Sea Bright to Manasquan Reach SEABRIGHTMANASQU
AMENDMENT 1
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G, RO
1.2 SPECIAL SCHEDULING REQUIREMENTS
1.2.1 Required Project Completion
All work under this contract must be completed by March 1. All base work under this contract must be completed by March 1, 2020. If options are exercised, options to be placed by March 1, 2020, will be exercised 10 days after NTP. If any other option is exercised within 150 days of NTP, work must be completed by March 1, 2021.
1.2.2 Order Of Work
Proceed with the placement of the beachfill in a continuous manner along the shoreline starting at Station 457+00, moving generally South to North and ending at Station 174+00, or as directed by the Contracting Officer.
Proceed with the placement of the beachfill in a continuous manner along the shoreline, moving generally South to North, or as directed by the Contracting Officer. Contractor will be allowed to pump fill material in both directions from landed pipeline on condition that the contractor will pump fill material first to the south, then to the north.
Place beach fill in maximum 1,000-foot-wide beach work zone/closure areas.
Working in more than 1 closure area at a time shall be at the discretion of the COR and with coordination with local communities. Access to the beach for each community shall be maintained at all times except within the active established beach fill work zone(s)Place beach fill in maximum 1,000-foot-wide beach work zone/closure areas. Working in more than 1 closure area at a time shall be at the discretion of the COR and with coordination with local communities. Access to the beach for each community shall be maintained at all times except within the active established beach fill work zone(s).
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of
SECTION 01 14 00 Page 1
Sea Bright to Manasquan Reach SEABRIGHTMANASQU
AMENDMENT 1
ingress and egress. Wear hard hats in designated areas. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.2 Working Hours
Working hours for dredging are 24 hours a day including Sunday and Government holidays. Local government approval is required to ensure compliance with local ordinances and local Boards.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --