This pre-solicitation notice describes an upcoming Invitation for Bids for repairs and improvements to twelve buildings at Camp Buckner in West Point, New York. The U.S. Army Corps of Engineers, New York District will seek to award a firm-fixed price contract between $10-25 million to address structural integrity, building envelope, life safety, and health concerns. Work will include hazardous material abatement, HVAC and broadband installation, plumbing and lighting upgrades, and utility infrastructure repairs. The IFB is anticipated to be issued on December 10-15, 2020 with bids due approximately 30 days later. A site visit is scheduled for December 16-18, 2020 and contract performance is 400 calendar days from notice to proceed. The NAICS code is 236220 and bids must be submitted electronically as instructed in the solicitation. The procurement will be a 100% small business set-aside and questions must be submitted in writing to the listed contract specialist by email.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

-- Reduce the percentage amount to 20% in Clause 52.236-1 -- Make some changes to the Specifications -- Provide Government's responses to Bidders' inquiries (for Informational Purposes only) -- Replace the Wage Rates w ith the most current issue dated 01/01/2021 The Bid Opening Date is 19 January 2021 at 2:00 pm EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 38

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0005

X 9B. DATED (SEE ITEM 11)

18-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jan-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

AMENDMENT 0003

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

a. None

2. The following DRAWINGS have been REVISED but NOT REISSUED:

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

a. 00 22 20

b. 00 24 00

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

4. The following SPECIFICATIONS SECTIONS have been REVISED but NOT REISSUED:

a. 01 91 00.15 10

i. Remove Appendix C - Design Phase Commissioning Plan (pg. 419-436 of 1199)

GOVERNMENT’S RESPONSES TO BIDDERS’ INQUIRIES

(FOR INFORMATIONAL PURPOSES ONLY):

Q&A number

Bidder Inquiry Number

Comment Response

1 8974920 There is a discrepancy in the bid date:

One place it says to Submit Bids no later than 2:00 PM EST on 19 January 2021 (or as amended) an then in Section 13 it says to submit bid on __1_5_ _Ja_n_ _2_0_2_1___ (date).

The correct Bid Due Date is 19 January 2021 at 2:00 PM EST. Section 13 is incorrect.

2 8978606 Spec section 00 24 00 "evaluation factors for award, 1.1 states "to be provided by contracting division 12 the solicitation".

We do not see this information in the solicitation. Please provide the evaluation factors for award.

Spec Section 00 24 00 and 00 22 20 will be deleted from the specs.

Spec section 00 24 00 "evaluation factors for award" will not be used as this is an Invitation For Bid and not a Request For Proposal.

Additionally Spec section 00 22 20 "Proposal Submission Requirements and Instructions" Will also not be used as this is an Invitation For Bids.

3 8978629 spec sect 01 91 00.1510 "Total Building Commission" in 1.1 summary states "employ the services of an independent commissioning firm". Throughout this spec section, it reads as the contractor is to hire the commissioning agent. At the end of the section there is a design phase commissioning plan and on page 7 it defines the commissioning authority as an entity identified by the owner who plans, schedules and coordinates the commissioning team to implement the commissioning process.

Please verify if the owner or contractor hires the commissioning authority

Contractor shall hire an independent Commissioning Authority. Appendix C, Design phase commissioning plan will be removed from spec section 01 91 00.1510 in this amendment.

4 8978608 Page 39 of the solicitation requires the contractor to perform on site with its own organization, work at least 40% of the total amount of work to be performed under the contract. Please confirm 40% of the work will have to be performed by the contractor

The percentage of work required to be performed by the contractor will be reduced to 20 percent.

52.236-1 PERFORMANCE OF WORK

BY THE CONTRACTOR will be amended to state the following:

52.236-1 PERFORMANCE OF WORK

BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract.

This revision is included in this amendment.

5 8981008 Drawing S-501 "Concrete repair notes" B Repair of spalled surfaces - contractor to include costs for 900 SF of concrete surface repair C. repair of large cracks - contractor shall include costs for 800 LF of routing existing slab cracks & filling with epoxy.

D. surface applied crack healer - contractor to include costs for 14400 SF of concrete surface repair E. Abandoned existing penetration infill -contractor shall include costs for 240 infills Please advise if these quantities are for entire project and if so, how do they get divided between base bid #1 the barracks and base bid #2 the latrines?

The repair quantities are for the entire project. Of the twelve buildings three are latrines and nine are barracks so assume 3/12ths or 1/4th of the repairs will be in the latrines (base bid #2) and 3/4ths will be in the barracks (base bid #1).

6 8981849 Drawing A-302 - Detail D1/A-302

STATES THAT " 6" Z- GIRT AT 16" O.C

MECHANICALLY FASTEN TO TOP

FLANGE OF RAFTER" NEED THE

CLARIFICATION FOR THE

FOLLOWING ITEMS:

• WHAT IS THE LENGTH OF Z- GIRT.

• WHAT IS THE INTERVAL OF

RAFTER

• SIZE AND DETAIL OF METAL

STRAPING @ 24" OC

MECHANICALLY FASTENED.

• DRAWING A-101 DOES NOT SHOW

ANY PARTITION TYPE., IS THERE

ANY PARTITIONS ?

• WHAT IS THE LENGTH OF Z- GIRT.

Response: Z-girts span from rafter to rafter, which are located on the column lines.

• WHAT IS THE INTERVAL OF

RAFTER

Response: This varies slightly based off of column line intervals, but typically it's 20'.

• SIZE AND DETAIL OF METAL

STRAPING @ 24" OC

MECHANICALLY FASTENED.

Response: ¾" x .020", Strapping is to support the insulation.

• DRAWING A-101 DOES NOT SHOW

ANY PARTITION TYPE., IS THERE

ANY PARTITIONS ?

Response: Interior Partitions are noted on the plan (the only interior partitions for the sleeping quarters are the walls at the utility room, office, and wall dividing the Men/Women. These partition types, as well as the partition key, can be found on A-601.

7 8981863 Existing Corrugated Metal - Please clarify name of this component and distance to each other. (Also, see attached File - RFI 1

Area above insulation is a void between the insulation and metal roof. The insulation spans between the Z-girts, which sit on and are fastened to the top flange of the existing rafter/beam. This leaves a couple inches (field verify dimension) between the top of the Z-girt and the metal roof. See the bottom left image on G-003 for the existing rafter/beam condition.

8 8984050 Block 10 specifies the bid due date is 1/19/21 @ 2:00pm but Block 13 indicates 1/15/21 @ 2:00pm. Please clarify.

The correct Bid Due Date is 19 January 2021 at 2:00 PM EST. Block 13 is incorrect.

9 8984055 Site Visit - Would it be possible to schedule a second site visit after New Years?

A second site visit will be held on 8 January 2021 at 1:00pm.

10 8984394 Refer to drawing A601 – detail E8 shows Spray foam fire proofing. Is there a section for this item.

There is no spray foam on the project.

Detail E8 is a standard detail diagram to show partition continuity.

WAGE RATES 01/01/2021

General Decision Number: NY20210007 01/01/2021

Superseded General Decision Number: NY20200007

State: New York aed 01/04/2021

Construction Types: Building, Heavy and Highway

Counties: Dutchess, Orange, Sullivan and Ulster Counties in New York.

BUILDING CONSTRUCTION PROJECTS FOR ALL COUNTIES EXCEPT

SULLIVAN (does not include single family homes and apartment up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021

* ASBE0040-003 05/01/2020

SULLIVAN AND ULSTER COUNTIES

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials whether they contain asbestos or not from mechanical systems..........$ 36.36 22.76 Insulator/asbestos worker

(includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)....................$ 36.36 22.76

ASBE0091-002 05/27/2019

DUTCHESS AND ORANGE COUNTIES

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation materials;

whether they contain asbestos or not from mechancial systems..........$ 42.62 40.85 Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)....................$ 42.62 40.85

BOIL0005-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 55.23 33%+24.12+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0005-001 06/01/2019

Rates Fringes

BRICKLAYER (BUILDING

CONSTRUCTION)

DUTCHESS, ORANGE

(Excluding the town of

Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.09 34.50 ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.59 34.50

BRICKLAYER (HEAVY

CONSTRUCTION)

DUTCHESS, ORANGE

(Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 41.31 33.94 ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.59 34.50

BRICKLAYER (HIGHWAY

CONSTRUCTION)

DUTCHESS, ORANGE

(Excluding the town of Tuxedo), SULLIVAN and

ULSTER COUNTIES

Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.59 34.50

CARP0279-005 07/01/2019

Rates Fringes

Carpenters:

BUILDING CONSTRUCTION

Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08

CARP0740-002 07/01/2020

DUTCHESS AND ORANGE COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 44.25 39.91

CARP1556-005 07/01/2020

DUTCHESS AND ORANGE COUNTIES

Rates Fringes

Diver Tender.....................$ 50.34 51.79 Diver............................$ 70.80 51.79 Dock Builder & Piledrivermen.....$ 55.93 51.79

ELEC0363-001 04/01/2020

Rates Fringes

ELECTRICIAN

DUTCHESS (Remaining Townships), ULSTER AND SULLIVAN COUNTIES...........$ 42.00 3%+32.36+a ORANGE and DUTCHESS (Townships of Fishkill, East Fishkill and Beacon) COUNTIES....................$ 46.00 3%+32.36+a

FOOTNOTE:

a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ELEC1249-002 05/06/2019

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION-LIGHTING AND

TRAFFIC SIGNAL INCLUDING ANY

AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC

SIGNAL SYSTEMS, AND TRAFFIC

MONITORING SYSTEMS, ROAD

WEATHER INFORMATION SYSTEMS)

Flagman.....................$ 27.77 6.75%+24.15 Groundman (Digging Machine Operator)...................$ 41.65 6.75%+24.15 Groundman (Truck Driver)....$ 37.02 6.75%+24.15 Groundman Truck Driver (Tractor Trailer Unit)......$ 37.02 6.75%+24.15 Lineman and Technician......$ 46.28 6.75%+24.15 Mechanic....................$ 37.02 6.75%+24.15

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-004 05/06/2019

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 31.23 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Groundman Truck driver.....$ 41.64 6.75%+24.15 Lineman and Technician.....$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Substation:

Cable Splicer..............$ 57.26 6.75%+24.15 Flagman....................$ 31.23 6.75%+24.15 Ground man truck driver....$ 41.64 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Lineman & Technician.......$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 58.71 6.75%+24.15 Flagman....................$ 32.02 6.75%+24.15 Groundman Digging Machine Operator...................$ 48.03 6.75%+24.15 Groundman Truck Driver (tractor-trailer unit).....$ 42.70 6.75%+24.15 Groundman Truck Driver.....$ 42.70 6.75%+24.15 Lineman & Technician.......$ 53.37 6.75%+24.15 Mechanic...................$ 42.70 6.75%+24.15

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-005 05/06/2019

SULLIVAN COUNTY

Rates Fringes

ELECTRICIAN (LIGHTING AND

TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER

OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEM,

TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION

SYSTEMS.)

Flagman.....................$ 27.00 6.75%+24.15 Groundman (Digging Machine

Operator)...................$ 40.50 6.75%+24.15 Groundman (Truck Driver)....$ 36.00 6.75%+24.15 Groundman Truck Driver (tractor trailer unit)......$ 36.00 6.75%+24.15 Lineman & Technician........$ 45.00 6.75%+24.15 Mechanic....................$ 36.00 6.75%+24.15

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-008 01/01/2019

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 32.78 3%+4.93 Groundman..................$ 16.49 3%+4.93 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 31.12 3%+4.93 Tree Trimmer................$ 25.79 3%+9.98+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0138-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 60.49 34.765+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0106-004 07/01/2018

NORTHERN PART OF DUTCHESS (To The Northern Boundary line of the City of Poughkeepsie)

Power Equipment Operator

HEAVY & HIGHWAY

GROUP 1....................$ 43.47 26.05+a GROUP 2....................$ 42.56 26.05+a GROUP 3....................$ 39.99 26.05+a GROUP 4....................$ 47.47 26.05+a GROUP 5....................$ 46.47 26.05+a GROUP 6....................$ 45.47 26.05+a GROUP 7....................$ 45.08 26.05+a

POWER EQUIPMENT OPERATORS HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage

Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day

ENGI0106-008 07/01/2018

NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE

CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION

Power equipment operators:

GROUP A(1)..................$ 43.79 25.70+a 1..........................$ 45.04 25.70+a 2..........................$ 46.04 25.70+a GROUP A.....................$ 43.30 25.70+a GROUP B.....................$ 42.28 25.70+a GROUP C.....................$ 39.38 25.70+a

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

FOOTNOTE:

a. Paid Holiday: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP A(1): Crane Premiums

1 over 150' :add $1.00 2 over 200': add $2.00

GROUP A: Shovel, All excavator (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under).

GROUP B: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hosting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller.

GROUP C: Fork lift, high lift, lull, Oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps.

ENGI0137-001 03/06/2017

DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)

BUILDING CONSTRUCTION

GROUP 1A....................$ 53.95 28.52+a GROUP 1B....................$ 49.68 28.52+a GROUP 2A....................$ 52.03 28.52+a GROUP 3A....................$ 50.11 28.52+a GROUP 3B....................$ 47.67 28.52+a GROUP 4A....................$ 49.60 28.52+a GROUP 4B....................$ 41.85 28.52+a GROUP 5.....................$ 45.17 28.52+a GROUP 5A....................$ 56.63 28.52+a GROUP 5B....................$ 42.83 28.52+a GROUP 6.....................$ 44.92 28.52+a

NOTES: Hazmat: 20% above regular rate Pumping operation Premium .50

Crane Operators (100-149 ft) 2.00

Crane Operators (149 ft +) 3.00

Loader Operators (over 5 cu y) .50 Shovel Operators (over 4 cu yd)1.00

FOOTNOTE:

a. New Years Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day, Christmas Day, plus Lincoln's Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day, Veteran's Day.

POWER EQUIPMENT OPERATORS CLASSIFICATION

GROUP 1-A: Carrier- trailer horse; concret-portable hoist;

crane & hoist engineer-steel (concrete, material, super structure sub- structure); derrick (stone-steel); elevator & cage; hoist- single/double or triple drum; hoist-portable mobile unit; hoist engineer-concert (crane-derrick-mine hoist); hoist engineer- material; overhead crane; power house plant; telephies (cableway); whirly; maintenance engineer; Lull hilift or similar; hydraulic crane 25 ton and over; cherry picker 25 tons and over; backhoe Oliver 88; fordson; dynahoe; dual purpose and similar machines;

Barber Green Loader-euclid loader or similar type; conway or similar mucking macking machines; dragline; gradall;

shovel; backhoe etc. (crawler or truck); front end loaders;

hydraulic boom; jersey spreader; lift slab console;

letournequ or tounapull (scrapers over 20 yds struck);

mucking machines; pavement breaker (air ram); paver (concrete); road boring machine; road mix machines; ross carrier and similar machines; post hole digger; shovel (tunnels); side boom; spreader (asphalt);

scoopmobile-tractor-shovel over 1 1/2 yds. trenching machines vermeer concrete saw trencher and similar; tractor type demolition equipment; winch truck (a frame); hydraulic crane over 10 ton up to 25 ton); cherry picker over 10 ton up to 25 ton)

GROUP 1-B: Compressor (steel erection); pulse meter and push button buzz box; elevator; mechanic (outside) all types;

welder; scrapers 20 yds struck and under; machine pulling sheep's foot roller; vibratory rollers; roller 4 tons and over.

GROUP 2-A: Compactor self-propelled; grader; bulldoze D7 and similar tractors with a draw bar horsepower of 100 or over;

bulldozer D6 and under; welder; scraper 20 yds struck and under; machine pulling sheep's foot roller; vibratory rollers.

GROUP 3-A: Asphalt plant; boiler (high pressure); concrete mixing plants; concrete pump; firemen; forklift; forklift (electric); joy drill or similar tractor drilling machine;

loader - 1 1/2 yards and under; locomotive (all sizes);

mixer concrete - 21E and over; portable asphalt plant;

portable batch plant; portable crusher; quarry master;

stone crusher; well drilling machine and well point system;

cherry picker under 10 tons; hydraulic crane under 10 tons;

concert buffy; one yard an up ride on dumper (benford or similar).

GROUP 3-B: Compressor over 125 cu. feet; conveyor belt machine regardless of size; lighting unit (portable & generator); welding machine (steel erection and excavation); and compressor plant; stud machine; ladder hoist.

GROUP 4-A: Air tractor drill; batch plant; bending machine;

concrete breaker; concrete spreader; curb cutter machine;

farm tractor (all types); finishing machine-concrete;

hepavac clean air machine (all similar types: removal of asbestos etc.); material hopper-sand-stone-cement;

mixer-concrete-under 21E; mulching grass spreader;

pump-gypsum, etc., pump-plaster-grout -fireproofing; shop mechanic (not employed on job site); roller under 4 ton;

spreading and fine grading machine; steel cutting machine;

syphon pump-air-steam; tar joint machine; turbo jet burner or similar equipment; vibrator (1 to 5); fine grading machine; roof hoist (tugger hoist); television cameras-water- sewer-gas-etc.

GROUP 4-B: Compressor to 125 feet; dust; dust collector;

heater all types; pump; pump station (water and sewer);

steam jenny; sweeper; chipper; mulcher.

GROUP 5: Motorized roller (walk behind)

GROUP 5-A: Master Mechanic

GROUP 5-B: Utility Man

GROUP 6: Warehouse Man

ENGI0137-007 03/06/2017

Poughkeepsie and South thereof

Rates Fringes

Power Equipment Operator

(HEAVY & HIGHWAY)

GROUP 1.....................$ 58.54 28.15+a GROUP 1-A...................$ 51.68 28.15+a GROUP 1-B...................$ 54.42 28.15+a GROUP 2-A...................$ 49.52 28.15+a GROUP 2-B...................$ 51.05 28.15+a GROUP 3.....................$ 48.67 28.15+a GROUP 4-A...................$ 44.29 28.15+a GROUP 4-B...................$ 38.13 28.15+a GROUP 5.....................$ 54.69 28.15+a GROUP 5-A-1.................$ 54.69 28.15+a

GROUP 5-A-2.................$ 66.22 28.15+a GROUP 5-A-3.................$ 63.97 28.15+a GROUP 5-A-4.................$ 60.03 28.15+a GROUP 5-A-5.................$ 50.65 28.15+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Boom Truck; Cherry Picker; Clamshell; Crane, (Crawler, Truck); Dragline; Rough Terrain Crane

GROUP 1-A: Auger; Auto Grader; Dynahoe and Dual purpose and similar machines; Boat Captain; Boring Machine (all types);

Bull Dozer-all sizes; Central Mix Plant Operator;

Chipper-all types; Close circuit t.v.; Compactor with Blade; Concrete Portable Hoist; C.M.I. or similar; Conway or similar mucking machines; Gradall, Shovel Backhoe, etc.

Grader; Derrick, (Stone- Steel; Elevator & cage, materials or passengers; Front end loaders over 1 1/2 yds.; Hoist Single, Double, Triple Drum, Hoist Portable Mobile Unit;

Hoist Engineer-Concrete (Crane-Derrick-Mine Hoist); Hoist Engineer-Material, Hydraulic Boom; Letourneau or Tournapull (Scrapers over 20 yds. struck); Log Skidder; Movable Concrete Barrier Transfer & Transport Vehicle; mucking machines; overhead crane; paver (conccrete); pulsemeter;

push button (buzz box) elevator; road mix machines; Robot Hammer (brock or similar), Ross carrier and similar machines; shovels (tunnels); side boom; Slip Form Machine;

spreader (asphalt); scoopmobile-tractor-shovel over 1 1/2 yards; trenching machines; telephies- vermeer concrete saw trencher and/or similar; tractor-type demolition equipment, Whirly

GROUP 1-B: Road Paver, Asphalt

GROUP 2-A: Ballast Regulators; Compactor self-propelled; Cow Tracks; Fusion Machine; Rail Anchor Machines; Roller 4 ton and over; Scrapers - 20 yards struck; Switch Tampers;

Vibratory roller, etc.

GROUP 2-B: Mechanic (outside) all types

GROUP 3-A: Air tractor drill; asphalt plant; batch plant;

boiler (high pressure; concrete breaker; concrete pump concrete spreader; curb cutter machine; farm tractor (all types); finishing machine (concrete); fine grading machine;

fireman; forklift; forklift (electric); joy drill or similar tractor drilling machine; loader - 1 1/2 yards and under; locomotive (all sizes), maintenance engineer;

machine pulling sheeps foot roller; material hopper; mixer concrete - 21-E and over; mulching grass spreader; portable asphalt plant, portable batch plant, portable crusher;

powerhouse plant; quarry master; roller under 4 ton;

spreading and fine grading machine; steel cutting machine;

stone crusher; sweeper; turbojet burner or similar; well drilling machine ; winch truck ""A"" frame. John Henry Drill or similar.

GROUP 4-A: Service men (fuel or grease truck).

GROUP 4-B: Oiler; Compressor - compressor plant; paint compressor-steel erection; conveyor belt machine; lighting unit (portable & generator); oiler; pumps - pump station-water-sewer- gypsum- plaster, etc.;

roller-motorized (walk-behind); welding machine (steel erection excavation); well point system; bending machine;

dust collector; mixer - concrete under 21-E; heater all types; steam jenny; syphon pump-air-steam; tar joint machine; vibrator (1 to 5); Compressor Truck Mounted (2-6)

GROUP 5: Oiler GROUP 5-A-1: Master Mechanic

GROUP 5-A-2: Engineer - all tower cranes, all climbing cranes and all cranes of 100 ton capacity or greater (3900 Manitowac or similar) irrespective of manufacturer and regardless of how the same is rigged (except for pile rigs).

GROUP 5-A-3: Engineer-- Pile Driver

GROUP 5-A-4: Hoist Engineer- Steel -Sub Structure

GROUP 5-A-5: Jersey-spreader, pavement breaker (air ram);

Post Hole Digger

NOTES:

Loader Operator (over 5 cu yds) .50 Shoval Operators (over 4 cu yd) 1.00 Hazmat premium over regular rate 20%

CRANES:

100 ft- 149 ft: receive $2.00 more than Group 1 rate 149 ft and over receive $3.00 more than Group 1 rate

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day; Lincoln's Birthday; Good Friday; Memorial Day; Independence Day; Labor Day; Veterans Day; Columbus Day; November Election Day; Thanksgiving Day;

and Christmas Day

ENGI0825-007 01/01/2018

ORANGE, ULSTER AND SULLIVAN COUNTIES

BUILDING, HEAVY & HIGHWAY

GROUP 1....................$ 50.57 30.30

GROUP 2....................$ 48.98 30.30

GROUP 3....................$ 47.07 30.30

GROUP 4....................$ 45.44 30.30

GROUP 5....................$ 43.73 30.30

GROUP 6....................$ 52.39 30.30

NOTES:

Hazmat Premium 20% Hydrographic Premium .50

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (BLDG, HEAVY & HWY)

GROUP 1: Autograde-Pavement-Profiler (CMI and Similar Type);

utograde-Pavement-Profiler (CMI and Similar Types);Autograde Slipform Paver (CMI and Similar Types);

Backhoe; Central Power Plants (all types); Concrete Paving Machine (s-240 and Similar Types); Cranes (All Types, Including Overhead and Straddle Traveling Type); Cranes, Gantry; Derricks (Land, Floating or Chicago Boom Type);

Drillmaster/Quartmaster (Down the Hole Drill) Rotary Drill;

Self-Propelled, Hydraulic Drill, Self-Powered Drill Draglines, Elevator Graders, Front End Loaders (5 yds. and over), Gradalls, Grader: Rago, Helicopters (Copilot), Helicopters, (Communication Engineer), Locomotive (large), Mucking Machines, Pavement and Concrete Breaker (Superhammer, Hoe Ram, Brokk 250 and Similar Types), Pile Driver (length of boom including length of leads shall determine premium rate applicable), Roadway Surface Grinder Scooper (loader and shovel), Shovels, Tree Chooper with Boom, Trench Machines, Tunnel Boring Machines.

GROUP 2: ""A"" Frame; Backhoe (Combination); Boom Attachment on Loaders (Rate based on size of bucket) not applicable to Pipehook) Boring and Drilling Machines, Brush Chopper, Shredder and Tree Shredder Tree Shearer, Cableways, Carry-alls, Concrete Pump, Concrete Pumping System, Pumpcrete and Similar Types, Conveyors, 125 ft and over;

Drill Doctor (duties include dust collector, maintenance), Front End Loader (22 yds. but less than 2 yds.), Graders (Finish); Groove Cutting Machine (ride on type), Heater Planer; Hoists: (all type hoists, Shall Also Include Steam, Gas, Diesel, Electric, Air Hydraulic, Single and Double Drum, Concrete, Brick Shaft, Caisson, Snorkel Roof, and or any other similar type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type). Long Boom Rate to Be Applied if Hoist is ""outside material lower hoist"";

Hydraulic Cranes-10tons and Under; Hydro-Axe;

Hydro-Blaster; Jacket (Screw Air Hydraulic Power Operated Unit or Console Type: Not Hand Jack or Pile Load Test Type), Log Skidder; Pans, Pavers (all) Concrete; Plate and Frame Filter Press; Pumpcrete Machines; Squeeze Crete and Concrete Pumping (regardless of size); Scrapers; Sidebooms;

Straddle Carrier, Ross and Similar Types; Vacuum Truck;

Whip Hammer; Winch Trucks (Hoisting).

GROUP 3: Asphalt Curbing Machine, Asphalt Plant Engineer, Asphalt Spreader; Autograde Tube Finisher & Texturing Machine (CMI and Similar types) Autograde Curecrete Machine (CMI and Similar Types); Bar Bending Machines (power), Batchers, Batching Plant and Crusher on-site; Belt Conveyor Systems; Boom Type Skimmer Machines; Bridge Deck Finisher;

Bulldozers (all); Car Dumpers (A:road); Chief of Party;

Compressor and Blower Type Units (used) Independenty or Mounted On Dual Purpose Trucks, On Job Site or In Conduction with Job Site, In Loading and Unloading of Concrete, Cement, Fly Ash, Instantcrete, or Similar Type Materials); Compressor 92 or 3 in Battery); Concrete Finishing Machines; Concrete Saws and Cutters (ride on type); Concrete Spreaders, Hetzel, Rexomatic and Similar types; Concrete Vibrators; Conveyors, Under 125 ft), Crushing Machines, Ditching Machine, Small (ditchwitch, Vermeer or Similar type); Dope Dots (mechanical with or without pump), dumpsters; Elevator; Fireman; Forklifts (economobile, lull, and similar types of equipment); Front End Loaders (1 yd. and over but less than 2 yds.);

Generators (2 or 3 in Battery/ within 100 ft); Giraffe Grinders, Graders and Motor Patrols; Grout Pump; Gunnite Machines (excluding nozzle); Hammer Vibratory (in conduction with generators); Hoists (Roof, Tuggeraerial Platfrom Hoist and House Cars), Hoppers, Hoppers Doors (power operated); Hydro-Blaster (where required); Ladders (Motorized); Laddervator; Locomotive, Dinky type;

Maintenance, Utility Man; Mechanics; Mixers (Excepting Paving Mixers); Motor Patrols and Graders; Pavement Breakers, Small, Self-Propelled ride on type (also maintains compressor or hydraulic unit); Pavement Breaker, Truck Mounted; Pipe Bending Machine (power); Pitch Pump;

Plaster Pump (regardless of size); Post Hole Digger (post pounder and auger); Rod Bending Machines (power); Roller, Black Top; Scales, (power); Seaman Pulverizing Mixer;

Shoulder Widener; Silos; Skimmer Machines (Boom Type);

Steel Cutting Machine, Services and Maintains; Tamrock Drill; Tractors; Tug Captain; Vibrating Plants (used in conduction with unloading); welder and Repair Machines.

Concrete cleaning/decontamination machine operator;

Directional boring machine; Heavy equipment robotics operator; Master environmental maintenance operator; Ultra high pressure waterjet cutting tool system operator;

maintenance operator; Vacuum blasting machine operator

GROUP 4: Brooms and Sweepers; Chippers; Compressors (single);

Concrete Spreaders (small type); Conveyor Loaders (not including Elevator Graders); Engines, Large Diesel (1620 h.p.) and Staging Pump; Farm Tractors; Fertilizing Equipment (Operator and Maintenance of); Fine Grade Machine (small type); Form Line Graders (small type); Front End Loader (under 1 yd); Generator (single); Grease, Gas, Fuel and Oil Supply Trucks; Heaters (Nelson or Other Type Including Propane, Natural Gas or Flowtype Units); Lights, Portable Generating Light Plants; Mixers, Concrete Small;

Mulching Equipment (Operation and Maintenance of); Pumps (2 of Less Than 4 Inch Suction); Pumps 94 Inch Suction and Over Including Submersible Pumps); Pumps (Diesel Engine and Hydraulic); Immaterial of Power; Road Finishing Machines (Small Type); Rollers, Grade, Full Or Stone Base; Seeding Equipment (Operation and maintence of); Sprinkler and Water Pump Trucks (Used on job Site or in conduction with Job Site); Steam Jennies and Boilers, Irrespective of Use;

Stone Spreader; Tamping Machines, Vibrating Ride On;

Temporary Heating Plant (nelson or Other Type, Including Propane, Natural Gas or Flow Type Units); Water and Sprinkler Trucks (Used On Job Site In Conduction with Job Site); Welding Machines-Within 100 ft (Gas, and /or Electric Converters of any type, single, tow or three in a battery). welding system, multiple (rectifier transformer type) well point systems (including installation by bull gang and maintenance of); Off Road back dumps.

GROUP 5: Oiler

GROUP 6: Helicopter Pilot

a. PAID HOLIDAYS: New Years Day, Washington's Birthday Memorial Day, July 4th, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day during the calendar week in which the holiday occurs.

ENGI0825-008 01/01/2018

ORANGE, ULSTER AND SULLIVAN COUNTIES

Rates Fringes

Power equipment operators:

BUILDING CONSTRUCTION

STEEL ERECTION

GROUP 1....................$ 59.09 30.30

GROUP 2....................$ 57.43 30.30

GROUP 3....................$ 50.14 30.30

GROUP 4....................$ 47.48 30.30

GROUP 5....................$ 45.95 30.30

GROUP 6....................$ 44.19 30.30

GROUP 7....................$ 53.70 30.30

BUILDING CONSTRUCTION TANK

ERECTION

GROUP 1....................$ 58.81 30.30

GROUP 2....................$ 57.22 30.30

GROUP 3....................$ 53.70 30.30

GROUP 4....................$ 50.13 30.30

GROUP 5....................$ 44.92 30.30

OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES

GROUP 1....................$ 51.20 30.30

GROUP 2....................$ 49.55 30.30

GROUP 3....................$ 47.41 30.30

GROUP 4....................$ 45.91 30.30

GROUP 5....................$ 44.19 30.30

GROUP 6....................$ 53.13 30.30

NOTES:

Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75

STEEL ERECTION CLASSIFICATIONS

GROUP 1: Cranes (All Cranes, Land or Floating with Booms Including Jib 140 ft and over, Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms including Jib 140 ft and over above ground).

GROUP 2: Cranes (All Cranes, Land or Floating with Booms Including Jib Less Than 140 ft Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms Including Jib Less Than 140 ft above Ground).

GROUP 3: ""A"" Frame, Cherry Pickers 10 tons and under, Hoists Shall Also Include Steam, Gas, Desel, Electric, Air Hydraulic, Single and Double Drum Concrete, Brick Shaft Caisson, or Any Other Similar Type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type; Jacks:

Screw Air Hydraulic Power Operated unit or Console Type (not hand Jack or Pile Load Test Type); Side Booms.

GROUP 4: Aerial Platform used as Hoist; Compressor: 2 or 3 in Battery; Elevators or House Cars; Conveyors and Tugger Hosits; Chief of Party; Firemanp; Forklift; Generators (2 or 3); Maintenance (Utility Man); Rod Bending Machine (power); Welding Machines (Gas or Electric, 2 or 3 in

Battery, Including Diesels); Captain: Power Boats: Tug Master: Power Boats.

GROUP 5: Compressor, Single; Welding Machine, Single, Gas, Diesel, and Electric Converters of any Type: Welding System Multple (Rectifier Transformer Type); Generator, Single.

GROUP 6: Oiler

GROUP 7: Helicopter Pilot .

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs.

For BUILDING CONSTRUCTION TANK ERECTION CLASSIFICATIONS

NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50

TANK ERECTION CLASSIFICATIONS

GROUP 1: Operating Engineers on all Cranes, Derricks, ets with Booms Including Jib 140 ft or More Above Ground.

GROUP 2: Operating Engineer on all Equipment, Including Cranes, Derricks, ets with Booms Including Jib, Less Than 140 ft above the ground.

GROUP 3: Helicopter Pilot Engineer.

GROUP 4: Air Compressors, Welding Machines and Generators are Covered and are Defined as Cover: Gas, Diesel, or Electric Driven Equipment and Sources of Power from a Permanent Plant: ie: Staem, Comgressed Air, Hydraulic or Other Power, For The Operating of any Machine or Automatic Tools, Used In The Erection, Alteration, Repair and Dismantling of Tanks and Any and All ""Dual Purpose"" Trucks Used On The Construction Job Site, or in the Loading and Unloading of Materials, at the Construction Job Sited or in Conjuction with the Job Site.

GROUP 5: Oiler

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day provided the Employee works one day in the calendar week during which the holiday occurs

For OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINE

CLASSIFICATIONS

N0TES:

Hydrographic Premium .50 Hazmat Premium 20% Tunnel Premium .75

OILSTATIC MAINLINES AND TRANSPORTATION PIPE LINES

CLASSIFICATIONS

GROUP 1: Backhoe; Cranes (all types); Draglines, Front End Loaders (5yds. and over), Gradalls, Helicopters (co-pilot), Helicopters (Communication Engineer); Scooper (Loader and Shovel) Koehring; Trench Machines.

GROUP 2: ""A"" Frame; Backhoe (Combination Hoe Loader); Boring and Drilling Machines; Ditching Machines, Small, Ditchwitch, Vermeer or Similar type; Forklifts; Front End Loaders 92 yds. and over but less than 5 yds.); Graders, Finish (fine); Hydraulic Cranes 10 tons and under (over 10 tons) Cranes Rate Applies); Side Booms: Winch Trucks (Hoisting).

GROUP 3: Backfiller; Brooms and Sweepers; Bulldozers;

Compressor (2 or 3 in battery); Chief of Party; Front End Loaders (under 2 yds); Generators; Giraffe Grinders;

Graders and Motor Patrols; Machnic; Pipe Bending Machine (power);Tractors; Water and Sprinkler Trucks used on Job Site or in Conduction with Job Site); Welder and Repair Mechanic; Captain (power boats); Tug Master (power boats).

GROUP 4: Compressor (single); Dope Pots (Mechanical with or without Pump); Dust Collectors; Pumps (4 inch suction and over); Pumps (2 of less than 4 inche suction); Pumps, Diesel Engine and Hydraulic (immaterial of power); Welding Machines, Gas or Electric Converters of any type- 2 or 3 in Battery Multple Welders; Well Point Systems (including installation and Maintenance); Fram Tractors.

GROUP 5: Oiler, grease, gas, fuel and oil supply trucks; Tire repair and maintenance

GROUP 6: Helicopter Pilot

FOOTNOTE:

a. Paid Holidays: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day and Christmas Day provided the Employee works one day in calendar week during which the holidays occurs.

IRON0417-001 07/01/2020

Rates Fringes

IRONWORKER.......................$ 40.48 46.45+a

a) Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving (unpaid), Christmas Day.

* LABO0017-002 06/01/2019

Rates Fringes

LABORER

DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING

CONSTRUCTION)

GROUP 1....................$ 35.95 27.15

GROUP 2....................$ 37.75 27.15