43 41 23-AM0004.pdf

PDF 39 KB Posted

Attached to
Chrome Plating Facility Repair Project, Watervliet, NY
Solicitation number
W912DS21R0002
Issued by

About this file

This solicitation is for a Chrome Plating Facility Repair Project at Watervliet Arsenal in Watervliet, New York. The scope of work involves in-kind repair and replacement of major components in the large caliber chrome plating area, including chrome plating tanks, electropolish tanks, caustic clean and strip tanks, rectifiers, and cold water rinse tanks divided between two plating lines. Work will address deficiencies such as tank wall corrosion beyond service life, corroded piping systems, and nonfunctional pumps and controls. Both plating lines and a common air scrubber will be rebuilt. The period of performance is 720 calendar days from notice to proceed. The estimated cost range is $10-25 million. The NAICS code is 236210 and the soliciting agency is the Department of the Army Corps of Engineers New York District. The solicitation number is W912DS21R0002 and responses are due per the SAM website, where registration is required.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chrome Plating Facility 100% Design Watervliet Arsenal, Watervliet, NY

SECTION 43 41 23

REPLACEMENT OF CARBON STEEL TANKS

02/11

Amendment 0003

Amendment 0003* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASME I NTERNATI ONAL ( ASME)

ASME B16. 5 ( 2013) Pi pe Fl anges and Fl anged Fi t t i ngs:

NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d

ASTM I NTERNATI ONAL ( ASTM)

ASTM C581 ( 2003; E 2008; R 2008) St andar d Pr act i ce f or Det er mi ni ng Chemi cal Resi st ance of Ther moset t i ng Resi ns Used i n Gl ass- Fi ber - Rei nf or ced St r uct ur es, I nt ended f or Li qui d Ser vi ce

ASTM D5948 ( 2005; R 2012) St andar d Speci f i cat i on f or Mol di ng Compounds, Ther moset t i ng

BRI TI SH STANDARDS I NSTI TUTE ( BSI )

BS EN 13121- 3 ( 2008; AMD 2012; AMD 2011) GRP Tanks and Vessel s f or Use Above Gr ound — Par t 3:

Desi gn and Wor kmanshi p

I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)

I SO 7005- 2 ( 1988) Met al l i c Fl anges Par t 2: Cast I r on Flanges

NATI ONAL AERONAUTI CS AND SPACE ADMI NI STRATI ON ( NASA)

RCBEA 2. 63 ( 2004) Tank and St or age Tank Un- pr essur i zed

RCBEA GUI DE ( 2004) NASA Rel i abi l i t y Cent er ed Bui l di ng and Equi pment Accept ance Gui de

1. 2 ADMI NI STRATI VE REQUI REMENTS

1. 2. 1 Pr econst r uct i on Requi r ement s

1. 2. 1. 1 Fabr i cat i on Dr awi ngs

Submi t f i el d f abr i cat i on dr awi ngs f or car bon st eel t anks, i ncl udi ng const r uct i on and anchor age det ai l s, 30 days pr i or t o st ar t of const r uct i on

SECTION 43 41 23 Page 1 AMENDMENT 0003AMENDMENT 0004

Amendment 0004 work.

1. 2. 1. 2 I nst al l at i on Dr awi ngs

Submi t i nst al l at i on dr awi ngs f or car bon st eel t anks i ncl udi ng al l anchor age det ai l s 30 days pr i or t o st ar t of const r uct i on wor k. Al so submi t equi pment dat a i ncl udi ng equi pment wei ght and oper at i ng l oads, hor i zont al and ver t i cal l oads, sei smi c dat a, l ocat i on and pr oj ect i on of anchor bol t s, hor i zont al and ver t i cal c l ear ances f or i nst al l at i on, pl an di mensi ons of r el at i ve el evat i ons, and ot her i nst al l at i on r equi r ement s such as ut i l i t y ser vi ces.

Al so i ncl ude i n submi t t al coor di nat i on dr awi ngs showi ng t he pr ocesses, st r uct ur al , and ar chi t ect ur al el ement s of t he wor k. I ndi cat e wher e conf l i c t s or c l ear ance pr obl ems exi st bet ween t he var i ous f unct i ons.

Cl ear l y show on dr awi ngs:

a. Mat er i al , equi pment , and f i xt ur e l i s t s i ncl udi ng speci f i cat i on and dr awi ng r ef er ence number s, war r ant y i nf or mat i on, and f abr i cat i on s i t e.

b. Const r uct i on equi pment l i s t s consi st i ng of pr oposed const r uct i on equi pment t o be used i n t he pr oj ect , i ncl udi ng descr i pt i ve dat a.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00. 10 10

DI GI TAL SUBMI TTAL PROCEDURES AND CORRESPONDENCE:

SD- 01 Pr econst r uct i on Submi t t al s

Mat er i al , Equi pment , and Fi xt ur e Li st s; G

Const r uct i on Equi pment Li st s; G

Li st i ng of Pr oduct I nst al l at i on; G

SD- 02 Shop Dr awi ngs

Fabr i cat i on Dr awi ngs; G

I nst al l at i on Dr awi ngs; G

SD- 03 Pr oduct Dat a

Equi pment and Per f or mance Dat a; G

St or age Tanks; G

Accessor i es; G

SD- 05 Desi gn Dat a

Desi gn Anal ysi s and Cal cul at i ons; G

SD- 06 Test Repor t s

Chemi cal Resi st ance Test s; G

SECTION 43 41 23 Page 2 AMENDMENT 0003AMENDMENT 0004

Tank I nt egr i t y; G

Hydr ost at i c Test s; G

SD- 07 Cer t i f i cat es

Cer t i f i cat es of Conf or mance; G

Installers

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Fabr i cat or ' s Fi el d Repor t s; G

SD- 11 Cl oseout Submi t t al s

Recor d Dr awi ngs; G

1. 4 QUALI TY ASSURANCE

Submi t l i s t i ng of pr oduct i nst al l at i on f or car bon st eel t anks i dent i f y i ng at l east f i ve uni t s, s i mi l ar t o t hose pr oposed f or use, t hat have been i n successf ul ser vi ce f or a mi ni mum of f i ve year s. I dent i f y f abr i cat or , addr ess of i nst al l at i on, ser vi ce or gani zat i on, and dat e of i nst al l at i on.

30 days pr i or t o commencement of wor k, submi t cer t i f i cat es of conf or mance ver i f y i ng compl i ance wi t h t he st andar ds and speci f i cat i ons f or t he f ol l owi ng i t ems:

a. Car bon st eel t anks

b. Fabr i cat or

PART 2 PRODUCTS

2. 1 FABRICATION

Tanks shal l be const r uct ed of ei t her A572 car bon st eel 3/ 8- i nch pl at e or A53, API 5L Gr ade B car bon st eel pi pe as i ndi cat ed on t ank det ai l s and schedul es. Al l wel ds shal l be c l eaned. Fi ni shed t anks shal l be f r ee f r om bur r s and shar p edges i nsi de and out . Seams and j oi nt s bet ween t ank pl at es and r ei nf or cement shal l be caul ked wi t h a t wo- par t pol ysul f ami de seal ant i n bet ween wel ds i n or der pr ovi de a cont i nuous seal .

2. 2 CHEMI CAL RESI STANCE REQUI REMENTS

Submi t t est r epor t s f or t he f ol l owi ng:

Tank i nt egr i t y

2. 3 CAPACI TY AND DI MENSI ONAL REQUI REMENTS

See t ank schedul e l ocat ed on dr awi ng M- 0602. Maxi mum def l ect i on of s i de wal l and bot t om of t ank shal l be 0. 125 i nches.

SECTION 43 41 23 Page 3 AMENDMENT 0003AMENDMENT 0004

2. 4 ACCESSORIES

2. 4. 1 Out l et Nozzl es

Pr ovi de si ngl e f l anged out l et connect i ons per dr awi ng M- 0501.

2. 4. 2 Tank Li ner s

Wher e i ndi cat ed on t he t ank schedul e, t anks shal l i ncor por at e l i ner s per speci f i cat i on 43 41 19 TANK LI NERS.

2. 4. 3 Mi scel l aneous Har dwar e

Pr ovi de al l r equi r ed bol t s, nut s, washer s, ot her f ast ener s and f ast ener har dwar e r equi r ed f or t ank i nst al l at i on. Fast ener mat er i al shal l mat ch t he chemi cal r esi st ance of t he pi pe mat er i al f or t he r espect i ve t anks.

2. 4. 4 I dent i f i cat i on Pl at e

Pr ovi de phenol i c- pl ast i c i dent i f i cat i on pl at e st at i ng t ank number , pr ocess name and t emper at ur e, wi t h l et t er s at l east 1 i nch hi gh. Submi t sampl e t ank i dent i f i cat i on pl at e t o Gover nment f or appr oval .

PART 3 EXECUTI ON

3. 1 REPLACEMENT OF CARBON STEEL TANKS

Pr i or t o demol i t i on, submi t demol i t i on pl an t o cont r act i ng of f i cer . Tanks wi l l be demol i shed i n pl ace whi l e mai nt ai ni ng t he i nt egr i t y of adj acent equi pment and st r uct ur e t hat i s not t o be r emoved. Tank suppor t st r uct ur e wi l l r emai n unl ess not at ed di f f er ent l y on dr awi ngs or i n st r uct ur al specifications.

Pr i or t o i nst al l at i on of new t anks, ver i f y t hat al l equi pment suppor t s and f oundat i ons ar e i n pl ace, compl et e and r eady t o r ecei ve t anks.

Pr ovi de al l necessar y equi pment t o i nst al l t anks i ncl udi ng but not l i mi t ed t o t r ucks, ski ds, l i f t s , hoi st s, j acks, chai ns, and hand t ool s. Pr ovi de al l r equi r ed har dwar e, st eel and mi scel l aneous mat er i al s r equi r ed t o i nst al l t anks as i ndi cat ed on dr awi ngs. Pr ovi de har dwar e i ncl udi ng but not l i mi t ed t o bol t s, nut s, washer s and shi ms wi t h chemi cal r esi st ance mat chi ng t he pi pi ng mat er i al f or each r espect i ve t ank.

3. 1. 1 Repl acement of Emer gency Tank 212

Tank 212 wi l l be demol i shed i nt o pi eces of manageabl e s i ze t o r emove f r om t he l owest l evel t o above gr ade wi t h t he l east amount of di st ur bance t o t he sur r oundi ng ar ea. Coor di nat e r emoval of t ank wi t h onsi t e per sonnel and cont act i ng of f i cer .

Tank wi l l be f abr i cat ed i n pl ace. Coor di nat e conveyance of new car bon st eel t ank member s t o l owest l evel wi t h onsi t e per sonnel and cont r act i ng officer.

3. 1. 2 Repl acement of Chr ome Pl at i ng Tanks 207 and 307

Tanks wal l be demol i shed and i nst al l ed i n a manner t hat mai nt ai ns st r uct ur al i nt egr i t y of t he exi st i ng beam webs. No mor e t han an 8 f oot by 8 f oot sect i on of car bon st eel t ank wal l shal l be r emoved at a t i me

SECTION 43 41 23 Page 4 AMENDMENT 0003AMENDMENT 0004 wi t hout bei ng r epl aced. Exi st i ng wel ds t o beam webs shal l be cut and cl eaned t o al l ow f or new wel ds t o be appl i ed bet ween exi st i ng beams and new sheet st eel .

Exi st i ng bot t om of t ank shal l r emai n wi t h new Car bon st eel pl at e af f i xed t o exi st i ng bot t om i n a manner t hat wi l l ensur e no f ut ur e movement .

3. 1. 3 Repl acement of Ful l Pi t Hei ght Round Tanks

Tanks wi l l be r emoved up t hr ough f l oor by use of shop cr ane and cut above shop f l oor i nt o a maxi mum of f our segment s. Lengt h of segment cut s wi l l be coor di nat ed wi t h hook cl ear ance hei ght of shop cr ane. Suppor t of r emai nder of t ank dur i ng r emoval of each sect i on wi l l be coor di nat ed so as t o avoi d damage t o sur r oundi ng ar ea and equi pment .

Tanks wi l l be i nst al l ed i n a s i mi l ar manner t o t hei r demol i t i on af t er f oundat i ons and suppor t s ar e admi ni st er ed t o i n accor dance wi t h st r uct ur al specifications.

3. 2 HYDROSTATI C TEST

Af t er t ank has been i nst al l ed, bef or e pi pi ng connect i ons ar e made and equi pment at t ached, bl ock out l et s and f i l l s t r ai ght - shel l por t i on wi t h wat er . Per f or m hydr ost at i c t est s t o det er mi ne i f l eak pr oof st or age i s pr ovi ded, and cor r ect def i c i enci es.

Submi t wr i t t en f abr i cat or ' s f i el d r epor t s of al l t est dat a made at t he j ob s i t e f or r evi ew and f i nal appr oval no l at er t han 30 cal endar days pr i or t o cont r act compl et i on. Repai r or r epl ace unsat i sf act or y t anks and r et est at no addi t i onal cost t o t he Gover nment unt i l l eak pr oof syst ems ar e obt ai ned.

3. 3 CLEANING

Af t er i nst al l at i on has been compl et ed and pi pi ng connect i ons have been made, c l ean t ank and nozzl es i n accor dance wi t h manuf act ur er ' s instructions.

Tanks shal l be c l eaned t o r emove al l oi l s , gr eases, and di r t . Tanks shal l be f i l l ed t o desi gn capaci t y wi t h a c l eani ng sol ut i on of 15 per cent by vol ume Br ul i n 815GD or appr oved equal . Tanks shal l t hen be heat ed t o 150 degr ees F f or one hour . Af t er c l eani ng t anks shal l be r i nsed unt i l c l eani ng sol ut i on has been r emoved. Thi s pr ocess shal l be r epeat ed unt i l al l oi l s , gr ease and di r t ar e r emoved.

The heat ed cl eani ng sol ut i on shal l be t r ansf er r ed t o non- heat ed t anks i n or der t o c l ean t hose t anks as wel l . Repeat t he pr ocedur e ment i oned above.

3. 3. 1 Disposal

Spent c l eani ng sol ut i ons shal l be cool ed t o 110 degr ees F and dr ai ned t o t he i ndust r i al wast e sumps.

3.4 INSPECTION

I nspect i nst al l ed t anks f or i ndi cat i ons of def ect i ve wor kmanshi p or i mpr oper i nst al l at i on pr act i ces. Repai r or r epl ace al l f aul t y const r uct i on and damaged wor k at no addi t i onal cost t o t he Gover nment .

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0003

SECTION 43 41 23 Page 5 AMENDMENT 0003AMENDMENT 0004

-- End of Section --

SECTION 43 41 23 Page 6 AMENDMENT 0003AMENDMENT 0004

File details come from the government source that posted it. Updated .