S-102 Construction Framing Plans.pdf

PDF 1 MB Posted

Attached to
Fire Island to Moriches Inlet (FIMI) Contract 3C (Well & Pump House), Ocean Beach, NY
Solicitation number
W912DS-20-B-0010
Issued by

About this file

This document contains construction framing plans and related details for a federal contract opportunity issued by the Department of the Army Corps of Engineers Engineering District New York. The framing plans provide specifications for cast-in-place concrete slabs, grade beams, pile supported foundations, rebar schedules, and other structural elements for a new well and pump house to be located in Ocean Beach, New York. Relevant details include slab thicknesses, rebar spacing, pile locations, notes on concrete mix designs and special inspections. The related federal contract opportunity is solicitation number W912DS-20-B-0010 for construction services for the Fire Island to Moriches Inlet Contract 3C project. Responses to the solicitation are due on the specified date, with award of the contract to occur thereafter.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B M

B M

B M

BM-1 BM-1 BM-1

BM-1 BM-1

B M

B M

B M

C1

P3

EL: +2'-6"

8N 8N

8N8N

KNEE WALL

BELOW (TYP.)

BM-1

C1

P3

8N

8N

P3P3

P3

P3

P3 P3

C1

P3

UPPER FLOOR FRAMING PLAN

SCALE: 1/4"=1'-0"

2 3

9'-8"

8'-3"

8'-3"

8'-3" 8'-3"

D

C

B

4'-3"

A

6'-4

NOTES:

1. AVERAGE EXISTING GRADE ELEVATION = +2.2' = REFERENCE ELEVATION UNLESS OTHERWISE NOTED.

2. TOP OF PLATFORM LEVEL SLAB ELEVATION = +11'-0", UNLESS OTHERWISE NOTED ON PLAN.

3. TOP OF PILE SUPPORTED GRADE BEAM TO BE AT ELEVATION = (+0'-0") UNLESS OTHERWISE NOTED THUS (......) ON PLAN.

4. CONCRETE WALL TO BE REINFORCED WITH #6 VERT. BARS AT 6" O.C. AND #4 HORIZ. BARS AT 12" O.C., EACH FACE.

5. EAST-WEST REBAR IN SLABS ARE TO BE THE OUTER-MOST LAYER, UNLESS OTHERWISE NOTED.

6. INFORMATION SHOWN IN HELICAL SCEW ANCHOR SCHEDULE IS FOR ESTIMATING PURPOSED ONLY. FINAL DESIGN TO BE

DETERMINED AND SUBMITTED BASED ON THE PROJECT REQUIREMENTS IN THE DRAWINGS, GENERAL NOTES AND

SPECIFICATIONS.

LEGEND:

INDICATES HELICAL SCREW ANCHORS. REFER TO GENERAL NOTES AND HELICAL SCREW ANCHOR

SCHEDULE FOR MORE INFORMATION.

INDICATES DRIVE-CAST DISPLACEMENT PILE HELICAL SCREW ANCHORS REQUIRING LATERAL CAPACITY.

REFER TO GENERAL NOTES AND HELICAL SCREW ANCHOR SCHEDULE FOR MORE INFORMATION.

INDICATES 8" THICK ONE-WAY CAST-IN-PLACE CONCRETE SLAB, REINFORCED WITH #6 @ 12" O/C, T&B E.W.

INDICATES 6" THICK ONE-WAY CAST-IN-PLACE CONCRETE SLAB, REINFORCED WITH #4 @ 6" O/C, T&B E.W.

6N

8N

6N

S-103

B M

B M

B M

B M

B M

EL: +11'-0"

B M

6N

6N

6N

N

6N 6N 6N 6N6N

3'-0"

1'-0"

1'-7

1'-3

3'-9

6'-0

EMERGENCY

GENERATOR,

MAX OPERATING

WEIGHT 1304 LBS.

BM-2 BM-2 BM-2 BM-2 BM-2

C1C1C1

C1 C1 C1

C1C1C1

C1

S-103

2 3

9'-8"

8'-3"

8'-3"

8'-3" 8'-3"

D

C

B

4'-3"

A

6'-4

FOUNDATION FRAMING PLAN

SCALE: 1/4"=1'-0"

1'-0" CONCRETE

TANK WALL, TYP.

2'-0"

S-103

S-103

B M

BM-1 BM-1 BM-1

B M

BM-1

BM-1

B M

B M

BM-1

BM-1

B M

B M

SEE MEP DWGS.

FOR PIPING

ENCASEMENT

P3 C1

P2

C1

P2

C1

P2

C1

P2

P3

P3

C1

P2

C1

P2

6"

6"

2'-0"

C2

P1

BM-2 BM-2 BM-2

2'-3" 3'-0"

BM-4

1'-8

BM-4

BM-4

N

C2

P1

C2

P1

C2

P1

C2

P1

C2

P1

C2

P1

C2

P1

C2

P1

C2

P1

REFER TO CIVIL & OTHER DRAWINGS FOR

PIPE LOCATIONS. SHOW PIPE PENETRATIONS

ON CONCRETE REBAR SHOP DRAWINGS

COORDINATE ELECTRICAL CONDUIT

EMBEDDED IN SLAB WITH MEP DRAWINGS

12" OVERFLOW PIPE,

INVERT AT EL. +8'-0".

SEE CIVIL DWGS.

3'-0"

C1

S-103

17-1851

MTS

DK / TC

06/16/2017

5591-50-2 de Bruin

PRIOR TO START OF STRUCTURAL WORK:

1. CONTRACTOR SHALL CHECK FOR LATEST

PROJECT BULLETINS AND ADDENDA.

2. CONTRACTOR SHALL CONFIRM THAT ALL

SUBCONTRACTORS ARE USING THE

LATEST STRUCTURAL DRAWINGS.

3. CONTRACTOR SHALL VERIFY ALL EXISTING

CONDITIONS RELATED TO NEW WORK

AND PROVIDE FIELD DIMENSIONS.

4. CONTRACTOR SHALL SUBMIT SHOP

DRAWINGS FOR REVIEW AND APPROVAL,

PRIOR TO MATERIAL ORDERING AND

FABRICATION.