SUBMITTAL_REGISTER.PDF
PDF 692 KB Posted
- Attached to
- General Purpose Storage Building, Watervliet, NY Federal contract opportunity
- Solicitation number
- W912DS-18-B-0014
About this file
Submittal Register
View the file
Other files for this federal contract opportunity
Show all 50
General Purpose Storage Building, Watervliet, NY has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 67 PAGES
WATERVLIET WAREHOUSE
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 G ROList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3 G ROView Location Map
1.4 G ROProgress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
3.5.2 G RONarrative Report
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.5 G ROBio-Based Products
1.5.4 G RORecycled Content
1.5.6 G ROOzone Depleting Substances
1.4.1.1 G ROPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.4.1.1 G ROFinal Sustainability eNotebook
1.4.1.1 G ROAmended Final Sustainability
eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 67 PAGES
01 35 26 SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
SD-07 Certificates
3.4.1.1 G RONACE Coating Inspector
3.4.3 G RONACE Coating Inspector
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 67 PAGES
01 45 35 1.5 G ROSpecial Inspector
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
SD-06 Test Reports
2.4Backflow Preventer Tests
SD-07 Certificates
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 G ROSolid Waste Management Permit
1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
1.6.9.1 G RODirt and Dust Control Plan
1.5.4 G ROEmployee Training Records
SD-06 Test Reports
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates
1.5.4 G ROEmployee Training Records
1.5.4Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.7.1 G ROWaste Determination
Documentation
1.5.4 G ROAssembled Employee Training
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 67 PAGES
01 57 19 1.9 G ROSolid Waste Management Permit
3.7.2.1 G ROSolid Waste Management Report
3.7.3.1 G ROHazardous Waste/Debris
Management
1.5.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
01 58 00 SD-02 Shop Drawings
1.3.1 GSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.6 G ROWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.8.1 G DOWarranty Management Plan
1.8.5 G DOWarranty Tags
1.6 G DOSpare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.7 G DOOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G DOAs-Built Drawings
3.3 G DORecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 67 PAGES
01 78 00 3.6 G DOAs-Built Record of Equipment and Materials
3.4 G DOFinal Approved Shop Drawings
3.5Construction Contract
Specifications
2.3 G DOCertification of EPA Designated
Items
3.9 G DOInterim DD FORM 1354
3.9 G DOChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G DODemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.6 G RONotification
SD-11 Closeout Submittals
3.3.4Receipts
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G DOFormwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 67 PAGES
03 11 13.00 10 3.1.1 G DOFormwork
2.2.1 G DOForm Removal Schedule
SD-03 Product Data
Form Materials: G,DO
SD-04 Samples
1.3 G DOSample Panels
2.2.3 G DOFiber Voids
SD-05 Design Data
2.1 G DOCalculations
SD-06 Test Reports
3.2 G DOInspection
SD-07 Certificates
2.2.3 G DOFiber Voids
03 15 00.00 10 SD-02 Shop Drawings
2.4 G ROWaterstops
SD-03 Product Data
2.2 G ROPreformed Expansion Joint Filler
2.3 G ROSealant
2.4 G ROWaterstops
SD-04 Samples
2.3.2 G ROLubricant for Preformed
Compression Seals
2.3.3 G ROField-Molded Type
2.4 G ROWaterstops
2.5.2 G ROSplicing Waterstops
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 67 PAGES
03 15 00.00 10 2.2 G ROPreformed Expansion Joint Filler
2.3 G ROSealant
2.4 G ROWaterstops
03 20 00.00 10 SD-01 Preconstruction Submittals
3.1.3.2 G DOButt-Splices
SD-02 Shop Drawings
3.1 G DOReinforcement
SD-03 Product Data
2.2.3 G DOMechanical Butt-Splices
2.2 G DOReinforcing Steel
SD-04 Samples
2.2.2 G DOEpoxy-Coated Bars
SD-06 Test Reports
2.6 G DOTests, Inspections, and
Verifications
SD-07 Certificates
2.2 G DOReinforcing Steel
1.4.1 G DOQualified Welders
1.4.2 G DOQualification of Steel Bar
Butt-Splicers
03 30 00.00 10 SD-01 Preconstruction Submittals
1.6.2 G DOQuality Control Plan
1.6.1Laboratory Accreditation
3.11.5.6 G DOSampling Plan
SD-03 Product Data
Part 2Recycled Content Products
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 67 PAGES
03 30 00.00 10 2.2 G DOCementitious Materials
2.1.7 G DOFloor Finish
G DOFloor Hardener
2.4 G DOChemical Admixtures
SD-04 Samples
2.4.5 G DOSurface Retarder
SD-05 Design Data
2.1.1 G DOMixture Proportions
3.3 G DOLightweight Aggregate Concrete
SD-06 Test Reports
2.1.1 G DOMixture Proportions
3.11 G DOTesting and Inspection for CQC
2.2.3 G DOFly Ash
2.2.6 G DOGround Granulated Blast-Furnace
(GGBF) Slag
2.3 G DOAggregates
3.11.5.1 G DOAir Content
3.11.5.3 G DOSlump
3.11.5.6 G DOCompressive Strength
2.5 G DOWater
SD-07 Certificates
1.6 G DOContractor Quality Control
personnel
3.2.1 G DOReady-Mix Plant
03 33 00 SD-02 Shop Drawings
1.4.1Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 67 PAGES
03 33 00 SD-04 Samples
2.1Materials
1.4.2Panels
03 35 00.00 10 SD-03 Product Data
Part 2Recycled Content Products
SD-04 Samples
1.3.1Field Test Panels
1.3.1.1Sample Wall Panels
1.3.1.2Slab Panels
SD-08 Manufacturer’s Instructions
Dry Shake Finish
04 20 00 SD-02 Shop Drawings
3.3.2.1 G DOCut CMU
3.4.1.1 G DODetail Drawings
SD-03 Product Data
1.5.1 G DOHot Weather Procedures
1.5.2 G DOCold Weather Procedures
2.4.1.1 G DOCementitious Materials
SD-04 Samples
2.2.2.2 G DOConcrete Masonry Units (CMU)
2.4.1.3 G DOAdmixtures for Masonry Mortar
2.6.2 G DOAnchors, Ties, and Bar
Positioners
2.6.3 G DOJoint Reinforcement
SD-05 Design Data
2.1.2 G DOMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 67 PAGES
04 20 00 2.2.2.3Fire-Rated Concrete Masonry
Units
3.2.5 G DOBracing Calculations
SD-06 Test Reports
2.2.2.3 G DOFire-Rated Concrete Masonry
Units
3.6.1.1 G DOField Testing of Mortar
3.6.1.2 G DOField Testing of Grout
3.6.1.3 G DOPrism Tests
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.2 G DOConcrete Masonry Units (CMU)
2.4.1.1 G DOCementitious Materials
2.4.1.3 G DOAdmixtures for Masonry Mortar
2.4.2.2 G DOAdmixtures for Grout
2.6.2 G DOAnchors, Ties, and Bar
Positioners
2.6.3 G DOJoint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 67 PAGES
04 20 00 2.2.2.2.1 SRecycled Content
05 05 23.16 SD-01 Preconstruction Submittals
3.2 G ROWelding Quality Assurance Plan
SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification
1.3.6 G ROInspector Qualification
1.3.2 G ROPrevious Qualifications
1.3.3 G ROPre-Qualified Procedures
2.2 G ROWelding Electrodes and Rods
SD-06 Test Reports
3.3 G RONondestructive Testing
SD-07 Certificates
1.3.1 G ROCertified Welding Procedure
Specifications (WPS)
1.3.1 G ROCertified Brazing Procedure
Specifications (BPS)
1.3.1 G ROCertified Procedure Qualification
Records (PQR)
1.3.1 G ROCertified Welder Performance
Qualifications (WPQ)
1.3.1 G ROCertified Brazer Performance
Qualifications (BPQ)
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 G DOErection Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 67 PAGES
05 12 00 SD-02 Shop Drawings
1.5.2 G DOFabrication Drawings
SD-03 Product Data
2.6.2 G DOShop Primer
2.4.1 G DOWelding Electrodes and Rods
2.3.2.3 G DODirect Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3 G DOTension Control Bolts
SD-06 Test Reports
2.6.2 G DOClass B Coating
2.3 G DOBolts, Nuts, and Washers
3.7.1.2 G DOWeld Inspection Reports
3.7.2.1 G DODirect Tension Indicator Washer
Inspection Reports
3.7.3.1 G DOBolt Testing Reports
3.7.4 G DOEmbrittlement Test Reports
SD-07 Certificates
2.2 G DOSteel
2.3 G DOBolts, Nuts, and Washers
2.5Galvanizing
2.4.3 G DOPins and Rollers
1.3 G DOAISC Fabrication Plant Quality
Certification
1.3 G DOAISC Erector Quality Certification
1.5.3.1 G DOWelding Procedures and
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 67 PAGES
05 12 00 2.4.1 G DOWelding Electrodes and Rods
05 21 00 SD-01 Preconstruction Submittals
1.3.2 G DOWelder Qualification
SD-02 Shop Drawings
1.3.1 G DOpipe bridge steel joist and upper
and lower connecting framing
SD-05 Design Data
2.2 G DODesign Calculations
SD-06 Test Reports
3.3 G OErection Inspection
3.3 G DOWelding Inspections
SD-07 Certificates
1.3.2 G DOCertification of Compliance
SD-11 Closeout Submittals
2.3 SRecycled Content of Steel
Products
05 30 00 SD-02 Shop Drawings
1.3.4 G DOFabrication Drawings
SD-03 Product Data
2.2 G DOAccessories
2.1 G DODeck Units
2.1.4 G DOGalvanizing Repair Paint
2.2.9 G DOMechanical Fasteners
2.1.4 G DOTouch-Up Paint
1.3.2 G DOWelding Equipment
1.3.2 G DOWelding Rods and Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 67 PAGES
05 30 00 SD-05 Design Data
2.1 G DODeck Units
SD-07 Certificates
1.3.2 G DOWelder Qualifications
1.3.2 G DOWelding Procedures
1.3.3.1 G DOFire Safety
1.3.1 G DOManufacturer's Certificate
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 40 00 SD-02 Shop Drawings
1.6.1Framing Components
GDO
SD-03 Product Data
2.1 G DOStuds, Joists
SD-05 Design Data
1.6.2Metal Framing Calculations
GDO
SD-07 Certificates
1.4 G DOLoad-Bearing Cold-Formed Metal
Framing
3.2.1 G DOWelds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 67 PAGES
05 50 13 2.5 G ROAngles and Plates
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
2.3.1Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 G ROFabrication Drawings
3.2 G ROIron and Steel Hardware
3.2 G ROSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 G ROStructural Steel Plates, Shapes, and Bars
2.2.2 G ROStructural Steel Tubing
2.2.4 G ROCold-Finished Steel Bars
2.2.3 G ROHot-Rolled Carbon Steel Bars
2.2.5 G ROCold-Drawn Steel Tubing
2.2.7 G ROConcrete Inserts
2.2.8 G ROMasonry Anchorage Devices
2.1.2 G ROProtective Coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 67 PAGES
05 52 00 2.2.10 G ROSteel Railings and Handrails
1.2.1 G ROAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 G ROWelding Procedures
1.4.2 G ROWelder Qualification
SD-08 Manufacturer’s Instructions
3.2 G ROInstallation Instructions
06 10 00 SD-02 Shop Drawings
2.3.1 G RONailing Strips
SD-03 Product Data
1.8Fire-retardant Treatment
2.4Oriented Strand Board
2.5.3Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.10.1Certificates of Grade
1.10.2 G ROCertified Sustainably Harvested
Wood
1.7Preservative Treatment
1.10.3Indoor Air Quality
SD-10 Operation and Maintenance
Data
3.4Take-back Program
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 67 PAGES
06 10 00 2.3.1 SCertified Sustainably Harvested
Framing Lumber
2.4.1.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
2.4.2.1 SCertified Sustainably Harvested
Plywood Roof Sheathing
2.4.3.1 SCertified Sustainably Harvested
Plywood for Other Uses
2.4.3.2 SCertified Sustainably Harvested
Structural-use and OSB Panels for
Other Uses
2.5.3 SIndoor Air Quality for Aerosol
Adhesives
2.5.3 SIndoor Air Quality for Non-aerosol
Adhesives
07 11 13 SD-07 Certificates
1.3Materials
07 21 13 SD-03 Product Data
1.3 G ROManufacturer's Standard Details
2.2 G ROBlock or Board Insulation
2.3 G ROVapor Retarder
2.4 G ROPressure Sensitive Tape
1.4 G ROProtection Board or Coatings
2.6 G ROAccessories
SD-07 Certificates
2.2 G ROBlock or Board Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 67 PAGES
07 21 13 2.3 G ROVapor Retarder
2.5 G ROProtection Board or Coating
1.8 G ROSpecial Warranties
1.5 G ROULE Greenguard
SD-08 Manufacturer’s Instructions
2.2Block or Board Insulation
2.6.1Adhesive
SD-11 Closeout Submittals
1.5 SULE Greenguard
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 27 36 SD-01 Preconstruction Submittals
1.9.1 G ROQualification of Manufacturer
1.9.2 G ROQualification of Installer
1.10 G ROQuality Control Plan
1.10 G ROSafety Plan
1.8.1 G ROFire Prevention Plan
1.8.2 G RORespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.10 G ROFoam Air Barrier System
1.5.1 G ROFire-Rated Assemblies
SD-03 Product Data
2.2.2 G ROClosed Cell
2.3 G ROPrimers, Adhesives, and Mastics
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 67 PAGES
07 27 36 2.5 G ROSealants
1.5.2 G ROSafety Data Sheets
2.2.1 G ROThermal Barrier Materials
2.2.1 G ROAccessories
SD-04 Samples
1.5 G ROSpray Foam Air Barrier
SD-06 Test Reports
1.5.4 G RO_Field Peel Adhesion Test
3.4.5.1 G ROThermographic Test
1.5.3 G ROPrimers
1.5.4 G ROFire-Ratings Of Thermal and or
Barrier Materials
1.5.4 G ROFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.4 G ROFlame Propagation Of Wall
Assemblies
3.4.1 G ROSite Inspections
SD-07 Certificates
2.2.2 G ROClosed cell
1.9.1 G ROQualification of Manufacturer
1.9.2 G ROQualification of Installer
SD-08 Manufacturer’s Instructions
1.6.1 G ROSPF Handling, Storage, and
Spray Procedures
3.2.1 G ROSubstrate Preparation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 67 PAGES
07 27 36 1.5.1 G ROThermal Barrier
2.3 G ROPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.10Core Samples
3.3.2Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
SD-11 Closeout Submittals
2.1.1Volatile Organic Compound
(VOC) Content
2.1.2Recycled Content
07 41 63 SD-01 Preconstruction Submittals
1.4.1 G ROQualification of Manufacturer
1.4.1 G ROQualification of Installer
1.4.1 G ROQualifications for Welding
1.4.1 G ROWork Plan
1.4.1 G ROOn-Site Inspection and
Acceptance Procedure
SD-02 Shop Drawings
1.4.1 G RORoofing Panels
1.4.1 G ROFlashing and Accessories
SD-03 Product Data
1.4.1 G ROSustainable Acquisition
1.4.1 G ROCoil Stock
1.4.1 G ROFactory Color Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 67 PAGES
07 41 63 1.4.1 G ROSub-girts and Formed Shapes
1.4.1 G ROClosure Materials
1.4.1 G ROInsulation
1.4.1 G ROPressure-Sensitive Tape
1.4.1 G ROSealants and Caulking
1.4.1Rated Wall Assembly
1.4.1 G ROGalvanizing Repair Paint
1.4.1 G ROAluminized Steel Repair Paint
1.4.1 G ROAccessories
SD-04 Samples
1.4.1 G ROCoil Stock
1.4.1 G RORoofing Panels
2.3.1.2 G ROFasteners
2.5.1 G ROMetal Closure Strips
1.4.1 G ROInsulation
1.4.1 G ROManufacturer's Color Charts and
Chips
SD-05 Design Data
1.4.1Wind Design Analysis
SD-06 Test Reports
3.4.1.2 G ROLeakage Tests
1.4.1Fire Rating Test Report
3.1 G ROCoatings and Base Metals of
Metal Roofing
1.4.1 G ROFactory Finish and Color
Performance Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 67 PAGES
07 41 63 1.4.1 G ROWind Uplift Test Report
SD-07 Certificates
1.4.1Coil Stock
2.3.1.2Fasteners
1.4.1Galvanizing Repair Paint
1.4.1Safety Data Sheets
2.4.3Coating Physical Properties:
SD-08 Manufacturer’s Instructions
1.4.1Installation of Roof Panel
Assemblies
SD-11 Closeout Submittals
1.7Warranty
1.7.120-year 'No-Dollar-Limit' warranty for labor and materials
3.3.5 G ROInformation Form and Placard
3.4.2Manufacturer's Field Inspection
Reports
1.4.1Application Instructions
07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.4.1Qualifications for Welding Work
SD-02 Shop Drawings
1.5.1Fabrication and Installation drawings
1.5.1Wall Panel Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 67 PAGES
07 42 63 1.5.1Flashing and Accessories
1.5.1Anchorage Systems
SD-03 Product Data
1.5.10Certification
1.5.1sustainable acquisition
1.5.1Manufacturer's catalog data
1.5.1Factory Color Finish
1.5.1Sub-girts and Formed Shapes
1.5.1Closure Materials
1.5.1Insulation
1.5.1Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
2.5.4.2Sealants and Caulking
1.5.1Galvanizing Repair Paint
1.5.1Aluminized Steel Repair Paint
1.5.1Accessories
SD-04 Samples
1.5.1Wall Panel Assemblies
1.5.1Fasteners
1.5.1Metal Closure Strips
1.5.1Insulation
1.5.1manufacturer's color charts and chips
SD-05 Design Data
1.5.1wind design analysis
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 67 PAGES
07 42 63 3.7.2Leakage Tests
1.3.2wind load tests
1.5.1Factory Color Finish
SD-07 Certificates
1.5.1Fasteners
1.5.1Galvanizing Repair Paint
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.1wall system assembly wind load
SD-08 Manufacturer’s Instructions
1.5.1Installation of Wall panels
SD-11 Closeout Submittals
1.8Warranty
1.5.1Instructions
1.5.1Material Safety Data Sheets
1.5.120 year 'No-Dollar-Limit' warranty
2.1.3 SSolar Reflectance Index
07 60 00 SD-02 Shop Drawings
3.1.18 G ROCovering on flat, sloped, or
curved surfaces
3.1.15 G ROGutters
3.1.16 G RODownspouts
3.1.19 G ROExpansion joints
3.1.10 G ROBase flashing
3.1.11 G ROCounterflashing
3.1.20 G ROFlashing at roof penetrations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 67 PAGES
07 60 00 3.1.12 G ROReglets
3.1.14 G RODrip edge
3.1.17 G ROEave flashing
SD-11 Closeout Submittals
3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 G ROFirestopping System
SD-03 Product Data
2.2 G ROFirestopping Materials
SD-06 Test Reports
3.3 G ROInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 G ROInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 G ROSealants
2.3 G ROPrimers
2.4 G ROBond Breakers
2.5 G ROBackstops
3.1 G ROField Adhesion
SD-07 Certificates
1.4.1 G ROIndoor Air Quality
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 67 PAGES
07 92 00 2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.6 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.7 G ROFrames
2.7 G ROFrames
2.5Accessories
SD-03 Product Data
2.1 G RODoors
2.7 G ROFrames
2.5Accessories
SD-04 Samples
2.11.4 G ROFactory-applied enamel finish
08 33 23 SD-02 Shop Drawings
2.2.1 G ROOverhead Coiling Doors
2.2.3 G ROCounterbalancing Mechanism
2.2.4 G ROManual Door Operators
2.2.5 G ROElectric Door Operators
2.2.1.3 G ROBottom Bars
2.1.1.1 G ROGuides
2.2.3.1 G ROMounting Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 67 PAGES
08 33 23 2.2.1.9 G ROOverhead Drum
2.2.2.3 G ROHood
2.1.1.1 G ROInstallation Drawings
SD-03 Product Data
2.2.1 G ROOverhead Coiling Doors
2.2.2 G ROHardware
2.2.3 G ROCounterbalancing Mechanism
2.2.4 G ROManual Door Operators
2.2.5 G ROElectric Door Operators
SD-05 Design Data
2.2.1 G ROOverhead Coiling Doors
2.2.2 G ROHardware
2.2.3 G ROCounterbalancing Mechanism
2.2.4 G ROManual Door Operators
2.2.5 G ROElectric Door Operators
SD-06 Test Reports
1.3.1 G ROAir Infiltration Tests
SD-10 Operation and Maintenance
Data
3.3.2 G ROOperation and Maintenance
Manuals
3.3.2 G ROMaterials
3.3.2 G RODevices
3.3.2 G ROProcedures
3.3.2 G ROManufacture's Brochures
3.3.2 G ROParts Lists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 67 PAGES
08 33 23 SD-11 Closeout Submittals
3.3.1 G ROWarranty
08 51 13 SD-02 Shop Drawings
2.2 G ROWindows
1.10Fabrication Drawings
SD-03 Product Data
2.2 G ROWindows
2.3.8.1 G ROHardware
2.3.3 G ROFasteners
1.11 G ROWindow Performance
2.4 G ROThermal-Barrier Windows
2.5 G ROMullions
2.3.10 G ROScreens
2.3.2 G ROWeatherstripping
2.3.8 G ROAccessories
2.3.4Adhesives
1.11.4 G ROThermal Performance
SD-05 Design Data
2.2 GStructural Calculations for
Deflection
1.4.2 G RODesign Analysis
SD-06 Test Reports
1.4.3Minimum Condensation
Resistance Factor
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 67 PAGES
08 51 13 2.2 G ROWindows
1.7Plastic Identification
SD-11 Closeout Submittals
2.1.1 SRecycled Content of Aluminum
Windows
08 51 23 SD-02 Shop Drawings
2.3Windows
SD-03 Product Data
2.2.1Steel Framing Materials
2.7.3Hardware
2.7.4Fasteners
2.7Accessories
2.7.3.1Hardware Materials
SD-04 Samples
2.8.2 G ROColor Coating
2.3Windows
SD-10 Operation and Maintenance
Data
2.3 G ROWindows
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Steel
Framing Materials
08 71 00 SD-02 Shop Drawings
1.3 G ROManufacturer's Detail Drawings
1.3Verification of Existing Conditions
1.5 G ROHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 67 PAGES
08 71 00 2.3.8 G ROKeying System
SD-03 Product Data
2.3 G ROHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 G ROHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.6.1Insulating Glass
1.3Glazing Accessories
SD-04 Samples
1.6.1Insulating Glass
2.4.2Glazing Compound
2.4.5Tape
2.4.3.1Sealant
SD-07 Certificates
1.6.1Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 67 PAGES
08 91 00 SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 G ROWall louvers
1.5 G ROWall louvers
09 29 00 SD-03 Product Data
2.2.3Water-Resistant Gypsum Backing
Board
2.2.7Accessories
1.3Certifications
2.2.1Gypsum Board
SD-07 Certificates
2.2 G ROAsbestos Free Materials
1.3.1 G ROIndoor Air Quality
SD-11 Closeout Submittals
2.2.1 SRecycled Content for Gypsum
Board
2.2.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.2.1 SIndoor Air Quality for Gypsum
Board
2.2.4 SVOC Content of Joint Compound
2.2.6 SIndoor Air Quality for Non-aerosol
Adhesives
2.2.6 SIndoor Air Quality for Aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 67 PAGES
09 30 10 SD-02 Shop Drawings
3.2 G RODetail Drawings
SD-03 Product Data
2.1 G ROTile
2.2 G ROSetting-Bed
2.4 G ROMortar, Grout, and Adhesive
2.2.6 G ROReinforcing Wire Fabric
SD-04 Samples
2.1 G ROTile
2.1 G ROAccessories
2.1 G ROTransition Strips
2.5 G ROTransition Strips
2.4 G ROGrout
SD-07 Certificates
2.1Tile
2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions
3.6Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 G ROInstallation
SD-11 Closeout Submittals
1.2LEED Documentation
2.4Adhesives
09 51 00 SD-03 Product Data
1.2.4Acoustical Ceiling Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 67 PAGES
09 51 00 1.4Certification
SD-04 Samples
2.1Acoustical Units
2.1.1Acoustic Ceiling Tiles
SD-06 Test Reports
1.2.1Ceiling Attenuation Class and
Test
SD-07 Certificates
2.1Acoustical Units
2.1.1Acoustic Ceiling Tiles
09 65 00 SD-03 Product Data
2.7 G ROResilient Flooring and
Accessories
2.3Adhesives
SD-04 Samples
2.7 G ROResilient Flooring and
Accessories
SD-06 Test Reports
3.3 G ROMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 G ROSurface Preparation
3.1 G ROInstallation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 67 PAGES
09 65 00 2.7 G ROResilient Flooring and
Accessories
09 67 23.15 SD-04 Samples
1.3.1.1 G ROJoint Sealant
1.3.2.3 G ROJoint Sealant
1.3.3.1 G ROJoint Sealant
1.3.1.2 G ROThin Film Flooring System
1.3.2.4 G ROThin Film Flooring System
1.3.3.2 G ROThin Film Flooring System
2.3 G ROWhite Aluminum Oxide Non-Skid
Grit
SD-06 Test Reports
1.3.1.1 G ROJoint Sealant
1.3.2.3 G ROJoint Sealant
1.3.3.1 G ROJoint Sealant
1.3.1.2 G _ROThin Film Flooring System
1.3.2.4 G _ROThin Film Flooring System
1.3.3.2 G _ROThin Film Flooring System
1.3.1.3 G ROPrimer
1.3.1.4 G ROUrethane Topcoat
2.3 G ROWhite Aluminum Oxide Non-Skid
Grit
1.7 G ROPatch Test Demonstration
1.3.1.5 G RODaily Inspection Report
3.9.3 G ROAdhesion Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 67 PAGES
09 67 23.15 1.3.2.1 G ROWork Plan
1.3.2.2 G ROFlooring System Applicator
Qualifications
1.3.1.1 G ROJoint Sealant
1.3.2.3 G ROJoint Sealant
1.3.3.1 G ROJoint Sealant
1.3.1.2 G ROThin Film Flooring System
1.3.2.4 G ROThin Film Flooring System
1.3.3.2 G ROThin Film Flooring System
1.3.2.5 G ROWarranty
SD-08 Manufacturer’s Instructions
1.3.1.1 G ROJoint Sealant
1.3.2.3 G ROJoint Sealant
1.3.3.1 G ROJoint Sealant
1.3.1.2 G ROThin Film Flooring System
1.3.2.4 G ROThin Film Flooring System
1.3.3.2 G ROThin Film Flooring System
1.3.3.3 G ROWater-Based Alkaline Degreaser
SD-11 Closeout Submittals
3.9.2.2 G ROInspection Logbook
09 90 00 SD-02 Shop Drawings
3.10Piping identification
3.10stencil
SD-03 Product Data
2.1 G ROCoating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 67 PAGES
09 90 00 2.1Manufacturer's Technical Data
Sheets
SD-04 Samples
1.10 G ROColor
SD-07 Certificates
1.3Applicator's qualifications
1.11.6.1 G ROQualification Testing
SD-08 Manufacturer’s Instructions
3.6.2Mixing
1.7.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 G _ROCoatings:
10 14 00.10 SD-02 Shop Drawings
3.1 G ROApproved Detail Drawings
SD-03 Product Data
2.1Modular Exterior Signage System
3.1Installation
1.2 G ROExterior Signage
1.2.1Wind Load Requirements
SD-04 Samples
1.2 G ROExterior Signage
SD-10 Operation and Maintenance
Data
3.1.2 G ROProtection and Cleaning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 67 PAGES
10 14 00.20 SD-02 Shop Drawings
1.5.2 G RODetail Drawings
SD-03 Product Data
3.1 G ROInstallation
1.7 G ROWarranty
SD-04 Samples
1.5.1 G ROInterior Signage
SD-10 Operation and Maintenance
Data
3.1 G ROApproved Manufacturer's
Instructions
3.1.2 G ROProtection and Cleaning
10 28 13 SD-03 Product Data
2.1.2 G ROFinishes
2.2 G ROAccessory Items
SD-04 Samples
2.1.2 G ROFinishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
10 44 16 SD-03 Product Data
1.2.1 G ROAccessories
1.2.1 G ROWall Brackets
3.2.1 G ROReplacement Parts List
SD-04 Samples
1.2.1 G ROWall Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 67 PAGES
10 44 16 1.2.1 G ROAccessories
11 13 19.13 SD-02 Shop Drawings
1.4.2 G DODetail Drawings
SD-03 Product Data
2.2 G DOLoading Dock Levelers
2.2.5.2 G DODock Bumpers
2.7.1 G DORestraining Device
2.7.3 G DODock Seals
SD-04 Samples
2.2.5.2Dock Bumpers
2.2.5.2Rubber
SD-10 Operation and Maintenance
Data
2.2 G DOLoading Dock Levelers
2.7.1 G DORestraining Device
SD-11 Closeout Submittals
1.4.3 G DORecord Drawings
12 21 00 SD-03 Product Data
2.1 G ROWindow Blinds
3.2Installation
1.4Certification
SD-04 Samples
2.1 G ROWindow Blinds
SD-06 Test Reports
2.1Window Blinds
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 67 PAGES
12 21 00 2.1 G ROWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 G ROWindow Blinds
13 34 19 SD-01 Preconstruction Submittals
1.6.3 G DOManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.7 G DODetail Drawings
1.6.1 G DODetail Drawings
SD-03 Product Data
1.6.1 G DOManufacturer's catalog data
SD-04 Samples
1.6.1 G DOCoil Stock
2.1.8 G DOCoil Stock
1.2.1.9 G DORoof Panels
1.2.1.9 G DOWall Panels
2.5.2 G DOFasteners
2.8.1 G DOMetal Closure Strips
SD-05 Design Data
1.6.1 G DOdescriptive and technical
literature
1.6.1 G DObuilding design analysis
SD-06 Test Reports
1.6.1 G DOtest reports
1.6.1 G DOCoatings and base metals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 67 PAGES
13 34 19 1.6.1 G DOFactory Color Finish Performance
Requirements
SD-07 Certificates
1.6.1 G DOsystem components
1.6.1 G DOCoil Stock
2.1.8 G DOCoil Stock
1.6.1 G DOAluminized Steel Repair Paint
1.6.1 G DOGalvanizing Repair Paint
1.6.1 G DOEnamel Repair Paint
1.6.1 G DOQualification of Manufacturer
1.6.1 G DOQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 G DOInstallation of Roof and Wall
panels
1.7 G DOshipping, handling, and storage
SD-11 Closeout Submittals
G DOManufacturer's Warranty
G DOContractor's Warranty for
Installation
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 G DOShop Drawings
3.9As-Built Drawings
SD-03 Product Data
1.4.1Fire Protection Related
Submittals
2.3 G DOMaterials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 67 PAGES
21 13 13.00 10 1.6Spare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.4.3 G DOSway Bracing
1.2.1.3 G DOHydraulic Calculations
SD-06 Test Reports
3.8Preliminary Test Report
3.9Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10 GOperating and Maintenance
Manuals
21 30 00 SD-01 Preconstruction Submittals
1.3Fire Pump Installation Related
Submittals
1.7.1 GFire Protection Specialist
SD-02 Shop Drawings
3.3.1 G DOInstallation Drawings
3.10.2 GAs-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 67 PAGES
21 30 00 3.3.2 G DOPiping Layout
3.3.2 G DOPump Room
SD-03 Product Data
2.1 G DOCatalog Data
1.6Spare Parts
3.8.2Preliminary Tests
3.8 GField Tests
1.7.6 GManufacturer's Representative
3.10.1 G DOField Training
3.8.3Army Final Acceptance Test
SD-06 Test Reports
3.8.2Preliminary Tests
3.8.3Army Final Acceptance Test
SD-07 Certificates
1.7.1Fire Protection Specialist
1.7.2Qualifications of Welders
1.7.3Qualifications of Installer
1.7.4Preliminary Test Certification
1.7.5Final Test Certification
SD-10 Operation and Maintenance
Data
3.10.1 GOperating and Maintenance
Instructions
2.13Flow Meter
22 00 00 SD-02 Shop Drawings
3.7.1 GPlumbing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.