View the file

Other files

File Type Posted
Copy_of_Bid_Abstract_SeaBright_-_W912DS19B0015_04SEP2019.pdf PDF
01_14_00.pdf PDF
082019_W912DS19B0015U0002.pdf PDF
WQCAtlanticCOastofNJ.pdf PDF
01_11_00.pdf PDF
C-112.pdf PDF
31_24_00.00_18.pdf PDF
sb-m_beach-35FT-SORTED-LiDAR-HYDRO-ELEV.XYZ XYZ file
01_35_30.pdf PDF
sb-m_beach-15FT-SORTED-PROFILES-ELEV.XYZ XYZ file
01_22_00.00_10.pdf PDF
Final_-_W912DS19B0015_(003).pdf_19082019_(002)_(003)_(002).pdf PDF
SebrightManasquanBorrow_Median_sorted_2019.xyz XYZ file
01_14_00.pdf PDF
W912DS19B0015_29072019.pdf PDF
W912DS-19-B-0015_SPECS_20190725_SEAB.pdf PDF
W912DS-19-B-0015_PLANS_20190715_sb-m.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sea Br i ght t o Manasquan Reach SEABRIGHTMANASQU

AMENDMENT 2

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 FAR 52. 211- 10, COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK

a. The Cont r act or shal l be r equi r ed t o ( i ) commence wor k under t hi s cont r act wi t hi n f i ve ( 5) cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed, ( i i ) pr osecut e t he wor k di l i gent l y, and ( i i i ) compl et e t he ent i r e base wor k r eady f or use, and r emove al l equi pment f r om t he cont r act ar ea not l at er t han Mar ch 1, 2020.

I f opt i ons ar e exer ci sed, opt i ons t o be pl aced by Mar ch 1, 2020, wi l l be exer ci sed 10 days af t er NTP. I f any ot her opt i on i s exer ci sed wi t hi n 150 days of NTP, wor k must be compl et ed by Mar ch 1, 2021; t hi s wor k shal l be r eady f or use, wi t h al l equi pment r emoved f r om t he cont r act ar ea not l at er t han 500 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he not i ce t o pr oceed. Ther e i s t o be no const r uct i on act i v i t i es bet ween Mar ch 1, 2020 and Oct ober 15, 2020, unl ess appr oved by USACE upon f ur t her coor di nat i on wi t h NJDEP and USFWS. The t i me st at ed f or compl et i on shal l i ncl ude f i nal c l eanup of t he pr emi ses. ( FAR 52. 212- 3)

a. The Cont r act or shal l be r equi r ed t o ( i ) commence wor k under t hi s cont r act wi t hi n f i ve ( 5) cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed, ( i i ) pr osecut e t he wor k di l i gent l y, and ( i i i ) compl et e t he ent i r e base wor k r eady f or use, and r emove al l equi pment f r om t he cont r act ar ea no l at er t han Mar ch 1, 2020. The t i me st at ed f or compl et i on shal l i ncl ude f i nal c l eanup of t he pr emi ses. ( FAR 52. 212- 3) . I f opt i ons ar e exer ci sed wi t hi n 150 days f r om NTP, t he Cont r act or shal l be r equi r ed t o compl et e t hese opt i ons, and r emove al l equi pment f r om t he cont r act ar ea no l at er t han Mar ch 1, 2021. Const r uct i on act i v i t i es ar e pr ohi bi t ed bet ween Mar ch 1, 2020 and Oct ober 15, 2020, and af t er Mar ch 1, 2021. The t i me st at ed f or compl et i on shal l i ncl ude f i nal c l eanup of t he pr emi ses. ( FAR 52. 212- 3) .

Al l wor k shal l be i n accor dance wi t h t he dr awi ngs and speci f i cat i ons or i nst r uct i ons at t ached her et o and made a par t t her eof , or t o be f ur ni shed her eaf t er by t he Cont r act i ng Of f i cer and subj ect , i n ever y det ai l , t o hi s super vi s i on, di r ect i on, and i nst r uct i ons.

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes pl acement of t he beach f i l l mat er i al and i nci dent al r el at ed wor k, i ncl udi ng advanced nour i shment al ong t he l engt h of t he desi gn ber m, and f eeder beaches.

1. 2. 2 Location

The wor k i s l ocat ed f r om Sea Br i ght t o Long Br anch i n New Jer sey, appr oxi mat el y as i ndi cat ed. The exact l ocat i on i s shown i n t he bi d documents.

SECTI ON 01 11 00 Page 1

Sea Br i ght t o Manasquan Reach SEABRIGHTMANASQU

AMENDMENT 2

1. 3 DFARS 236. 204, Di scl osur e of t he Magni t ude of Const r uct i on Pr oj ect s

Thi s pr oj ect i s est i mat ed bet ween $25, 000, 000 and $100, 000, 000.

1. 4 AUTHORI ZED CONSTRUCTI ON AREA AND TRESPASSI NG

Do not i nf l i c t damage upon l and and pr oper t i es out s i de t he aut hor i zed const r uct i on ar ea by unwar r ant ed ent r y upon, passage t hr ough, damage t o, or di sposal of , mat er i al on such l and or pr oper t y. The Cont r act or may make a separ at e agr eement wi t h any ot her par t y, r egar di ng t he use of , or r i ght t o, l and or f aci l i t i es out s i de t he cont r act ar ea. I f such an agr eement i s made, i t must be i n wr i t i ng and a copy shal l be pr ovi ded t o t he Cont r act i ng Of f i cer . The Cont r act or must hol d and save t he Gover nment , i t s of f i cer s, and agent s f r ee f r om l i abi l i t y ar i s i ng f r om t r espassi ng or damage occasi oned by hi s oper at i ons.

1. 5 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 2

01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 DFARS 236.204, Disclosure of the Magnitude of Construction Projects
1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING
1.5 EXISTING WORK
PART 2 PRODUCTS
PART 3 EXECUTION

File details come from the government source that posted it.