082019_W912DS19B0015U0002.pdf

PDF 205 KB Posted

Attached to
Sea Bright to Manasquan Renourishment (Beach fill); NJ, Project - MONMOUTH COUNTY NEW JERSEY
Solicitation number
W912DS-19-B-0015
Issued by

About this file

Amendment U0002

View the file

Other files

File Type Posted
Copy_of_Bid_Abstract_SeaBright_-_W912DS19B0015_04SEP2019.pdf PDF
01_11_00.pdf PDF
01_14_00.pdf PDF
WQCAtlanticCOastofNJ.pdf PDF
01_11_00.pdf PDF
C-112.pdf PDF
31_24_00.00_18.pdf PDF
sb-m_beach-35FT-SORTED-LiDAR-HYDRO-ELEV.XYZ XYZ file
01_35_30.pdf PDF
sb-m_beach-15FT-SORTED-PROFILES-ELEV.XYZ XYZ file
01_22_00.00_10.pdf PDF
Final_-_W912DS19B0015_(003).pdf_19082019_(002)_(003)_(002).pdf PDF
SebrightManasquanBorrow_Median_sorted_2019.xyz XYZ file
01_14_00.pdf PDF
W912DS19B0015_29072019.pdf PDF
W912DS-19-B-0015_SPECS_20190725_SEAB.pdf PDF
W912DS-19-B-0015_PLANS_20190715_sb-m.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise 13 A on SF 1442 to extend the Bid Opening Date to 4, September 2019 at 2 pm.

2. Revise and reissue Specifications

3. Revise and reissue Notes Section

4. Answer questions from prospective bidders for informational purposes only NOTE: Bidders must acknowledge receipt of this amendment by date specified in the bid (or as amended) by one of the following methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE

WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS19B0015

X 9B. DATED (SEE ITEM 11)

29-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2019 CODE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19B0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Aug-2019 02:00 PM to 04-Sep-2019 02:00 PM.

The following have been modified:

TOTALS/NOTES

NOTES:

1. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

2. The bidders are required to bid on all items or their bid will be rejected.

3. The low bidder for the purpose of award will be the confirming responsible bidder offering the lowest amount for the Total Base Bid and optional bid items.

4. Line item 0003 is pre-priced at $100,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirement.

5. The Bid Acceptance Period is as stated on Standard Form 1442.

6. Tapering are included in the items and exact locations are on the plan sheets.

7. All base work must be completed by March 1, 2020 due to environmental restrictions. . No work will occur between March 1, 2020, and October 15, 2020. No work will be allowed after March 1, 2021.

8. The government may exercise options within 150 day of NTP. Option work, if exercised, must be complete by March 1, 2021. The USACE will coordinate with the contractor to maximize the placement area next to adjacent base or option sections.

9. CLIN0031 (Option28) may be exercised if option work exercised exceeds the March 1, 2020 restriction.

10. The Government is under no obligation to exercise/award any option. No additional time will be added for exercised options.

(End of Summary of Changes)

Sea Bright to Manasquan Reach, Beach Erosion Control Project, Sea Bright to Long Branch, NJ

W912DS-19-B-0015

Amendment No.2

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

-None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

-None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

-None

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:

SECTION 01 11 00

SECTION 01 14 00

REVISED NOTES FOR THE BID SCHEDULE:

NOTES:

1. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

2. The bidders are required to bid on all items or their bid will be rejected.

3. The low bidder for the purpose of award will be the confirming responsible bidder offering the lowest amount for the Total Base Bid and optional bid items.

4. Line item 0003 is pre-priced at $100,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirement.

5. The Bid Acceptance Period is as stated on Standard Form 1442.

6. Tapering are included in the items and exact locations are on the plan sheets.

7. All base work must be completed by March 1, 2020 due to environmental restrictions. . No work will occur between March 1, 2020, and October 15, 2020. No work will be allowed after March 1, 2021.

8. The government may exercise options within 150 day of NTP. Option work, if exercised, must be complete by March 1, 2021. The USACE will coordinate with the contractor to maximize the placement area next to adjacent base or option sections.

9. CLIN0031 (Option28) may be exercised if option work exercised exceeds the March 1, 2020 restriction

10.The Government is under no obligation to exercise/award any option. No additional time will be added for exercised options.

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO

Question #1 Due to the size and scope of Amendment 0001 issued on August 19th, we respectfully request an extension to the bid date of 7 days, to September 4th.

Answer #1 (Revised SF 30)

Section 13 A has been updated to extend the Bid Opening to 4, September 2019 at 2 pm.