'

S-501

Hunts Point Riverside Dock 6 21 24

DISCIPLINE LEAD:

DESIGNER:

DRAFTED BY:

CHECKED BY:

CONTRACT NO.: DATE:

PROJECT TITLE:

ADDRESS:

NO. DATE REVISION

LOT:BLOCK:

DRAWING TITLE:

DRAWING NO.:

SHEETS IN

CONTRACT SET:

SHEET OF

RESERVED FOR PLAN EXAMINER'S STAMPS

PROJECT MANAGER

X336-199M

Hunts Point Dock

N/A N/A 1409 Lafayette Ave Bronx, NY 10474

CONSULTANTS:

BLUESHORE ENGINEERING LLC

NYC PARKS PROJECT MANAGER:

COMMISSIONER

DEPUTY COMMISSIONER, CAPITAL PROJECTS

LANDSCAPE ARCHITECTURE

VINCENT CIRRITO, PLA

ASSISTANT COMMISSIONER

NANCY PRINCE, PLA, FASLA

CHIEF OF LANDSCAPE ARCHITECTURE

MEREDITH GRIFFIN

CHIEF OF LANDSCAPE PROGRAM MANAGEMENT

ARCHITECTURE AND ENGINEERING

TERENCE MCCORMICK, PE

ASSISTANT COMMISSIONER FOR ARCHITECTURE

AND ENGINEERING PROGRAM MANAGEMENT

REBECCA BYRNES, RA

CHIEF OF ARCHITECTURE AND ENGINEERING

MARLISA WISE, RA

TEAM LEADER OF ARCHITECTURE

ALLAIRE O'CONNOR, PE

TEAM LEADER OF ENGINEERING

RICHARD GILBERT

JOSEPH ANGELI, MIGUEL SANCHEZ

JOSEPH ANGELI, MIGUEL SANCHEZ

RICHARD GILBERT

04/23/2024

DETAILS

S-501.00

TIES PER

2/S-501

S-501 1" DOMED

CONCRETE

STEEL PIPE

PILE

PER PLAN

2"

10"

TYP.

MIN 1"

CLR

#3 TIES,

TYP.

(5) #5 VERT.

BARS, TYP.

MHW EL. +2.98'

MLW EL. -3.26'

SHW EL. +3.69'

MUDLINE EL. -5.0'

TOP OF ROCK, APPROX

EL. -27.50'

STEEL PIPE

PILE

PER PLAN

CONCRETE

FILL

F'C=4000 PSI

MIN 1"CLR

VERT. BARS

PER 2/S-501

REMOVE DOCK

SUPPORT SYSTEM

CUT OFF AND GRIND SMOOTH

EXSTING INBOARD

PILES TO BE REMOVED.

SEE 1/S-201

EXISTING OUTBOARD PILES TO REMAIN

SEE 1/S-202 & 1/S-501

S-501

16"6"

1-1

ROLLER, TYP. OF

(4) PER PILE

HDG STEEL

PILE COLLAR

BRACE,

BOLTED TO

DOCK

EXISTING STEEL

PILE PER PLAN

DOCK PER

PLAN

PILE

MHW EL. +2.98'

SHW EL. +3.69'

6'-9"

EXISTING PIER EDGE BEAM

PER PLAN, TYP.

EXISTING JOISTS PER PLAN, TYP.DECK PER

PLAN

GANGWAY SUPPORT BEAM

PER PLAN

TIMBER PILE CAP PER

PLAN

NOTE: ALUMINUM GANGWAY NOT SHOWN FOR CLARITY

PILE

PILE

PILE

00 1' 2'6"

00 1' 2'6"

00 2' 3'1'

00 1' 2'6"

000 2' 4'1'

000 2' 4'1'

000 2' 4'1'

00 3" 6" 9" 12"

OR ENGINEER APPROVED

EQUIVALENT

3/8"

Hunts Point Riverside Dock 6 21 24

JACOB K. JAVITS FEDERAL BUILDING

26 FEDERAL PLAZA

NEW YORK NEW YORK 10278-0090

CENAN-OP-R

IMPORTANT

This letter must be completed and mailed to the Regulatory Branch at the above address prior to commencement of any work authorized under the permit.

Permittee: ______________________________ Permit No. ___________________________

Date Permit Issued: ______________________ Expiration Date: ______________________

Waterway: ____________________________________________________________________

Project Location: _______________________________________________________________

Work will commence on or about: _________________________

Name, Address & Telephone Number of Contractor:

Signature of Permittee Date

Fold this form into thirds, with the bottom third facing outward. Tape it together and mail to the address below or FAX to (212) 264-4260.

___________________ Place Stamp

___________________ Here

USACE Operations/Regulatory 16-406 c/o PSC Mail Center 26 Federal Plaza New York, New York 10278

JACOB K. JAVITS FEDERAL BUILDING

26 FEDERAL PLAZA

NEW YORK NEW YORK 10278-0090

CENAN-OP-R

IMPORTANT

This letter must be completed and mailed to the Regulatory Branch at the above address following completion or cancellation of work authorized under the permit.

Permittee: _ Permit No. __ __ _

Date Permit Issued: __________ _ Expiration Date: _______ ___

Waterway: __ ___ _

Project Location: ____ ___ __

Check and complete applicable item(s) listed below:

____ Work was completed on _________________________

____ Work will not be performed on the project.

____ Deviation from work authorized in permit is explained below.

____ Other (explain) _______________________________________ __________

____ For dredging projects, list the volume of material dredged, and the amount placed at each disposal location (if more than one).

________ cubic yards placed at ____________________________

________ cubic yards placed at ____________________________

________ cubic yards placed at ____________________________

Signature of Permittee Date

Fold this form into thirds, with the bottom third facing outward. Tape it together and mail to the address below or FAX to (212) 264-4260.

___________________ Place Stamp

___________________ Here

USACE Operations/Regulatory 16-406 c/o PSC Mail Center 26 Federal Plaza New York, New York 10278

-1-

NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND

REQUEST FOR APPEAL

Applicant: File Number: Date:

Attached is: See Section below

INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B

PERMIT DENIAL WITHOUT PREJUDICE C

PERMIT DENIAL WITH PREJUDICE D

APPROVED JURISDICTIONAL DETERMINATION E

PRELIMINARY JURISDICTIONAL DETERMINATION F

SECTION I

The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at https://www.usace.army.mil/Missions/Civil- Works/Regulatory-Program-and-Permits/appeals/ or Corps regulations at 33 CFR Part 331.

A: INITIAL PROFFERED PERMIT: You may accept or object to the permit

• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.

• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below.

B: PROFFERED PERMIT: You may accept or appeal the permit

• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.

• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice.

https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/appeals/ https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/appeals/

-2-

C. PERMIT DENIAL WITHOUT PREJUDICE: Not appealable You received a permit denial without prejudice because a required Federal, state, and/or local authorization and/or certification has been denied for activities which also require a Department of the Army permit before final action has been taken on the Army permit application. The permit denial without prejudice is not appealable. There is no prejudice to the right of the applicant to reinstate processing of the Army permit application if subsequent approval is received from the appropriate Federal, state, and/or local agency on a previously denied authorization and/or certification.

D: PERMIT DENIAL WITH PREJUDICE: You may appeal the permit denial You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice.

E: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information for reconsideration

• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the

Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD.

• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the

Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice.

• RECONSIDERATION: You may request that the district engineer reconsider the approved JD by submitting new information or data to the district engineer within 60 days of the date of this notice.

The district will determine whether the information submitted qualifies as new information or data that justifies reconsideration of the approved JD. A reconsideration request does not initiate the appeal process. You may submit a request for appeal to the division engineer to preserve your appeal rights while the district is determining whether the submitted information qualifies for a reconsideration.

F: PRELIMINARY JURISDICTIONAL DETERMINATION: Not appealable You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD.

POINT OF CONTACT FOR QUESTIONS OR INFORMATION:

If you have questions regarding this decision you may contact:

Stephan A. Ryba Chief, Regulatory Branch (CENAN-OP-R) USACE Operations/Regulatory 16-406 c/o PSC Mail Center 26 Federal Plaza New York, New York 10278

If you have questions regarding the appeal process, or to submit your request for appeal, you may contact:

Andrew Dangler Regulatory Appeals Review Officer North Atlantic Division – Fort Hamilton 301 John Warren Avenue – First Floor Brooklyn, NY 11252-6700

(518) 487-0215

-3-

SECTION II – REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT

REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. Use additional pages as necessary. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.)

ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record.

Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record.

RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation and will have the opportunity to participate in all site investigations.

Signature of appellant or agent.

Date:

Email address of appellant and/or agent: Telephone number:

We have completed our review of Application Number NAN-2024-00634-EMI.
PERMIT CONDITIONS:
GENERAL CONDITIONS:
Special Conditions:
Further Information:
CENAN-OP-RE
MEMORANDUM FOR RECORD
Date1_af_date: August 13, 2024
Date2: October 11, 2024
Work will commence on or about:
Text2:
Check and complete applicable items listed below:
undefined_2:
undefined_3:
amount placed at each disposal location if more than one:
cubic yards placed at:
cubic yards placed at_2:
cubic yards placed at_3:
1:
2:
1_2:
2_2:
3:
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Waterway: Bronx River
Project Location: Hunts Point Riverside Park, Borough of The Bronx, Bronx County, City of New York, New York
Expiration Date: August 13, 2027
Applicant: New York City Dept. of Parks and Recreation
Date: August 13, 2024
File Number: NAN-2024-00634
Check Box6: Off
Check Box1: Yes
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Reason for Appeal or Objection:
Date6_af_date:
Email Address:
Telephone Number:
2024-08-13T08:34:52-0400
Rosita Miranda

File details come from the government source that posted it. Updated .