S-103 Construction Elevations.pdf
PDF 585 KB Posted
- Solicitation number
- W912DS-20-B-0010
About this file
This document contains construction drawings and specifications for a well and pump house. The drawings show building elevations, sections, and notes specifying the contractor shall verify existing conditions, submit shop drawings for approval prior to fabrication, and check for project bulletins and addendums.
The related federal contract opportunity is a solicitation by the U.S. Army Corps of Engineers Engineering District New York for construction services for Fire Island to Moriches Inlet Contract 3C. The project involves building a well and pump house in Ocean Beach, New York. Interested offerors should review the solicitation for details on response dates and requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 6 D C B
ELEVATION
SCALE: 1/4"=1'-0"
ELEVATION
SCALE: 1/4"=1'-0"
5 A
M
I N
7 8
12" OVERFLOW PIPE,
INVERT AT EL. +8'-0".
SEE CIVIL DWGS.
D C B
ELEVATION
SCALE: 1/4"=1'-0"
A
12" OVERFLOW PIPE,
INVERT AT EL. +8'-0".
SEE MEP DWGS.
3'-0"
5'-0"
8"Ø PIPE
WELL DISTRIBUTION PIPE
SEE MEP DWGS
WELL, PIPE & CASING
SEE MEP DWGS
1 2
SECTION
SCALE: 3/4"=1'-0"
17-1851
MTS
DK / TC
06/16/2017
5591-50-2 de Bruin
PRIOR TO START OF STRUCTURAL WORK:
1. CONTRACTOR SHALL CHECK FOR LATEST
PROJECT BULLETINS AND ADDENDA.
2. CONTRACTOR SHALL CONFIRM THAT ALL
SUBCONTRACTORS ARE USING THE
LATEST STRUCTURAL DRAWINGS.
3. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS RELATED TO NEW WORK
AND PROVIDE FIELD DIMENSIONS.
4. CONTRACTOR SHALL SUBMIT SHOP
DRAWINGS FOR REVIEW AND APPROVAL,
PRIOR TO MATERIAL ORDERING AND
FABRICATION.
File details come from the government source that posted it. Updated .