This solicitation is for maintenance dredging of two reaches of the Hudson River Federal Navigation Channel at Kingston and Germantown, New York. The U.S. Army Corps of Engineers seeks to remove approximately 130,000 cubic yards of shoaled material to a depth of -32 feet below mean low water plus one foot of overdepth allowance. Dredged material will be transported via hopper dredge or mechanical dredge to the Houghtaling Island Dredged Material Placement Site for unloading and placement. The contractor must commence work within five days of notice to proceed and substantially complete all work by December 31, 2020, with liquidated damages of $1,271.70 per day for delays. Plans and specifications will be available on June 19, 2020, with bid opening on July 3, 2020 and intended award date of August 1, 2020. This is an unrestricted procurement with an estimated value between $5-10 million.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kingston & Germantown, Hudson River, NY Federal Navigation Project 2020

SECTION 00 00 01 Page 1

SECTION 00 00 01

COVER SHEET

05/20

PART 1 GENERAL

NEW YORK DISTRICT

CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

INVENTATION FOR BIDS

FOR

MAINTENANCE DREDGING OF

KINGSTON AND GERMANTOWN

HUDSON RIVER, NEW YORK

FEDERAL NAVIGATION PROJECT

1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-20-B-0012.

2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of this IFB.)

5. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS

SOLICITATION. Bidders, Offerors, and applicants are cautioned to note the "Certification of Nonsegregated Facilities" in the solicitation.

Failure of bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitation involving awards of contracts exceeding $10,000, which are not exempt from the provisions of Equal Opportunity Clause. (1984 APR)

6. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00

Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

7. THIS IS A CIVIL WORKS PROGRAM PROCUREMENT AND IS NOT FUNDED BY THE

DEPARTMENT OF DEFENSE. BUY AMERICAN ACT - CONSTRUCTION MATERIALS (MAY

1993) IN ACCORDANCE WITH FAR 52.225-9 APPLIES.

8. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.

DOCUMENT 00 00 01 Page 2

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

-- End of Section --

SECTION 00 00 02 Page 1

SECTION 00 00 02

CHECK LIST FOR BIDDERS

05/20

PART 1 GENERAL

ATTACHED IS IFB FOR

MAINTENANCE DREDGING OF

KINGSTON AND GERMANTOWN

HUDSON RIVER NEW YORK

FEDERAL NAVIGATION PROJECT

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE

FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID INELIGIBLE FOR AWARD.

IMPORTANT ITEMS FOR YOU TO CHECK ARE

INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW. THIS

INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A

PROPER BID.

HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00

45 00) PORTION OF THE SOLICITATION?

IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

IS YOUR BID PROPERLY SIGNED?

A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A BID BOND ON

STANDARD FORM 24 OR A SIMILAR FORM CONTAINING THE SAME LANGUAGE AS A

STANDARD FORM 24?

IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?

IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND

ARE ALL REQUIRED SEALS AFFIXED?

IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR BID AS ON

THE BID BOND?

IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID GUARANTEE IS

TREATED THE SAME AS A LATE BID)

HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY ALTERING THE

PROVISIONS OF THE SOLICITATION?

WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID ITEM? (THE

SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)

ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES

LEGIBLE?

IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY INITIALED

BY THE PERSON SIGNING THE BID?

SECTION 00 00 02 Page 2

DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT IS A

SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID

OPENING TIME?

WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE SUBMISSIONS,

MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS, CONDITIONS,

AND NOTICES TO BIDDERS, SECTION 00 21 16 OF THE SOLICITATION.)

NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K. JAVITS FEDERAL

BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE TIME IT TAKES TO ENTER THE

BUILDING. BIDDER IS RESPONSIBLE TO ENSURE THAT ITS BID IS SUBMITTED

TIMELY.

BIDDER IS RESPONSIBLE TO ENSURE BID IS SUBMITTED ON TIME.

SECTION 00 01 15 Page 1

SECTION 00 01 15

LIST OF DRAWINGS

05/20

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause

"DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS

a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

b. The Contractor shall:

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

c. In general:

(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are available in the office of the District Engineer, U.S. Army Corps of Engineers, New

York District, 26 Federal Plaza, New York, N.Y. 10278-0090:

SECTION 00 01 15 Page 2

Contract drawings are as follows:

FY 2020

Maintenance Dredging of Kingston and Germantown, Hudson River, New York

Federal Navigation Project

SHEET NO. DESCRIPTION

Sheet 1 Index

Sheet 2 General Location & Coordinates

Sheet 3 Houghtaling Island Placement Site and Topography

Sheet 4 Houghtaling Island Placement Site Area A and Topography

Sheet 5 Houghtaling Island Offshore Hydrography

Sheet 6 Germantown Dredge Area Hydrographic Survey A

Sheet 7 Germantown Dredge Area Hydrographic Survey B

Sheet 8 Germantown Dredge Area Hydrographic Survey C

Sheet 9 Germantown Dredge Area Hydrographic Survey D

Sheet 10 Kingston Dredge Area Hydrographic Survey A

Sheet 11 Kingston Dredge Area Hydrographic Survey B

Sheet 12 Notes and Details

f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the

Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified.

Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl.

52.236-7002).

SECTION 00 90 00 Page 1

SECTION 00 90 00

WAGE RATES

02/09

1.1 DEFINITIONS

This section provides the wage rates applicable to all work under this contract as specified in Section 00 80 00 paragraph 3.1.18.

Advisory for Bidders: Wage rates for Hopper Dredges have been requested for this solicitation, and are forthcoming from the

Department of Labor (DOL). These wage rates will be incorporated into the solicitation by amendment when issued by DOL.

3.1 WAGE RATES

The following wage rates are subject to this contract.

"General Decision Number: NY20200001 01/03/2020

Superseded General Decision Number: NY20190001

State: New York

Construction Type: Heavy Dredging

Counties: New York Statewide.

STATEWIDE

New York

All dredging, except self-propelled hopper dredges, on the

Atlantic Coast and tributary waters emptying into the Atlantic

Ocean.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher)

SECTION 00 90 00 Page 2 for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

* ENGI0025-001 10/01/2019

STATEWIDE

Rates Fringes

Dredging:

CLASS A1....................$ 40.31 18.46+a+b

CLASS A2....................$ 35.92 18.46+a+b

CLASS B1....................$ 34.86 18.46+a+b

CLASS B2....................$ 32.82 18.46+a+b

CLASS C1....................$ 31.92 18.16+a+b

CLASS C2....................$ 30.89 18.16+a+b

CLASS D.....................$ 25.66 17.86+a+b

CLASSIFICATIONS:

CLASS A1: Deck Captain; Mechanical Dredge Operator, Leverman, Licensed Tug Operator over 1000 HP.

CLASS A2: Crane Operator (360 swing).

CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge

Operator, Engineer, Electrician, Chief Welder, Chief Mate, Fill Placer, Operator II, Maintenance Engineer, Licensed

Boat Operator, Licensed Crew Boat Operator.

CLASS B2: Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Assistant Fill Placer, Welder, Steward.

CLASS C2: Boat Operator.

CLASS D: Oiler, Deckhand, Shoreman, Rodman, Scowman, Cook, Messman, Porter/Janitor.

INCENTIVE PAY: (Add to Hourly Rate)

Operator (NCCCO License/Certification) $1.80 Licensed Tug

SECTION 00 90 00 Page 3

Operator over 1000 HP (Assigned as Master) (USCG licensed

Master of Towing Vessels (MOTV) $1.80; Licensed Boat

Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80

Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55;

Deckhand or Mate (AB with Lifeboatman endorsement (USCG)

$1.80; All classifications (lifeboatman endorsement only

(USCG) $1.55; Welder (ABS certification) $1.55

FOOTNOTES APPLICABLE TO ABOVE CRAFTS:

a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s

Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day

b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the

SECTION 00 90 00 Page 4 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union

SECTION 00 90 00 Page 5 average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the

SECTION 00 90 00 Page 6 interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 00 90 00 Page 7

"General Decision Number: NY20200002 04/10/2020

Superseded General Decision Number: NY20190002

Construction Types: Building, Heavy and Highway

Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington

Counties in New York.

BUILDING CONSTRUCTION PROJECTS (For all counties except

COLUMBIA, FULTON & GREENE) (does not include single family homes and apartments up to a including 4 stories), HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

1 02/07/2020

2 02/28/2020

3 04/03/2020

4 04/10/2020

ASBE0040-002 05/01/2019

SECTION 00 90 00 Page 8

Asbestos/Insulator Worker

SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 36.04 21.92

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 36.04 21.92

BOIL0197-002 01/01/2017

BOILERMAKER......................$ 34.54 24.78

BRNY0002-019 07/01/2018

BRICKLAYER

BRICKLAYERS, STONE MASONS,

CEMENT MASONS, PLASTERERS,

POINTERS, CAULKERS &

CLEANERS....................$ 36.19 20.48

HEAVY & HIGHWAY

CONSTRUCTION

CEMENT MASONS..............$ 37.23 19.51

MARBLE, TILE & TERRAZZO

FINISHERS...................$ 27.16 16.85

MARBLE, TILE & TERRAZZO

WORKERS.....................$ 34.66 19.58

CARP0279-006 07/01/2019

Carpenters:

HEAVY AND HIGHWAY

CONSTRUCTION (COLUMBIA AND

GREENE COUNTIES)

Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08

SECTION 00 90 00 Page 9

CARP0291-005 07/01/2019

SARATOGA COUNTY

BUILDING....................$ 31.52 21.70

WASHINGTON COUNTY

BUILDING....................$ 28.10 21.20

PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.

CARP0291-008 07/01/2019

ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES

BUILDING CONSTRUCTION

Carpenters & Soft Floor

Layers.....................$ 31.68 20.60

Piledriver.................$ 31.68 20.60

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters.................$ 33.02 21.10

CARP0291-010 07/01/2019

CARPENTERS..................$ 33.02 21.10

DIVER TENDERS...............$ 34.02 21.10

DIVERS (Dry Day)............$ 34.02 21.10

DIVERS......................$ 58.02 21.10

PILEDRIVERS.................$ 33.02 21.10

ELEC0236-001 06/01/2019

ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);

MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;

WASHINGTON

SECTION 00 90 00 Page 10

ELECTRICIAN......................$ 39.35 28.00

ELEC0363-004 04/01/2020

GREENE COUNTY (Portion of)

ELECTRICIAN......................$ 42.00 3%+32.36+a

FOOTNOTE:

a. Paid Holidays: New Year's Day, President's Day, Memorial

Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ELEC1249-003 05/06/2019

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal

Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 27.00 6.75%+24.15

Groundman (Truck Driver)....$ 36.00 6.75%+24.15

Groundman Truck Driver

(tractor trailer unit)......$ 36.00 6.75%+24.15

Lineman & Technician........$ 45.00 6.75%+24.15

Mechanic....................$ 36.00 6.75%+24.15

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/06/2019

ELECTRICIAN (Line

Construction)

Overhead and underground

SECTION 00 90 00 Page 11 distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 31.23 6.75%+24.15

Groundman digging machine operator...................$ 46.85 6.75%+24.15

Groundman truck driver

(tractor trailer unit).....$ 41.64 6.75%+24.15

Groundman Truck driver.....$ 41.64 6.75%+24.15

Lineman and Technician.....$ 52.05 6.75%+24.15

Mechanic...................$ 41.64 6.75%+24.15

Substation:

Cable Splicer..............$ 57.26 6.75%+24.15

Flagman....................$ 31.23 6.75%+24.15

Ground man truck driver....$ 41.64 6.75%+24.15

Groundman digging machine operator...................$ 46.85 6.75%+24.15

Groundman truck driver

(tractor trailer unit).....$ 41.64 6.75%+24.15

Lineman & Technician.......$ 52.05 6.75%+24.15

Mechanic...................$ 41.64 6.75%+24.15

Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation

Cable Splicer..............$ 58.71 6.75%+24.15

Flagman....................$ 32.02 6.75%+24.15

Groundman Digging Machine

SECTION 00 90 00 Page 12

Operator...................$ 48.03 6.75%+24.15

Groundman Truck Driver

(tractor-trailer unit).....$ 42.70 6.75%+24.15

Groundman Truck Driver.....$ 42.70 6.75%+24.15

Lineman & Technician.......$ 53.37 6.75%+24.15

Mechanic...................$ 42.70 6.75%+24.15

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Good Friday, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New

York State, provided the employee works two days before or two days after the holiday.

ELEC1249-007 05/06/2019

COLUMBIA COUNTY

ELECTRICIAN (LIGHTING AND

TRAFFIC SIGNAL INCLUDING ANY

AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC

SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD

WEATHER INFORMATION SYSTEMS)

Flagman.....................$ 27.77 6.75%+24.15

Groundman Digging Machine

Operator....................$ 41.65 6.75%+24.15

Groundman Truck Driver

(Tractor-trailer unit)......$ 37.02 6.75%+24.15

Groundman Truck Driver......$ 37.02 6.75%+24.15

Lineman and Technician......$ 46.28 6.75%+24.15

Mechanic....................$ 37.02 6.75%+24.15

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good

Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the

President of the United States and Election Day for the

Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2019

SECTION 00 90 00 Page 13

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 32.78 3%+4.93

Groundman..................$ 16.49 3%+4.93

Installer Repairman-

Teledata

Lineman/Technician-

Equipment Operator.........$ 31.12 3%+4.93

Tree Trimmer................$ 25.79 3%+9.98+a

a. New Year's Day, President's Day, Good Friday, Decoration

Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0035-001 01/01/2020

ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of

Durham, Greenville, New Baltimore, Coxcsackie and Athens);

MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND

WASHINGTON COUNTIES

Elevator Constructor.............$ 47.51 34.765+a+b a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ELEV0138-004 01/01/2020

COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,

GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY

(THE TOWNS OF HUNTER AND CATSKILL)

ELEVATOR MECHANIC................$ 60.49 34.765+a+b all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

SECTION 00 90 00 Page 14

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

ENGI0106-001 07/01/2018

HEAVY & HIGHWAY

Power equipment operators:

GROUP 1.....................$ 43.47 26.05+a

GROUP 2.....................$ 42.56 26.05+a

GROUP 3.....................$ 39.99 26.05+a

GROUP 4.....................$ 47.47 26.05+a

GROUP 5.....................$ 46.47 26.05+a

GROUP 6.....................$ 45.47 26.05+a

GROUP 7.....................$ 45.08 26.05+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop

Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb

Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual

Drum Paver, Excavator (All Purpose Hydraulically Operated)

(Gradall or Similar), Front End Loader ( 4 cu. yd. and

Over), Head Tower (Sauerman or Equal), Hoist (Two or Three

Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump

(jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or

Trailer Mounted Log , Chipper (Self Feeder), Tug Operator

(Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary

Drill (Truck or Tractor Mounted), Boring Machine, Cage

Hoist, Central Mix Plant (NonAutomated) and All Concrete

Batching Plants, Cherry Picker (5 tons capacity and under), SECTION 00 90 00 Page 15

Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication

Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One

Drum), Hydro-Axe, Kolman Plant Loader and Similar Type

Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant

Engineer, Profiler (105 H.P. and under), Grinder, Post Hole

Digger and Post Driver, Power Broom (towed), Power

Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam

Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant

Refrigeration Equipment (for soil stabilization)Road

Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type

Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy

Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw

(self-propelled), Conveyor, Deck Hand, Directional Drill

Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie

Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

ENGI0106-002 07/01/2018

BUILDING

SECTION 00 90 00 Page 16

GROUP A(1)..................$ 43.79 25.70+a

GROUP A.....................$ 43.30 25.70+a

1..........................$ 45.04 25.70+a

2..........................$ 46.04 25.70+a

GROUP B.....................$ 42.28 25.70+a

GROUP C.....................$ 39.38 25.70+a

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

a. Paid Holidays: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING):

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP A(1): Crane Premiums:

1 over 150'- $1.00

2 over 200'- $2.00

GROUP A: Shovel, All Excavators (including rubber tire full swing), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under), maintenance engineer, self contained crawler, drill-hydraulic rock drill.

GROUP B: Backhoe, (rubber-tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB

Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller

GROUP C: Fork lift, high lift, lull, oiler, fireman and

SECTION 00 90 00 Page 17 heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack

(belcrete system), seeding, and mulching machines, pumps

IRON0012-011 07/01/2019

ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY

(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);

RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON

COUNTIES:

Ironworkers:

Sheeter, Bucker-up..........$ 31.80 28.59

Sheeter.....................$ 31.80 28.59

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone

Derrickmen..................$ 31.55 28.59

IRON0440-007 01/01/2019

FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);

MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.

Johnsville):

IRONWORKER

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone

Derrickman..................$ 28.25 25.94

LABO0017-001 07/01/2019

COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

SECTION 00 90 00 Page 18

LABORER

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)

(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY

GROUP 1:...................$ 38.90 27.15+a

GROUP 2:...................$ 43.15 27.15+a

GREENE COUNTY (Township of

Catskill) HEAVY & HIGHWAY:

GROUP 1:...................$ 34.15 27.15+a

GROUP 2:...................$ 38.90 27.15+a

GROUP 3:...................$ 43.15 27.15+a

GROUP 4:...................$ 48.00 27.15+a

TUNNEL, SHAFT & CAISSON

WORK

GROUP 1....................$ 48.05 29.50+a

For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY

(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required

GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required

For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY

(Township of Catskill)

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas

Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.

GROUP 1: Flagperson, gateperson

SECTION 00 90 00 Page 19

GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.

Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.

Ground man on milling machine

GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous

SECTION 00 90 00 Page 20 material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Labor Day, Election Day, Veterans

Day, Thanksgiving Day, Christmas Day

GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and

Powderman;

Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air

LABO0035-001 07/01/2017

FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND

ST. JOHNSVILLE)

Laborers Building Construction

Asbestos Removal............$ 24.00 20.64+a

Blasters, Form Setters, MotorBuggy Operator (Rider

Type)......................$ 23.00 20.64+a

Hazardous Waste Removal

Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 24.00 20.64+a

HEAVY & HIGHWAY:

GROUP 1:...................$ 28.05 23.74+a

GROUP 2:...................$ 28.25 23.74+a

SECTION 00 90 00 Page 21

GROUP 3:...................$ 28.45 23.74+a

GROUP 4:...................$ 28.65 23.74+a

Laborers....................$ 22.50 20.64+a

Pipelayers, Motor Mixers, Motor Buggy Operator

(Walk Behind) Power Lift

(Walk Behind)...............$ 22.65 20.64+a

Wagon Drill Operator........$ 22.90 20.64+a

Day, Labor Day, Thanksgiving Day and Christmas Day.

GROUP 1: Common Laborers, Flagman, Outboard and Hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw

Operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman

GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters

LABO0157-001 07/01/2017

FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton

Park); SCHENECTADY and SCHOHARIE COUNTIES.

LABORER

BUILDING:

GROUP 1....................$ 28.74 20.14+a

GROUP 2....................$ 30.09 20.14+a

SECTION 00 90 00 Page 22

HEAVY & HIGHWAY:

GROUP 1:...................$ 30.55 21.29+a

GROUP 2:...................$ 30.75 21.29+a

GROUP 3:...................$ 30.95 21.29+a

GROUP 4:...................$ 31.15 21.29+a

GROUP 5:...................$ 32.55 21.29+a

LABORER CLASSIFICATIONS

Group 1: Common Laborers

Group 2: Asbestos and Toxic Materials

Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply

a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence

LABORER CLASSIFICATIONS

GROUP 1: Common laborers, flagman, outboard & hand boats

GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2"") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking

GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb

GROUP 5: Hazardous waste removal

LABO0190-001 07/01/2019

ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA

COUNTY (Townships of Stillwater, Halfmoon, Saratoga)

SECTION 00 90 00 Page 23

Laborers:

BUILDING:

GROUP 1....................$ 28.51 23.17

GROUP 2....................$ 29.86 23.17

LABORERS CLASSIFICATIONS

GROUP 1: Common Laborers

GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at

$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply

LABO0190-002 07/01/2018

ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).

GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO

COUNTY (Townships of Stillwater, Halfmoon Saratoga)

HEAVY & HIGHWAY:

GROUP 1:...................$ 30.94 22.70

GROUP 2:...................$ 31.14 22.70

GROUP 3:...................$ 31.34 22.70

GROUP 4:...................$ 31.54 22.70

GROUP 5:...................$ 32.94 22.70

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

LABORERS CLASSIFICATIONS

GROUP 1: Common laborers, flagmen, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and

SECTION 00 90 00 Page 24 sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking

GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb

GROUP 5: Hazardous waste removal

LABO0235-006 05/01/2018

COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):

GROUP 1....................$ 24.40 29.75+a

GROUP 2....................$ 28.16 29.75+a

GROUP 3....................$ 29.16 29.75+a

LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;

tool rooms

GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;

Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;

wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2"" or under; Nipper; Chucker;

Asphalt Workers

GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);

Laser Beam Operator; Form Setter/Aligners; Blasters

a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and

SECTION 00 90 00 Page 25

PAIN0009-013 05/01/2019

GLAZIER..........................$ 29.15 22.03

PAIN0155-002 05/01/2018

COLUMBIA AND GREENE COUNTIES

Painters:

Drywall Finisher............$ 32.99 22.76

Lead Abatement Work.........$ 32.99 22.76

Painter/Paperhanger.........$ 32.99 22.76

Spray Rate..................$ 33.99 22.76

PAIN0201-001 05/01/2019

Lead Abatement Workers, Structural Steel

Zone 1.....................$ 30.09 16.65

Zone 2.....................$ 30.09 16.65

Painters, Drywall

Finishers, Spray

Zone 1.....................$ 29.09 16.65

Zone 2.....................$ 29.09 16.65

Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

ZONE #2 All of WASHINGTON County

PAIN0806-002 10/01/2018

ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,

SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON

Structural Steel and Bridge.$ 49.50 41.88

PLUM0007-001 05/01/2018

ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;

SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, SECTION 00 90 00 Page 26

Halfmoon, Milton, Stillwater and Waterford)

PLUMBER/PIPEFITTER...............$ 41.59 25.94

PLUM0112-019 05/01/2018

Townships of Canajoharie and Minden

PLUMBER (Including

Steamfitting)

Northern Zone...............$ 35.50 27.55

PLUM0773-002 05/01/2019

SARATOGA (Remainder of County); WASHINGTON COUNTY:

PLUMBER/PIPEFITTER...............$ 37.50 30.98

ROOF0203-003 06/01/2019

SCHOHARIE COUNTY:

ROOFER.............

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .