Final_-_W912DS19B0015_(003).pdf_19082019_(002)_(003)_(002).pdf
PDF 527 KB Posted
- Attached to
- Sea Bright to Manasquan Renourishment (Beach fill); NJ, Project - MONMOUTH COUNTY NEW JERSEY
- Solicitation number
- W912DS-19-B-0015
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy_of_Bid_Abstract_SeaBright_-_W912DS19B0015_04SEP2019.pdf | ||
| 01_11_00.pdf | ||
| 01_14_00.pdf | ||
| 082019_W912DS19B0015U0002.pdf | ||
| WQCAtlanticCOastofNJ.pdf | ||
| 01_11_00.pdf | ||
| C-112.pdf | ||
| 31_24_00.00_18.pdf | ||
| sb-m_beach-35FT-SORTED-LiDAR-HYDRO-ELEV.XYZ | XYZ file | |
| 01_35_30.pdf | ||
| sb-m_beach-15FT-SORTED-PROFILES-ELEV.XYZ | XYZ file | |
| 01_22_00.00_10.pdf | ||
| SebrightManasquanBorrow_Median_sorted_2019.xyz | XYZ file | |
| 01_14_00.pdf | ||
| W912DS19B0015_29072019.pdf | ||
| W912DS-19-B-0015_SPECS_20190725_SEAB.pdf | ||
| W912DS-19-B-0015_PLANS_20190715_sb-m.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and issue bid schedule
2. Answer questions from prospective bidders for informational purposes only
3. Revise and reissue specifications
4. Revise 13. D of the 1442 to 45 days for bid acceptance period 5. Revise 11 of the 1442 to 5 calendar days and complete by March 1, 2020.
6. Update Project Magnitude Range to: Between $25,000,000.00 to $100,000,000.00 NOTE: Bidders must acknowledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the following methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS19B0015
X 9B. DATED (SEE ITEM 11)
29-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE
DATE
19-Aug-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Mobilization & Demobilization
FFP
Mobilization & Demobilization for Hydraulic Beach Fill FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1,330,500 Cubic
Yard Hydraulic Beach Fill
FFP
(Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Final Record Drawings
FFP
Pre-Priced of $100,000 FOB: Destination
$100,000
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 45,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 1 Hydraulic Beach Fill STA 435+00 to STA 428+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 40,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 2 Hydraulic Beach Fill STA 428+00 to STA 421+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 31,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 3 Hydraulic Beach Fill STA 359+00 to STA 353+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 55,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 4 Hydraulic Beach Fill STA 353+00 to STA 347+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008 71,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 5 Hydraulic Beach Fill STA 347+00 to STA 341+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009 81,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 6 Hydraulic Beach Fill STA 341+00 to STA 335+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010 97,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 7 Hydraulic Beach Fill 335+00 to STA 326+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0011 81,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 8 Hydraulic Beach Fill STA 250+00 to STA 240+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0012 97,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 9 Hydraulic Beach Fill STA 250+00 to STA 240+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0013 20,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 10 Hydraulic Beach Fill STA 240+00 to STA 235+50 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 20,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 11 Hydraulic Beach Fill STA 235+50 to STA 232+50 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0015 20,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 12 Hydraulic Beach Fill STA 232+50 to STA 229+50 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0016 20,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 13 Hydraulic Beach Fill STA 229+50 to STA 225+50 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0017 20,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 14 Hydraulic Beach Fill STA 225+50 to STA 218+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0018 20,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 15 Hydraulic Beach Fill STA 218+00 to STA 209+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0019 62,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 16 Hydraulic Beach Fill STA 209+00 to STA 197+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0020 55,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 17 Hydraulic Beach Fill STA 206+00 to STA 197+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0021 100,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 18 Hydraulic Beach Fill STA 178+00 to STA 170+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0022 52,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 19 Hydraulic Beach Fill STA 170+00 to STA 167+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0023 52,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 20 Hydraulic Beach Fill STA 167+00 to STA 164+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0024 50,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 21 Hydraulic Beach Fill STA 164+00 to ST5366262 A 161+00 (Estimated Quantities)
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0025 55,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 22 Hydraulic Beach Fill STA 161+00 to STA 155+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0026 90,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 23 Hydraulic Beach Fill STA 488+00 to STA 480+00 (Estimated Quantities)
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0027 97,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 24 Hydraulic Beach Fill STA 480+00 to STA 472+40 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0028 83,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 25 Hydraulic Beach Fill STA 472+40 to STA 465+00 (Estimated Quantities) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0029 77,000 Cubic
Yard OPTION Hydraulic Beach Fill
FFP
Option 26 Hydraulic Beach Fill STA 465+00 to STA 454+00 (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0030 1 Job OPTION Vibration Monitoring
FFP
Option 27 FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0031 1 Job OPTION Mobilization & Demobilization
FFP
Option 28 Mobilization & Demobilization for Hydraulic Beach Fill
TOTALS:
Total Base 0001 – 0003 $___________________________________
Total Option Clins 0004-0031 $______________________________
Total of all Clins Base plus Options 0001-0031 $________________
TOTALS/NOTES
NOTES:
1. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
2. The bidders are required to bid on all items or their bid will be rejected.
3. The low bidder for the purpose of award will be the confirming responsible bidder offering the lowest amount for the Total Base Bid and optional bid items.
4. Line item 0003 is pre-priced at $100,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirement.
5. The Bid Acceptance Period is as stated on Standard Form 1442.
6. Tapering are included in the items and exact locations are on the plan sheets.
7. All base work must be completed by March 1, 2020 due to environmental restrictions.
8. The government may exercise options within 150 day of NTP. If options are exercised within 60 days of notice to proceed (NTP), the Contractor shall be required to complete the entire base and options work exercised by March 1, 2020. If options are exercised after 60 days of NTP, the Contractor shall be required to complete the option work that is exercised (post 60 days of NTP) no later than March 1, 2021. All option work, if exercised, must be complete by March 1, 2021. Optional CLIN for mobilization/demobilization may be exercised if option work exercised exceeds the March 1, 2020 restriction. The USACE will coordinate with the contractor to maximize the placement area next to adjacent base sections.
9. All option work, if exercised, must be completed by March 1, 2021.
No work will occur between March 1, 2020, and October 15, 2020. No work will be allowed after March 1, 2021.
10. CLIN0031 (Option28) may be exercised if option work exercised exceeds the March 1, 2020 restriction.
11. The Government is under no obligation to exercise/award any option. No additional time will be added for exercised options.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete base items ready for use not later than March 1, 2020. Any optional work exercised after 60 days from Notice to Proceed must be completed by March 1, 2021.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work on March 1, 2020 for the base items and options exercised within 60 days of NTP, and March 1, 2021 for options exercised after 60 days. The Contractor shall pay liquidated damages to the Government in the amount of $4,879 for each calendar day of delay until the work is completed or accepted for first tier and$1,219.75 for each calendar day of delay until the work is completed or accepted for second tier (b)If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. (End of clause)
SECTION 00 10 00 - SOLICITATION
The offeror acceptance period has decreased by 75 from 120 to 45.
The required performance has changed from Project Title: Seabright to Manasquan, NJ 1. 100% Unrestricted Full and Open Competition with HubZone Evaluation preference.2. NAICS Code 237990, Size Standard $27,500,000.00. Project Magnitude Range: Between $25,000,000.00 to $30,000,000.00. Submit Bids no later than 2:00PM EST on 28 Aug 2019 to:U.S. Army Corps of EngineersNew York District, Contracting Division, Room 16-30026 Federal Plaza, New York, NY 10278-0090Due to heightened security at U.S.
Government installations, all Bidders are instructed to allow ample time to get through the security checkpoint in order to have their bids delivered before 2:00PM on the date of the bid opening.5. Contract Specialist is Sandra Schenning, sandra.l.schenning@usace.army.mil to Project Title: Seabright to Manasquan, NJ 1. 100% Unrestricted Full and Open Competition with HubZone Evaluation preference.2.
NAICS Code 237990, Size Standard $27,500,000.00. Project Magnitude Range: Between $25,000,000.00 to $100,000,000.00. Submit Bids no later than 2:00PM EST on 28 Aug 2019 to:U.S. Army Corps of Engineers New York District, Contracting Division, Room 16-30026 Federal Plaza, New York, NY 10278-0090Due to heightened security at U.S. Government installations, all Bidders are instructed to allow ample time to get through the security checkpoint in order to have their bids delivered before 2:00PM on the date of the bid opening.5. Contract Specialist is Sandra Schenning, sandra.l.schenning@usace.army.mil.
Sea Bright to Manasquan Reach, Beach Erosion Control Project, Sea Bright to Long Branch, NJ
W912DS-19-B-0015
Amendment No.1
To Bidders The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
-None
2. The following DRAWINGS have been ADDED:
- C-112, see file in FBO with this amendment.
3. The following DRAWINGS have been REVISED but NOT REISSUED:
- G-001
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
-None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
-None
3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:
1-SECTION 01 22 00.00 10
2-SECTION 31 24 00.00 18
3-SECTION 01 11 00
4-SECTION 01 35 30
5-SECTION 01 14 00
See files In FBO with this amendment
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
1-WQC attachment to SECTION 00 90 01
REVISED SPECIFICATIONS:
1-WQC attachment to SECTION 00 90 01, see attachment in FBO with this amendment.
Questions and Answers:
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.
This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.
Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.
RFI SET #1:
Question #1: Section 01 11 00, Paragraph 1.1.a. states: “The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed”.
The SF 1442 states: “The Contractor shall begin performance within 10 calendar days and complete within 120 calendar days after receiving NTP”.
a. Can the Owner please clarify the commencement requirement?
Answer #1: (Revised SF 30.)
Question #2: Section 01 11 00, Paragraph 1.3 states: “This project is estimated between $15,000,000 and $35,000,000.” Further, the SF 1442 shows a Project Magnitude Range of $25,000,000 to $30,000,000.
a. Can the Owner please clarify the project magnitude?
Answer #2: (Revised SF 30 and Section 01 11 00)
Question #3: Can the Owner please provide Plan Sheets for Line Items 0004 and 0005?
Answer #3: Yes, sheet C-112 was added. See file In FBO with this amendment.
Question #4: Can the Owner please provide Cross Sections and current XYZ data for the Borrow Areas?
Answer #4: Yes, xyz data is available. See file In FBO with this amendment.
Question #5: Page 13 of Section 01 50 00 contains the following bullet point for Government Field Office Requirements:
• “Provide 2 vehicles with 4-wheel drive, less than 3 years old (minimum 6 passengers) for
Government's use. Maintenance of the vehicles including all fuel, State inspections, and required insurance shall be the Contractor's responsibility.”
Further, page 14 contains the following bullet point for the same section:
• “The Contractor shall also supply 2 vehicles with gas cards sufficient to cover the duration of the project for Government's official use. These vehicles shall be a utility vehicle type, seven passenger with 4-wheel drive not more than 3 years old. Insurance, registration, and fuel and maintenance of the vehicle including State Inspections shall be the contractor's responsibility.”
a. Will the Contractor be required to provide 2 vehicles or 4 vehicles for the Government?
Answer #5: Two vehicles.
Question #6: Section 01 45 00, Paragraph 3.4.1 states the requirements for the CQC organization to include a Safety and Health Manager. Can this Safety and Health Manager have other roles such as SSHO or Quality Control Manager?
Answer #6: No, Safety and Health Manager cannot have other roles.
Question #7: Is the Contractor allowed to perform its own Grain Size Analysis, as discussed in Paragraph 1.6.m. in Section 31 24 00?
Answer #7: Yes. Added language to 31 24 00 for core analysis: "Core Analysis. Sieving will be done using recently calibrated sieves, with sieve graduations at half phi intervals on the Wentworth scale. Sieving will include a quality control program for repeat sieving of one standard sample during the core analysis study. Tabulated results will report median size in millimeters as well as phi units. Results of the sieving will be plotted as grain size distribution and the mean, median, and standard deviation computed for each sample collected."
Question #8: Can the Government confirm that any bird nesting surveys (i.e. for Piping Plover or Roseate Tern) will be provided at the expense of the Government?
Answer #8: Yes, beginning on 15 March 2020 and continuing through the breeding season (15 August) or the date of the last fledging, a Corps’ biologist(s) or designated representative(s) shall survey and monitor the action area and identify plover territorial, courtship and nesting areas. The USACE will also provide the Contractor any survey data obtained from NJDEP/NJFWS.
Question #9: Can the Government confirm that the Contractor is only required to provide a UXO Technician on the beach, and if a UXO Technician is required on the dredge, an equitable adjustment in pricing will be made?
Answer #9: Yes.
Question #10: According to the Solicitation, all work must be completed 120 days after NTP, which coincides with the required completion date of March 1, 2020. The Solicitation also states that additional time will be considered for any options that are exercised.
a. For planning purposes, can the Owner please provide an amount of days allowed for each option, so that the Contractor can plan accordingly?
b. Because the 120 day allotment ends on or around March 1, 2020, it appears that should any options be awarded, the Contractor should receive more days which would push them past the March 1, 2020 deadline. How does the Government plan on allowing Contractors to work the optional reaches if they are past the March 1, 2020 deadline?
Answer #10: The government may exercise options within 150 day of NTP. If options are exercised within 60 days of notice to proceed (NTP), the Contractor shall be required to complete the entire base and options work exercised by March 1, 2020. If options are exercised after 60 days of NTP, the Contractor shall be required to complete the option work that is exercised (post 60 days of NTP) no later than March 1, 2021. All option work, if exercised, must be complete by March 1, 2021. Optional CLIN for mobilization/ demobilization may be exercised if option work exercised exceeds the March 1, 2020 restriction. The USACE will coordinate with the contractor to maximize the placement area next to adjacent base sections.
Question: #11: According to the Solicitation, all work must be completed by March 1, 2020, due to environmental restrictions. What are the environmental restrictions?
Answer #11: No work beyond March 1st is per the USFWS Programmatic Biological Opinion and subsequent USACE coordination with USFWS for the protection of piping plovers under Section 7 of the Endangered Species Act.
Question: #12: Previous Contracts in the same vicinity have occurred year round. Would the Government consider removing the March 1st restriction and allow Contractor to implement endangered species surveyors/biologists if necessary?
Answer #12: USACE is currently coordinating with USFWS and maintaining compliance with the USFWS Programmatic Biological Opinion.
Question: #13: Would the Owner please consider allowing Contractors 365 days to complete the Work in lieu of the 120 days?
a. If 365 days is not considered, would the Owner please consider allowing Contractors to start after March 1st, 2020?
Answer #13:The government may exercise options within 150 day of NTP. If options are exercised within 60 days of notice to proceed (NTP), the Contractor shall be required to complete the entire base and options work exercised by March 1, 2020. If options are exercised after 60 days of NTP, the Contractor shall be required to complete the option work that is exercised (post 60 days of NTP) no later than March 1, 2021. All option work, if exercised, must be complete by March 1, 2021. Optional CLIN for mobilization/ demobilization may be exercised if option work exercised exceeds the March 1, 2020 restriction. The USACE will coordinate with the contractor to maximize the placement area next to adjacent base sections.
RFI SET #2:
Question #1: We have noted the presence of an environmental window in the specifications, restricting work after March 1st. historically, dredging and beach fill has been performed in this area outside of this window. In addition, this puts a significant restraint on the ability of the government to award options, based on this schedule.
Please confirm that the environmental window will apply to this project.
Answer #1: Yes, environmental window will apply to this project.
Question #2: Please clarify the number of additional days allowed for options, should they be awarded.
Answer #2: The government may exercise options within 150 day of NTP. If options are exercised within 60 days of notice to proceed (NTP), the Contractor shall be required to complete the entire base and options work exercised by March 1, 2020. If options are exercised after 60 days of NTP, the Contractor shall be required to complete the option work that is exercised (post 60 days of NTP) no later than March 1, 2021. All option work, if exercised, must be complete by March 1, 2021. Optional CLIN for mobilization/ demobilization may be exercised if option work exercised exceeds the March 1, 2020 restriction. The USACE will coordinate with the contractor to maximize the placement area next to adjacent base sections.
Question #3: The referenced specification states that working hours for dredging are 24 hours per day, 7 days per week; however, it also states that local government approval is required to ensure compliance with local ordinances and local boards. Please confirm that dredging and beach fill operations will not be limited to reduced hours based on any local ordinances.
Answer #3: Yes, dredging and beach fill operations will not be limited to reduced hours based on any local ordinances.
Question #4: The referenced specification states that the Air Program Manager, through the Contracting Officer, must be notified at least 6 months prior to bringing equipment to the construction site so that air permits can be secured. Given the accelerated schedule for this project, please confirm that the permits have already been secured or that the minimum 6 month notification requirement will be waived.
Answer #4: The Air Program Manager has already been notified of the equipment type and schedule and work is approved to proceed. Please reference contractor's air emissions requirements, such as the submission of monthly calculators, in section 01 11 35
Question #5: Plan Sheet Detail with survey data for Stations 435+00 to 421+00 (Options 1-2) appears to be missing. Can the government please provide this information?
Answer #5: Yes, sheet C-112 was added. See file In FBO with this amendment.
Question #6: The General Plan Sheet and Detailed Plan Sheets for Options 23-24 indicate different fill area stationing from the CLIN Schedule. Please clarify the fill stationing for Options 23-24 and provide revised drawings, if necessary.
Answer #6: Yes, bid schedule was revised. See file In FBO with this amendment.
Question #7: Please provide the most recent hydrographic survey data for the borrow areas available for use on this project, preferably in XYZ format.
Answer #7: Yes, xyz data is available. See file In FBO with this amendment.
Question #8: Please provide the current water quality certificate, including terms and conditions, applicable to this project.
Answer #8: The following are applicable WQC, including terms and conditions. See specifications section 00 90 01 and files added to FBO with this amendment:
1) 1995 NJDEP Federal Consistency Determination Water Quality Certificate (FedCon/WQC) for the Beach Erosion Control Project Section II Asbury Park to Manasquan Monmouth County
2) 1990 WQC Beachfill from Seabright to Ocean Township, NJ
Question #9: The magnitude for this project differs in the SF1442 and in Section 01 11 00. Please clarify.
Answer #9: Revised SF 30 and Section 01 11 00.
Question #10: The referenced specification states that beach fill work should start at Station 457+00 and proceed generally south to north. Please confirm that contractors be allowed to land the pipeline and pump fill material in both directions, in order to manage pipeline lengths and optimize production.
Answer #10: Yes, contractor will be allowed to pump fill material in both directions on condition that the contractor will pump fill material to the south first, then to the north.
Question #11: The CLIN Schedule notes that options will be awarded linearly South to North, as to not impede on the placement work plan. Please confirm that any options will be awarded prior to completion of the adjacent base sections and will not require re-mobilization of the contractor’s pipeline.
Answer #11: Note was revised. Options to be placed by March 1, 2020, may be exercised within 60 days after NTP. If any other option is exercised within 150 days of NTP, work must be completed by March 1, 2021. If options are exercised they will be awarded to maximize placement adjacent to base bid area. Optional CLIN for mobilization/demobilization may be exercised if option work exercised exceeds the March 1, 2020 restriction.
e3ct9ss8 Highlight
| 1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: |
| Answer #10: The government may exercise options within 150 day of NTP. If options are exercised within 60 days of notice to proceed (NTP), the Contractor shall be required to complete the entire base and option work exercised by March 1, 2020. If opti... |