C-102 Site Plan.pdf

PDF 370 KB Posted

Attached to
Fire Island to Moriches Inlet (FIMI) Contract 3C (Well & Pump House), Ocean Beach, NY
Solicitation number
W912DS-20-B-0010
Issued by

About this file

This document package includes a site plan drawing and related federal contract opportunity notice. The site plan drawing depicts the layout and construction details for a proposed well station and pump house to be located at 503 Bayberry Walk in Ocean Beach, New York. Key elements of the site plan include a new well, water tank, electrical service upgrades, sanitary piping connections, concrete slabs and walkways, fencing, and other site infrastructure details.

The related federal contract opportunity is a solicitation issued by the U.S. Army Corps of Engineers New York District for contract services under the Fire Island to Moriches Inlet project. The solicitation seeks construction of the well and pump house depicted in the site plan drawing, to be located at 503 Bayberry Walk in Ocean Beach, New York. The estimated value of the contract is between $500,000 and $1,000,000. The response due date is not provided. The selected contractor will be responsible for coordination with local officials and utility providers during construction.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.0

.0

1 2 3 4 5 6

D

C

B

A

Conc. Walk

Found

Stake

Deck

Wood

Wood Deck

Deck Over

2nd Story Wood Ramp

Conc.

Wood Deck

Steps

Wood

Deck

Wood

O .H

E

L E

C T

R

IC

2.3

S E

W E

R

1.8

2.3

2.3

W id e

B a y b e rr y W a lk

0502-001.00-03.00-056.000

Frame Building

2 Story

#502

0502-001.00-03.00-054.000

Frame Building

2 Story

#504

D e h n h o ff

W a lk

W

A T

E R

N69°29'16"E 80.00'

N '4

W

± 80'

S

'4

E

S69°29'16"W

80.00'

EL= 2.28

E=1,218,484.49 N= 176,322.35

CROSS CUT

.1

.1

.0

1 2 .5

.5

.9

.1

.2

.2

5' Wood Fence

Wood Deck

G E

N E

R A

T O

R

2.20

2.20

2.20

2.30

2.20

2.20

1.80

2.30

WOOD DECK EL. 11.00

EN

LD

LD

2.10

8" to 8" TEE

10" D.I.P WATER

TEE

8"x8"x8"

E L

.0

B L

D G

S

L A

B

C O

N C

R E

T E

ROOM

STORAGE

ROOM

PUMP

595 SF - FF 11.00

0502-001.00-03.00-055.000

FRAMED WELL HOUSE

PROPOSED WOOD

OH OH OH OH

.8 de Bruin

PROJECT NO. DRAWING NO.

SCALE:

PROJECT:

NO. REVISIONS DATE

PROJECT ENGINEER:

DRAWING TITLE:

FILE NO.

DATE:

DRAWN BY:

CHECKED BY:

of the alteration.

alteration, and a specific description followed by his signature, the date of drawing with the notation “altered by” engineer shall affix his seal to the professional engineer, the altering altered under the direction of a drawing in any way. If the drawing is engineer, to alter any item on this direction of a licensed professional person, unless he is acting under the New York State Education Law for any It is a violation of Section 7209 of the

Civil Engineering & Construction Management

11 Union Avenue Bethpage New York 11714 de Bruin Engineering, P.C.

PS

D

A T

E

T

IM

E

F

IL

E

RWD

C-102

SITE PLAN

1" = 5'

516.513.1313

WELL STATION #5

CONSTRUCTION OF

OCEAN BEACH

VILLAGE OF

OCEAN BEACH, NY

503 BAYBERRY WALK

0 BID DOCUMENTS 05-22-20

1 AMENDMENT 1 06-12-20

PROPOSED GRADE3.30

LEGEND

WOOD DECK

ENTRANCE

CONCRETE DRIVEWAY (SEE DETAIL 1/C-201)

CONCRETE SLAB (SEE STRUCTURAL)

6" GRAVEL (SEE DETAIL 2/C-201)

WOOD HANDRAIL

Midway Walk

.0

LD

EN

LOADING DOOR

SANITARY SERVICE

WITH THE CONTRACTING OFFICER AND THE VILLAGE.

VILLAGE. THE CONTRATOR SHALL COORDINATE THE APPROVAL AND DELIVERY

8. UPON APPROVAL, EXCESS EXCAVATED MATERIAL WILL BE ACCEPTED BY THE

SECTION 26 10 10.

7. COORDINATE ELECTRICAL SERVICE WITH PSEG AND REFER TO SPECIFICAITON

ORINGAL INSTALLATION.

FILL THE MATERIALS ARE TO BE REINSTALLED IN THE SAME MANNER AS THE

DOCUMENTED. UPON COMPLETION OF INSTALLATION OF PIPE AND FLOWABLE

THE PROJECT MANAGER AND THE ORIGINAL INSTALLATION METHODS

EXISTING MATERIALS ARE TO BE CAREFULLY REMOVED IN THE PRESENCE OF

6. WHERE "REMOVE & RESET" OR "REMOVE & REINSTALL" IS CALLED OUT.

CONCRETE SHALL CONFORM TO SECTION 033000 CAST-IN-PLACE CONCRETE.

5. ALL CONCRETE SHALL HAVE 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI.

4. SITE IS VACANT

3. SITE LOCATED IN FEMA ZONE AE-8.

2. ALL ELEVATION ARE IN NAVD 1988.

DATED 04/15/2019.

1. ALL SURVEY INFORMATION REFERENCED FROM GAYRON DE BRUIN SURVEY

NOTES:

8" DIAMETER BOLLARD

EXPANSION JOINT

CONTRACTION JOINT

SINGLE GATE

DOUBLE GATE

DWGS FOR DETAILS.

ARCHITECTURAL

STAIR TO SLAB SEE

BELOW STAIR. ANCHOR

POUR CONCRETE PAVING

6' MONROE STYLE WOOD FENCE

PRIVACY WALL

5.0'

Y A

R D

S

ID

E .7

Y A

R D

S

ID

E .0

(TYP)

(T Y

P

1.5'

.5

5.0'

.0

' (TYP)

(T Y

P

10.0'

.0

(TYP)

(T Y

P

15.0'

FRONT YARD

27.8'

9"

(TYP)

44.7' .3

LC

.2

(SEE MEP PLANS)

TO SANITARY

FLOOR DRAIN

(SEE MEP PLANS)

PUMP PIER

ASSOCIATED

WELL PIPE AND

NEW WELL.

(SEE MEP PLANS)

WELL DISTRIBUTION PIPE

F L O

W

(SEE MEP PLANS)

TO TANK BELOW

BLOW OFF PIPE

DRIVEWAY

CONCRETE

PROPOSED

DISCHAGE PIPE D=8"

PLANS)

(SEE STRUC

FOUNDATION

(SEE ARCH PLANS)

HATCH DOOR

OF NEW TANK ACCESS

APPRX. LOCATION

WATER SERVICE

WATER SERVICE GATE VALVE

33.9' NEW WELL

CONCRETE SIDEWALK (SEE DETAIL 6/C-201)

DIRT

WYE FITTING

NEW 6" X 8"

45° BEND

NEW 6" DIA.

COUPLINGS

EXISTING WITH FERNCO

AND CONNECT TO

OF 8"Ø SDR 35 PVC

INSTALL NEW SECTION

I=-0.23

I=0.94

SANITARY

NOT SHOWN FOR CLARITY

AND ELEVATED PORTION OF BUILDING.

INSTALL 6" GRAVEL BELOW DECK, STAIR

1/2" WATER SERVICE (SEE MEP)

1/2" WATER SERVICE (SEE MEP)

3/4" WATER SERVICE (SEE MEP)

POLE (NOTE 7)

SERVICE

NEW PSEG

3 PHASE SERVICE

400A, 208Y/120V, NEW OVERHEAD

SERVICE MAST

NEW

UTILITY METER

NEW PSEG

ELECTRIC SERVICEOHOH

DETAIL

WALL PENETRATION

SEE MEP PLANS FOR

12"Ø CLASS 53 DI PIPE.

TANK OVERFLOW

N E

W W

E L

L

.7

.7

3.0' .3

.7

F L O

W

SDR 35 PVC SANITARY SERVICE

NEW 6" DIA.

OFFICER

WITH THE VILLAGE AND CONTRACTING

ACCESS LOCATION AND INSTALLATION

TO STRUCTURE. COORDINATE TEMPORARY

RAILINGS AND TEMPORARY ACCESS

REPONSIBLE FOR PROVIDING SAFETY

TO THE SITE. CONTRACTOR IS

STEPS AND RAILINGS TO GAIN ACCESS

PORTION OF DECK, ACCESS RAMP,

REMOVE AND REPLACE IN-KIND

ENTRY DOOR

LOCATION OF

APPROXIMATE

FLOOR SLAB

THROUGH TANK

8" DIA PENTRATION4

.9

5.0'

8" DISCHAGE PIPE

PIPE

OVERFLOW

12" DIA

D

IS

C H

A G

E P

IP

E

N

File details come from the government source that posted it. Updated .