This document is an amendment to a solicitation for the Maintenance Dredging of Bronx River, NY, Federal Navigation Project, Solicitation Number W912DS24B0023. The amendment corrects the unit of measure for certain line items from "TON Miles" to "TON" and does not change the bid opening date of October 22, 2024 at 2:00 P.M. EST.
The solicitation includes the following key details:
- The project involves dredging of the Bronx River, NY, Federal Navigation Project with placement of the dredged material at the Historic Area Remediation Site (HARS).
- The estimated quantities for the dredging areas are provided, with a base bid for CLINs 0001 through 0006 and optional items for CLINs 0007 and 0008 for additional debris removal and disposal.
- Award will be made to the responsible and responsive bidder with the lowest total price for CLINs 0001 through 0008.
- Bidders must bid on both the base bid and optional items, and any unbalanced bids may be rejected.
- The contractor must complete the entire basic work within 32 calendar days after the notice to proceed.
- All requests for information must be submitted 15 days prior to the bid opening.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Bidder must acknow ledge receipt of this amendment by the date specif ied in the IFB (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS24B0023
X 9B. DATED (SEE ITEM 11)
20-Sep-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
Correct bid schedule unit of measure from "TON Miles" to "TON" for line items 0005, 0007 and 0008. Bid Opening remains 22-Oct-2024 at 2:00 P.M. EST
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION
NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Oct-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization FFP
Mobilization and Demobilization FOB:
Destination
PSC CD: Y1KZ
NET AMT
0002 48,760 Cubic
Yard
Basic Work - Dredging Area 1 FFP Dredging (to -10 feet MLLW + 1 foot allowable overdepth), Transportation and Placement (Sheets 3-6 of the contract drawings).Removal of material (48,760 CY) except ledge rock lying above the plane of 10 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Dredging Area 1 of the Bronx River, NY, Federal Navigation Project with placement of the dredged material at the Historic Area Remediation Site (HARS). Estimated Quantities.
FOB: Destination PSC CD: Y1KZ
0003 73,910 Cubic
Basic Work - Dredging Area 2A
FFP
Dredging (to -10 feet MLLW + 1 foot allowable overdepth), Transportation and Placement (Sheets 6-9 of the contract drawings).Removal of material (73,910 CY) except ledge rock lying above the plane of 10 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Dredging Area 2A of the Bronx River, NY, Federal Navigation Project with placement of the dredged material at the Historic Area Remediation Site (HARS). Estimated Quantities.
FOB: Destination
0004 19,945 Cubic
Basic Work - Dredging Area 2B
FFP
Dredging (to -10 feet MLLW + 1 foot allowable overdepth), Transportation and Placement (Sheets 9-10 of the contract drawings).Removal of material (19,945 CY) except ledge rock lying above the plane of 10 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Dredging Area 2B of the Bronx River, NY, Federal Navigation Project with placement of the dredged material at the Historic Area Remediation Site (HARS). Estimated Quantities.
0005 40 Ton
Basic Work - Debris Removal and Disposal
FFP
Basic Work - Debris Removal and Disposal (During dredging)
0006 1 Job
Black Box Monitoring
FFP
(See specifications Section 35 20 23.10 18)
0007 20 Ton OPTION Option 1 - Debris Removal and Disposal
FFP
During dredging this is an additional ton beyond the 40 tons in CLIN 0005 and it is from 41 to 60 tons if needed.
0008 20 Ton OPTION Option 2 - Debris Removal and Disposal
FFP
During dredging this is an additional ton beyond the 60 tons in CLIN 0007 and it is from 61 to 80 tons if needed.
TOTALS AND NOTES
TOTAL BASE BID (CLINs 0001 THRU 0006) $
TOTAL OPTION BID (CLINs 0007 THRU 0008) $
TOTAL BID (CLINs 0001 THRU 0008) $
NOTES TO BIDDERS:
NOTE 01:Bidders are required to bid on both the Base Bid Items and the Optional Items on the Price Schedule or their bid will be rejected.
NOTE 02:Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001 through 0008.
W912DS24B0023
NOTE 03:Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Item may be rejected. An unbalanced bid is one, which is based on price significantly less than the cost for some work and prices are significantly overstated for other work.
NOTE 04:Bidders are reminded that they must bid on the issued plans and specifications as amended.
Any deviations, conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.
NOTE 05:Options may be exercised within thirty-two (32) calendar days of receipt by the contractor of the Notice to Proceed.). No Additional time will be added. The Government is under no obligation to exercise any Optional Item. Options will not be exercised if the contract has expired. Option 1 may be exercised only if we exceed the tonnage in CLIN 0005. Option 2 may be exercised only if we exceed the tonnage in Option 1.
NOTE 06:All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on 09-11, 22 January 2024.
NOTE 07:All bidders are hereby advised that the contractor is to complete the entire basic work ready for use, not later than thirty-two (32) calendar days after the date the Contractor receives the notice to proceed.
The time stated for completion shall include final cleanup of the premises.
NOTE 08:All Request for Information (RFI) must be submitted fifteen (15) days prior to bid opening.
Anything submitted after that will not be addressed. All RFI’s need to be sent to Jo Ann McCue at jo.a.mccue@usace.army.mil and Nicholas Emanual at Nicholas.P.Emanuel@usace.army.mil.
(End of Summary of Changes) mailto:jo.a.mccue@usace.army.mil mailto:Nicholas.P.Emanuel@usace.army.mil