This document provides details for a federal solicitation seeking construction services. The solicitation involves in-kind repair and replacement of components for a chrome plating facility at Watervliet Arsenal in New York. Services include rebuilding two plating lines and tanks for cleaning, stripping, and rinsing processes. An air scrubber will also be replaced. The period of performance is 720 calendar days from notice to proceed. The estimated value is between $10-25 million. The North American Industry Classification code is 236210 and responses are due through the SAM website. The contracting agency is the Department of the Army Corps of Engineers Engineering District New York.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DS21R0002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page for details of this Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 68
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Mar-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21R0002
X 9B. DATED (SEE ITEM 11)
18-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Mar-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Chrome Plating Facility Repair
Watervliet, NY
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE
The purpose of this amendment is to:
1. Provide responses to RFIs.
2. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation.
The Solicitation Documents are revised as follows:
Delete the following specifications and replace with the attached revised specifications of the same number.
05 12 00 Structural Steel 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating 09 96 00 High-Performance Coatings 26 35 43 Silicon-Controlled Rectifier 40 95 00 Process Control 40 95 00 Appendix C Instrument Data Sheets 43 41 19 Tank Liners 44 10 00 Air Pollution Control The Specifications will be posted via beta.sam.gov, under the attachment section on 30 March 2021.
3. Update Sections 00 21 00; see the Summary of Changes below.
4. Update Wage Determination number: NY20210002; see the Summary of Changes below.
5. Revise the description of CLIN 0009 from Replacement of Rectifiers to Contaminated Soil Removal and Disposal. Revise the Quantity and Unit of Issue for CLIN 0010 has been changed from 175 Cubic Yards to 1 Job.
Offeror must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the following methods: in the space provided on SF1442, by separate letter, or by signing block 15 below.
FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
SECTION 00 10 00 - SOLICITATION
CLIN 0009
The CLIN description has changed from REPLACEMENT OF RECTIFIERS to Contaminated Soil
Removal and Disposal.
The CLIN extended description has changed from:
The additional cost above CLIN0001 for CONTAMINATED SOIL REMOVAL AND DISPOSAL and shall include removal and disposal of contaminated soil associated with construction on this project. Costs for this item shall include excavation, laboratory analytical testing, characterization, manifesting, confirmation sampling, containerization, transportation, and off-site disposal. For estimating purposes any waste encountered would be classified as industrial waste and not Hazardous waste.
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
To:
soil associated with construction on this project. Costs for this item shall include excavation, laboratory analytical testing, characterization, manifesting, confirmation sampling, containerization, transportation, and off-site disposal.
For estimating purposes any waste encountered would be classified as industrial waste and not Hazardous waste.
CLIN 0010
The pricing detail quantity has decreased by 174.00 from 175.00 to 1.00.
The unit of issue has changed from Cubic Yard to Job.
The following Delivery Schedule item for CLIN 0010 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
720 dys. ANP 175 WATERVLIET RESIDENCY
SCOTT KOSNICK
CONSTRUCTION DIVISION 1
BUFFINGTON STREET, BL
E 206
WATERVLIET NY 12189
518-266-6362 FOB: Destination
W912DS
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
720 dys. ANP 1 WATERVLIET RESIDENCY
SCOTT KOSNICK
CONSTRUCTION DIVISION 1
BUFFINGTON STREET, BL
E 206
WATERVLIET NY 12189
518-266-6362 FOB: Destination
W912DS
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
EVALUATION CRITERIA
CRITERIA AND FACTORS FOR EVALUATION, BASIS OF AWARD, EVALUATION
CRITERIA, RATING SYSTEM AND DEFINITION
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
SECTION 00 22 10 – SELECTION PROCEDURES AND BASIS OF AWARD
BEST VALUE TRADE OFF
1.0 OVERVIEW
2.0 BASIS OF AWARD
3.0 GENERAL INSTRUCTIONS AND PROPOSAL SUBMISSION REQUIREMENTS
4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS, SUBFACTORS AND
ELEMENTS
5.0 VOLUME 1 – PERFORMANCE CAPABILITY
5.1 TAB B – FACTOR 1 – PAST PERFORMANCE
5.2 TAB C – FACTOR 2 – PROPOSED CONTRACT DURATION, PHASING AND
SUMMARY SCHEDULE
5.3 TAB D – FACTOR3 –TECHNICAL APPROACH
5.4 TAB E – FACTOR 4 – ORGANIZATIONAL APPROACH
6.0 VOLUME 2 – SMALL BUSINESS
6.1 TAB A – FACTOR 5 – SMALL BUSINESS PARTICIPATION PLAN
6.2 TAB B – FACTOR 5 – PAST UTILIZATION OF SMALL BUSINESS
7.0 VOLUME 3 – FACTOR 6 – PRICE AND PRO FORMA INFORMATION
7.1 TAB A – PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND
CONTRACT LINE ITEM SCHEDULE)
7.2 TAB B – BID GUARANTEE
7.3 TAB C – SELF PERFORMED WORK
ATTACHMENTS
1 – PROPOSAL DATA SHEETS
2 – PAST PERFORMANCE EVALUATION QUESTIONNAIRE
3 – SPECIALIZED EXPERIENCE PRIME CONTRACTOR OR KEY SUB CONTRACTOR
4 – SMALL BUSINESS PARTICIPATION PLAN
5 – KEY EMPLOYEE RESUME
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
1.0 OVERVIEW
This is a single-step "Best Value Trade Off" solicitation in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for the Chrome Plating Facility Repair project located at Watervliet Arsenal, NY. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation is fair and reasonable, and offers the best overall value to the Government.
2.0 BASIS OF AWARD
This is a Best Value Trade Off procurement where the Contracting Officer will award a firm fixed price contract to the responsible Offeror whose proposal the Source Selection Authority and Contracting Officer have determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price.
All technical factors (1-5) when combined are approximately equal in importance to price factor 6.
Technical factor 3 is the most important technical factor, followed by technical factor 1 and then followed by all remaining technical factors that are equal in importance to each other and less important than factors 1 and 3. The intent of this solicitation is to obtain the best value for the Government. After the Government individually evaluates and rates each proposal, the Source Selection Authority and Contracting Officer will compare proposals to determine which proposal represents the best value.
The price used in the trade-off analysis shall be the aggregate amount for the base items and options
(CLINS
0001-0012). The trade-off analysis will be conducted based on an evaluation of all factors, including price, and a best value proposal will be determined. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. If there is a lower priced, conforming offer(s), the Source Selection Authority must determine that the added value of a more expensive proposal (within an acceptable range) would justify award to that Offeror. The magnitude of the project is between $10,000,000 and $25,000,000.
3.0 GENERAL INSTRUCTIONS AND PROPOSAL SUBMISSION REQUIREMENTS
3.1 GENERAL INSTRUCTIONS
3.1.1 Who May Submit:
i. Competition will be unrestricted (i.e. open to all businesses regardless of Small
Business status). Any legally organized Offeror may submit a proposal.
3.1.2 Inquiries about this solicitation:
i. Prospective Offerors should submit inquiries related to this solicitation only by e-mail to: E-MAIL ADDRESS: Michael.L.Mccue@usace.army.mil Include the solicitation number, and project title with any questions/clarifications. Written questions must be received by this office not later than 7 calendar days prior to the date set for receipt of offers.
TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.
Oral explanations or instructions are not binding. Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
As this is a competitive negotiation acquisition, there is no public proposal opening and no information will be given out as to the number of Offerors or the results of the competition until all awards are made.
3.1.3 Page Limit and Size of Electronic Materials shall be submitted in the following volumes:
In order to effectively and equitably evaluate all proposals, the Contracting Officer/PCO must receive information sufficiently detailed to clearly address submission requirements as outlined below. Pages containing text shall be submitted electronically on standard 8- 1/2 x 11 inch size paper. Schedules, Drawings and/or sketches may be submitted electronically on paper not exceeding 11 x 17 inch paper, (each 11 x 17 counts as two pages). Use of 'TAB' pages are encouraged to identify each section of the proposal and shall not count against proposal's total page count. Each page of text shall be minimally single spaced with a minimum 12-point font and one inch margins all around. Any sheet with printed material (text or graphics) shall be considered a page, excluding dividers, cover sheets, letters of commitment, team agreements, and/or Joint Venture agreements.
3.1.4 Joint Ventures
i. When an Offeror is submitting a proposal as a joint venture, all members of the joint venture must sign the SF 1442 and any financial surety instrument that is required, unless a written agreement by all members of the joint venture is furnished with the proposal designating one firm with the legal authority to bind the other member(s) of the joint venture. Signatures on the written agreement designating one member of the joint venture as having legal authority to bind all other members of the joint venture must be executed by the duly authorized representatives of the respective joint venture members. All joint venture members will remain jointly and severally liable for all actions, representations, and other activities by the joint venture and by other joint venture members in connection with this solicitation and subsequent contract. A copy of the joint
Volume Tab Title Maximum Pages
1 A Factor 1: Past Performance No Page Limit
B Factor 2: Proposed Contract Duration, Phasing and Summary Schedule
C Factor 3: Technical Approach 10
1 D Factor 4: Organizational Approach 10
A Factor 5: Small Business Participation Plan No page limit
2 B Factor 5: Past Utilization of Small Business No page limit
3 A Factor 6: Price (Standard Form 1442 & Contract Line Item Schedule)
No page limit
3 B Factor 6: Bid Guarantee No page limit
3 C Factor 6: Self-Performed Work No page limit
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only venture agreement and agreement providing evidence of the authority to legally bind all other members of the joint venture must be submitted with the Offeror’s proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
ii. If submitting a proposal as a joint venture, the experience, past performance, and other information about each of the joint venture partners can be submitted for the joint venture. The experience of each joint venture partner will be considered the experience of the joint venture entity. Joint ventures must also submit the following additional documentation:
3.1.4.ii.1 A copy of the Joint Venture Agreement.
3.1.4.ii.2 A detailed statement outlining the following in terms of percentages, where appropriate:
3.1.4.ii.3 The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
3.1.4.ii.4 The structure of the joint venture and decision making responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work under the contract.
3.1.4.ii.5 Identification of key personnel having the authority to bind the joint venture to any and all agreements, including any subcontracts, executed by the joint venture.
3.1.4.ii.6 Identification of party or parties maintaining the joint venture bank accounts for the payment of all expenses and the deposit of all receipts, keeping the books and records of the joint venture, and paying applicable taxes for the joint venture.
3.1.4.ii.7 Identification of party or parties having overall control of the joint venture.
iii. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture entities and identify the entity, or whether they are hired directly as employees of the joint venture.
iv. A complete and legally binding document with all information required under this section titles “Joint Ventures” shall be included in Volume I of the proposal.
3.2 PROPOSAL SUBMISSION REQUIREMENTS
3.2.1 Proposal Requirements and Submission
Proposals should be submitted initially on the most favorable terms. Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.
Do not submit any material not required by this solicitation (such as company or system brochures). Offerors must meet all technical portions (construction criteria) of the RFP.
The fact that the technical specifications and the drawings are not evaluated factors during solicitation does not relieve the Offerors from meeting all technical, or other, Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only requirements of the RFP.
The Government will not make assumptions concerning the intent, capabilities, or experiences of the Offerors. Clear identification of proposal details shall rest as sole responsibility of the Offeror. Therefore the proposal shall meet the following basic requirements:
i. Proposals shall be typed and easy to read. Margins (1-inch) shall be clean and clear.
ii. Must contain a Proposal Cover Sheet, to include the Offeror’s e-mail address, cell phone number, Name, Address, DUNS, and CAGE code. The proposal cover sheet is required by Provision “FAR 52.215-1, Instructions to Offerors— Competitive Acquisition.”
iii. Proposals shall be organized, concise, and submitted in the volumes and in the order indicated herein. Volumes shall be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.
iv. Proposals shall contain a Table of Contents and include at the bottom left side of each page the volume and page number.
v. Offerors shall submit a signed dated Standard Form 1442, Solicitation, Offer, and Award. Any and all amendments must be acknowledged by the Offeror in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.
vi. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, and the like are not necessary.
However, proposals shall completely and adequately address the requirements of this solicitation.
vii. Failing to submit attachments or failing to properly complete the proposal, may result in rejection of the Offer without further evaluation. Therefore, Offerors are urged to follow instructions and contact the Contract Specialist if instructions are not understood.
3.2.2 Where to Submit:
The Offeror’s proposal shall be submitted electronically, as described below. The RFP will provide the Government address and receipt date for proposal submittal. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.
NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER
TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL,
HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall email their proposals using the following link:
https://safe.apps.mil/
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
Please send proposals using the link above to Contract Specialist Michael McCue at Michael.L.Mccue@usace.army.mil and to Contracting Officer Nicholas Emanuel at Nicholas.P.Emanuel@usace.army.mil.
INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
REQUEST FOR UPLOAD CODE: Offerors must email Contract Specialist Michael McCue at Michael.L.Mccue@usace.army.mil and to Contracting Officer Nicholas Emanuel at Nicholas.P.Emanuel@usace.army.mil no later than two (2) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code two (2) working days before proposal submission date may not be able to receive a request code in time to upload their submission.
"IMPORTANT NOTE: To use DoD SAFE, offerors must request an individual upload link from a DoD employee to enter the SAFE site as a guest. The link brings the guest to a submission page. On the submission page, the guest enters the USACE recipient's email address and selects the file to upload. Note that DOD SAFE auto-populates a "civ@mail.mil" email address but these email addresses are not used within USACE. Please be sure to use the "@usace.army.mil" email addresses provided above. Once the file is uploaded, DoD SAFE sends a notification and claim passcode to the email address entered. If the wrong email address is entered, the USACE recipient will not know that the file was uploaded and cannot retrieve the file. The guest will receive confirmation that the file was successfully uploaded to DoD SAFE, but DoD SAFE does not confirm whether the guest sent the file to the correct USACE recipient or a valid email address. The website automatically deletes uploaded files that are not retrieved after seven days. If the files are uploaded to the auto-populated email addresses they will not be received by the designated USACE recipients and the proposal will be considered late.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.
INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:
1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
Michael McCue at Michael.L.Mccue@usace.army.mil and Contracting Officer Nicholas Emanuel at Nicholas.P.Emanuel@usace.army.mil. The E- Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E-Mail address for both the Contracting Officer and Specialist. The Proposer can enter an additional E-Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Proposer can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS:
For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website as documented by the SAFE system. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website.
The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals.
Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
3.3 VOLUME 1– MINIMUM SUBMISSION CRITERIA (TECHNICAL PROPOSAL): For purposes of this RFP, an “Offeror” may include a group of two (2) or more entities that have formed a “contractor team arrangement,” as that term is defined in the Federal Acquisition Regulation, Part
9.6. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently- proposed contractor team arrangement, will be considered as a part of the evaluation of the Offeror’s proposal.
In the case of affiliates, past performance of an Offeror’s “affiliate,” as that term is defined in FAR 2.101, will be evaluated (as described within this section) if the Offeror demonstrates a firm commitment that the affiliate will participate meaningfully (e.g., roles, responsibilities, etc.) in the performance of the contract. This commitment, nature of each entity’s relationship and meaningful participation shall be described in a document signed by authorized representatives of both the Offeror and its affiliate. If a teaming agreement or commitment is not provided, the projects and experience of any team members outside of the Prime Offeror will not be considered.
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
The contractor team agreement/commitment shall be provided at the beginning of the Offeror’s technical proposal, prior to Factor 1, and will not be included in the overall page count.
The following are to be used in determining the status of the Offeror’s team for the evaluation of project submissions under Factor 1:
3.3.1 In the case of contractor team arrangements involving a Prime Contractor and Subcontractor(s), where the Prime Contractor submits the proposal in response to this RFP, the Prime Contractor is considered the “Prime Offeror”.
3.3.2 In the case of joint ventures, the “Prime Offeror” experience is limited to entities with signed agreements.
3.3.3 In the case of mentor/protégé relationships, the relationship must be established by the two Offerors and approved by the chosen Government Agency prior to proposal submission. The “Prime Offeror” experience is limited to entities with signed agreements. The approved mentor/protégé document from the Government Agency must be submitted along with the teaming agreement.
3.3.4 In the case of additional projects submitted by subcontractors, the subcontractor must submit the final cost of their portion of the project along with total project cost and all other required information.
3.3.5 In the case of Offerors that are large, multi-function firms (consisting of subsidiaries), experience may be submitted by any segment of the firm (e.g., division, group, and unit) that is submitting a proposal in response to this RFP.
3.3.6 In the case of affiliates, Past performance of an Offeror's "affiliate," as that term is defined in FAR 2.101, will be evaluated (as described within this section) if the Offeror demonstrates a firm commitment that the affiliate will participate meaningfully in the performance of the contract. This commitment and meaningful participation shall be described in a document signed by authorized representatives of both the Offeror and its affiliate.
3.3.7 If a teaming agreement or commitment is not provided, the projects of any team members outside of the Prime Offeror will not be considered. If the Joint Venture/Mentor Protégé is a Small and Large Business, the Small Business will be evaluated as the Prime Offeror.
4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS, RATINGS AND
ELEMENTS
The SSEB will evaluate the proposals and assign a consensus rating for the evaluation factor.
Offerors will be informed of the non-Government advisors who will assist in the evaluation, and Offerors will be informed that the non-Government advisors will not be involved with any related subsequent contract(s). The use of non-Government advisors will be strictly controlled.
Non-Government Advisor Contractor: Burns & McDonnell, Inc.
Non-Government advisors will be required to sign a Non-Disclosure Agreement for the Chrome Plating Facility Repair solicitation. Additionally, they shall also be required to submit documentation to the Procuring Contracting Officer (PCO) indicating their personal stock holdings for a conflicts of interest review in consultation with the legal advisor prior to being allowed access to source selection information.
The chairperson of the Source Selection Evaluation Board (SSEB) will monitor non-Governmental advisor activities while in the evaluation area. This support will be limited to specific tasks on an as needed basis, and only in those areas where Government expertise is not available. The non-Governmental advisors will perform their evaluation in a separate room to ensure that their review and resultant evaluation report is limited to the areas in which their expertise is required. The non-Governmental advisors will not provide ratings nor participate in any technical evaluation board proceedings nor discussions.
After the non-Government advisors have completed their particular area of evaluation, they will be
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only released from the evaluation process. All non-Government advisors will only have access to the information corresponding to their area(s) of expertise. They will not have access to the past performance or price sections of the proposal.
Firms are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to evaluate proposals. Firms should not assume that they will have an opportunity to clarify or correct anything in their proposal after submission. However, the Government reserves the right to hold discussions if it determines that discussions are necessary. Therefore, proposals should be submitted on the most favorable terms that the Offeror can submit to the Government. If discussions are necessary, the Contracting Officer reserves the right to limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
Determination of Competitive Range refers to the range of proposals that are identified as the most highly rated, unless the range is further reduced for the purposes of efficiency. Competitive range will be determined on the basis of the ratings of each proposal against all evaluation factors. The Government must then indicate to, or discuss with, each Offeror still being considered for award, significant weaknesses, deficiencies, and other aspects of its proposal. The Contracting Officer will notify all contractors eliminated from the competitive range.
If discussions are held, the Government may engage in a broad give and take with those firms in the competitive range, in accordance with FAR 15.306 (d). The Government will provide the Firm an advance agenda for the discussions. During discussions, the Government may ask the Firm to further explain its proposal and to answer questions about it.
Upon conclusion of discussions, those firms still considered within the competitive range, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.
4.1 VOLUME 1 – PERFORMANCE CAPABILITY
LOCATION FACTOR
NUMBER
DESCRIPTION RELATIVE
IMPORTANCE
Volume 1 Tab A Factor 1 Past Performance Technical factor 3 is the most important technical factor, followed by technical factor 1. All remaining technical factors (2, 4, & 5) are equal in importance and less than factor 1.
Volume 1 Tab B Factor 2 Proposed Contract Duration, Phasing & Summary Schedule
Volume 1 Tab C Factor 3 Technical Approach Volume 1 Tab D Factor 4 Organizational
Approach
4.2 VOLUME 2 – SMALL BUSINESS PARTICIPATION PLAN
DESCRIPTION RELATIVE
IMPORTANCE
Volume 2 TAB 1 Factor 5 Small Business Participation Plan
Technical factor 5 is equal in importance to technical factors 2 & 4. Volume 2 TAB 2 Factor 5 Past Utilization Of Small
Business
4.3 VOLUME 3 – PRICE
DESCRIPTION RELATIVE
IMPORTANCE
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
Vol 3 Factor 6 Price All technical factors (1-5) when combined are approximately equal in importance to price.
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
5.0 VOLUME 1 – PERFORMANCE CAPABILITY
GENERAL: The technical factors consist of examples of Past Performance that meet the relevant scope, complexity, and magnitude described below. This Volume also includes factors for a Proposed Contract Duration, Phasing & Summary Schedule, Organizational Approach, and Technical Approach.
DEFINITIONS:
• Deficiency: A material failure of a response or proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. (FAR 15.001)
• Weakness: A flaw in the response or proposal that increases the risk of unsuccessful contract performance.
• Significant Weakness: A flaw in the response or proposal that appreciably increases the risk of unsuccessful contract performance. Denoted with an (S).
• Strength: Any aspect of a proposal that, when judged against a stated evaluation criterion, enhances the merit of the proposal or increases the probability of successful performance of the contract.
• Significant Strength: A significant strength appreciably enhances the merit of a proposal or appreciably enhances the probability of successful contract performance. Denoted with an (S).
• Deviation: Proposal implies or specifically offers a deviation below the specified criteria. The Offeror may or may not have called the deviation to the Government's attention. A deviation is a deficiency. The proposal must conform to the solicitation requirements for award.
• Uncertainty: Any aspect of a non-cost/price factor response or proposal for which the intent of the offer is unclear (e.g. more than one way to interpret the offer or inconsistencies in the response or proposal indicating that there may have been an error, omission, or mistake).
EVALUATION RATING SYSTEM
• General: The Government will review the proposals and rate the quality of each evaluation factor. The SSEB will rate each proposal against the specified evaluation criteria in the Solicitation requirements. They will not compare proposals at this time. After all proposals are rated, the Government will compare the ratings and relative advantages and disadvantages of proposals against each other.
• Review Write-up: The Government will support each rating with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.
• Rating System: After listing proposal strengths, weaknesses and deficiencies, the SSEB will assign an adjective rating of "Outstanding", "Good", "Acceptable", "Marginal", or "Unacceptable" to each factor except the Past Performance Factor, which reflect the Government's confidence in each Offeror's ability, as demonstrated in its proposal, to perform the requirements stated in the RFP. The adjectival ratings shall be assigned, using the evaluation criteria, which incorporate a proposal risk assessment:
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
5.1 VOLUME 1 – FACTOR 1 – PAST PERFORMANCE
The Offeror will provide Past Performance information on relevant projects using the Past Performance and Specialized Experience Questionnaires included in the solicitation. Contractor Performance Assessment Reporting System (CPARS) shall be submitted for projects, when available. Your client should receive form ATTACHMENT 2 – PAST PERFORMANCE QUESTIONNAIRE (PPQ) with items 1 through 4 completed and the “Note” that appears on its reverse side as well as the “Adjective Rating and Definitions” that are used for the ratings in the form.
Ensure correct phone numbers and email addresses are provided for the client point of contact.
Completed Past Performance Questionnaires should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ form, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Contract Specialist prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Also include performance recognition documents received within the last five (5) years such as award fee determinations, customer letters of commendation, and any other forms of performance recognition.
The Government reserves the right to verify the experience by reviewing the Construction Contractor (or Architect-Engineer) Performance Assessment Reporting System (CPARS), other DoD or Government appraisal systems or to interview commercial owners or references. The Government may check any or all cited references to verify supplied information. The relevant experience of key personnel proposed for this project will not be evaluated or considered under this factor.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
The source selection evaluation team will review this past performance information and determine the quality and usefulness as it applies to a performance competence assessment as described in the guidelines, below.
Less than satisfactory performance information includes the issuance of cure notices, terminations for default, or the requirement for excessive oversight in order to achieve satisfactory completion. A single example of less than satisfactory performance, if significant enough, may lead to a less than satisfactory rating for this factor. Likewise, multiple examples of less significant less than satisfactory performance may lead to a less than satisfactory rating for this factor.
In conducting the performance competence assessment, the Government will consider the relevancy of the past performance information available. Highly relevant projects are those that are similar in scope, magnitude, and complexity to the current solicitation, although the past performance may still be considered if the projects do not fully meet the criteria for Factor 1.
In addition, the Offeror is required to provide any information on past projects (within the past five (5) years) that were terminated (for any reason) or in which they have been issued a CURE NOTICE and provide accompanying information as to the details for such action(s) with an explanation of why they were terminated or issued a cure notice.
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
5.1.1 EVALUATION CRITERIA
The SSEB will evaluate the risks associated with an Offeror’s likelihood of success in performing the requirements stated in the RFP based on the Offeror’s demonstrated performance on recent, relevant contracts. A performance confidence assessment rating will be assigned to each past performance.
Rating Guidelines for Factor 1: Refer to the Table is section 5.1.3
NOTE: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (or “neutral confidence”) past performance.
5.1.2 RELEVANT PAST PERFORMANCE
The Offeror will be evaluated on the relevancy of the past performance demonstrated in the submitted form, ATTACHMENT 3 - SPECIALIZED EXPERIENCE. The Offeror must list their experience of similar project scope, complexity and magnitude.
Submit a minimum of two (2) projects but no more than three (3) projects that have been completed and turned over or at least 75% construction complete. All the submitted projects shall be recent construction experience which means that completion should be no more than twelve (12) years preceding the date of this solicitation. The projects shall meet the descriptions of scope, complexity and magnitude as outlined below. At least one (1) project must be the repair of chrome plating facilities or a chemical, industrial or manufacturing facility. Other projects submitted must predominately relate to industrial engineering (e.g., construction of an office building or a levy will not be accepted).
If any firm has multiple divisions, limit the project examples to those performed by the division submitting the offer.
Letters of commitment (Signed by both the Subcontractor and Offeror) are required in order for the Government to consider Subcontractor experience in the proposal evaluation. Other divisions within the Offer’s company may be considered as subcontractors for the submitting division.
The projects submitted should include the following criteria. Projects do not have to include all of the criteria; however, projects that meet many or all of the criteria would be given a higher degree of relevancy.
i. Similar scope is defined as repair of chrome plating facilities or a chemical, industrial or manufacturing facility.
ii. Demonstrate the specialized experience of the Offeror and/or proposed team, including sub-contractors, on projects the same/similar in size complexity, and magnitude as those described in the solicitation for same/similar construction services. Emphasis shall be placed on renovation projects involving fully operational processing facilities, to include tank lines and associated equipment for chemical cleaning and/or plating processes or fully operational heavy industrial facilities, to include fuel processing facilities, paint/paint facilities or other specialized industrial processing facilities, during construction. If using subcontractors as part of the proposed team to demonstrate experience, describe the role they will play in this project and the percentage of work to be performed.
iii. Similar complexity is defined as repair of a Chrome Plating Facility and all
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only supporting activities associated (e.g., electric, mechanical, controls) in an occupied facility. This includes demonstrating the management and coordination of a multi-disciplined construction team.
iv. Similar magnitude shall be considered for Chrome Plating Facility repairs greater than $10,000,000 or similar repair/construction projects greater than $15,000,000. Offeror’s shall provide cost to each construction project submitted for consideration.
The Government will consider the experience demonstrated by the projects in its evaluation. Proposals will be highly rated when the Offeror demonstrates extensive experience in all or nearly all of the aspects defining relevance and listed below. Where this experience includes the following, the proposal may be given additional consideration (the following list does not encompass all possible items for which additional consideration may be given):
i. The Offeror acted as a prime contractor in the majority of the example experiences.
ii. More than one (1) recent relevant experience is repair of a large Chrome Plating facility.
iii. The majority of the example experiences are projects performed at Watervliet Arsenal or with the U.S. Army Corps of Engineers.
iv. The majority of the experiences are projects performed within the last three years.
v. The experiences demonstrate previous experience between current proposal team members.
vi. Chrome Plating Facility, chemical, industrial or manufacturing facility repair construction projects greater than $15,000,000.
Where this experience includes the following, the proposal may be given less consideration (the following list does not encompass all possible items for which less consideration may be given):
i. Few or no projects are provided where the Offeror acted as Prime contractor.
ii. Chrome Plating Facility repair construction projects were less than $10,000,000 or similar large chemical, industrial or manufacturing construction projects were less than $15,000,000
iii. Example experiences where the Offeror or their proposed subcontractor were subcontractors and their role was minor in comparison to the whole project.
iv. Example projects were performed by a Division of the company other than the Division submitting the offer.
v. Example experiences are from proposed subcontractors in lieu of the Offeror.
vi. The example experiences do not demonstrate previous teaming experience between current proposal team members.
vii. Experience examples are not verifiable.
5.1.3 RATING GUIDELINES FOR FACTOR 1
PAST PERFORMANCE RELEVANCY RATINGS
RATINGS DESCRIPTION
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
PAST PERFORMANCE (CONFIDENCE ASSESSMENT RATING SYSTEM)
Past Performance Risk Ratings assess the risks associated with an Offeror's likelihood of success in performing the requirements stated in the RFP based on the Offeror's demonstrated performance on recent, relevant contracts. Performance Confidence Assessment (Overall) Rating System:
PERFORMANCE CONFIDENCE ASSESSMENT
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the
Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Based on the Offeror’s recent relevant performance record, the Government will make a determination as to the expectation that the Offeror will successfully perform the required effort. A performance confidence assessment rating will be assigned.
Where no recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the Offeror will receive a Neutral Confidence (neutral) rating. This rating is neither favorable nor unfavorable.
5.2 VOLUME 1 – FACTOR 2 – PROPOSED CONTRACT DURATION, PHASING, AND SUMMARY
SCHEDULE
Submit a summary level schedule for the Chrome Plating Facility repair construction project. The schedule must be task oriented, indicating number of calendar days, after notice to proceed, by which milestones are to be achieved. Schedule pages must be legible on 11x17 sheets of paper. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10: Project Schedule shall have the same minimal requirements described herein. The length of the schedule can match the proposed contract duration but not exceed
Source Selection Plan
W912DS21R0002
Unclassified/For Official Use Only
it. If it is shorter than the proposed contract duration, it is binding. The schedule at a minimum shall include the following activities.
i. Design/Post Award Kick-Off Meeting
ii. Preconstruction submittals and Design Transmittals
iii. Manufacture and delivery of major components (ie. Air Scrubber)
iv. Onsite Mobilization
v. Start and End of Phase 1 Construction
vi. Commissioning of Phase 1
vii. Start and End of Phase 2 Construction
viii. Commissioning of Phase 2
ix. Start and End of Phase…