This document provides details regarding a federal solicitation for maintenance dredging of the Hudson River in New York. The U.S. Army Corps of Engineers seeks to remove approximately 130,000 cubic yards of sediment from two areas along the river to a depth of 32 feet below mean low water plus one foot of allowable overdepth. Dredged material will be transported via hopper dredge or mechanical dredge to an upland placement site provided by the government at Houghtaling Island. The contractor must prepare the site and meet all permit conditions for dredging and placement. Work may commence no earlier than September 1st and must be substantially complete between that date and December 31st at one location, and between September 1st and November 31st at the other. The estimated value of the contract is between $5-10 million. Plans and specifications will be available on June 19th and bids are due on July 3rd, with intended award on August 1st and notice to proceed on August 15th. Liquidated damages of $1,271.70 per calendar day will be assessed for delays in completion.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
Table of Contents Information Page Signature Page I. Introduction
II. Correspondence
III. Test Administration
A. Sponsor B. Testing Facility C. Dates of Experimentation D. Study Participants
IV. Materials and Methods
A. Sampling B. Homogenizing and Compositing C. Physical and TOC Analysis
V. Physical and Analysis Results
Figures and Tables
Figure 1a Site Map Sample Locations- Albany Turning Basin Figure 1b Site Map Sample Locations- Germantown Reach Figure 1c Site Map Sample Locations- Kingston Reach Table 1 DGPS Coordinates Table 2 Sample Identification and Compositing Scheme Table 3 Grain Size Distribution, Percent Moisture and TOC Results
Appendices Appendix A: Sediment Core Logs Appendix B: Photographs Appendix C: Chains of Custody Appendix D: Sample Use Forms Appendix E: Percent Moisture and Grain Size Distribution Raw Data, Calculations, and Graphs Appendix F: TOC Raw Data and SRM Control Chart
Page
Information Page
Technical Report on the Sampling and Testing of Material from Upper Hudson River for FNC Maintenance Dredging
Contract No. W912DS-17-D-0006
Delivery Order No. W912DS-19-F-0052
STUDY INITIATION DATE
April 25, 2019
STUDY COMPLETION DATE
August 28, 2019
PERFORMING LABORATORY
Aqua Survey, Inc.
469 Point Breeze Road
Flemington, New Jersey 08822
SPONSOR
Army Corps of Engineers, New York District 26 Federal Plaza
New York, NY 10278
LABORATORY PROJECT ID
ASI Study No. 39-062
I. INTRODUCTION
The objective of this project was to collect and analyze sediment from the Upper Hudson River for FNC maintenance dredging. This work was conducted in accordance with Appendix B, Attachment 1, of the technical manual entitled “The Management and Regulation of Dredging Activities and Dredged Material in New Jersey’s Tidal Waters” (Dredging Manual).
ASI performed all sampling and physical analyses (grain size distribution, percent moisture & total organic carbon analysis). Chemical analysis of the samples was performed by ALS in Kelso, WA and Battelle in Columbus, OH. The results of the chemical analyses are not included in this report.
II. CORRESPONDENCE
The following pages provide correspondence for this project.
6 . ISSUE D BY CODE
W912DS17D0006
1 . CO N TRA CT/P U RCH . O RD E R/
A G RE E M E N T N O .
W 912D S
2 . D E L IVE RY O RD E R/ CA L L N O .
W912DS19F0052
6P AGE 1 OF
5 . P RIO RITY
CODE 9622EQ
8 . DEL IVERY FOB
DEST INAT ION
OT HE R
(See Sch edule if o t h er)
OR D ER FOR SUPPLIES OR SER VICES
3 . D A TE O F O RD E R/CA L L
2019 A pr 19
4 . RE Q ./ P U RCH . RE Q U E ST N O .
W16R OE90922483
OPER ATION S D IVISION
26 F ED ER AL PLAZ A R OOM 1937
N EW Y OR K N Y 10278
X
U S AR MY C OR PS OF EN GIN EER S, N EW Y OR K
26 F ED ER AL PLAZ A, R M 1843
N EW Y OR K N Y 10278-0090
7 . ADM INIST E RE D BY (if o th er th a n 6 )
( YYYYM M M D D )
1 0 . D E L IVE R TO FO B P O IN T BY (D ate)
( YYYYM M M D D )
AQU A SU R VEY IN C
J ON D OI
469 POIN T BR EEZ E R D
F LEMIN GTON N J 08822-4701
CODE 0L3C09 . CONT RACT OR FACIL IT Y
SEE SCHEDULE
1 2 . D ISCO U N T TE RM S
N et 30 D ays
M A RK IF BU SIN E SS IS1 1 .
SM A L L
SM A L L
D ISA D VA N TA G E D
W O M E N -O W N E D
1 3 . M AIL INVOICE S T O T HE ADDRESS IN BLOCK
See Item 15
2 5 . T OT AL $48,271.00
OPER ATION S D IVISION
KELLY L.VEGA
26 F ED ER AL PLAZ A R OOM 1937
N EW Y OR K N Y 10278
X
1 7 . ACCOUNT ING AND AP P ROP RIAT ION DAT A/ L OCAL USE
CODE
1 8 . IT E M NO. 1 9 . SCHEDUL E OF SUP P LIE S/ SERVICE S
* If q u a n t i ty a ccep ted b y th e G o ver n m en t is s a m e a s q u a n t i ty a ccep ted b elo w q u a n t i ty o r d er ed a n d en cir cle.
DE L IVE RY/1 6 .
1 4 . SHIP T O
Se e Sche dule
W 912D S 964145
MARK ALL
P AC KAG ES AND
P AP ERS W ITH
IDENTIFIC ATIO N
NUMB ERS IN
B LO C KS 1 AND 2 .
2 3 . AM OUNT
1 5 . P AYM ENT W IL L BE M ADE BY CODE
U SAC E, F IN AN C E C EN TER MILLIN GTON
ATTN : C EF C -AO-P, AC C OU N TS PAY ABLE BR AN C H
5722 IN TEGR ITY D R IVE
MILLIN GTON TN 38054-5005
Th is d el iv ery o rd er/cal l i s i s s u ed o n an o th er G o v ern men t ag en cy o r in acco rd an ce w i th an d s u b ject to terms an d co n d i t io n s o f ab o v e n u mb ered co n tract .
T YP E CAL L
OF P URCHASE
ORDE R
SEE SCHEDULE
24. UNITED STATES OF AMERICA
TEL: (917)790-8173
EMAIL: francis.cashman@usace.army.mil
CONTRACTING / ORDERING OFFICER
q u a n t i ty o r d er ed , in d ica te b y X . If d i f f er en t , en ter a ctu a l
BY: FRANCIS CASHMAN
If t h is bo x is m ark ed, sup p lier m ust sign Accep t an ce an d ret urn t h e fo llo win g n um ber o f co p ies:
NAM E OF CONT RACT OR SIGNAT URE T YP E D NAM E AND T IT L E
( YYYYM M M D D )
DAT E SIGNE D
ACCE P T ANCE. T HE CONT RACT OR HE REBY ACCE P T S T HE OFFE R REP RESE NT ED BY T HE NUM BE RED P URCHASE ORDE R AS IT M AY P REVIOUSL Y HAVE BEE N OR IS NOW M ODIFIE D, SUBJE CT T O AL L OF T HE T E RM S
AND CONDIT IONS SE T FORT H, AND AGRE ES T O P ERFORM T HE SAM E.
Referen ce y o u r q u o te d ated
Fu rn is h th e fo l lo w in g o n terms s p eci fied h erein . REF :
2 0 . QUANT IT Y
ORDERE D/
ACCE P T ED*
2 1 . UNIT 2 2 . UNIT P RICE
D IFFE RE N CE S
2 6 .
INSP E CT E D RE CE IVED ACCEP T E D, AND CONFORM S T O T HE
CONT RACT EXCEP T AS NOT E D
2 7 a. QUANT IT Y IN COL UM N 2 0 HAS BE E N
( YYYYM M M D D )
c. DAT E d. P RINT E D NAM E AND T IT L E OF AUT HORIZ ED
GOVERNM E NT RE P RE SENT AT IVE
b. SIGNAT URE OF AUT HORIZ E D GOVE RNM E NT RE P RE SENT AT IVE
e. M AIL ING ADDRE SS OF AUT HORIZ ED GOVE RNM ENT REP RESE NT AT IVE
36. I ce r tify th is account is cor re ct and prope r for paym e nt.
g. E -M AIL ADDRESSf. T EL EP HONE NUM BE R
a. DAT E
( YYYYM M M D D )
b. SIGNAT URE AND T IT LE OF CE RT IFYING OFFICE R
2 8 . SHIP NO. 2 9 . DO VOUCHER NO. 3 0 .
INIT IAL S
3 2 . P AID BY 3 3 . AM OUNT VE RIFIED
CORRE CT FOR
3 5 . BIL L OF LADING NO.
3 4 . CHE CK NUM BE R
3 7 . RE CEIVED AT 3 8 . RECE IVE D BY
( YYYYM M M D D )
3 1 . P AYM E NT
COM P L ET E
P ART IAL
FINAL
P ART IAL
FINAL
DD For m 1155, DEC 2001 P RE VIOUS EDIT ION IS OBSOL ET E .
3 9 . DAT E RE CE IVED 4 0 . T OT AL
CONT AINERS
4 1 . S/R ACCOUNT NO. 4 2 . S/R VOUCHE R NO.
AD D R ESS
AN D
N AME
Aqua Survey, Inc. Jon Doi, Executive Vice President 2019Apr22
III. TEST ADMINISTRATION
A. Sponsor
Army Corps of Engineers, New York District 26 Federal Plaza New York, NY 10278
B. Testing Facilities
ALS Environmental 1317 South 13th Avenue Kelso, WA 98626
Aqua Survey, Inc.
469 Point Breeze Road Flemington, NJ 08822
Battelle 505 King Avenue Columbus, OH 43201-2693
C. Dates of Experimentation
Date of Study Initiation: April 25, 2019 Date of Study Completion: August 28, 2019
D. Study Participants
Jon Doi, Ph.D. Executive Vice President Thomas Dolce Field Operations Manager Robert Fristrom Field Operations Specialist Andrew Froening Field Operations Support Cheryl Hall Quality Assurance Officer Elizabeth Horn Staff Scientist Willard Reasoner Field Operations Specialist Mathew Shappell Field Operations Support Ari Sloss Laboratory Support Michelle Thomas Laboratory Manager
IV. MATERIALS AND METHODS
All sampling and testing were performed in accordance with Appendix B, Attachment 1 of the technical manual “The Management and Regulation of Dredging Activities and Dredged Material in New Jersey’s Tidal Waters” (NJDEP Dredging Manual).
A. Sampling
Test sediment from twenty-one locations was collected from three areas (Albany Turning Basin, Germantown Reach, and Kingston Reach) in the Upper Hudson River by Aqua Survey personnel on April 25, 26, 29, and 30, 2019
The vessel used for sampling, the R/V Pompton was positioned using a Trimble SPS855 Differential Global Positioning System (DGPS).
Sediment collection was performed using a Rossfelder P-3 vibracore with flexible plastic core liners. The project depth was minus 33 feet, including 1 foot overdredge.
The core samples collected were inspected and photographed.
Characteristics were recorded on Sediment Core Logs. All samples were assigned unique ASI sample numbers. These samples were received on ice under chain of custody and were stored at 2-4 °C.
See Figures 1a, 1b, and 1c for the sample locations maps and Table 1 for sample identification numbers and DGPS coordinates.
The appendices contain all supporting documentation including sediment core logs (Appendix A), photographs (Appendix B), chains of custody (Appendix C), sample use forms (Appendix D), grain size distribution and percent moisture (Appendix E), and TOC raw data (Appendix F).
B. Homogenizing and Compositing
Each of the 21 core samples was carefully homogenized using a stainless steel mixer. This procedure followed the specific guidelines found on pages 9-11 and in Appendix A of the Dredging Manual and in ASI’s standard operating procedure SOP/PRP/008. Samples were mixed until uniform in color and texture. Four composites were created from the individual core samples. Table 2 provides sample identification numbers and the compositing scheme.
C. Physical and Total Organic Carbon Analysis
Sub-samples of each homogenized core and the composites were analyzed by ASI for percent moisture and grain size in accordance with the ASTM method D422-63, Standard Test Method for Particle-Size Analysis of Soils, re-approved 2002.
Total Organic Carbon (TOC) was also determined at ASI based on the guidance from EPA Office of Solids Waste and Emergency Response SW-846 Method No. 9060 (Volume IC, Chapter 5, Revision 0, 9/86). The instrument for this analysis was the Dohrmann TOC Boat Sampler, Model 183 (Serial number 98202003), which was connected to the Dohrmann Apollo 9000 TOC Analyzer.
See Appendix E for the grain size distribution and percent moisture raw data and Appendix F for the TOC raw data.
V. PHYSICAL ANALYSIS AND TOC RESULTS
The grain size distribution, percent moisture, and total organic carbon for each core and composite are shown in Table 3.
Core 5 Core 4
Core 3 Core 2
Core 1
Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
692000
692000
692200
692200
692400
692400
692600
692600
692800
692800
693000
693000
693200
693200
693400
693400
693600
693600
693800
693800
694000
694000
694200
694200
694400
694400
0 13
0 13
0 13
0 13
0 13
0 13
0 13
0 13
0 13
0 13
Aqua Survey Inc.
469 Point Breeze Rd.
Flemington, NJ 08822
Tel: (908) 788-8700 Fax: (908) 788-9165 www.AquaSurvey.com
© OpenStreetMap (and) contributors, CC-BY-SA µ
ASI Project: 39-062 Coordinate System:
State Plane NAD 83 New York- West Survey Foot
ACOE-NYD
Upper Hudson River- Albany Turning Basin
Sample Locations - Map
0 100 200 300 40050
Feet
Figure 1a. Site Map- Albany Turning Basin
Core 9
Core 8 Core 7
Core 6
Core 16
Core 15
Core 14
Core 13
Core 12
Core 11
Core 10
Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
650000
650000
651000
651000
652000
652000
653000
653000
654000
654000
655000
655000
656000
656000
657000
657000
658000
658000
659000
659000
660000
660000
661000
661000
662000
662000
663000
663000
664000
664000
Aqua Survey Inc.
469 Point Breeze Rd.
Flemington, NJ 08822
Tel: (908) 788-8700 Fax: (908) 788-9165 www.AquaSurvey.com
© OpenStreetMap (and) contributors, CC-BY-SA µ
ASI Project: 39-062 Coordinate System:
State Plane NAD 83 NY- East US Survey Foot
ACOE-NYD
Upper Hudson River- Germantown Reach
Sample Locations - Map
0 700 1,400 2,100 2,800350
Feet
Figure 1b. Site Map- Germantown Reach
!.Core 21
Core 20
Core 19
Core 18
Core 17
Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
633000
633000
634000
634000
635000
635000
636000
636000
637000
637000
638000
638000
639000
639000
640000
640000
641000
641000
642000
642000
643000
643000
644000
644000
645000
645000
646000
646000
647000
647000
648000
648000
Aqua Survey Inc.
469 Point Breeze Rd.
Flemington, NJ 08822
Tel: (908) 788-8700 Fax: (908) 788-9165 www.AquaSurvey.com
© OpenStreetMap (and) contributors, CC-BY-SA µ
ASI Project: 39-062 Coordinate System:
State Plane NAD 83 NY- East US Survey Foot
ACOE-NYD
Upper Hudson River-
Kingston Reach Sample Locations - Map
0 900 1,800 2,700 3,600450
Feet
Figure 1c. Site Map- Kingston Reach
Table 1. DGPS Coordinates, Core Locations
Core Name Northings Eastings
Core 1 1381835.9 693291.7
Core 2 1381362.7 693083.4
Core 3 1381380.1 692887.7
Core 4 1381583.7 693163.3
Core 5 1381645.8 693055.5
Core 6 1216145.8 660330.5
Core 7 1215705.7 659973.4
Core 8 1215351.5 659669.1
Core 9 1215025.2 659416.4
Core 10 1213776.3 658413.4
Core 11 1213801.8 658081.9
Core 12 1213162.5 657546.5
Core 13 1212626.1 657138.5
Core 14 1211886.7 656892.6
Core 15 1208347.5 654157.9
Core 16 1207941.5 653906.5
Core 17 1133071.1 638524.8
Core 18 1132147.3 638475.0
Core 19 1131641.6 638485.3
Core 20 1131064.7 638559.3
Core 21 1130330.2 638640.6
Table 2. Sample Identification and Compositing Scheme
Core Name ASI ID # Compositing Scheme
Core 1 20190278
Albany Turning Basin Composite 20190299
Core 2 20190279
Core 3 20190280
Core 4 20190281
Core 5 20190282
Core 6 20190283
Germantown Reach Composite 20190300
Core 7 20190284
Core 8 20190285
Core 9 20190286
Core 10 20190287
Core 11 20190288
Core 12 20190289
Core 13 20190290
Core 14 20190291
Core 15 20190292
Core 16 20190293
Core 17 20190294 Kingston Reach Composite #20190301
Core 18 20190295
Core 19 20190296
Core 20 20190297 Kingston Reach Composite #20190302 Core 21 20190298
Table 3. Grain Size Distribution, Percent Moisture, and TOC Results
Sample ID ASI # Total % Gravel
Total % Sand
Total % Silt
Total % Clay
Moisture
TOC
Ppm
% TOC
of
Dry Weight
ATB-1 20190278 0.0 23.5 56.4 20.1 48.0 31,260 3.13
ATB-1 20190278 dup 0.0 26.3 55.2 18.5
ATB-1 20190278 trp 0.0 28.4 53.0 18.6
ATB-2 20190279 0.0 20.3 56.1 23.6 59.6 40,761 4.08
ATB-3 20190280 0.0 20.4 57.1 22.5 57.3 36,055 3.61
ATB-4 20190281 0.0 16.8 61.0 22.2 57.6 36,671 3.67
ATB-5 20190282 0.1 19.6 56.6 23.7 56.8 34,107 3.41
ATB Composite 20190299 0.0 17.5 59.5 23.0 54.4 35,038 3.50
GR-6 20190283 0.3 89.6 9.6 0.5 24.9 1,785 0.18
GR-6 20190283 dup 0.0 88.8 11.2
GR-6 20190283 trp 0.1 88.8 11.1
GR-7 20190284 0.2 86.7 11.7 1.4 25.4 1,811 0.18
GR-8 20190285 0.3 84.5 12.9 2.3 24.2 2,095 0.21
GR-9 20190286 0.2 83.9 10.9 5.0 26.3 3,956 0.40
GR-10 20190287 0.1 83.8 12.5 3.6 26.9 3,019 0.30
GR-11 20190288 0.0 82.9 13.8 3.3 26.1 3,135 0.31
GR Composite 20190300 0.2 85.8 11.8 2.2 26.8 2,429 0.24
KR-12 20190289 0.3 92.3 7.3 0.1 24.3 1,665 0.17
KR-13 20190290 0.0 89.3 10.5 0.2 25.8 2,537 0.25
KR-14 20190291 0.2 85.2 13.3 1.3 26.9 5,208 0.52
KR-15 20190292 0.1 90.1 8.8 1.0 25.9 1,625 0.16
KR-16 20190293 0.0 90.0 9.1 0.9 26.9 1,525 0.15
KR-17 20190294 0.0 48.2 34.3 17.5 38.4 14,281 1.43
KR-18 20190295 0.0 21.3 48.8 29.9 46.0 21,438 2.14
KR-19 20190296 0.1 24.2 50.1 25.6 45.3 22,183 2.22
KR (17-19) Composite 20190301 0.0 28.8 48.7 22.5 42.8 18,217 1.82
KR-20 20190297 0.1 44.6 39.0 16.3 39.7 16,160 1.62
KR-20 20190297 dup 39.6
KR-20 20190297 trp 39.9
KR-21 20190298 0.0 27.0 50.3 22.7 42.4 16,611 1.66
KR (20-12) Composite 20190302 0.0 30.1 49.8 20.1 42.4 16,792 1.68
KR (20-12) Composite 20190302 42.8
KR (20-12) Composite 20190302 42.7
APPENDICES
Appendix A
Sediment Core Logs
Appendix B
Photographs
Core 1, 0 – 1.8’, 4/25/19, ASI ID # 20190278
Core 2, 0 – 2.0’, 4/25/19, ASI ID #20190279
Core 4, 0 – 2.2’, 4/25/19, ASI ID # 20190281
Core 3, 0 – 2.3’, 4/25/19, ASI ID # 20190280
Core 5, 0 – 1.9’, 4/25/19, ASI ID # 20190282
Core 6, 0 – 1.7’, 4/26/19, ASI ID # 20190283
Core 8, 0 – 2.1’, 4/26/19, ASI ID # 20190285
Core 7, 0 – 1.9’, 4/26/19, ASI ID # 20190284
Core 10, 0 – 1.9’, 4/26/19, ASI ID # 20190287
Core 9, 0 – 2.0’, 4/26/19, ASI ID # 20190286
Core 11, 0 – 1.8’, 4/26/19, ASI ID # 20190288
Core 13, 0 – 1.7’, 4/29/19, ASI ID # 20190290
Core 12, 0 – 1.8’, 4/29/19, ASI ID # 20190289-Missing Photo, see Sediment Core Log.
Core 14, 0 – 2.2’, 4/29/19, ASI ID # 20190291
Core 15, 0– 2.7’, 4/29/19, ASI ID # 20190292
Core 17, 0 – 2.5’, 4/30/19, ASI ID # 20190294
Core 16, 0 – 2.1’, 4/29/19, ASI ID # 20190293
Core 18, 0 – 2.3’, 4/30/19, ASI ID # 20190295
Core 19, 0 – 2.3’, 4/30/19, ASI ID # 20190296
Core 20, 0 – 3.6’, 5/30/19, ASI ID # 20190297
Core 21, 0 – 2.2’, 4/30/19, ASI ID # 20190298
Appendix C
Chains of Custody
Appendix D
Sample Use Forms
Appendix E
Percent Moisture and Grain Size Distribution Raw Data, Calculations and Graphs
Appendix F
TOC Raw Data and SRM Control Chart
| Table of Contents |
| Figure 1a- Sample Locations Map- Albany Turning Basin |
| Figure 1b- Sample Locations Map- Germantown Reach |
| Figure 1c- Sample Locations Map- Kingston Reach |
| Table 1- DGPS Coordinates |
| Table2- Sample Identification and Compositing Scheme |
| Table 3- Grain Size, % Moisture, and TOC Results |
| Appendices |
| Appendix A- Core Logs |
| Appendix B- Photos |
| Appendix C- Chains of Custody |
| Appendix D- Sample Use Forms |
| Appendix E- % Moisture and Grain Size Raw Data, Calculations, and Graphs |
| Appendix F- TOC Raw Data and SRM Control Chart |
File details come from the government source that posted it. Updated .