This federal contract opportunity notice solicits bids for the Chrome Plating Facility Repair Project at Watervliet, New York. The scope of work includes in-kind repair and replacement of major components in the large caliber chrome plating area, specifically the 120 mm pit used for cannon tube plating. Work encompasses replacing chrome plating tanks, electropolish tanks, caustic clean and strip tanks, rectifiers, and cold water rinse tanks on two plating lines. Additional work consists of replacing the air scrubber common to both lines. The solicitation number is W912DS21R0002. The period of performance is 720 calendar days from notice to proceed. The estimated value is between $10-25 million. The NAICS code is 236210. Bids must be submitted through the System for Award Management (SAM) website. The contracting agency is the Department of the Army Corps of Engineers Engineering District New York.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chrome Plating Facility 100% Design Watervliet Arsenal, Watervliet, NY
SECTION 05 12 00
STRUCTURAL STEEL
08/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303 (2016) Code of Standard Practice for Steel Buildings and Bridges
AISC 325 (2017) Steel Construction Manual
AISC 326 (2009) Detailing for Steel Construction
AISC 360 (2016) Specification for Structural Steel Buildings
AISC 420 (2010) Certification Standard for Shop Application of Complex Protective Coating Systems
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
ASME INTERNATIONAL (ASME)
ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay
ASTM INTERNATIONAL (ASTM)
ASTM A6/A6M (2017a) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A29/A29M (2016) Standard Specification for General Requirements for Steel Bars, Carbon and Alloy, Hot-Wrought
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
SECTION 05 12 00 Page 1 AMENDMENT 0002AMENDMENT 0003
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A992/A992M (2011; R 2015) Standard Specification for Structural Steel Shapes
ASTM B695 (2004; R 2016) Standard Specification for Coatings of Zinc Mechanically Deposited on Iron and Steel
ASTM C827/C827M (2016) Standard Test Method for Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures
ASTM C1107/C1107M (2017) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM F436/F436M (2016) Standard Specification for Hardened Steel Washers Inch and Metric Dimensions
ASTM F844 (2007a; R 2013) Washers, Steel, Plain (Flat), Unhardened for General Use
ASTM F959/F959M (2017a) Standard Specification for Compressible-Washer-Type Direct Tension Indicators for Use with Structural Fasteners, Inch and Metric Series
ASTM F1136/F1136M (2011) Standard Specification for Zinc/Aluminum Corrosion Protective Coatings for Fasteners
ASTM F1554 (2018) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
ASTM F2329/F2329M (2015) Standard Specification for Zinc Coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts, and Special Threaded Fasteners
SECTION 05 12 00 Page 2 AMENDMENT 0002AMENDMENT 0003
ASTM F2833 (2011; R 2017) Standard Specification for Corrosion Protective Fastener Coatings with Zinc Rich Base Coat and Aluminum Organic/Inorganic Type
ASTM F3125/F3125M (2015a) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and Metric Dimensions
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC Paint 20 (2002; E 2004) Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic)
SSPC Paint 29 (2002; E 2004) Zinc Dust Sacrificial Primer, Performance-Based
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2019) Structural Engineering
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR Part 1926, Subpart R Steel Erection
Amendment 0002* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Erection and Erection Bracing Drawings; G, AE
SD-02 Shop Drawings
Fabrication Drawings Including Details of Connections; G, AE
Fabrication Drawings Including Details of Connections for Scrubber Platform; G, AE
SD-03 Product Data
Shop Primer
SECTION 05 12 00 Page 3 AMENDMENT 0002AMENDMENT 0003
Welding Electrodes and Rods
Direct Tension Indicator Washers
Non-Shrink Grout
Tension Control Bolts
Recycled Content for Structural Steel
Recycled Content for Hollow Structural Sections
Recycled Content for Steel Pipe
SD-05 Design Data
Design analysis for Scrubber Platform; G, AE
SD-06 Test Reports
Bolts, Nuts, and Washers
Weld Inspection Reports
Direct Tension Indicator Washer Inspection Reports
Bolt Testing Reports
SD-07 Certificates
Steel
Bolts, Nuts, and Washers
Galvanizing
AISC Structural Steel Fabricator Quality Certification
AISC Structural Steel Erector Quality Certification
Welding Procedures and Qualifications
Welding Electrodes and Rods
Certified Welding Inspector
Welding Procedure Specifications (WPS)
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0002
Amendment 0002* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
1.3 AISC QUALITY CERTIFICATION
Work must be fabricated by an AISC Certified Structural Steel Fabricator, in accordance with AISC 207 , Category BU. Submit AISC Structural Steel Fabricator quality certification.
Work must be erected by an AISC Structural Steel Certified Erector, in
SECTION 05 12 00 Page 4 AMENDMENT 0002AMENDMENT 0003 accordance with AISC 207 , Category CSE. Submit AISC Structural Steel erector quality certification.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0002
1.3 QUALITY ASSURANCE
1.3.1 Preconstruction Submittals
1.3.1.1 Erection and Erection Bracing Drawings
Submit for record purposes. Indicate the sequence of erection, temporary shoring and bracing. The erection drawings must conform to AISC 303 .
1.3.2 Fabrication Drawing Requirements
Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with AISC 303 , AISC 326 and AISC 325 . Fabrication drawings must not be reproductions of contract drawings. Include complete information for the fabrication and erection of the structure's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Use AWS A2.4 standard welding symbols. Clearly highlight any deviations from the details shown on the contract drawings highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings. Submit fabrication drawings including details of connections for scrubber platform from delegated design of scrubber platform. Include all information required from the previous paragraph.
1.3.3 Certifications
1.3.3.1 Welding Procedures and Qualifications
Prior to welding, submit certification for each welder stating the type of welding and positions qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests. If the qualification date of the welder or welding operator is more than 6 months old, the welding operator's qualification certificate must be accompanied by a current certificate by the welder attesting to the fact that he has been engaged in welding since the date of certification, with no break in welding service greater than 6 months.
Conform to all requirements specified in AWS D1.1/D1.1M .
1.3.4 Scrubber Platform Delegated Design
Contractor to design and fabricate steel platform for the use of access and maintenance to the new scrubber. Submit design analysis for scrubber platform. See structural drawings for requirements.
Design to be signed and sealed by a professional engineer.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide the structural steel system, including shop primer or galvanizing, complete and ready for use. Provide structural steel systems including design, materials, installation, workmanship, fabrication, assembly, SECTION 05 12 00 Page 5 AMENDMENT 0002AMENDMENT 0003 erection, inspection, quality control, and testing in accordance with AISC 303 , AISC 360 , and UFC 3-301-01 , except as modified in this contract.
2.2 STEEL
2.2.1 Structural Steel
Wide flange and WT shapes, ASTM A992/A992M , unless otherwise required by design. Angles, Channels and Plates, ASTM A36/A36M. Provide structural steel containing a minimum of 80 percent recycled content. Submit data identifying percentage of recycled content for structural steel.
2.2.2 Hollow Structural Sections
ASTM A500/A500M , Grade C, unless otherwise required by design. Provide hollow structural sections containing a minimum of 25 percent recycled content. Submit data identifying percentage of recycled content for hollow structural sections.
2.2.3 Steel Pipe
ASTM A53/A53M, Type E or S, Grade B, weight class STD (Standard) or as indicated, unless otherwise required by design. Provide steel pipe containing a minimum of 50 percent recycled content. Submit data identifying percentage of recycled content for steel pipe.
2.3 BOLTS, NUTS, AND WASHERS
Submit the certified manufacturer's mill reports which clearly show the applicable ASTM mechanical and chemical requirements together with the actual test results for the supplied fasteners.
2.3.1 High-Strength Bolts
High strength bolts and nuts must be shipped together in the same shipping container. Fasteners indicated to be galvanized shall be tested by the supplier to show that the galvanized nut with the supplied lubricant provided may be rotated from the snug tight condition well in excess of the rotation required for pretensioned installation without stripping.
The supplier shall supply nuts that have been lubricated and tested with the supplied bolts.
2.3.1.1 Bolts
ASTM F3125/F3125M , Grade A325M A325, Type 1 Heavy Hex Head Style, plain finish, unless otherwise required by design.
2.3.1.2 Nuts
ASTM A563, Grade and Style as specified in the applicable ASTM bolt standard, unless otherwise required by design.
2.3.1.3 Direct Tension Indicator Washers
ASTM F959/F959M . Submit product data for direct tension indicator washers, unless otherwise required by design.
SECTION 05 12 00 Page 6 AMENDMENT 0002AMENDMENT 0003
2.3.1.4 Washers
ASTM F436/F436M , plain carbon steel, unless otherwise required by design.
2.3.2 Tension Control Bolts
ASTM F3125/F3125M , Grade F1852, Type 1, twistoff style assemblies consisting of steel structural bolts with splined ends, heavy-hex carbon steel nuts, and hardened carbon steel washers, unless otherwise required by design. Assembly finish must be plain. Submit product data for tension control bolts.
2.3.3 Foundation Anchorage
2.3.3.1 Anchor Rods
ASTM F1554 Gr 36, Class 1A, unless otherwise required by design.
2.3.3.2 Anchor Nuts
ASTM A563, Grade A, hex style, unless otherwise required by design.
2.3.3.3 Anchor Washers
ASTM F844, unless otherwise required by design.
2.3.3.4 Anchor Plate Washers
ASTM A36/A36M, unless otherwise required by design.
2.4 STRUCTURAL STEEL ACCESSORIES
2.4.1 Welding Electrodes and Rods
AWS D1.1/D1.1M . Submit product data for welding electrodes and rods.
2.4.2 Non-Shrink Grout
ASTM C1107/C1107M , with no ASTM C827/C827M shrinkage. Grout must be nonmetallic. Submit product data for non-shrink grout.
2.4.3 Welded Shear Stud Connectors
ASTM A29/A29M, Grades 1010 through 1020. AWS D1.1/D1.1M , Table 7.1, Type B.
2.5 GALVANIZING
ASTM F2329/F2329M , ASTM F1136/F1136M , ASTM F2833 or ASTM B695 for threaded parts or ASTM A123/A123M for structural steel members, as applicable, unless specified otherwise galvanize after fabrication where practicable.
2.6 FABRICATION
Fabrication must be in accordance with the applicable provisions of AISC 325 . Fabrication and assembly must be done in the shop to the greatest extent possible. Punch, subpunch and ream, or drill bolt holes perpendicular to the surface of the member.
SECTION 05 12 00 Page 7 AMENDMENT 0002AMENDMENT 0003
Compression joints depending on contact bearing must have a surface roughness not in excess of 500 micro inch as determined by ASME B46.1 , and ends must be square within the tolerances for milled ends specified in
ASTM A6/A6M.
Shop splices of members between field splices will be permitted only where indicated on the Contract Drawings. Splices not indicated require the approval of the Contracting Officer.
2.6.1 Markings
Prior to erection, identify members by a painted erection mark.
Connecting parts assembled in the shop for reaming holes in field connections must be match marked with scratch and notch marks. Do not locate erection markings on areas to be welded. Do not locate match markings in areas that will decrease member strength or cause stress concentrations. Affix embossed tags to hot-dipped galvanized members.
2.6.2 Shop Primer
SSPC Paint 20 or SSPC Paint 29 , (zinc rich primer). Shop prime structural steel, except as modified herein, in accordance with SSPC PA 1 . Do not prime steel surfaces embedded in concrete, galvanized surfaces, or surfaces within 0.5 inch of the toe of the welds prior to welding (except surfaces on which metal decking and shear studs are to be welded). If flash rusting occurs, re-clean the surface prior to application of primer. Apply primer in accordance with endorsement "SPE-P1" of AISC 420 or approved equal NACE or SSPC certification to a minimum dry film thickness of 2.0 mil. Submit shop primer product data.
Prior to assembly, prime surfaces which will be concealed or inaccessible after assembly. Do not apply primer in foggy or rainy weather; when the ambient temperature is below 45 degrees F or over 95 degrees F; or when the primer may be exposed to temperatures below 40 degrees F within 48 hours after application, unless approved otherwise by the Contracting Officer. Repair damaged primed surfaces with an additional coat of primer.
2.6.2.1 Cleaning
SSPC SP 6/NACE No.3 , except steel exposed in spaces above ceilings, attic spaces, furred spaces, and chases that will be hidden to view in finished construction may be cleaned to SSPC SP 3 when recommended by the shop primer manufacturer. Maintain steel surfaces free from rust, dirt, oil, grease, and other contaminants through final assembly.
2.7 DRAINAGE HOLES
Drill adequate drainage holes to eliminate water traps. Hole diameter must be 1/2 inch and location indicated on the detail drawings. Hole size and locations must not affect the structural integrity.
PART 3 EXECUTION
3.1 ERECTION
a. Erection of structural steel must be in accordance with the applicable provisions of AISC 325 , AISC 303 and 29 CFR Part 1926, Subpart R .
After final positioning of steel members, provide full bearing under base
SECTION 05 12 00 Page 8 AMENDMENT 0002AMENDMENT 0003 plates and bearing plates using nonshrink grout. Place nonshrink grout in accordance with the manufacturer's instructions.
3.1.1 STORAGE
Store the material out of contact with the ground in such manner and location as to minimize deterioration.
3.2 CONNECTIONS
Except as modified in this section, design connections indicated in accordance with AISC 360 . Build connections into existing work. Do not tighten anchor bolts set in concrete with impact torque wrenches. Holes must not be cut or enlarged by burning. Bolts, nuts, and washers must be clean of dirt and rust, and lubricated immediately prior to installation.
3.2.1 High-Strength Bolts
Provide direct tension indicator washers in all ASTM F3125/F3125M , Grade A325 bolted connections. Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, fully tension bolts, progressing from the most rigid part of a connection to the free edges.
Fastener components shall be protected from dirt and moisture in closed containers at the site of the installation. Fastener components that are not incorporated into the work shall be returned to protected storage at the end of the work shift.
3.2.1.1 Installation of Direct Tension Indicator Washers (DTIW)
Where possible, install the DTIW under the bolt head and tighten the nut.
If the DTIW is installed adjacent to the turned element, provide a flat washer between the DTIW and nut when the nut is turned for tightening, and between the DTIW and bolt head when the bolt head is turned for tightening.
3.2.2 Tension Control Bolts
Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, fully tension bolts, progressing from the most rigid part of a connection to the free edges.
3.3 GAS CUTTING
Use of gas-cutting torch in the field for correcting fabrication errors is not permitted on any major member in the structural framing. Use of a gas cutting torch will be permitted on minor members not under stress only after approval has been obtained from the Contracting Officer.
3.4 WELDING
Welding must be in accordance with AWS D1.1/D1.1M . Provide AWS D1.1/D1.1M qualified welders, welding operators, and tackers.
Develop and submit the Welding Procedure Specifications (WPS) for all welding, including welding done using prequalified procedures. Submit for approval all WPS, whether prequalified or qualified by testing.
SECTION 05 12 00 Page 9 AMENDMENT 0002AMENDMENT 0003
3.4.1 Removal of Temporary Welds, Run-Off Plates, and Backing Strips
Remove only from finished areas.
3.5 SHOP PRIMER REPAIR
Repair shop primer in accordance with the paint manufacturer's recommendation for surfaces damaged by handling, transporting, cutting, welding, or bolting.
3.5.1 Field Priming
Field prime steel exposed to the weather, or located in building areas without HVAC for control of relative humidity. After erection, the field bolt heads and nuts, field welds, and any abrasions in the shop coat must be cleaned and primed with paint of the same quality as that used for the shop coat.
3.6 GALVANIZING REPAIR
Repair damage to galvanized coatings using ASTM A780/A780M zinc rich paint for galvanizing damaged by handling, transporting, cutting, welding, or bolting. Do not heat surfaces to which repair paint has been applied.
3.7 FIELD QUALITY CONTROL
Perform field tests, and provide labor, equipment, and incidentals required for testing. Notify the Contracting Officer in writing of defective welds, bolts, nuts, and washers within 7 working days of the date of the inspection.
3.7.1 Welds
3.7.1.1 Visual Inspection
AWS D1.1/D1.1M . Furnish the services of AWS-certified welding inspectors for fabrication and erection inspection and testing and verification inspections. A Certified Welding Inspector must perform visual inspection on 100 percent of all welds. Document this inspection in the Visual Weld Inspection Log. Submit certificates indicating that certified welding inspectors meet the requirements of AWS QC1.
Inspect proper preparation, size, gauging location, and acceptability of all welds; identification marking; operation and current characteristics of welding sets in use. Submit weld inspection reports.
3.7.2 Direct Tension Indicator Washers
3.7.2.1 Direct Tension Indicator Washer Compression
Test direct tension indicator washers in place to verify that they have been compressed sufficiently to provide the 0.015 inch gap, as required by ASTM F959/F959M . Submit direct tension indicator washer inspection reports.
3.7.3 High-Strength Bolts
3.7.3.1 Testing Bolt, Nut, and Washer Assemblies
Test a minimum of 3 bolt, nut, and washer assemblies from each mill
SECTION 05 12 00 Page 10 AMENDMENT 0002AMENDMENT 0003 certificate batch in a tension measuring device at the job site prior to the beginning of bolting start-up. Demonstrate that the bolts and nuts, when used together, can develop tension not less than the provisions specified in AISC 360 , depending on bolt size and grade. The bolt tension must be developed by tightening the nut. A representative of the manufacturer or supplier must be present to ensure that the fasteners are properly used, and to demonstrate that the fastener assemblies supplied satisfy the specified requirements. Submit bolt testing reports.
3.7.3.2 Inspection
Inspection procedures must be in accordance with AISC 360 . Confirm and report to the Contracting Officer that the materials meet the project specification and that they are properly stored. Confirm that the faying surfaces have been properly prepared before the connections are assembled. Observe the specified job site testing and calibration, and confirm that the procedure to be used provides the required tension.
Monitor the work to ensure the testing procedures are routinely followed on joints that are specified to be fully tensioned.
3.7.4 Inspection and Testing of Steel Stud Welding
Perform verification inspection and testing of steel stud welding conforming to the requirements of AWS D1.1/D1.1M , Stud Welding Clause.
The Contracting Officer will serve as the verification inspector. Bend test studs that do not show a full 360 degree weld flash or have been repaired by welding as required by AWS D1.1/D1.1M , Stud Welding Clause.
Studs that crack under testing in the weld, base metal or shank will be rejected and replaced by the Contractor at no additional cost.
-- End of Section --
SECTION 05 12 00 Page 11 AMENDMENT 0002AMENDMENT 0003
Chrome Plating Facility 100% Design 119201AM2
SECTION 06 73 01
FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
05/18
Amendment 0002
PART 1 GENERAL
This Section includes, but is not limited to, new fiberglass reinforced plastic (FRP) grating for elevated platforms and walkways.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures
ASTM INTERNATIONAL (ASTM)
ASTM D635 (2018) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position
ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics
ASTM D696 (2016) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica Dilatometer
ASTM D790 (2017) Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials
ASTM D953 (2018) Standard Test Method for Pin-Bearing Strength of Plastics
ASTM D2344/D2344M (2016) Standard Test Method for Short-Beam Strength of Polymer Matrix Composite Materials and Their Laminates
ASTM D2863 (2017a) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
SECTION 06 73 01 Page 1 AMENDMENT 0003
ASTM E662 (2019) Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials
ASTM G154 (2016) Standard Practice for Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials
ASTM G155 (2013) Standard Practice for Operating Xenon Arc Light Apparatus for Exposure of Non-Metallic Materials
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
U.S. DEPARTMENT OF DEFENSE (DOD)
SAE CMH-17-36 (2012) Composite Materials Handbook, Vol.
3, Polymer Matrix Composites Material Usage, Design, and Analysis
UNDERWRITERS LABORATORIES (UL)
UL 94 (2013; Reprint Sep 2017) UL Standard for Safety Tests for Flammability of Plastic Materials for Parts in Devices and Appliances
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Drawings, Templates, and Directions; G RO AE
SD-03 Product Data
FRP Grating; G AE
Clips and Anchorage; G AE
SD-06 Test Reports
Bearing Strength Testing
Flexural Properties
Ultraviolet Testing
Shear Strength
Tensile Properties
SECTION 06 73 01 Page 2 AMENDMENT 0003
Toxicity Testing
Coefficient of Lineal Thermal Expansion
Flame Spread Testing
SD-07 Certificates
Manufacturer's Sample Warranty
Certification of Anchorage System compliance with ASCE 7
Proof of Certification from a minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR)
SD-08 Manufacturer's Instructions
Shipping, Handling, And Erection Procedures
Care and Maintenance Instructions
SD-09 Manufacturer's Field Reports
Manufacturer's Certification of Installation
SD-11 Closeout Submittals
Manufacturer's Warranty
1.3 QUALITY CONTROL
Provide items by manufacturers having a minimum of 10 years of experience in the design and manufacture of similar products and systems. In addition, if requested, provide a record of at least five separate, similar, successful installations in the last 5 years. Submit manufacturer's catalog data, to include two copies of the manufacturer's specifications, load tables, dimension diagrams, and anchor details for the following items:
a. FRP Grating.
b. Clips and Anchorage.
Provide 3-year manufacturer's limited warranty on all FRP products against defects in materials and workmanship. Submit the Manufacturer's Sample Warranty before work starts.
Submit installation drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are embedded in concrete or masonry.
Submit Certification of Anchorage System compliance with ASCE 7. Deliver such items to the Contracting Officer and the project site before installation starts.
Ensure that the manufacturer is certified to ISO 9001-2008. Submit the Proof of Certification from a minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR).
SECTION 06 73 01 Page 3 AMENDMENT 0003
1.4 DELIVERY, HANDLING, AND STORAGE
Submit the manufacturer's recommendations for shipping, handling, and erection procedures, and care and maintenance instructions. Deliver manufactured materials in original, unbroken pallets, packages, containers, or bundles bearing the label of the manufacturer. Ensure that all adhesives, resins, and their catalysts and hardeners are crated or boxed separately, and noted as such.
Handle all materials to prevent abrasion, cracking, chipping, twisting, other deformations, and other types of damage. Store adhesives, resins and their catalysts in dry indoor facilities between 70 and 85 degrees F until they are required.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide gratings composed of continuous roving fiberglass reinforcement and resin in qualities, quantities, properties, arrangements, and dimensions as necessary to meet the design requirements and dimensions as specified.
Provide resin of isophthalic polyester with chemical formulations as necessary to provide the corrosion resistance, strength, and other physical properties conforming to the specified requirements.
Ensure that all surfaces of FRP items and fabrications are nonslip grit, resin-rich, and free of voids, dry spots, cracks, and unreinforced areas.
Completely cover all glass fibers with resin to protect against their exposure to ultraviolet light, wear, or weathering.
2.1.1 Design Requirements
Submit documentation for the following product tests before work starts:
Test Standard Structural Performance Requirements
Minimum Flexural Strength
Minimum Flexural Modulus
Bearing Strength Testing
ASTM D953
Flexural Properties
ASTM D790 30,000 psi (1.8 x 10 to power of 6) psi
Ultraviolet Testing
ASTM G155
ASTM G154
Shear Strength
ASTM D2344/D2344M 4,500 psi
Tensile Properties
ASTM D638 30,000 psi
SECTION 06 73 01 Page 4 AMENDMENT 0003
Test Standard Structural Performance Requirements
Minimum Flexural Strength
Minimum Flexural Modulus
Toxicity Testing SAE CMH-17-36
Coefficient of Lineal Thermal
Expansion
ASTM D696 8.0 x 10 power minus 6 in/in/degree F
Flame Spread Testing
ASTM D2863
ASTM E662
UL 94
2.1.2 Performance Requirements
2.1.2.1 Structural Performance of Gratings
Provide gratings capable of withstanding the effects of gravity loads in accordance with ASCE 7, ICC IBC , and the following loads and stresses within the limits and under the conditions indicated:
Floors: Uniform load of 200 lb/square foot.
Walkways and Elevated Platforms Other Than Exits: Uniform load of 200 lb/square foot.
Walkways and Elevated Platforms Used as Exits: Uniform load of 200 lb/square foot.
Provide grating products with a flame spread rating of 25 or less per ASTM E84 Tunnel Test. Test gratings for burn time of less than 30 seconds and an extent of burn rate of less than or equal to 10 millimeters per
ASTM D635.
2.2 FABRICATION
2.2.1 Molded FRP Grating
Ensure that all field-fabricated and shop-fabricated grating cuts are coated with vinyl ester resin to provide maximum corrosion resistance in accordance with the manufacturer's instructions.
Provide grating made as one-piece molded construction with tops and bottoms of bearing bars and cross bars in the same plane with a rectangular mesh pattern providing unidirectional strength and reinforced with continuous roving of an equal number of layers in each direction.
Ensure that the top layer of reinforcement is no more than 1/8 inch below the top surface of the grating to provide maximum stiffness and prevent resin chipping of unreinforced surfaces having percentage of glass (by weight) not exceeding 35 percent.
Ensure that no dry glass fibers are visible on any surface of bearing bars or cross bars after molding, and that all bars are smooth and uniform, with no evidence of fiber orientation irregularities, interlaminar voids, porosity, resin-rich areas or resin-starved areas.
Fillet grating bar intersections to a minimum radius of 1/16 inch to eliminate local stress concentrations and the possibility of resin cracking at these locations.
SECTION 06 73 01 Page 5 AMENDMENT 0003
Amendment 0002* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Molded Floor Grating: 1-1/2 inch deep by 1-1/2 inch square mesh, or as required by design, ( Text Del et ed) gr at i ng l ocat ed; at equi pment al l l evel s t o i nf i l l openi ngs and l ower t r ench.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0002
Provide fire-retardant grating with a tested flame spread rating of 25 or less when tested in accordance with ASTM E84.
Fiberglass Grating, Molded, Stair Tread Panel: Rectangular, fiberglass, SGF polyester resin, gray, 1 inch grid height, 1-1/2 inch by 6 inch rectangular (interior) grid, grit surface, long way of opening runs parallel to length of stair tread panel, 1-5/8 inch wide integral nosing on both sides of stair tread panel length, 65 percent open area.
2.2.2 Pultruded Glass-Fiber-Reinforced Gratings
Bar gratings assembled from components made by simultaneously pulling glass fibers and extruding thermosetting plastic resin through a heated die under pressure to produce a product without voids and with a high glass-fiber content.
a. Resin Type: Polyester.
b. Traffic Surface: Applied abrasive finish.
c. Flame-Spread Index: 25 or less when tested according to ASTM E84.
d. Configuration: I4010; 1-inch I-bars spaced 1 inch o.c. (40 percent open).
Amendment 0002* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
e. Location: ( Text Del et ed) St ai r l andi ngs and cent er cat wal k EL 83' - 6" r equi r i ng 1" gr at i ng.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0002
2.2.3 Fasteners
Provide Type 316 stainless-steel fasteners, clips, and anchorage. Select fasteners for type, grade, and class required. Touch up area if damaged during attachment.
PART 3 EXECUTION
3.1 INSTALLATION
Install items at locations indicated, according to the manufacturer's instructions. Submit 3 copies of manufacturer's Certification of Installation to the Contracting Officer. Verify all measurements and take all field measurements necessary before fabrication. Include all materials and parts necessary to complete each item, even though such work is not definitely shown or specified. Perform cutting, drilling, and fitting required for installing gratings. Set units accurately in location, alignment, and elevation; measured from established lines; and
SECTION 06 73 01 Page 6 AMENDMENT 0003 levels and free of rack. Comply with recommendations of cited bar grating standards, including installation clearances and standard anchoring details.
a. Attach removable units to supporting members with the type and size of clips and fasteners indicated or, if not indicated, as recommended by the grating manufacturer for the type of installation conditions shown.
b. Attach nonremovable units to supporting members by welding where both materials are same; otherwise, fasten by bolting as indicated above.
3.1.1 Anchorage, Fastenings, and Connections
Provide anchorage where necessary for fastening miscellaneous FRP items securely in place.
3.2 CLOSEOUT ACTIVITIES
3.2.1 Manufacturer's Warranty
Submit original and 3 copies of manufacturer's signed Warranty.
SECTION 06 73 01 Page 7 AMENDMENT 0003
SECTION 09 96 00
HIGH-PERFORMANCE COATINGS
11/14
Amendment 0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4258 (2017) Standard Practice for Surface Cleaning Concrete for Coating
ASTM D4259 (2018) Standard Practice for Preparation of Concrete by Abrasion Prior to Coating Application
ASTM SI10 (2016) American National Standard for Use of the International System of Units (SI):
The Modern Metric System
INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)
ICRI 310.2R (2013) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair
MASTER PAINTERS INSTITUTE (MPI)
MPI ASM (2012) Architectural Painting Specification Manual
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning
SSPC 6/NACE No.3 (2007; E 2004) Commercial Blast Cleaning
Amendment 0003* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
U. S. DEPARTMENT OF DEFENSE ( DOD)
MIL-STD-101 ( 2014; Rev C) Col or Code f or Pi pel i nes and f or Compr essed Gas Cyl i nder s
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0003
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
QPL-TNT-AP-28 (2004) Paint, Aluminum, Heat Resisting (1200 Degrees F)
SECTION 09 96 00 Page 1 AMENDMENT 0003
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Equipment List; G AE
SD-03 Product Data
Secondary Containment System
Novolac Epoxy
SD-04 Samples
Color Chips; G AE
SD-07 Certificates
Secondary Containment System
Novolac Epoxy
Manufacturer's Printed Instructions; G AE
1.3 QUALITY CONTROL
Comply with Master Painters Institute (MPI) Standards indicated and listed in "MPI Approved Products List." Comply with the requirements in "MPI Architectural Painting Specification Manual" before any project is started.
Submit an equipment list consisting of a list of proposed equipment to be used in performance of construction work.
Submit three color chips 3 inch by 4 inch or manufacturer's pull-down of each finish color and gloss as scheduled.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver special coating materials to the project in their original containers bearing manufacturer's name, descriptive label, and coating formulations. Provide new and unopened containers.
Store special coating materials in tightly closed containers in a covered, well-ventilated area where they are not exposed to excessive heat, fumes, sparks, flame, or direct sunlight. Protect water-based coatings against freezing.
Store solvents, thinners, and equipment cleaners with the same care as the coating materials with ambient temperatures continuously maintained at a minimum 45 degrees F.
SECTION 09 96 00 Page 2 AMENDMENT 0003
PART 2 PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
Submit manufacturer's catalog data including manufacturer's name and identification. Include detailed data analysis of each special coating material required for the project, with all the coating constituents measured as percentages of the total weight of the coating. Also provide manufacturer's data concerning application, thinning, and average coverage per gallon.
2.1.1 Secondary Containment
Environmental Protection Agency (EPA) regulations that govern the construction and lining of secondary containment areas. These activities are governed by the Code of Federal Regulation (CFR) Title 40:
Secondary containment system capable of providing 72 hour protection against the following commodities:
a. 10 percent NAOH solution, remainder water at 190 degrees F.
b. 46 percent Sulfuric acid plus 41 percent Phosphoric acid, remainder water at 110 degrees F.
c. 25 percent Chromic acid, remainder water at 110 degrees F.
2.2 MATERIALS
2.2.1 Secondary Containment System
Protective Coating System for new and existing concrete basement floor and concrete walls up to 4 feet.
Primer / Sealer:
Epoxy water emulsion suitable for applications on damp concrete.
Moisture Vapor Transmission (MVT) System:
A self-leveling system to be applied to concrete to control moisture vapor emissions. The product can be applied with a pin rake, screed rake or notched trowel/squeegee at a nominal thickness of 1/8 minimum. It is designed to provide a refinished surface on concrete prior to the application of a non-permeable flooring finish and can be applied vertically.
For vertical applications, apply the mortar via hawk and trowel pulling material up the vertical starting at the bottom, working up. Typical thickness is 60-90 mils. Round edge trowels lessen application marks.
Solvent can be used to clean and lubricate the trowel. The applied surface can be lightly rolled with a roller cover dampened with solvent for smoothing; too much solvent can cause the mortar to sag. Within 15 minutes of application broadcast a fine (40-60 mesh) silica sand into the surface. A refusal broadcast is not practical on a vertical surface but enough sand should be visible at the surface to insure bond of the intermediate or topcoat material.
Crack Bridging System:
SECTION 09 96 00 Page 3 AMENDMENT 0003
Epoxy technology with crack bridging and waterproofing capabilities and can be topcoated with a chemically resistant topcoat. The epoxy achieves flexibility without the use of plasticizers or other additives which can separate or migrate as the system age. Fiberglass scrim may be incorporated into the system to add tensile strength.
Generic Novolac Topcoat: (High temperature epoxy):
An advanced technology ceramic novolac epoxy. It is engineered to provide protection from aggressive chemicals. Can be applied by single leg application and cures to service in 24 hours. Product should be solvent-free, low odor, resists thermal cracking when applied to either steel or concrete. Prime Coat: Apply one coat of epoxy water emulsion primer to all concrete surfaces. This coating shall be applied at a dry film thickness of 2 to 4.5 mils.
MVT System: Apply with a pin rake, screed rake or notched trowel/squeegee at a nominal thickness of 1/8 minimum.
First Coat: Apply one coat of Novolac Epoxy to all areas. This coating shall be applied at a dry film thickness of 15.0 to 25 mils.
Finish Coat: Apply one coat of Novolac Epoxy to all areas. This coating shall be applied at a dry film thickness of 15.0 to 25 mils.
Amendment 0003* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
2.2.2 Novolac Epoxy
Protective Coating System for new, existing steel, platforms, tank support and reinforcing pipes st eel r ei nf or ci ng, and pi pe suppor t s .
Prime Coat: Apply one coat of epoxy polyamide primer to all bare steel surfaces. This coating shall be applied at a dry film thickness of 2.5 to
4.0 mils.
Intermediate Coat: Apply one coat of Novolac Epoxy to all areas. This coating shall be applied at a dry film thickness of 15.0 to 25 mils.
Finish Coat: Apply one coat of Novolac Epoxy to all areas. This coating shall be applied at a dry film thickness of 15.0 to 25 mils.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0003
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Surface Preparation
Protect adjacent materials and equipment against damage from spillage, dripping, and spatter of coating materials. Leave clean building materials and equipment with all damaged surfaces corrected. Provide "WET PAINT" signs to indicate newly painted surfaces.
Protect work of other trades against damage from coating operation.
Correct damage by cleaning, repairing, replacing, and recoating, as approved by the Contracting Officer, and leave in an undamaged condition.
At completion of construction activities of other trades, touch up and
SECTION 09 96 00 Page 4 AMENDMENT 0003 restore damaged or defaced coated surfaces.
Provide forced ventilation for interior spaces during application and drying of coatings to prevent the buildup of toxic or explosive concentrations of solvent vapors.
Provide fire extinguishers of the required quantity and correct type to combat flammable liquid fires.
Dispose of rags that are used to wipe up coating materials, solvents, and thinners by drenching with water and placing them in a covered metal container.
3.1.2 Cleaning
At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
Clean application equipment promptly and thoroughly with a suitable solvent after each use and stored in a clean, covered, well-ventilated container.
3.1.3 Concrete Surfaces
Remove plates, machined surfaces, and similar items already in place that are not to be coated. Provide surface-applied protection before surface preparation and coating where removal is impractical or impossible. After completing coating operations, reinstall items that were removed.
Clean dirt, oil, grease, and incompatible paints from substrates to ensure bonding. Coordination of shop-applied prime coats with high-performance coatings is critical. Remove incompatible primers. Reprime substrate with compatible primers as required to produce coating systems indicated.
3.1.3.1 Concrete Substrates
Remove release agents, curing compounds, efflorescence, and chalk.
Surface Preparation: Remove all surface contamination, loose or weakly adherent particles, laitance, grease, oil, curing compounds, paint, dust and debris by blast track method or approved mechanical means (acid etch is not allowed). If surface is questionable, perform a test patch.
Create a minimum surface profile for the system specified in accordance with the methods described in ICRI No. 03732 to achieve profile numbers as follows:
The prepared concrete shall have a surface profile equal to CSP 5 or greater.
3.1.3.2 Steel Substrates
Remove all visible oil, grease, dust, dirt, loose mill scale, rust, coating, oxides, and corrosion products. Clean using methods recommended in writing by coating manufacturer. Conform to SSPC 6/NACE No.3 for blast cleaning.
SECTION 09 96 00 Page 5 AMENDMENT 0003
3.1.4 Coating Material Preparation
Mix and prepare coating materials in accordance with the coating manufacturer's printed instructions for applying the particular material and coat. Keep materials which are not in actual use in closed containers.
Coating materials that have been mixed with an automatic shaker are allowed to stand to let air bubbles escape, then given a final hand mixing before application. Stir materials so as to produce a mixture of uniform density. Stir at frequent intervals during application to prevent skinning. Do not stir film which may form on the surface of the material. Remove film and strain, if necessary.
3.1.4.1 Thinning
Thinning is done in accordance with coating manufacturer's printed directions for the particular material and coat.
3.1.4.2 Tinting
Ensure prime and intermediate coats of paint are slightly different tints from the finish coat to facilitate identification of each coat. Tinting is done by the coating manufacturer and clearly identified as to color and coat.
3.2 APPLICATION
Interior painting is not allowed until the building is enclosed and has thoroughly dried out. Painting is not allowed below 50 degrees F or above 95 degrees F. Apply paint in accordance with the coating manufacturer's recommendations, and as specified.
Ensure coating application is done by skilled applicators. Apply coatings to clean and properly prepared surfaces. Apply coatings with clean, high-quality application equipment. Allow sufficient time between coats to ensure complete drying and curing. Sand and dust surfaces between coatings, as required, to produce a surface free of visible defects.
Lightly sand high gloss coatings and clear finishes between coats to ensure bond of following coats.
Apply coats to the surfaces in an even film. Cloudiness, spotting, holidays, laps, application marks, runs, sags, and other similar surface imperfections are not acceptable. Remove defective coating applications and re-coat as directed.
Ensure coating lines such as wainscots are sharp, true, and well-defined.
Tape may be used to establish coating lines, providing tape is removed before ragging or sawtooth edges form.
Ensure surfaces, including edges, corners, crevices, welds, and other similar changes in surface plane, meet the dry-film thickness not less than specified.
3.2.1 Brush Application
Use clean, proper size brushes for high-quality application of the specified coating materials. Brush out slow-dry coatings. Brush out quick-dry coatings only enough to spread out evenly.
SECTION 09 96 00 Page 6 AMENDMENT 0003
3.2.2 Roller Application
Use clean roller covers of the proper nap length, nap texture, and material for high-quality application of the specified coating materials.
Ensure roller application is equivalent in all respects to the same coats applied by high-quality brush application.
3.2.3 Spray Application
Do not allow spray application of coatings. Spray application equipment is limited to airless-spray equipment and electrostatic-spray equipment.
Ensure equipment is clean and operated by workmen skilled in high quality application of coating materials.
Spray application of coatings is limited to finish coats on metal frame works, siding, decking, wire mesh, and other surfaces where hand work would be inferior. Apply spray coatings as equivalent in all respects to the same coats applied by high quality brush application. Permit each spray coat to cure before the succeeding coat is applied. Do not double back with application equipment, for the purpose of building up film thickness of two coats in one operation.
Cover surfaces adjacent to sprayed areas to prevent damage from overspray, coating rebound, and spray drift.
3.3 FIELD QUALITY CONTROL
3.3.1 Field Test
Government may take dry-film tests from time to time on finished surfaces. Apply additional coatings to surfaces where there is less than the minimum specified dry-film thickness.
3.3.2 Repairing
Remove damaged and unacceptable portions of completed work and replace with new work to match adjacent surfaces at no additional cost to the Government.
Amendment 0003* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
3. 4 PI PI NG I DENTI FI CATI ON
Pi pi ng I dent i f i cat i on, I ncl udi ng Sur f aces I n Conceal ed Spaces: Pr ovi de i n accor dance wi t h MIL-STD-101 C. Pl ace st enci l i ng i n c l ear l y v i s i bl e l ocat i ons. On pi pi ng not cover ed by MIL-STD-101 C, st enci l appr oved names or code l et t er s, i n l et t er s a mi ni mum of 1/ 2- i nch hi gh f or pi pi ng and a mi ni mum of 2 i nches hi gh el sewher e. St enci l ar r ow- shaped mar ki ngs on pi pi ng t o i ndi cat e di r ect i on of f l ow usi ng bl ack st enci l pai nt .
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0003
SECTION 09 96 00 Page 7 AMENDMENT 0003
SECTION 26 35 43
SILICON-CONTROLLED RECTIFIER
05/11
Amendment 0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.