Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to General Purpose Storage Building, Watervliet, NY, newest first.
File Type Posted
Bid_Abstract_-__W912DS18B0014.pdf PDF
EP-601_(revision_2).pdf PDF
W912DS18B0014-0007.pdf PDF
A-501.pdf PDF
A-601.pdf PDF
photo 9.jpg JPG image
03_30_00._00_10.pdf PDF
A-101.pdf PDF
photo 5.jpg JPG image
photo 14.jpg JPG image
photo 13.jpg JPG image
M-101.pdf PDF
W912DS18B0014-0007.pdf PDF
photo 10.jpg JPG image
A-502.pdf PDF
A-201.pdf PDF
C-505__24JUL18.pdf PDF
10_44_16.pdf PDF
photo 11.jpg JPG image
S-001.pdf PDF
G-003.pdf PDF
EP-602_-_PANEL_SCHEDULES_(24jul18).pdf PDF
photo 22.jpg JPG image
photo 19.jpg JPG image
Watervliet_Arsenal_1A1_Approvals.pdf PDF
A-401.pdf PDF
photo 3.jpg JPG image
photo 12.jpg JPG image
EP-101_24jul18.pdf PDF
photo 20.jpg JPG image
W912DS18B0014-0006.pdf PDF
12_21_00.pdf PDF
41_22_13.14.pdf PDF
03_33_00.pdf PDF
22_00_00.pdf PDF
08_71_00.pdf PDF
W912DS18B0014-0005_-_Revised_7.27.pdf PDF
08_33_23.pdf PDF
00_73_00.00_18.pdf PDF
09_30_10.pdf PDF
C-101_AMENDMENT.pdf PDF
S-404_Watervliet_Warehouse_Loading_Dock_Amendment.pdf PDF
W912DS18B0014-0005.pdf PDF
W912DS18B0014_-_0003.pdf PDF
WVA_Storage_Warehouse_sign_in_sheet.pdf PDF
specification_41_22_13.14.pdf PDF
W912DS18B0014_-_0001.pdf PDF
W912DS18B0014.pdf PDF
WATERVLIETWHSE_100PCNT_SPECS_RTA.pdf PDF
75906_WVA_Warehs_Dwg_RTA.pdf PDF
Show all 50

General Purpose Storage Building, Watervliet, NY has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 67 PAGES

WATERVLIET WAREHOUSE

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 G ROList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.3 G ROView Location Map

1.4 G ROProgress and Completion

Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

3.5.2 G RONarrative Report

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.5 G ROBio-Based Products

1.5.4 G RORecycled Content

1.5.6 G ROOzone Depleting Substances

1.4.1.1 G ROPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.4.1.1 G ROFinal Sustainability eNotebook

1.4.1.1 G ROAmended Final Sustainability

eNotebook

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 67 PAGES

01 35 26 SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

SD-07 Certificates

3.4.1.1 G RONACE Coating Inspector

3.4.3 G RONACE Coating Inspector

01 45 35 SD-06 Test Reports

3.1.2Daily Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Certificate of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 67 PAGES

01 45 35 1.5 G ROSpecial Inspector

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

SD-06 Test Reports

2.4Backflow Preventer Tests

SD-07 Certificates

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.9 G ROSolid Waste Management Permit

1.5.2 G RORegulatory Notifications

1.6 G ROEnvironmental Protection Plan

1.6.9.1 G RODirt and Dust Control Plan

1.5.4 G ROEmployee Training Records

SD-06 Test Reports

3.7.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.5.4 G ROEmployee Training Records

1.5.4Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.7.1 G ROWaste Determination

Documentation

1.5.4 G ROAssembled Employee Training

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 67 PAGES

01 57 19 1.9 G ROSolid Waste Management Permit

3.7.2.1 G ROSolid Waste Management Report

3.7.3.1 G ROHazardous Waste/Debris

Management

1.5.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

01 58 00 SD-02 Shop Drawings

1.3.1 GSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.8.1 G DOWarranty Management Plan

1.8.5 G DOWarranty Tags

1.6 G DOSpare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G DOOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G DOAs-Built Drawings

3.3 G DORecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 67 PAGES

01 78 00 3.6 G DOAs-Built Record of Equipment and Materials

3.4 G DOFinal Approved Shop Drawings

3.5Construction Contract

Specifications

2.3 G DOCertification of EPA Designated

Items

3.9 G DOInterim DD FORM 1354

3.9 G DOChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G DODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals

3.3.4Receipts

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G DOFormwork

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 67 PAGES

03 11 13.00 10 3.1.1 G DOFormwork

2.2.1 G DOForm Removal Schedule

SD-03 Product Data

Form Materials: G,DO

SD-04 Samples

1.3 G DOSample Panels

2.2.3 G DOFiber Voids

SD-05 Design Data

2.1 G DOCalculations

SD-06 Test Reports

3.2 G DOInspection

SD-07 Certificates

2.2.3 G DOFiber Voids

03 15 00.00 10 SD-02 Shop Drawings

2.4 G ROWaterstops

SD-03 Product Data

2.2 G ROPreformed Expansion Joint Filler

2.3 G ROSealant

2.4 G ROWaterstops

SD-04 Samples

2.3.2 G ROLubricant for Preformed

Compression Seals

2.3.3 G ROField-Molded Type

2.4 G ROWaterstops

2.5.2 G ROSplicing Waterstops

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 67 PAGES

03 15 00.00 10 2.2 G ROPreformed Expansion Joint Filler

2.3 G ROSealant

2.4 G ROWaterstops

03 20 00.00 10 SD-01 Preconstruction Submittals

3.1.3.2 G DOButt-Splices

SD-02 Shop Drawings

3.1 G DOReinforcement

SD-03 Product Data

2.2.3 G DOMechanical Butt-Splices

2.2 G DOReinforcing Steel

SD-04 Samples

2.2.2 G DOEpoxy-Coated Bars

SD-06 Test Reports

2.6 G DOTests, Inspections, and

Verifications

SD-07 Certificates

2.2 G DOReinforcing Steel

1.4.1 G DOQualified Welders

1.4.2 G DOQualification of Steel Bar

Butt-Splicers

03 30 00.00 10 SD-01 Preconstruction Submittals

1.6.2 G DOQuality Control Plan

1.6.1Laboratory Accreditation

3.11.5.6 G DOSampling Plan

SD-03 Product Data

Part 2Recycled Content Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 67 PAGES

03 30 00.00 10 2.2 G DOCementitious Materials

2.1.7 G DOFloor Finish

G DOFloor Hardener

2.4 G DOChemical Admixtures

SD-04 Samples

2.4.5 G DOSurface Retarder

SD-05 Design Data

2.1.1 G DOMixture Proportions

3.3 G DOLightweight Aggregate Concrete

SD-06 Test Reports

2.1.1 G DOMixture Proportions

3.11 G DOTesting and Inspection for CQC

2.2.3 G DOFly Ash

2.2.6 G DOGround Granulated Blast-Furnace

(GGBF) Slag

2.3 G DOAggregates

3.11.5.1 G DOAir Content

3.11.5.3 G DOSlump

3.11.5.6 G DOCompressive Strength

2.5 G DOWater

SD-07 Certificates

1.6 G DOContractor Quality Control

personnel

3.2.1 G DOReady-Mix Plant

03 33 00 SD-02 Shop Drawings

1.4.1Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 67 PAGES

03 33 00 SD-04 Samples

2.1Materials

1.4.2Panels

03 35 00.00 10 SD-03 Product Data

Part 2Recycled Content Products

SD-04 Samples

1.3.1Field Test Panels

1.3.1.1Sample Wall Panels

1.3.1.2Slab Panels

SD-08 Manufacturer’s Instructions

Dry Shake Finish

04 20 00 SD-02 Shop Drawings

3.3.2.1 G DOCut CMU

3.4.1.1 G DODetail Drawings

SD-03 Product Data

1.5.1 G DOHot Weather Procedures

1.5.2 G DOCold Weather Procedures

2.4.1.1 G DOCementitious Materials

SD-04 Samples

2.2.2.2 G DOConcrete Masonry Units (CMU)

2.4.1.3 G DOAdmixtures for Masonry Mortar

2.6.2 G DOAnchors, Ties, and Bar

Positioners

2.6.3 G DOJoint Reinforcement

SD-05 Design Data

2.1.2 G DOMasonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 67 PAGES

04 20 00 2.2.2.3Fire-Rated Concrete Masonry

Units

3.2.5 G DOBracing Calculations

SD-06 Test Reports

2.2.2.3 G DOFire-Rated Concrete Masonry

Units

3.6.1.1 G DOField Testing of Mortar

3.6.1.2 G DOField Testing of Grout

3.6.1.3 G DOPrism Tests

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2 G DOConcrete Masonry Units (CMU)

2.4.1.1 G DOCementitious Materials

2.4.1.3 G DOAdmixtures for Masonry Mortar

2.4.2.2 G DOAdmixtures for Grout

2.6.2 G DOAnchors, Ties, and Bar

Positioners

2.6.3 G DOJoint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 67 PAGES

04 20 00 2.2.2.2.1 SRecycled Content

05 05 23.16 SD-01 Preconstruction Submittals

3.2 G ROWelding Quality Assurance Plan

SD-03 Product Data

1.3 G ROWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification

1.3.6 G ROInspector Qualification

1.3.2 G ROPrevious Qualifications

1.3.3 G ROPre-Qualified Procedures

2.2 G ROWelding Electrodes and Rods

SD-06 Test Reports

3.3 G RONondestructive Testing

SD-07 Certificates

1.3.1 G ROCertified Welding Procedure

Specifications (WPS)

1.3.1 G ROCertified Brazing Procedure

Specifications (BPS)

1.3.1 G ROCertified Procedure Qualification

Records (PQR)

1.3.1 G ROCertified Welder Performance

Qualifications (WPQ)

1.3.1 G ROCertified Brazer Performance

Qualifications (BPQ)

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G DOErection Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 67 PAGES

05 12 00 SD-02 Shop Drawings

1.5.2 G DOFabrication Drawings

SD-03 Product Data

2.6.2 G DOShop Primer

2.4.1 G DOWelding Electrodes and Rods

2.3.2.3 G DODirect Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3 G DOTension Control Bolts

SD-06 Test Reports

2.6.2 G DOClass B Coating

2.3 G DOBolts, Nuts, and Washers

3.7.1.2 G DOWeld Inspection Reports

3.7.2.1 G DODirect Tension Indicator Washer

Inspection Reports

3.7.3.1 G DOBolt Testing Reports

3.7.4 G DOEmbrittlement Test Reports

SD-07 Certificates

2.2 G DOSteel

2.3 G DOBolts, Nuts, and Washers

2.5Galvanizing

2.4.3 G DOPins and Rollers

1.3 G DOAISC Fabrication Plant Quality

Certification

1.3 G DOAISC Erector Quality Certification

1.5.3.1 G DOWelding Procedures and

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 67 PAGES

05 12 00 2.4.1 G DOWelding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals

1.3.2 G DOWelder Qualification

SD-02 Shop Drawings

1.3.1 G DOpipe bridge steel joist and upper

and lower connecting framing

SD-05 Design Data

2.2 G DODesign Calculations

SD-06 Test Reports

3.3 G OErection Inspection

3.3 G DOWelding Inspections

SD-07 Certificates

1.3.2 G DOCertification of Compliance

SD-11 Closeout Submittals

2.3 SRecycled Content of Steel

Products

05 30 00 SD-02 Shop Drawings

1.3.4 G DOFabrication Drawings

SD-03 Product Data

2.2 G DOAccessories

2.1 G DODeck Units

2.1.4 G DOGalvanizing Repair Paint

2.2.9 G DOMechanical Fasteners

2.1.4 G DOTouch-Up Paint

1.3.2 G DOWelding Equipment

1.3.2 G DOWelding Rods and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 67 PAGES

05 30 00 SD-05 Design Data

2.1 G DODeck Units

SD-07 Certificates

1.3.2 G DOWelder Qualifications

1.3.2 G DOWelding Procedures

1.3.3.1 G DOFire Safety

1.3.1 G DOManufacturer's Certificate

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 40 00 SD-02 Shop Drawings

1.6.1Framing Components

GDO

SD-03 Product Data

2.1 G DOStuds, Joists

SD-05 Design Data

1.6.2Metal Framing Calculations

GDO

SD-07 Certificates

1.4 G DOLoad-Bearing Cold-Formed Metal

Framing

3.2.1 G DOWelds

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 67 PAGES

05 50 13 2.5 G ROAngles and Plates

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.1Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G ROFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 G ROStructural Steel Plates, Shapes, and Bars

2.2.2 G ROStructural Steel Tubing

2.2.4 G ROCold-Finished Steel Bars

2.2.3 G ROHot-Rolled Carbon Steel Bars

2.2.5 G ROCold-Drawn Steel Tubing

2.2.7 G ROConcrete Inserts

2.2.8 G ROMasonry Anchorage Devices

2.1.2 G ROProtective Coating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 67 PAGES

05 52 00 2.2.10 G ROSteel Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions

3.2 G ROInstallation Instructions

06 10 00 SD-02 Shop Drawings

2.3.1 G RONailing Strips

SD-03 Product Data

1.8Fire-retardant Treatment

2.4Oriented Strand Board

2.5.3Adhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.10.1Certificates of Grade

1.10.2 G ROCertified Sustainably Harvested

Wood

1.7Preservative Treatment

1.10.3Indoor Air Quality

SD-10 Operation and Maintenance

Data

3.4Take-back Program

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 67 PAGES

06 10 00 2.3.1 SCertified Sustainably Harvested

Framing Lumber

2.4.1.1 SCertified Sustainably Harvested

Plywood Wall Sheathing

2.4.2.1 SCertified Sustainably Harvested

Plywood Roof Sheathing

2.4.3.1 SCertified Sustainably Harvested

Plywood for Other Uses

2.4.3.2 SCertified Sustainably Harvested

Structural-use and OSB Panels for

Other Uses

2.5.3 SIndoor Air Quality for Aerosol

Adhesives

2.5.3 SIndoor Air Quality for Non-aerosol

Adhesives

07 11 13 SD-07 Certificates

1.3Materials

07 21 13 SD-03 Product Data

1.3 G ROManufacturer's Standard Details

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

2.4 G ROPressure Sensitive Tape

1.4 G ROProtection Board or Coatings

2.6 G ROAccessories

SD-07 Certificates

2.2 G ROBlock or Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 67 PAGES

07 21 13 2.3 G ROVapor Retarder

2.5 G ROProtection Board or Coating

1.8 G ROSpecial Warranties

1.5 G ROULE Greenguard

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.6.1Adhesive

SD-11 Closeout Submittals

1.5 SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 27 36 SD-01 Preconstruction Submittals

1.9.1 G ROQualification of Manufacturer

1.9.2 G ROQualification of Installer

1.10 G ROQuality Control Plan

1.10 G ROSafety Plan

1.8.1 G ROFire Prevention Plan

1.8.2 G RORespirator Plan

SD-02 Shop Drawings

1.5Spray Foam Air Barrier

1.10 G ROFoam Air Barrier System

1.5.1 G ROFire-Rated Assemblies

SD-03 Product Data

2.2.2 G ROClosed Cell

2.3 G ROPrimers, Adhesives, and Mastics

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 67 PAGES

07 27 36 2.5 G ROSealants

1.5.2 G ROSafety Data Sheets

2.2.1 G ROThermal Barrier Materials

2.2.1 G ROAccessories

SD-04 Samples

1.5 G ROSpray Foam Air Barrier

SD-06 Test Reports

1.5.4 G RO_Field Peel Adhesion Test

3.4.5.1 G ROThermographic Test

1.5.3 G ROPrimers

1.5.4 G ROFire-Ratings Of Thermal and or

Barrier Materials

1.5.4 G ROFlame Spread And Smoke

Developed Index Ratings Of SPF

Products

1.5.4 G ROFlame Propagation Of Wall

Assemblies

3.4.1 G ROSite Inspections

SD-07 Certificates

2.2.2 G ROClosed cell

1.9.1 G ROQualification of Manufacturer

1.9.2 G ROQualification of Installer

SD-08 Manufacturer’s Instructions

1.6.1 G ROSPF Handling, Storage, and

Spray Procedures

3.2.1 G ROSubstrate Preparation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 67 PAGES

07 27 36 1.5.1 G ROThermal Barrier

2.3 G ROPrimers, Adhesives, and Mastics

SD-09 Manufacturer’s Field

Reports

1.10Core Samples

3.3.2Daily Work Record

3.4.5Visual Inspection and Thermal

Scanning

SD-11 Closeout Submittals

2.1.1Volatile Organic Compound

(VOC) Content

2.1.2Recycled Content

07 41 63 SD-01 Preconstruction Submittals

1.4.1 G ROQualification of Manufacturer

1.4.1 G ROQualification of Installer

1.4.1 G ROQualifications for Welding

1.4.1 G ROWork Plan

1.4.1 G ROOn-Site Inspection and

Acceptance Procedure

SD-02 Shop Drawings

1.4.1 G RORoofing Panels

1.4.1 G ROFlashing and Accessories

SD-03 Product Data

1.4.1 G ROSustainable Acquisition

1.4.1 G ROCoil Stock

1.4.1 G ROFactory Color Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 67 PAGES

07 41 63 1.4.1 G ROSub-girts and Formed Shapes

1.4.1 G ROClosure Materials

1.4.1 G ROInsulation

1.4.1 G ROPressure-Sensitive Tape

1.4.1 G ROSealants and Caulking

1.4.1Rated Wall Assembly

1.4.1 G ROGalvanizing Repair Paint

1.4.1 G ROAluminized Steel Repair Paint

1.4.1 G ROAccessories

SD-04 Samples

1.4.1 G ROCoil Stock

1.4.1 G RORoofing Panels

2.3.1.2 G ROFasteners

2.5.1 G ROMetal Closure Strips

1.4.1 G ROInsulation

1.4.1 G ROManufacturer's Color Charts and

Chips

SD-05 Design Data

1.4.1Wind Design Analysis

SD-06 Test Reports

3.4.1.2 G ROLeakage Tests

1.4.1Fire Rating Test Report

3.1 G ROCoatings and Base Metals of

Metal Roofing

1.4.1 G ROFactory Finish and Color

Performance Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 67 PAGES

07 41 63 1.4.1 G ROWind Uplift Test Report

SD-07 Certificates

1.4.1Coil Stock

2.3.1.2Fasteners

1.4.1Galvanizing Repair Paint

1.4.1Safety Data Sheets

2.4.3Coating Physical Properties:

SD-08 Manufacturer’s Instructions

1.4.1Installation of Roof Panel

Assemblies

SD-11 Closeout Submittals

1.7Warranty

1.7.120-year 'No-Dollar-Limit' warranty for labor and materials

3.3.5 G ROInformation Form and Placard

3.4.2Manufacturer's Field Inspection

Reports

1.4.1Application Instructions

07 42 63 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer

1.5.4Qualification of Installer

1.5.4.1Qualifications for Welding Work

SD-02 Shop Drawings

1.5.1Fabrication and Installation drawings

1.5.1Wall Panel Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 67 PAGES

07 42 63 1.5.1Flashing and Accessories

1.5.1Anchorage Systems

SD-03 Product Data

1.5.10Certification

1.5.1sustainable acquisition

1.5.1Manufacturer's catalog data

1.5.1Factory Color Finish

1.5.1Sub-girts and Formed Shapes

1.5.1Closure Materials

1.5.1Insulation

1.5.1Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

2.5.4.2Sealants and Caulking

1.5.1Galvanizing Repair Paint

1.5.1Aluminized Steel Repair Paint

1.5.1Accessories

SD-04 Samples

1.5.1Wall Panel Assemblies

1.5.1Fasteners

1.5.1Metal Closure Strips

1.5.1Insulation

1.5.1manufacturer's color charts and chips

SD-05 Design Data

1.5.1wind design analysis

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 67 PAGES

07 42 63 3.7.2Leakage Tests

1.3.2wind load tests

1.5.1Factory Color Finish

SD-07 Certificates

1.5.1Fasteners

1.5.1Galvanizing Repair Paint

1.5.3Qualification of Manufacturer

1.5.4Qualification of Installer

1.5.1wall system assembly wind load

SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall panels

SD-11 Closeout Submittals

1.8Warranty

1.5.1Instructions

1.5.1Material Safety Data Sheets

1.5.120 year 'No-Dollar-Limit' warranty

2.1.3 SSolar Reflectance Index

07 60 00 SD-02 Shop Drawings

3.1.18 G ROCovering on flat, sloped, or

curved surfaces

3.1.15 G ROGutters

3.1.16 G RODownspouts

3.1.19 G ROExpansion joints

3.1.10 G ROBase flashing

3.1.11 G ROCounterflashing

3.1.20 G ROFlashing at roof penetrations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 67 PAGES

07 60 00 3.1.12 G ROReglets

3.1.14 G RODrip edge

3.1.17 G ROEave flashing

SD-11 Closeout Submittals

3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 G ROFirestopping System

SD-03 Product Data

2.2 G ROFirestopping Materials

SD-06 Test Reports

3.3 G ROInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 G ROInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 G ROSealants

2.3 G ROPrimers

2.4 G ROBond Breakers

2.5 G ROBackstops

3.1 G ROField Adhesion

SD-07 Certificates

1.4.1 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 SIndoor Air Quality For Interior

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 67 PAGES

07 92 00 2.2.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.6 SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.7 G ROFrames

2.7 G ROFrames

2.5Accessories

SD-03 Product Data

2.1 G RODoors

2.7 G ROFrames

2.5Accessories

SD-04 Samples

2.11.4 G ROFactory-applied enamel finish

08 33 23 SD-02 Shop Drawings

2.2.1 G ROOverhead Coiling Doors

2.2.3 G ROCounterbalancing Mechanism

2.2.4 G ROManual Door Operators

2.2.5 G ROElectric Door Operators

2.2.1.3 G ROBottom Bars

2.1.1.1 G ROGuides

2.2.3.1 G ROMounting Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 67 PAGES

08 33 23 2.2.1.9 G ROOverhead Drum

2.2.2.3 G ROHood

2.1.1.1 G ROInstallation Drawings

SD-03 Product Data

2.2.1 G ROOverhead Coiling Doors

2.2.2 G ROHardware

2.2.3 G ROCounterbalancing Mechanism

2.2.4 G ROManual Door Operators

2.2.5 G ROElectric Door Operators

SD-05 Design Data

2.2.1 G ROOverhead Coiling Doors

2.2.2 G ROHardware

2.2.3 G ROCounterbalancing Mechanism

2.2.4 G ROManual Door Operators

2.2.5 G ROElectric Door Operators

SD-06 Test Reports

1.3.1 G ROAir Infiltration Tests

SD-10 Operation and Maintenance

Data

3.3.2 G ROOperation and Maintenance

Manuals

3.3.2 G ROMaterials

3.3.2 G RODevices

3.3.2 G ROProcedures

3.3.2 G ROManufacture's Brochures

3.3.2 G ROParts Lists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 67 PAGES

08 33 23 SD-11 Closeout Submittals

3.3.1 G ROWarranty

08 51 13 SD-02 Shop Drawings

2.2 G ROWindows

1.10Fabrication Drawings

SD-03 Product Data

2.2 G ROWindows

2.3.8.1 G ROHardware

2.3.3 G ROFasteners

1.11 G ROWindow Performance

2.4 G ROThermal-Barrier Windows

2.5 G ROMullions

2.3.10 G ROScreens

2.3.2 G ROWeatherstripping

2.3.8 G ROAccessories

2.3.4Adhesives

1.11.4 G ROThermal Performance

SD-05 Design Data

2.2 GStructural Calculations for

Deflection

1.4.2 G RODesign Analysis

SD-06 Test Reports

1.4.3Minimum Condensation

Resistance Factor

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 67 PAGES

08 51 13 2.2 G ROWindows

1.7Plastic Identification

SD-11 Closeout Submittals

2.1.1 SRecycled Content of Aluminum

Windows

08 51 23 SD-02 Shop Drawings

2.3Windows

SD-03 Product Data

2.2.1Steel Framing Materials

2.7.3Hardware

2.7.4Fasteners

2.7Accessories

2.7.3.1Hardware Materials

SD-04 Samples

2.8.2 G ROColor Coating

2.3Windows

SD-10 Operation and Maintenance

Data

2.3 G ROWindows

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Steel

Framing Materials

08 71 00 SD-02 Shop Drawings

1.3 G ROManufacturer's Detail Drawings

1.3Verification of Existing Conditions

1.5 G ROHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 67 PAGES

08 71 00 2.3.8 G ROKeying System

SD-03 Product Data

2.3 G ROHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G ROHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.6.1Insulating Glass

1.3Glazing Accessories

SD-04 Samples

1.6.1Insulating Glass

2.4.2Glazing Compound

2.4.5Tape

2.4.3.1Sealant

SD-07 Certificates

1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

1.5Wall louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 67 PAGES

08 91 00 SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.4 G ROWall louvers

1.5 G ROWall louvers

09 29 00 SD-03 Product Data

2.2.3Water-Resistant Gypsum Backing

Board

2.2.7Accessories

1.3Certifications

2.2.1Gypsum Board

SD-07 Certificates

2.2 G ROAsbestos Free Materials

1.3.1 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 SRecycled Content for Gypsum

Board

2.2.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.2.1 SIndoor Air Quality for Gypsum

Board

2.2.4 SVOC Content of Joint Compound

2.2.6 SIndoor Air Quality for Non-aerosol

Adhesives

2.2.6 SIndoor Air Quality for Aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 67 PAGES

09 30 10 SD-02 Shop Drawings

3.2 G RODetail Drawings

SD-03 Product Data

2.1 G ROTile

2.2 G ROSetting-Bed

2.4 G ROMortar, Grout, and Adhesive

2.2.6 G ROReinforcing Wire Fabric

SD-04 Samples

2.1 G ROTile

2.1 G ROAccessories

2.1 G ROTransition Strips

2.5 G ROTransition Strips

2.4 G ROGrout

SD-07 Certificates

2.1Tile

2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions

3.6Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 G ROInstallation

SD-11 Closeout Submittals

1.2LEED Documentation

2.4Adhesives

09 51 00 SD-03 Product Data

1.2.4Acoustical Ceiling Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 67 PAGES

09 51 00 1.4Certification

SD-04 Samples

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

SD-06 Test Reports

1.2.1Ceiling Attenuation Class and

Test

SD-07 Certificates

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

09 65 00 SD-03 Product Data

2.7 G ROResilient Flooring and

Accessories

2.3Adhesives

SD-04 Samples

2.7 G ROResilient Flooring and

Accessories

SD-06 Test Reports

3.3 G ROMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2 G ROSurface Preparation

3.1 G ROInstallation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 67 PAGES

09 65 00 2.7 G ROResilient Flooring and

Accessories

09 67 23.15 SD-04 Samples

1.3.1.1 G ROJoint Sealant

1.3.2.3 G ROJoint Sealant

1.3.3.1 G ROJoint Sealant

1.3.1.2 G ROThin Film Flooring System

1.3.2.4 G ROThin Film Flooring System

1.3.3.2 G ROThin Film Flooring System

2.3 G ROWhite Aluminum Oxide Non-Skid

Grit

SD-06 Test Reports

1.3.1.1 G ROJoint Sealant

1.3.2.3 G ROJoint Sealant

1.3.3.1 G ROJoint Sealant

1.3.1.2 G _ROThin Film Flooring System

1.3.2.4 G _ROThin Film Flooring System

1.3.3.2 G _ROThin Film Flooring System

1.3.1.3 G ROPrimer

1.3.1.4 G ROUrethane Topcoat

2.3 G ROWhite Aluminum Oxide Non-Skid

Grit

1.7 G ROPatch Test Demonstration

1.3.1.5 G RODaily Inspection Report

3.9.3 G ROAdhesion Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 67 PAGES

09 67 23.15 1.3.2.1 G ROWork Plan

1.3.2.2 G ROFlooring System Applicator

Qualifications

1.3.1.1 G ROJoint Sealant

1.3.2.3 G ROJoint Sealant

1.3.3.1 G ROJoint Sealant

1.3.1.2 G ROThin Film Flooring System

1.3.2.4 G ROThin Film Flooring System

1.3.3.2 G ROThin Film Flooring System

1.3.2.5 G ROWarranty

SD-08 Manufacturer’s Instructions

1.3.1.1 G ROJoint Sealant

1.3.2.3 G ROJoint Sealant

1.3.3.1 G ROJoint Sealant

1.3.1.2 G ROThin Film Flooring System

1.3.2.4 G ROThin Film Flooring System

1.3.3.2 G ROThin Film Flooring System

1.3.3.3 G ROWater-Based Alkaline Degreaser

SD-11 Closeout Submittals

3.9.2.2 G ROInspection Logbook

09 90 00 SD-02 Shop Drawings

3.10Piping identification

3.10stencil

SD-03 Product Data

2.1 G ROCoating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 67 PAGES

09 90 00 2.1Manufacturer's Technical Data

Sheets

SD-04 Samples

1.10 G ROColor

SD-07 Certificates

1.3Applicator's qualifications

1.11.6.1 G ROQualification Testing

SD-08 Manufacturer’s Instructions

3.6.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SD-10 Operation and Maintenance

Data

2.1 G _ROCoatings:

10 14 00.10 SD-02 Shop Drawings

3.1 G ROApproved Detail Drawings

SD-03 Product Data

2.1Modular Exterior Signage System

3.1Installation

1.2 G ROExterior Signage

1.2.1Wind Load Requirements

SD-04 Samples

1.2 G ROExterior Signage

SD-10 Operation and Maintenance

Data

3.1.2 G ROProtection and Cleaning

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 67 PAGES

10 14 00.20 SD-02 Shop Drawings

1.5.2 G RODetail Drawings

SD-03 Product Data

3.1 G ROInstallation

1.7 G ROWarranty

SD-04 Samples

1.5.1 G ROInterior Signage

SD-10 Operation and Maintenance

Data

3.1 G ROApproved Manufacturer's

Instructions

3.1.2 G ROProtection and Cleaning

10 28 13 SD-03 Product Data

2.1.2 G ROFinishes

2.2 G ROAccessory Items

SD-04 Samples

2.1.2 G ROFinishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

10 44 16 SD-03 Product Data

1.2.1 G ROAccessories

1.2.1 G ROWall Brackets

3.2.1 G ROReplacement Parts List

SD-04 Samples

1.2.1 G ROWall Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 67 PAGES

10 44 16 1.2.1 G ROAccessories

11 13 19.13 SD-02 Shop Drawings

1.4.2 G DODetail Drawings

SD-03 Product Data

2.2 G DOLoading Dock Levelers

2.2.5.2 G DODock Bumpers

2.7.1 G DORestraining Device

2.7.3 G DODock Seals

SD-04 Samples

2.2.5.2Dock Bumpers

2.2.5.2Rubber

SD-10 Operation and Maintenance

Data

2.2 G DOLoading Dock Levelers

2.7.1 G DORestraining Device

SD-11 Closeout Submittals

1.4.3 G DORecord Drawings

12 21 00 SD-03 Product Data

2.1 G ROWindow Blinds

3.2Installation

1.4Certification

SD-04 Samples

2.1 G ROWindow Blinds

SD-06 Test Reports

2.1Window Blinds

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 67 PAGES

12 21 00 2.1 G ROWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 G ROWindow Blinds

13 34 19 SD-01 Preconstruction Submittals

1.6.3 G DOManufacturer's Qualifications

SD-02 Shop Drawings

1.2.1.7 G DODetail Drawings

1.6.1 G DODetail Drawings

SD-03 Product Data

1.6.1 G DOManufacturer's catalog data

SD-04 Samples

1.6.1 G DOCoil Stock

2.1.8 G DOCoil Stock

1.2.1.9 G DORoof Panels

1.2.1.9 G DOWall Panels

2.5.2 G DOFasteners

2.8.1 G DOMetal Closure Strips

SD-05 Design Data

1.6.1 G DOdescriptive and technical

literature

1.6.1 G DObuilding design analysis

SD-06 Test Reports

1.6.1 G DOtest reports

1.6.1 G DOCoatings and base metals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 67 PAGES

13 34 19 1.6.1 G DOFactory Color Finish Performance

Requirements

SD-07 Certificates

1.6.1 G DOsystem components

1.6.1 G DOCoil Stock

2.1.8 G DOCoil Stock

1.6.1 G DOAluminized Steel Repair Paint

1.6.1 G DOGalvanizing Repair Paint

1.6.1 G DOEnamel Repair Paint

1.6.1 G DOQualification of Manufacturer

1.6.1 G DOQualification of Erector

SD-08 Manufacturer’s Instructions

1.6.2 G DOInstallation of Roof and Wall

panels

1.7 G DOshipping, handling, and storage

SD-11 Closeout Submittals

G DOManufacturer's Warranty

G DOContractor's Warranty for

Installation

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 G DOShop Drawings

3.9As-Built Drawings

SD-03 Product Data

1.4.1Fire Protection Related

Submittals

2.3 G DOMaterials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 67 PAGES

21 13 13.00 10 1.6Spare Parts

3.8 GPreliminary Tests

3.9 GFinal Acceptance Test

3.10 GOnsite Training

1.4.1 GFire Protection Specialist

1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 G DOSway Bracing

1.2.1.3 G DOHydraulic Calculations

SD-06 Test Reports

3.8Preliminary Test Report

3.9Final Acceptance Test Report

SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.10 GOperating and Maintenance

Manuals

21 30 00 SD-01 Preconstruction Submittals

1.3Fire Pump Installation Related

Submittals

1.7.1 GFire Protection Specialist

SD-02 Shop Drawings

3.3.1 G DOInstallation Drawings

3.10.2 GAs-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 67 PAGES

21 30 00 3.3.2 G DOPiping Layout

3.3.2 G DOPump Room

SD-03 Product Data

2.1 G DOCatalog Data

1.6Spare Parts

3.8.2Preliminary Tests

3.8 GField Tests

1.7.6 GManufacturer's Representative

3.10.1 G DOField Training

3.8.3Army Final Acceptance Test

SD-06 Test Reports

3.8.2Preliminary Tests

3.8.3Army Final Acceptance Test

SD-07 Certificates

1.7.1Fire Protection Specialist

1.7.2Qualifications of Welders

1.7.3Qualifications of Installer

1.7.4Preliminary Test Certification

1.7.5Final Test Certification

SD-10 Operation and Maintenance

Data

3.10.1 GOperating and Maintenance

Instructions

2.13Flow Meter

22 00 00 SD-02 Shop Drawings

3.7.1 GPlumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD